CN204679238U - The pick-up unit of power construction seat belt hanger - Google Patents

The pick-up unit of power construction seat belt hanger Download PDF

Info

Publication number
CN204679238U
CN204679238U CN201520245743.5U CN201520245743U CN204679238U CN 204679238 U CN204679238 U CN 204679238U CN 201520245743 U CN201520245743 U CN 201520245743U CN 204679238 U CN204679238 U CN 204679238U
Authority
CN
China
Prior art keywords
equipment base
shaped
channel
power construction
belt hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520245743.5U
Other languages
Chinese (zh)
Inventor
孙伟
吴黎明
朱凯元
沈红峰
朱宗林
杜超
傅利成
史建勋
纪宏德
熊伟
张幸
金星
曹晨宇
屠晔炜
王德法
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Permanent Photoelectromotive Force Of Jiaxing City Builds Ltd An Great Managing Security Tools And Instruments Inspection Center
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Permanent Photoelectromotive Force Of Jiaxing City Builds Ltd An Great Managing Security Tools And Instruments Inspection Center
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Permanent Photoelectromotive Force Of Jiaxing City Builds Ltd An Great Managing Security Tools And Instruments Inspection Center, Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Permanent Photoelectromotive Force Of Jiaxing City Builds Ltd An Great Managing Security Tools And Instruments Inspection Center
Priority to CN201520245743.5U priority Critical patent/CN204679238U/en
Application granted granted Critical
Publication of CN204679238U publication Critical patent/CN204679238U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Emergency Lowering Means (AREA)

Abstract

电力施工安全带悬挂器的检测装置,所述的电力施工安全带悬挂器为一柱式防坠落装置,该装置包括一个下端设置有锁紧机构的复合绝缘杆,在该复合绝缘杆的上端部设置有安全带的悬挂点火悬挂装置,所述的柱式防坠落装置通过所述的锁紧机构固定在一个工字形设备基座上,一上端部横梁中间安装有电动葫芦并为设备基座提供受力支撑的龙门架,其两侧支撑架体中间的横撑上横置有一井字形转接附件,且在所述井字形转接附件上固定有可拆卸的工字形设备基座;所述的工字形设备基座为用来安装检修平台的、模拟闸刀或开关的固定支架;它具有结构简单,使用安装方便,设备基座稳定性好,能够使试验与其他防坠落冲击试验兼容,大大减少设备制作费用等特点。

A detection device for a safety belt hanger for electric power construction. The safety belt hanger for electric power construction is a column-type fall prevention device. The device includes a composite insulating rod with a locking mechanism at the lower end. A suspension ignition suspension device with a safety belt is provided. The column-type fall prevention device is fixed on an I-shaped equipment base through the locking mechanism, and an electric hoist is installed in the middle of an upper end crossbeam to provide For the gantry frame supported by force, a well-shaped transfer attachment is placed horizontally on the cross brace in the middle of the supporting frame body on both sides, and a detachable I-shaped equipment base is fixed on the well-shaped transfer attachment; The I-shaped equipment base is used to install the maintenance platform and simulate the fixed bracket of the knife or switch; it has a simple structure, easy to use and install, and the stability of the equipment base is good, which can make the test compatible with other anti-drop impact tests. Greatly reduce equipment production costs and other characteristics.

Description

电力施工安全带悬挂器的检测装置Detection device for safety belt hanger in electric power construction

技术领域 technical field

本实用新型涉及的是一种电力施工安全带悬挂器的检测装置,属于电力施工设备的安全检测技术领域。 The utility model relates to a detection device for a safety belt hanger in electric power construction, which belongs to the technical field of safety detection of electric power construction equipment.

背景技术 Background technique

在电力系统的各种事故中,坠落事故是当今最主要的伤亡事故之一。因此,保证高处作业施工人员的安全,是安全生产工作的重中之重。 Among various accidents in the power system, the fall accident is one of the most important casualty accidents today. Therefore, ensuring the safety of construction workers working at heights is the top priority of safety production work.

在《国家电网公司电力安全工作规程》中(后面简称《安规》),对高处作业有相应的严格规定: In the "State Grid Corporation Electric Power Safety Work Regulations" (hereinafter referred to as "Safety Regulations"), there are corresponding strict regulations on high-altitude operations:

1)凡在坠落高度基准面2m及以上的高处进行的作业,都应视作高处作业”; 1) Any operation carried out at a height of 2m or more above the falling height reference plane shall be regarded as an operation at a height";

2)在没有脚手架或者在没有栏杆的脚手架上工作,高度超过1.5m时,应使用安全带,或采取其他可靠的安全措施; 2) When working without scaffolding or on scaffolding without railings and the height exceeds 1.5m, safety belts should be used or other reliable safety measures should be taken;

3)安全带应采用高挂低用的方式; 3) Seat belts should be hung high and used low;

4)禁止系挂在移动或不牢固的物件上[如隔离开关(刀闸)支持绝缘子、瓷横担、未经固定的转动横担、线路支柱绝缘子、避雷器支柱绝缘子等]; 4) It is forbidden to hang on moving or unstable objects [such as isolating switch (knife switch) supporting insulators, porcelain cross arms, unfixed rotating cross arms, line post insulators, lightning arrester post insulators, etc.];

5)脚手架的安装、拆除和使用,应执行《安规》中的有关规定及国家相关规程规定。 5) The installation, dismantling and use of scaffolding shall comply with the relevant regulations in the "Safety Regulations" and relevant national regulations.

由《安规》中的上述相关条款可见,变电站中几乎所有的闸刀、开关、线路安装和维护工作,都已视为高处作业。而其中有较多的工作,可能在1到几小时内便可完成,如果采用搭脚手架的方式来工作,不仅费工时,而且要经过繁琐的安装、验收、使用、拆除等工序,稍有不慎,便会带来新的安全隐患;而闸刀、开关、线路横担等处缺少可供牢固悬挂安全带的构件。因此,一种新型的安全带悬挂器应运而生,正式名称叫“单柱型检修平台”—变电站检修时固定于单一设备基座上,用于悬挂安全带或防坠器的柱式防坠落装置(见图1)。 It can be seen from the above-mentioned relevant clauses in the "Safety Regulations" that almost all the installation and maintenance of switches, switches, and lines in substations have been regarded as high-altitude operations. And there are a lot of work, which may be completed within 1 to several hours. If you use scaffolding to work, it will not only take a lot of time, but also have to go through cumbersome installation, acceptance, use, dismantling and other processes, which is slightly inconvenient. If you are not careful, it will bring new potential safety hazards; and the switch blades, switches, line cross arms, etc. lack components for firmly hanging the safety belt. Therefore, a new type of seat belt hanger came into being, and its official name is "single-column maintenance platform" - a column-type fall prevention platform that is fixed on a single equipment base during substation maintenance and used to hang safety belts or fall arresters. device (see Figure 1).

近段时间以来,国内生产的各式安全带悬挂器,质量良莠不齐,只有加以严格科学的试验,才能防止安全事故的发生。 Recently, the quality of all kinds of seat belt hangers produced in China is uneven. Only by rigorous and scientific tests can safety accidents be prevented.

对单柱型检修平台的检测,主要存在以下困难: There are mainly the following difficulties in the detection of single-column maintenance platforms:

1)无法单独工作,需要设计专用的设备基座,以及其他专业的配套设施; 1) It cannot work alone, and needs to design a special equipment base and other professional supporting facilities;

2)稳定性要求高,底座短时内能够承受至少1000千克力以上的多次冲击,只要有稍许可见的偏转,就会导致安装不正,扭矩过大,试验失败,简单的结构无法满足试验要求。 2) High stability requirements. The base can withstand multiple impacts of at least 1000 kgf in a short period of time. As long as there is a slight deflection, it will lead to incorrect installation, excessive torque, and test failure. The simple structure cannot meet the test requirements. .

3)与其他防坠落试验兼容,其中有悬挂装置强度试验和冲击试验,需要使用100kg模拟人,工作强度较大,要考虑装置间的配合,防止相互干扰,见图2、3所示。 3) Compatible with other fall prevention tests, including the suspension device strength test and impact test, which require the use of a 100kg manikin, and the work intensity is relatively high. Consideration should be given to the cooperation between the devices to prevent mutual interference, as shown in Figures 2 and 3.

发明内容 Contents of the invention

本实用新型的目的在于克服现有技术存在的不足,而提供一种结构简单,使用安装方便,设备基座稳定性好,可以承受1t以上的冲击扭转力,能够使试验与其他防坠落冲击试验兼容,节约成本;在保证了检测质量的前提下,能大大减少设备制作费用的电力施工安全带悬挂器的检测装置。 The purpose of the utility model is to overcome the deficiencies of the prior art, and provide a simple structure, easy to use and install, good stability of the equipment base, can bear the impact torsion force of more than 1t, and can make the test and other anti-falling impact tests Compatible and cost-saving; under the premise of ensuring the quality of inspection, it is a detection device for electric construction safety belt hangers that can greatly reduce equipment production costs.

本实用新型的目的是通过如下技术方案来完成的,一种电力施工安全带悬挂器的检测装置,所述的电力施工安全带悬挂器为一柱式防坠落装置,该装置包括一个下端设置有锁紧机构的复合绝缘杆,在该复合绝缘杆的上端部设置有安全带的悬挂点火悬挂装置,所述的柱式防坠落装置通过所述的锁紧机构固定在一个工字形设备基座上,一上端部横梁中间安装有电动葫芦并为设备基座提供受力支撑的龙门架,其两侧支撑架体中间的横撑上横置有一井字形转接附件,且在所述井字形转接附件上固定有可拆卸的工字形设备基座。 The purpose of this utility model is accomplished through the following technical scheme, a detection device of a safety belt hanger for electric power construction, the safety belt hanger for electric power construction is a column type anti-falling device, and the device includes a lower end with a The composite insulating rod of the locking mechanism is provided with a safety belt suspension ignition suspension device at the upper end of the composite insulating rod, and the column type fall prevention device is fixed on an I-shaped equipment base through the locking mechanism A gantry frame with an electric hoist installed in the middle of the beam at the upper end and provides force support for the equipment base. A detachable I-shaped equipment base is fixed on the attachment.

所述的工字形设备基座为用来安装检修平台的、模拟闸刀或开关的固定支架,它由三根槽钢在同一平面内连接成工字形,并由工字形的两端平行布置槽钢分别可拆地固定在井字形转接附件的两平行支撑槽钢上面。 The I-shaped equipment base is a fixed bracket used to install the maintenance platform, simulating a switch knife or a switch. It is connected by three channel steels in the same plane to form an I-shape, and the two ends of the I-shape are arranged in parallel. Respectively detachably fixed on the two parallel support channel steels of the well-shaped transfer accessories.

所述工字形设备基座的中间槽钢内部,填入有两小块用于增加强度的小号槽钢并焊连在一起;所述井字形转接附件由两根平行布置的支撑槽钢和至少两根垂直连接两根支撑槽钢中间的横置槽钢通过螺丝搭接而成,所述井字形转接附件的两端通过螺丝或螺栓固定在龙门架两侧支撑架体中间的横撑上面。 The inside of the middle channel steel of the I-shaped equipment base is filled with two small pieces of small channel steel for increasing strength and welded together; It is formed by overlapping with at least two horizontal channel steels vertically connecting the middle of two supporting channel steels through screws, and the two ends of the well-shaped transfer attachment are fixed to the horizontal channel steel in the middle of the supporting frame bodies on both sides of the gantry frame by screws or bolts. Hold it up.

本实用新型具有结构简单,使用安装方便,设备基座稳定性好,可以承受1t以上的冲击扭转力,能够使试验与其他防坠落冲击试验兼容,节约成本;在保证了检测质量的前提下,能大大减少设备制作费用等特点。 The utility model has the advantages of simple structure, convenient use and installation, good stability of the equipment base, can bear the impact torsion force of more than 1 ton, can make the test compatible with other anti-drop impact tests, and save costs; on the premise of ensuring the detection quality, It can greatly reduce the cost of equipment production and so on.

附图说明 Description of drawings

图1是单柱型检修平台的结构示意图。 Figure 1 is a schematic diagram of the structure of a single-column maintenance platform.

图2是单柱型检修平台的强度试验示意图。 Figure 2 is a schematic diagram of the strength test of the single-column maintenance platform.

图3是单柱型检修平台的冲击试验示意图。 Figure 3 is a schematic diagram of the impact test of the single-column maintenance platform.

图4是本实用新型所述检测装置的正面结构示意图。 Fig. 4 is a schematic view of the front structure of the detection device of the present invention.

图5是本实用新型所述检测装置的侧面结构示意图。 Fig. 5 is a schematic side view of the detection device of the present invention.

具体实施方式 Detailed ways

下面将结合附图对本实用新型作详细的介绍:图1所示,本实用新型所述的一种电力施工安全带悬挂器的检测装置,其中的电力施工安全带悬挂器为一柱式防坠落装置,该装置包括一下端设置有锁紧装置1的复合绝缘杆2,在该复合绝缘杆2的上端部设置有安全带的悬挂点或悬挂装置3。 The utility model will be described in detail below in conjunction with the accompanying drawings: As shown in Figure 1, a detection device for a safety belt hanger for electric power construction described in the utility model, wherein the safety belt hanger for electric power construction is a column type anti-falling device The device comprises a composite insulating rod 2 provided with a locking device 1 at the lower end, and a suspension point or a suspension device 3 for a safety belt is provided at the upper end of the composite insulating rod 2 .

图2所示为单柱型检修平台的强度试验示意图,它是在所述安全带的悬挂点或悬挂装置3上用连接绳4连接着重物5,利用重物5的下落从而进行单柱型检修平台6的强度试验。 Figure 2 is a schematic diagram of the strength test of the single-column maintenance platform, which is to connect the weight 5 with the connecting rope 4 on the suspension point of the safety belt or the suspension device 3, and use the falling of the weight 5 to perform single-column maintenance. Strength test of maintenance platform 6.

图3所示为单柱型检修平台的冲击试验示意图,它是在所述安全带的悬挂点或悬挂装置3上用连接绳4连接着模拟人7,该模拟人上面通过一个无线释放器8连接着升降装置9,通过无线释放器8的释放,模拟人7下坠,从而进行单柱型检修平台6的冲击试验。 Fig. 3 is the schematic diagram of the impact test of the single-column maintenance platform, which is connected to the dummy 7 with a connecting rope 4 on the suspension point or the suspension device 3 of the safety belt, and a wireless release device 8 is passed through the dummy above the dummy Connected with the lifting device 9, through the release of the wireless release device 8, the simulated person 7 falls, so as to perform the impact test of the single-column maintenance platform 6.

结合图4所示,龙门架13上端部横梁14中间安装有起升装置9(即电动葫芦),其两侧是支撑架15,由上撑11和下撑12构成的“井”字型转接附件架设在两边的横撑16上,转接附件的上撑11上是可拆卸的“工”字形设备基座10。 As shown in Figure 4, a hoisting device 9 (i.e. electric hoist) is installed in the middle of the beam 14 at the upper end of the gantry frame 13, and on both sides are support frames 15. The connecting accessories are erected on the cross braces 16 on both sides, and the upper supporting 11 of the connecting accessories is a detachable "I" shaped equipment base 10.

结合图5中所示,所述的设备基座10由支撑座17和承重座18构成,它由三根槽钢在同一平面内焊接成“工”字形,中两端分别用2颗螺栓固定在转接附件的上撑11上。 As shown in Fig. 5, the equipment base 10 is composed of a support base 17 and a load bearing base 18, which is welded into an "I" shape by three channel steels in the same plane, and the two ends are respectively fixed on the On the upper support 11 of the transfer accessory.

本实用新型所述工字形设备基座10的承重座18用于安装检修平台6,中间用两块500mm宽的小号槽钢焊接作为加强筋19;所述“井”字形转接附件由两根平行布置的槽钢上撑11和两根横置槽钢下撑12通过螺丝搭接而成,下撑12焊接在龙门架13两侧支撑架体15中间的横撑16上面。 The load-bearing seat 18 of the I-shaped equipment base 10 described in the utility model is used to install the maintenance platform 6, and the middle is welded with two 500mm wide small channel steels as the reinforcing ribs 19; the "well" shaped adapter is composed of two A channel steel upper support 11 arranged in parallel and two horizontal channel steel lower supports 12 are lapped by screws, and the lower support 12 is welded on the cross support 16 in the middle of the support frame body 15 on both sides of the gantry frame 13 .

    图4所示,本实用新型主要包括一个龙门架,该龙门架主要有2个的作用: As shown in Figure 4, the utility model mainly includes a gantry, which mainly has 2 functions:

(1)为设备基座提供受力支撑; (1) Provide force support for the equipment base;

(2)安装电动葫芦等起重设备。 (2) Install lifting equipment such as electric hoist.

所述的拆卸式“工字型”设备基座为一模拟闸刀或开关的固定支架,用来安装检修平台。采用这种特殊结构主要有以下2个作用: The detachable "H-shaped" equipment base is a fixed bracket simulating a knife or a switch, and is used for installing an inspection platform. The use of this special structure mainly has the following two functions:

(1)采用焊接的方式,将3根槽钢在同一平面内连接成“工字型”,使槽钢在轴向的抗扭能力增强; (1) By welding, three channel steels are connected in the same plane to form an "I-shape", so that the torsion resistance of the channel steel in the axial direction is enhanced;

(2)将2块小号的槽钢填入结构内部的槽中,并满焊,进一步增加强度。 (2) Fill 2 pieces of small channel steel into the groove inside the structure and fully weld them to further increase the strength.

所述的“井字型”转接附件由2根长约5m的上撑,以及2根1.5m的下撑,用螺丝上下搭接成“井字型”组合而成,可以横跨在龙门架的横向支撑上,为设备基座提供支撑。 The "well-shaped" transfer attachment is composed of two upper supports with a length of about 5m and two lower supports with a length of 1.5m. Provide support for the equipment base on the lateral support of the rack.

转接附件的作用主要有以下3点: The functions of the transfer accessories mainly include the following three points:

(1)提供高度。使设备基座能够离地面有1.5m以上的高度,模拟高空作业; (1) Provide height. Make the base of the equipment more than 1.5m above the ground to simulate high-altitude operations;

(2)承受竖直方向上的静负荷、冲击负荷; (2) To bear the static load and impact load in the vertical direction;

(3)节约成本。小型的设备基座承受了大部分的作用力,减少了大型的转接附件的作用力,试验中只可能导致可拆卸更换的设备基座受损,从而保留大型的转接附件。 (3) Cost savings. The small equipment base bears most of the force, which reduces the force of the large transfer accessories. In the test, only the detachable and replaceable equipment base may be damaged, thereby retaining the large transfer accessories.

    首先,安装“井字型”附件: First, install the "tic-tac-toe" add-on:

(1)用2根长1400 mm的平行布置的长形槽钢,上边的侧面开间距为50 mm的φ12调整孔,下边直接焊接到龙门架两边的中间横撑上。 (1) Use two 1400 mm long long channel steels arranged in parallel, with φ12 adjustment holes with a spacing of 50 mm on the upper sides, and the lower sides are directly welded to the middle cross braces on both sides of the gantry frame.

(2)将两根长5.2 m的横置槽钢,两端的侧壁开φ12的安装孔,侧接于两长形槽钢之间,找到合适的位置,用4颗螺丝侧式连接成“井字型”结构。 (2) Connect two 5.2 m long horizontal channel steels with φ12 mounting holes on the side walls at both ends, connect them sideways between the two long channel steels, find a suitable position, and use 4 screws to connect them sideways to form a " Well-shaped" structure.

其次,安装“工字型”可拆卸式设备基座: Second, install the "H-shaped" detachable equipment base:

(1)将设备基座二边槽钢的下边各开4个φ12的安装孔; (1) Open four φ12 mounting holes on the bottom of the channel steel on both sides of the equipment base;

(2)将设备基座放到“井字型”附件上,在附件对应的部位置开安装孔; (2) Put the equipment base on the "well-shaped" accessory, and open the installation hole at the corresponding part of the accessory;

(3)用螺丝将设备基座连接到附件上。 (3) Connect the device base to the accessory with screws.

    本实用新型具有如下特点:   The utility model has the following characteristics:

(1)设备基座稳定性好。独特的“工字型”内部加强的封闭结构,可以承受1t以上的冲击扭转力,保证试验多次后无目视可见的变形,比现场实际使用的设备基座的还要稳定; (1) The stability of the equipment base is good. The unique "I-shaped" internal reinforced closed structure can withstand the impact torsion force of more than 1t, ensuring that there is no visible deformation after repeated tests, and it is more stable than the actual equipment base used on site;

(2)主要部件可替换。由于用螺栓将“工字型”设备基座固定到大型的槽钢上,因此,既使冲击试验导致设备基座损坏,也只需将小型的设备基座更新,后继续试验,节约了成本。 (2) The main components can be replaced. Since the "I-shaped" equipment base is fixed to the large channel steel with bolts, even if the impact test causes damage to the equipment base, it is only necessary to renew the small equipment base and continue the test, saving costs .

(3)试验与其他防坠落冲击试验兼容。由于设计时充分考虑了其他试验配套,因此,在保证了检测质量的前提下,大大减少了设备制作费用。 (3) The test is compatible with other drop protection tests. Due to the full consideration of other test facilities during the design, the cost of equipment production is greatly reduced on the premise of ensuring the quality of the test.

Claims (3)

1. the pick-up unit of power construction seat belt hanger, described power construction seat belt hanger is a pillar falling proof device, this device comprises the compound inslation bar that a lower end is provided with latch mechanism, the suspension igniting suspender of securing band is provided with in the upper end of this compound inslation bar, it is characterized in that described pillar falling proof device is fixed on an I-shaped equipment base by described latch mechanism, in the middle of one upper end crossbeam, electric block be installed and provide the portal frame of stressed support for equipment base, horizontal in stull in the middle of its supported on both sides support body have a groined type switching annex, and dismountable I-shaped equipment base is fixed with on described groined type switching annex.
2. the pick-up unit of power construction seat belt hanger according to claim 1, it is characterized in that described I-shaped equipment base be for installation and repairing platform, simulation plug-in strip or the fixed support of switch, it connects into I-shaped by three channel-section steels in same plane, and by I-shaped two ends be arranged in parallel channel-section steel be detachably fixed on respectively groined type transfer annex two parallel support channel-section steels above.
3. the pick-up unit of power construction seat belt hanger according to claim 2, is characterized in that the middle channel-section steel of described I-shaped equipment base is inner, inserts two fritters together soldered for increasing the small size channel-section steel of intensity; Described groined type switching annex is formed by screw overlap joint with at least two vertical horizontal channel-section steels be connected in the middle of two support channel-section steels by two support channel-section steels be arranged in parallel, and the two ends of described groined type switching annex are by screw or be bolted to above the middle stull of portal frame supported on both sides support body.
CN201520245743.5U 2015-04-22 2015-04-22 The pick-up unit of power construction seat belt hanger Expired - Fee Related CN204679238U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520245743.5U CN204679238U (en) 2015-04-22 2015-04-22 The pick-up unit of power construction seat belt hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520245743.5U CN204679238U (en) 2015-04-22 2015-04-22 The pick-up unit of power construction seat belt hanger

Publications (1)

Publication Number Publication Date
CN204679238U true CN204679238U (en) 2015-09-30

Family

ID=54178921

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520245743.5U Expired - Fee Related CN204679238U (en) 2015-04-22 2015-04-22 The pick-up unit of power construction seat belt hanger

Country Status (1)

Country Link
CN (1) CN204679238U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104819817A (en) * 2015-04-22 2015-08-05 国家电网公司 Detection device for power construction safety belt hanger
CN113155632A (en) * 2021-04-07 2021-07-23 刘秋平 Detection system and detection process for safety belt hanger in electric power construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104819817A (en) * 2015-04-22 2015-08-05 国家电网公司 Detection device for power construction safety belt hanger
CN113155632A (en) * 2021-04-07 2021-07-23 刘秋平 Detection system and detection process for safety belt hanger in electric power construction
CN113155632B (en) * 2021-04-07 2022-09-30 华电四川发电有限公司攀枝花西区分公司 A detection system and detection technology of electric power construction safety belt hanger

Similar Documents

Publication Publication Date Title
CN203967625U (en) A kind of overhead facility crossing frame
CN104819817A (en) Detection device for power construction safety belt hanger
CN207518184U (en) The anti-fall aerial device of working at height single pole
CN204767097U (en) High altitude construction safety belt linkage
CN202260192U (en) Derrick mast with adjustable height
CN204661180U (en) A kind of tower crane
CN201083018Y (en) Mobile multipurpose fast mounting scaffold
CN201918653U (en) Protective bracket for overhaul of high-voltage disconnectors
CN209411641U (en) Frame type capacitive device repairing frame
CN219280494U (en) Tower beam temporary consolidation supporting structure for bridge tower stability control
CN207484921U (en) Assembled moving operating platform
CN202602133U (en) Multifunctional portable climbing pole
CN218420708U (en) Safety protection device suitable for high-place operation
CN218449131U (en) Main transformer high-pressure side GIS maintenance platform of pumped storage power station
CN207458703U (en) Shock-proof transformer stent and potential device
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN206767452U (en) A kind of lifting framework for GIS device Disintegration overhaul
CN103323224B (en) A kind of anti-falling safe pick-up unit
CN111206763A (en) Adjustable section steel suspension hanging basket
CN204038917U (en) Detachable external hanging type operating platform
CN206712336U (en) Shaft tower cable platform work protective cradle
CN214286363U (en) Special stores pylon based on 35kV framework formula equipment safety belt
CN212054743U (en) Subway construction safety protection early warning device
CN202153616U (en) Quick-mounted high-voltage disconnector insulation maintenance platform
CN214532226U (en) Windproof and anti-seismic angle steel tower

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20200422