CN202153616U - Fast-assembled high voltage isolation switch insulating troubleshooting platform - Google Patents

Fast-assembled high voltage isolation switch insulating troubleshooting platform Download PDF

Info

Publication number
CN202153616U
CN202153616U CN2011202791019U CN201120279101U CN202153616U CN 202153616 U CN202153616 U CN 202153616U CN 2011202791019 U CN2011202791019 U CN 2011202791019U CN 201120279101 U CN201120279101 U CN 201120279101U CN 202153616 U CN202153616 U CN 202153616U
Authority
CN
China
Prior art keywords
columns
high voltage
pedal
root posts
fast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011202791019U
Other languages
Chinese (zh)
Inventor
胡明
赵晓鹏
许想奎
邵连生
田强
王金平
徐志华
陈楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Corp
Original Assignee
Tianjin Electric Power Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin Electric Power Corp filed Critical Tianjin Electric Power Corp
Priority to CN2011202791019U priority Critical patent/CN202153616U/en
Application granted granted Critical
Publication of CN202153616U publication Critical patent/CN202153616U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a fast-assembled high voltage isolation switch insulating troubleshooting platform, comprising a framework type structure formed by four columns, pedal beams, protective cross beams, diagonal struts and locking bottom beams, wherein the protective cross beams are uniformly and fixedly mounted at the upper portions between two columns at front side and between two columns at rear side, the pedal beams are uniformly and fixedly mounted at the lower portions between two columns at front side and between two columns at rear side, a pedal plate is fixedly mounted on the four columns between the pedal beams and the protective cross beams, the locking bottom beams are symmetrically and fixedly mounted at the bottom end between two columns at front side and between two columns at rear side, and two diagonal struts are respectively mounted at the middle portions between two columns at left side and between two columns at right side. The fast-assembled high voltage isolation switch insulating troubleshooting platform can satisfy the basic demands of ''national power grid company electric power safe standards'' and ''live-line work insulating hard ladder general technology condition'', and compared with other troubleshooting platforms, the fast-assembled high voltage isolation switch insulating troubleshooting platform has the characteristics of being simple and fast in mounting, and being suitable for on-site rapid emergency maintenance work of the transformer station and for processing emergency defect of equipment.

Description

Ready-package high voltage isolator insulation inspection platform
Technical field
The utility model belongs to the power technology field, relates to transformer station and safeguards, especially a kind of ready-package high voltage isolator insulation inspection platform.
Background technology
Operation has three a large amount of posts/two post horizontal rotation type isolating switches in the electrical network at present, because the operation age is permanent, needs frequent repair and maintenance.In the repair and maintenance process; Receive the influence of factors such as on-the-spot physical features, power failure scope, device structure, common job platform can not satisfy the requirement of the on-the-spot repair and maintenance of response fast, as bucket arm vehicle can not near; The fail safe of insulation ladder is low, and insulation scaffold assembling speed waits slowly.The insulation column of isolating switch and the maintenance of current-carrying part are belonged to work high above the ground, need to rely on the operation bucket arm vehicle, use auxiliary completion such as insulating ladder or scaffolding.But limit by power failure scope and transformer station's physical features, be not to use bucket arm vehicle when overhauling this pattern isolating switch at every turn.When using conventional insulating ladder to carry out service work; Insulating ladder needs the special messenger to help; Need behind staff's ascending stair safety belt is hung on the isolating switch; Stand on the horizontal pedal of insulating ladder and carry out service work, it is extremely not convenient to work together, and the repair quality of isolating switch is difficult to the potential safety hazard that guarantees and exist the isolating switch porcelain insulator breaking to hurt sb.'s feelings.The preparation amount is big when setting up scaffold, and assembling speed is slow, when repair apparatus carries out transmission, needs scaffold is removed temporarily, causes overhaul of the equipments time lengthening, has the opposite effect for the power supply reliability of equipment.
Through retrieval, do not find the publication document relevant as yet with present patent application.
Summary of the invention
The purpose of the utility model is to overcome the weak point of prior art, provide a kind of in light weight, dielectric strength is high, assembling fast and reliable, property easy to use, safe is good and the ready-package high voltage isolator of use capable of being combined insulate inspection platform.
The utility model solves its technical problem and takes following technical scheme to realize:
A kind of ready-package high voltage isolator insulation inspection platform; It is the tower structure that constitutes by four root posts, pedal beam, protection crossbeam, bearing diagonal and locking bottom girder; Top stull, protection crossbeam, pedal beam, bearing diagonal and pedal and column all adopt the locking strap mode; It is characterized in that: the top between two columns on the two sides, front and back of four root posts is uniformly distributed with and installs the protection crossbeam at interval; Bottom between two columns on the two sides, front and back of four root posts is uniformly distributed with and installs foot-operated beam at interval; On four root posts between foot-operated beam and the protection crossbeam, be fixed with a pedal, the bottom symmetry between two columns on the two sides, front and back of four root posts installs the locking bottom girder, in the middle part of between two columns on the two sides, the left and right sides of four root posts, installs a bearing diagonal respectively.
And the top between two columns on the two sides, the left and right sides of four root posts symmetry respectively is fixed with a top stull.
And the bearing diagonal that the middle part is installed respectively between two columns on the two sides, the left and right sides of four root posts is a cross modal.
And the coaxial horizontal groove that is shaped in middle part in the said locking bottom girder is symmetrically installed with the locking mechanism of locknut jam plate on this horizontal groove.
The advantage and the good effect of the utility model are:
(1) this inspection platform adopts tower structure, light weight, and intensity is big, and whole employing diameter is the insulated pipes used of 50mm, and is made through after the careful mechanical structure analysis, and empirical tests can be born the load of 300kg easily.
(2) this inspection platform dielectric strength is high, and safe, the voltage withstand class of the insulated pipes used that is adopted can reach 220kV, and firm structure is among the protection of inspection platform the staff constantly with comprehensive safety measure in operation process.
(3) the locking strap mode of grafting and snapping is all adopted in the connection of this inspection platform structural member; Couple together very convenient, reliable, quick; Inspection platform can be separately, three or six be used in combination, connect each other during use, increased the fastness of platform greatly; Be fit to many people operation simultaneously, operating efficiency can access reliable lifting.
(4) this inspection platform satisfies the basic demand of " State Grid Corporation of China's electric power safety rules " and " live line working is with the hard terraced general technical specifications of insulation "; Compare with other inspection platforms; This platform has simple installation, quick, is fit to the characteristics of on-the-spot repairing operation fast of transformer station and the critical defective of treatment facility.
Description of drawings
Fig. 1 is the front view of the utility model;
Fig. 2 is the left view of Fig. 1;
Fig. 3 is the vertical view of the single locking bottom girder of the utility model.
Embodiment
Below in conjunction with accompanying drawing, through specific embodiment the utility model is done further to detail, following examples are descriptive, are not determinate, can not limit protection scope of the present invention with this.
A kind of ready-package high voltage isolator insulation inspection platform; It is the tower structure that constitutes by four root posts 3, pedal beam 6, protection crossbeam 2, bearing diagonal 4 and locking bottom girder 8; Top between two columns on the two sides, front and back of four root posts is uniformly distributed with at interval and installs the protection crossbeam, is two protection crossbeams in the present embodiment; Bottom between two columns on the two sides, front and back of four root posts is uniformly distributed with at interval and installs foot-operated beam, is two foot-operated beams in the present embodiment; On foot-operated beam and four root posts of protecting between the crossbeam, be fixed with a pedal 5, the bottom symmetry between two columns on the two sides, front and back of four root posts installs the locking bottom girder.
Top between two columns on the two sides, the left and right sides of four root posts symmetry respectively is fixed with a top stull 1; The middle part installs a bearing diagonal respectively between two columns on the two sides, the left and right sides of four root posts, and wherein bearing diagonal (label 4) is a cross modal with bearing diagonal (label 9).
Top stull, protection crossbeam, pedal beam, bearing diagonal and pedal and column all adopt locking strap (prior art does not have label) mode, peg graft fast and snapping with convenient.
The column bottom adopts welding to install mode with the locking bottom girder, and the coaxial horizontal groove 10 that is shaped in middle part in this locking bottom girder is symmetrically installed with the structure of locknut jam plate 7 on this horizontal groove, and soon jam plate is inlaid on the basic channel-section steel, and it is locked to adopt bolt and nut to carry out then.
It is the insulated pipes used of 50mm that the integral body of this inspection platform adopts diameter, and is made through after the careful mechanical structure analysis, and empirical tests can be born the load of 300kg easily; The voltage withstand class of the insulated pipes used that is adopted can reach 220kV.
This inspection platform can also use a plurality of insulation inspection platforms through connecting cross bar jointly, has guaranteed the firm degree of the integral installation of inspection platform more, and the staff may stand in and carries out relevant maintenance, maintenance work on the pedal.

Claims (4)

1. ready-package high voltage isolator insulation inspection platform; It is the tower structure that constitutes by four root posts, pedal beam, protection crossbeam, bearing diagonal and locking bottom girder; Top stull, protection crossbeam, pedal beam, bearing diagonal and pedal and column all adopt the locking strap mode; It is characterized in that: the top between two columns on the two sides, front and back of four root posts is uniformly distributed with and installs the protection crossbeam at interval; Bottom between two columns on the two sides, front and back of four root posts is uniformly distributed with and installs foot-operated beam at interval; On four root posts between foot-operated beam and the protection crossbeam, be fixed with a pedal, the bottom symmetry between two columns on the two sides, front and back of four root posts installs the locking bottom girder, in the middle part of between two columns on the two sides, the left and right sides of four root posts, installs a bearing diagonal respectively.
2. ready-package high voltage isolator according to claim 1 insulation inspection platform is characterized in that: the top between two columns on the two sides, the left and right sides of four root posts symmetry respectively is fixed with a top stull.
3. ready-package high voltage isolator according to claim 1 insulation inspection platform is characterized in that: the bearing diagonal that the middle part is installed respectively between two columns on the two sides, the left and right sides of four root posts is a cross modal.
4. ready-package high voltage isolator according to claim 1 insulation inspection platform is characterized in that: the coaxial horizontal groove that is shaped in middle part in the said locking bottom girder is symmetrically installed with the locking mechanism of locknut jam plate on this horizontal groove.
CN2011202791019U 2011-08-03 2011-08-03 Fast-assembled high voltage isolation switch insulating troubleshooting platform Expired - Fee Related CN202153616U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011202791019U CN202153616U (en) 2011-08-03 2011-08-03 Fast-assembled high voltage isolation switch insulating troubleshooting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011202791019U CN202153616U (en) 2011-08-03 2011-08-03 Fast-assembled high voltage isolation switch insulating troubleshooting platform

Publications (1)

Publication Number Publication Date
CN202153616U true CN202153616U (en) 2012-02-29

Family

ID=45694110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011202791019U Expired - Fee Related CN202153616U (en) 2011-08-03 2011-08-03 Fast-assembled high voltage isolation switch insulating troubleshooting platform

Country Status (1)

Country Link
CN (1) CN202153616U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038328A (en) * 2018-08-02 2018-12-18 深圳市福来过科技有限公司 Electric Power Equipment Insulation fast-assembling inspection platform
CN112186579A (en) * 2020-10-17 2021-01-05 江西广能电气设备有限公司 Substation equipment strutting arrangement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109038328A (en) * 2018-08-02 2018-12-18 深圳市福来过科技有限公司 Electric Power Equipment Insulation fast-assembling inspection platform
CN112186579A (en) * 2020-10-17 2021-01-05 江西广能电气设备有限公司 Substation equipment strutting arrangement

Similar Documents

Publication Publication Date Title
CN202153616U (en) Fast-assembled high voltage isolation switch insulating troubleshooting platform
CN202268637U (en) Special-purpose maintenance platform for 3AH type handcart type breaker
CN102820629B (en) The method of charged for replacement drainage thread parallel groove clamp
CN104167678B (en) Device and the application process thereof of 110 kilovolts of isolating switches of charged for replacement
CN201918653U (en) Protective bracket for overhaul of high-voltage disconnectors
CN205791238U (en) A kind of 10kV distribution line charged lifter of straightway three-phase conducting wire
CN208690822U9 (en) The dedicated inspection platform of 66kV disconnecting switch
CN201260040Y (en) High-voltage oil circuit breaker examining and operating platform
CN201273134Y (en) Novel ladder used for high-voltage circuit-breaker maintenance
CN103293452B (en) Insulating ladder Withstand test device
CN104819817A (en) Detection device for power construction safety belt hanger
CN204760830U (en) Isolator maintenance work frame
CN204661267U (en) Small-sized lifting inspection platform
CN105006758A (en) Isolation switch maintenance workbench and manufacturing process thereof
CN204679238U (en) The pick-up unit of power construction seat belt hanger
CN200992805Y (en) Knife inspection scaffold
CN203813320U (en) Tool for live exchange of 220 kV narrow base tower strain insulator string
CN204793776U (en) GW4 type isolator overhauls work platform
CN202961564U (en) Convenient-to-assemble type safety belt hanging frame
CN202395349U (en) Overhaul working platform for isolating switch
CN204720844U (en) A kind of fast-assembled high voltage isolation switch insulating troubleshooting platform
CN112683668A (en) Static load test device for communication support
CN209150590U (en) A kind of inspection rack applied to outdoor high voltage circuit breaker
CN217286944U (en) Anti-falling device
CN204651744U (en) On load tap changer core bucket extracting tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Free format text: FORMER OWNER: TIANJIN ELECTRIC POWER CORP.

Effective date: 20130521

Owner name: TIANJIN ELECTRIC POWER CORP.

Effective date: 20130521

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 300010 HEBEI, TIANJIN TO: 100031 XICHENG, BEIJING

TR01 Transfer of patent right

Effective date of registration: 20130521

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Patentee after: State Grid Corporation of China

Patentee after: Tianjin Electric Power Corp.

Address before: 300010 Tianjin city Hebei District Wujing Road No. 39

Patentee before: Tianjin Electric Power Corp.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120229

Termination date: 20190803