CN204676531U - Prestressed cable anchorage device - Google Patents

Prestressed cable anchorage device Download PDF

Info

Publication number
CN204676531U
CN204676531U CN201520232108.3U CN201520232108U CN204676531U CN 204676531 U CN204676531 U CN 204676531U CN 201520232108 U CN201520232108 U CN 201520232108U CN 204676531 U CN204676531 U CN 204676531U
Authority
CN
China
Prior art keywords
prestressed cable
correcting
anchorage device
cable anchorage
steel strand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520232108.3U
Other languages
Chinese (zh)
Inventor
庹明贝
陈成
郑立敏
陈才权
官灿
赵泽民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSCEC Strait Construction and Development Co Ltd
Original Assignee
CSCEC Strait Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSCEC Strait Construction and Development Co Ltd filed Critical CSCEC Strait Construction and Development Co Ltd
Priority to CN201520232108.3U priority Critical patent/CN204676531U/en
Application granted granted Critical
Publication of CN204676531U publication Critical patent/CN204676531U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The utility model relates to a kind of prestressed cable anchorage device, and it comprises waist rail, correcting wedge group, cover plate, steel strand and ground tackle; Described correcting wedge group comprises two correcting wedges be disposed on waist rail lateral surface, and the inclined-plane of each correcting wedge outwardly; The outer side of two correcting wedges is located at by described cover plate, is provided with the through hole holding steel strand and pass in the middle part of it; Described steel strand are fixed by ground tackle through after waist rail, correcting wedge group and cover plate successively.It is simple that the purpose of this utility model is to provide a kind of structure, effectively can improve the prestressed cable anchorage device of construction prestressed cable quality.The utility model has the advantage of: by regulating waist depth of beam to make the level inclination of steel strand equal correcting wedge upper end acute angle, thus ensure that the center line of steel strand and the axis conllinear of ground tackle.

Description

Prestressed cable anchorage device
Technical field
The utility model relates to the realm of building construction, particularly a kind of prestressed cable anchorage device.
Background technology
Prestress anchorage cable is the important support pattern of deep foundation pit support in building operations.There is crack in job site surrounding deep foundation pit road, building, even the security incident such as foundation pit collapse occurs repeatedly, and the accident wherein caused because of prestress anchorage cable defect occupies sizable ratio.In prestress anchorage cable practice of construction process, by the impact of place, environment, equipment and operator's level, prestress anchorage cable center line is difficult to control well with the concentric conllinear of ground tackle center line, and anchored end device non-directional slippage during prestress application, thus cause prestress anchorage cable and ground tackle center line to there is various angle and adjacent anchor fixed end to misplace the problem such as uneven, bring great difficulty to actual stretch-draw work.By adjusting the stretching force of tensioning equipment, easily cause the actual pre-applied force of prestress anchorage cable excessive or too small, can not ensure that on-the-spot practice of construction and Foundation Pit Support Design are theoretical consistent, bring potential safety hazard to foundation ditch, thus cause surrounding building and road to occur crack, even foundation pit collapse.
Conventional wedge way excavates a U-type groove on rectangle wedge shape iron block, and the processing of this wedge U-type groove is more difficult, and during construction, workman installs also more difficult, easily comes off; Or on circular wedge shape iron block, excavate a circular hole, the same perforate difficulty of the circular wedge shape iron block of this band cellular type, and during prestress application, counter-force face is little, and stress is concentrated serious.
Summary of the invention
It is simple that the purpose of this utility model is to provide a kind of structure, effectively can improve the prestressed cable anchorage device of construction prestressed cable quality.
The purpose of this utility model is achieved through the following technical solutions: a kind of prestressed cable anchorage device, and it comprises waist rail, correcting wedge group, cover plate, steel strand and ground tackle; Described correcting wedge group comprises two correcting wedges be disposed on waist rail lateral surface, and the inclined-plane of each correcting wedge outwardly; The outer side of two correcting wedges is located at by described cover plate, is provided with the through hole holding steel strand and pass in the middle part of it; Described steel strand are fixed by ground tackle through after waist rail, correcting wedge group and cover plate successively.
Compared to prior art, the utility model has the advantage of:
1. by regulating waist depth of beam to make the level inclination of steel strand equal correcting wedge upper end acute angle, thus ensure that the center line of steel strand and the axis conllinear of ground tackle.
2. correcting wedge group is two correcting wedges be disposed on waist rail lateral surface, and steel strand, through two correcting wedges, without the need to digging hole, and do not contact between correcting wedge and steel strand, can not produce unnecessary frictional force.
3. waist rail arranges stiffening rib, stiffening rib and two correcting wedge contrapositions are arranged, and ensure that prestressing force power transmission is clearly clear, are also filled with concrete between two stiffening ribs of upside channel-section steel simultaneously, make channel-section steel both sides, upside stability when pressure-bearing stronger, strength and stiffness are larger.
4. be provided with some bracing frames on the downside of waist rail, bracing frame is for supporting fixing waist rail, correcting wedge group, cover plate and ground tackle, prevent its displacement from making the center line of steel strand and the axis not conllinear of ground tackle, and the gravity decreasing above-mentioned component is on prestressed impact.
Accompanying drawing explanation
Fig. 1 is the structural representation of a kind of prestressed cable anchorage device of the utility model embodiment.
Fig. 2 is the top view of Fig. 1.
Fig. 3 is the structural representation of the utility model another kind of prestressed cable anchorage device embodiment.
Label declaration: 1 waist rail, 1-1 channel-section steel, 1-2 batten plate, 1-3 stiffening rib, 1-4 concrete, 2 cover plates, 3 steel strand, 4 ground tackles, 5 correcting wedges, 6 bracing frames.
Detailed description of the invention
Below in conjunction with Figure of description and embodiment, the utility model content is described in detail:
The embodiment schematic diagram of a kind of prestressed cable anchorage device provided for the utility model as shown in Figure 1 to Figure 3.
A kind of prestressed cable anchorage device, it comprises waist rail 1, correcting wedge group, cover plate 2, steel strand 3 and ground tackle 4; Described correcting wedge group comprises two correcting wedges 5 be disposed on waist rail 1 lateral surface, and the inclined-plane of each correcting wedge 5 outwardly; The two outer sides of correcting wedge 5 are located at by described cover plate 2, are provided with the through hole holding steel strand 3 and pass in the middle part of it; Described steel strand 3 are fixed by ground tackle 4 through after waist rail 1, correcting wedge group and cover plate 2 successively.
Described cover plate 2 processes for rectangular steel plates, and the hypotenuse of its length and correcting wedge 5 is isometric, and width is greater than spacing between two correcting wedges 5.
Described correcting wedge 5 is acute angle right-angled triangle.Described correcting wedge 5 should be processed according to practice of construction situation, two acute angles on it suitably can carry out chamfering cutting, make the hypotenuse of correcting wedge 5 smooth, be convenient to the angle adjusted between cover plate 2 and waist rail 1 and make it equal with the level inclination of steel strand 3, ensure that steel strand center line and ground tackle axis conllinear.
As shown in Figure 1, the triangle that steel strand 3, horizon and cover plate 2 forms and correcting wedge 5 have an acute angle equal, steel strand 3 and horizontal angle is highly made to equal another acute angle of correcting wedge 5 by regulating waist rail 1, the triangle that steel strand 3, horizon and cover plate 2 is formed and correcting wedge 5 are similar triangles, because correcting wedge 5 is acute angle right-angled triangle, so steel strand 3 perpendicular to cover plate 2, and then can ensure that steel strand 3 and the concentric conllinear of ground tackle 4 center line.
Described waist rail 1 comprises two channel-section steel 1-1 and some batten plate 1-2, and two channel-section steel 1-1 are between the upper and lower every setting, and opening outwardly, and channel-section steel 1-1 both sides are connected and fixed by batten plate 1-2.
Described batten plate 1-2 is that rectangular steel plates processes, and the triangle vertical straight arm of angle of its length and correcting wedge 5 is isometric, and width is consistent with the width of cover plate 2.Preferably, batten plate 1-2 length should equal spacing between two channel-section steel 1-1 upper and lower sides.
Described correcting wedge 5 is welded on the batten plate 1-2 of front side, and batten plate 1-2 is provided with through hole and passes for steel strand 3, and lead to the hole site is determined according to practice of construction situation.
Be provided with two stiffening rib 1-3 in described channel-section steel 1-1 opening, described stiffening rib 1-3 position is right against correcting wedge 5 position.Concrete 1-4 is also filled with between the two stiffening rib 1-3 of upside channel-section steel 1-1.
Stiffening rib 1-3 when welding respectively with two correcting wedge 5 contrapositions, ensure that prestressing force power transmission is clearly clear, fill concrete 1-4 simultaneously between the two stiffening rib 1-3 of upside channel-section steel 1-1, make channel-section steel 1-1 both sides stability when pressure-bearing stronger, strength and stiffness are larger.
It also comprises the some bracing frames 6 be located on the downside of waist rail 1.
Shown bracing frame 6 comprises gripper shoe and is located at some triangular steel plate of gripper shoe bottom, and the present embodiment intermediate cam shape steel plate is two, arranges along interval, waist rail 1 direction.
Or shown bracing frame 6 is welded by two angle steel.

Claims (8)

1. a prestressed cable anchorage device, is characterized in that: it comprises waist rail (1), correcting wedge group, cover plate (2), steel strand (3) and ground tackle (4); Described correcting wedge group comprises two correcting wedges (5) be disposed on waist rail (1) lateral surface, and the inclined-plane of each correcting wedge (5) outwardly; Two correcting wedges (5) outer side is located at by described cover plate (2), is provided with the through hole holding steel strand (3) and pass in the middle part of it; Described steel strand (3) are fixed by ground tackle (4) afterwards through waist rail (1), correcting wedge group and cover plate (2) successively.
2. prestressed cable anchorage device according to claim 1, is characterized in that: described correcting wedge (5) is acute angle right-angled triangle.
3. prestressed cable anchorage device according to claim 1, it is characterized in that: described waist rail (1) comprises two channel-section steels (1-1) and some batten plates (1-2), two channel-section steels (1-1) are between the upper and lower every setting, and opening outwardly, channel-section steel (1-1) both sides are connected and fixed by batten plate (1-2).
4. prestressed cable anchorage device according to claim 3, it is characterized in that: be provided with two stiffening ribs (1-3) in described channel-section steel (1-1) opening, described stiffening rib (1-3) position is right against correcting wedge (5) position.
5. prestressed cable anchorage device according to claim 4, is characterized in that: be also filled with concrete (1-4) between two stiffening ribs (1-3) of upside channel-section steel (1-1).
6. the prestressed cable anchorage device according to claim 1-5 any one, is characterized in that: it also comprises the some bracing frames (6) being located at waist rail (1) downside.
7. prestressed cable anchorage device according to claim 6, is characterized in that: shown bracing frame (6) is welded by two angle steel.
8. prestressed cable anchorage device according to claim 6, is characterized in that: shown bracing frame (6) comprises gripper shoe and is located at some triangular steel plate of gripper shoe bottom.
CN201520232108.3U 2015-04-17 2015-04-17 Prestressed cable anchorage device Active CN204676531U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520232108.3U CN204676531U (en) 2015-04-17 2015-04-17 Prestressed cable anchorage device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520232108.3U CN204676531U (en) 2015-04-17 2015-04-17 Prestressed cable anchorage device

Publications (1)

Publication Number Publication Date
CN204676531U true CN204676531U (en) 2015-09-30

Family

ID=54176236

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520232108.3U Active CN204676531U (en) 2015-04-17 2015-04-17 Prestressed cable anchorage device

Country Status (1)

Country Link
CN (1) CN204676531U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574746A (en) * 2017-09-08 2018-01-12 天津城建大学 Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means and construction method
CN108166493A (en) * 2018-02-26 2018-06-15 温州设计集团有限公司 A kind of angle regulator applied on prestress anchorage cable anchor head
CN108797598A (en) * 2018-07-09 2018-11-13 江苏地基工程有限公司 The construction technology of pre-loaded support struts in a kind of deep basal pit
CN109457710A (en) * 2018-12-26 2019-03-12 中铁二十五局集团第五工程有限公司 A kind of plain fill deep basal pit combined type soil nail wall and construction method for supporting
CN109853589A (en) * 2018-12-13 2019-06-07 广州市吉华勘测股份有限公司 A kind of anchor cable pedestal
CN111636433A (en) * 2020-05-14 2020-09-08 广州一建建设集团有限公司 Adjustable die for manufacturing waist beam and using method thereof
CN111676974A (en) * 2020-04-13 2020-09-18 上海二十冶建设有限公司 Construction method for channel steel anchor cable in foundation pit supporting system
CN114482075A (en) * 2022-03-08 2022-05-13 福建省茂宏建设工程有限公司 Basement supporting structure and construction method thereof
CN114941330A (en) * 2022-06-08 2022-08-26 中国建筑土木建设有限公司 Temporary foundation pit pile anchor supporting device and method for passing through existing road channel downwards
CN115516170A (en) * 2021-01-11 2022-12-23 株式会社Jp建设 Reusable beam support module for weldless caulking

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107574746A (en) * 2017-09-08 2018-01-12 天津城建大学 Prefabricated bridge space concrete filled steel tube truss combination beamss attachment means and construction method
CN108166493A (en) * 2018-02-26 2018-06-15 温州设计集团有限公司 A kind of angle regulator applied on prestress anchorage cable anchor head
CN108797598A (en) * 2018-07-09 2018-11-13 江苏地基工程有限公司 The construction technology of pre-loaded support struts in a kind of deep basal pit
CN109853589A (en) * 2018-12-13 2019-06-07 广州市吉华勘测股份有限公司 A kind of anchor cable pedestal
CN109457710A (en) * 2018-12-26 2019-03-12 中铁二十五局集团第五工程有限公司 A kind of plain fill deep basal pit combined type soil nail wall and construction method for supporting
CN111676974A (en) * 2020-04-13 2020-09-18 上海二十冶建设有限公司 Construction method for channel steel anchor cable in foundation pit supporting system
CN111636433A (en) * 2020-05-14 2020-09-08 广州一建建设集团有限公司 Adjustable die for manufacturing waist beam and using method thereof
CN115516170A (en) * 2021-01-11 2022-12-23 株式会社Jp建设 Reusable beam support module for weldless caulking
CN115516170B (en) * 2021-01-11 2024-01-05 株式会社Jp建设 Beam support module for solderless caulking and reusable
CN114482075A (en) * 2022-03-08 2022-05-13 福建省茂宏建设工程有限公司 Basement supporting structure and construction method thereof
CN114941330A (en) * 2022-06-08 2022-08-26 中国建筑土木建设有限公司 Temporary foundation pit pile anchor supporting device and method for passing through existing road channel downwards

Similar Documents

Publication Publication Date Title
CN204676531U (en) Prestressed cable anchorage device
CN202170636U (en) Mould for pre-embedded foundation bolt of steel structural foundation
CN201128880Y (en) Hold hoops and support integrated structure for circular single pier
CN102660951A (en) Piling locating guide frame for integrally finishing construction of H-sections and steel sheet piles
CN107419854B (en) A kind of tie hoop spacer pad and its application method
CN203393709U (en) Anchor device for prestressed anchor cable
CN103882808B (en) Ramp bridge and main line bridge join the construction method across erecting beam support system
CN209760255U (en) Foundation ditch stock pedestal of angularly adjustable
CN213358957U (en) Foundation embedded part structure
CN206636168U (en) Overhanging type scaffold system
CN203097253U (en) Elevator shaft triangular support type formwork platform
CN112458905A (en) Splicing adjustment method for prefabricated capping beam and prefabricated stand column
CN203684102U (en) Supporting system for precast beam formed by connecting span erection of ramp bridge and main line bridge
CN204715362U (en) A kind of deep foundation ditch embedded column base bracing frame
CN104499435A (en) Bracket used for mounting self-anchored suspension bridge splay saddle base
CN211547739U (en) Supporting structure for rope saw static force cutting reinforced concrete inner support
CN210002264U (en) auxiliary device for installing damper
CN204418027U (en) A kind of bracket of the cable saddle floor installation that falls apart for self-anchored suspension bridge
KR101298399B1 (en) Support for a upper reinforcing bar of footings
CN102704490A (en) Assembled waist rail
CN207143984U (en) A kind of Road Bridge Pile Foundation bracing means
CN206706777U (en) Anchor pole breast beam structure
CN214401875U (en) Socketed pile steel platform tower crane foundation structure
CN205576923U (en) A locating rack for construction of pre -buried lattice column of reverse construction method
CN204266380U (en) The node structure of a kind of steel and concrete post and reinforced concrete beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant