CN204675256U - Metal tube load transfer device - Google Patents
Metal tube load transfer device Download PDFInfo
- Publication number
- CN204675256U CN204675256U CN201520407593.3U CN201520407593U CN204675256U CN 204675256 U CN204675256 U CN 204675256U CN 201520407593 U CN201520407593 U CN 201520407593U CN 204675256 U CN204675256 U CN 204675256U
- Authority
- CN
- China
- Prior art keywords
- pipe fitting
- metal tube
- cylinder
- slide block
- placing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jigging Conveyors (AREA)
Abstract
The utility model discloses a kind of metal tube load transfer device, comprise a bench board (1), a vibrating disk (2), always vibrating grizzly (3), a pipe fitting conveyer, a pipe fitting apparatus for placing and a control monitor unit; Described vibrating disk (2), straight vibrating grizzly (3), pipe fitting conveyer, pipe fitting apparatus for placing, control monitor unit are installed on bench board (1); Described vibrating disk (2) is communicated with by a pipeline (4) with the left-hand end of pipe fitting conveyer; The right-hand end of described pipe fitting conveyer is communicated with pipe fitting apparatus for placing; Described straight vibrating grizzly (3) is also close to conjunction with pipeline (4); Described control monitor unit is located at the top of pipe fitting conveyer; Described pipe fitting apparatus for placing is provided with a groove (5) placed for metal tube; The both sides of described groove (5) are also provided with multipair symmetrically arranged opening (6).Above-mentioned metal tube load transfer device can not make metal tube pile up and stuck motionless.
Description
Technical field
The utility model relates to a kind of pipe fitting feedway for metal tube automatic conveying, is specifically a kind of metal tube load transfer device.
Background technology
The metal tube load transfer device of prior art is generally a hopper, and described hopper bottom is provided with a square outlet passage fallen for metal tube.During use, first multiple metal tube proper alignment is put into hopper well, then utilize the effect of gravity that metal tube is one by one dropped successively.There is following defect in the metal tube load transfer device of said structure: drop owing to just utilizing gravity in the use procedure of reality, therefore have the situation generation that multiple metal tube is stuck in exit passageway, thus cause the functional reliability of prior art metal tube load transfer device to reduce.
Utility model content
The technical problems to be solved in the utility model is, provides a kind of metal tube that can not make to pile up and stuck motionless metal tube load transfer device.
The technical solution of the utility model is, provides a kind of metal tube load transfer device, comprises a bench board, a vibrating disk, always vibrating grizzly, a pipe fitting conveyer, a pipe fitting apparatus for placing and a control monitor unit; Described vibrating disk, straight vibrating grizzly, pipe fitting conveyer, pipe fitting apparatus for placing, control monitor unit are installed on bench board; The left-hand end of described vibrating disk and pipe fitting conveyer is by a pipeline communication; The right-hand end of described pipe fitting conveyer is communicated with pipe fitting apparatus for placing; Described straight vibrating grizzly is also close to conjunction with pipeline; Described control monitor unit is located at the top of pipe fitting conveyer; Described pipe fitting apparatus for placing is provided with a groove placed for metal tube; The both sides of described groove are also provided with multipair symmetrically arranged opening.
Described pipe fitting conveyer comprises a stay bearing plate, a slide block and establishes the first backgauge cylinder on the supporting plate, the second backgauge cylinder, first to promote cylinder and the second promotion cylinder; Described slide block slide anteroposterior coordinates on the supporting plate; Be provided with a left and right directions in described slide block to arrange and the passage passed for metal tube; The front end of described slide block is connected with the first piston rod promoting cylinder, and the stay bearing plate at slide block rear is provided with at least two blocks for limiting slide position; The first described backgauge cylinder, the second backgauge cylinder are located at passage both sides when slide block is positioned at front end; The first described backgauge cylinder is for being horizontally disposed with, and the piston rod of described first backgauge cylinder can be slidably fitted in passage; The second described backgauge cylinder is vertically arrange, and the second described backgauge cylinder can offset with metal tube; Described second promotes on the left of the passage that cylinder is located at when slide block is positioned at rear end, and described second promotes cylinder can be slidably fitted in passage.
Described pipe fitting apparatus for placing comprises a supporting plate, circular discs and a rotary cylinder; Described groove by run through whole circular discs the first groove and be located at supporting plate surface side the second groove form; Described circular discs energy normal-running fit is in supporting plate; Described rotary cylinder is fixed on supporting plate bottom, and the rotating shaft of described rotary cylinder is connected with the center-point of circular discs.
Described stay bearing plate and supporting plate are an entirety; Described stay bearing plate is also provided with a semi-circular recesses, and described semi-circular recesses is connected with the second groove.
Described control monitor unit comprises installation support on the supporting plate and a rack-mount camera, and described camera is towards above semi-circular recesses.
After adopting above structure, the utility model compared with prior art, has the following advantages:
Multiple metal tube is first put into vibrating disk by the utility model metal tube load transfer device, vibrating disk is sent by vibration, rotation by metal tube multiple in vibrating disk, and then enter pipeline, simultaneously under the action of straight vibrating grizzly, pipe fitting is made to enter pipe fitting conveyer, and make to enter a pipe fitting by the first backgauge cylinder of pipe fitting conveyer, the second backgauge cylinder, promote cylinder by first again and push metal tube to rear, then promote cylinder by second and metal tube is pushed in pipe fitting pipe fitting apparatus for placing.Because whole process is all by vibrating and rotate realization, and the position can monitoring metal tube by control monitor unit judges, then regulates the direction of metal tube.Therefore the multiple metal tube of the utility model metal tube load transfer device is not easily stuck in the situation generation of exit passageway, thus the functional reliability of the utility model metal tube load transfer device is increased, and transport efficiency is increased.
As improvement, described pipe fitting apparatus for placing comprises a supporting plate, circular discs and a rotary cylinder; Described groove by run through whole circular discs the first groove and be located at supporting plate surface side the second groove form; Described circular discs energy normal-running fit is in supporting plate; Described rotary cylinder is fixed on supporting plate bottom, and the rotating shaft of described rotary cylinder is connected with the center-point of circular discs.Can be adjusted the direction of metal tube by said structure, thus increase the transport efficiency of metal tube to a certain extent.
As improvement, described stay bearing plate and supporting plate are an entirety; Described stay bearing plate is also provided with a semi-circular recesses, and described semi-circular recesses is connected with the second groove.The setting of semi-circular recesses is more conducive to the transmission of pipe fitting, thus improves the transport efficiency of metal tube.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model metal tube load transfer device.
Fig. 2 is the structural representation of pipe fitting apparatus for placing.
Fig. 3 is the structural representation of slide block.
Shown in figure 1, bench board, 2, vibrating disk, 3, straight vibrating grizzly, 4, pipeline, 5, groove, the 5.1, first pipeline, 5.2, second pipe, 6, opening, 7, supporting plate, 8, circular discs, 9, rotary cylinder, 10, stay bearing plate, 11, slide block, the 12, first backgauge cylinder, the 13, second backgauge cylinder, 14, first promotes cylinder, 15, second cylinder is promoted, 16, passage, 17, block, 18, semi-circular recesses, 19, track, 20, support, 21, camera.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As shown in Figure 1, Figure 2, Figure 3 shows, a kind of metal tube load transfer device of the utility model, comprise bench board 1, vibrating disk 2, always vibrating grizzly 3, pipe fitting conveyer and a pipe fitting apparatus for placing, vibrating disk 2, straight vibrating grizzly 3 are the finished product that market can have been bought; Described vibrating disk 2, straight vibrating grizzly 3, pipe fitting conveyer, pipe fitting apparatus for placing, control monitor unit are installed on bench board 1; Described vibrating disk 2 is communicated with by a pipeline 4 with the left-hand end of pipe fitting conveyer; The right-hand end of described pipe fitting conveyer is communicated with pipe fitting apparatus for placing; Described straight vibrating grizzly 3 is also close to conjunction with pipeline 4; Described control monitor unit is located at the top of pipe fitting conveyer; Described pipe fitting apparatus for placing is provided with a groove 5 placed for metal tube; The both sides of described groove 5 are also provided with multipair symmetrically arranged opening 6.
Described pipe fitting conveyer comprises stay bearing plate 10, slide block 11 and the first backgauge cylinder 12, the second backgauge cylinder 13, first be located on stay bearing plate 10 promotes cylinder 14 and the second promotion cylinder 15; Described slide block 11 slide anteroposterior is engaged on stay bearing plate 10, and stay bearing plate 10 is provided with two parallel orbits 19, and slide block 11 slide anteroposterior is engaged in two parallel orbits 19; Be provided with a left and right directions in described slide block 11 to arrange and the passage 16 passed for metal tube; The front end of described slide block 11 is connected with the first piston rod promoting cylinder 14, and the stay bearing plate 10 at slide block 11 rear is provided with at least two blocks 17 for limiting slide block 11 position, namely first promotes cylinder 14 slide anteroposterior, band movable slider 11 slide anteroposterior; The first described backgauge cylinder 12, second backgauge cylinder 13 is located at passage 16 both sides when slide block 11 is positioned at front end; The first described backgauge cylinder 12 is for being horizontally disposed with, and the piston rod of described first backgauge cylinder 12 can be slidably fitted in passage 16; The second described backgauge cylinder 13 is vertically arrange, and the second described backgauge cylinder 13 can offset with metal tube, pushes down second pipe fitting that will enter by the second backgauge cylinder 13, prevents metal tube from entering too much; Described second promotes on the left of the passage 16 that cylinder 15 is located at when slide block 11 is positioned at rear end, and the described second piston rod promoting cylinder 15 can be slidably fitted in passage 16.
Described pipe fitting apparatus for placing comprises a supporting plate 7, circular discs 8 and a rotary cylinder 9; Described groove 5 is made up of the first groove 5.1 running through whole circular discs 8 and the second groove 5.2 of being located at the surperficial side of supporting plate 7, namely the first groove 5.1 and the second groove 5.2 communicate, but groove 5 is not but run through supporting plate 7 and circular discs 8, but run through a part for the whole of circular discs 8 and supporting plate 7, make pipe fitting can enter in circular discs 8 from supporting plate 7; Described circular discs 8 energy normal-running fit is in supporting plate 7; Described rotary cylinder 9 is fixed on supporting plate 7 bottom, and the rotating shaft of described rotary cylinder 9 is connected with the center-point of circular discs 8.Opening 6 is located in circular discs 8.
Described stay bearing plate 10 and supporting plate 7 are an entirety; Described stay bearing plate 10 is also provided with a semi-circular recesses 18, described semi-circular recesses 18 is connected with the second groove 5.2.
Described control monitor unit comprises one and is arranged on support on stay bearing plate 10 20 and and is arranged on camera 21 on support 20, described camera 21, towards above semi-circular recesses 18, namely can observe the direction of ground metal tube in semi-circular recesses 18 by camera 21.
Below only just most preferred embodiment of the present utility model is described, but can not be interpreted as it is limitations on claims.The utility model is not limited only to above embodiment, and its concrete structure allows to change.In every case the various change done in the protection domain of the utility model independent claims is all in protection domain of the present utility model.
Claims (5)
1. a metal tube load transfer device, is characterized in that: comprise a bench board (1), a vibrating disk (2), always vibrating grizzly (3), a pipe fitting conveyer, a pipe fitting apparatus for placing and a control monitor unit; Described vibrating disk (2), straight vibrating grizzly (3), pipe fitting conveyer, pipe fitting apparatus for placing, control monitor unit are installed on bench board (1); Described vibrating disk (2) is communicated with by a pipeline (4) with the left-hand end of pipe fitting conveyer; The right-hand end of described pipe fitting conveyer is communicated with pipe fitting apparatus for placing; Described straight vibrating grizzly (3) is also close to conjunction with pipeline (4); Described control monitor unit is located at the top of pipe fitting conveyer; Described pipe fitting apparatus for placing is provided with a groove (5) placed for metal tube; The both sides of described groove (5) are also provided with multipair symmetrically arranged opening (6).
2. metal tube load transfer device according to claim 1, is characterized in that: described pipe fitting conveyer comprise a stay bearing plate (10), a slide block (11) and be located at the first backgauge cylinder (12) on stay bearing plate (10), the second backgauge cylinder (13), first promotes cylinder (14) and second and promotes cylinder (15); Described slide block (11) slide anteroposterior is engaged on stay bearing plate (10); Be provided with a left and right directions in described slide block (11) to arrange and the passage (16) passed for metal tube; The piston rod that the front end and first of described slide block (11) promotes cylinder (14) is connected, and the stay bearing plate (10) at slide block (11) rear is provided with at least two blocks (17) for limiting slide block (11) position; The first described backgauge cylinder (12), the second backgauge cylinder (13) are located at passage (16) both sides when slide block (11) is positioned at front end; The first described backgauge cylinder (12) is for being horizontally disposed with, and the piston rod of described first backgauge cylinder (12) can be slidably fitted in passage (16); The second described backgauge cylinder (13) is vertically arrange, and the second described backgauge cylinder (13) can offset with metal tube; Described second promotes cylinder (15) is located at passage (16) left side when slide block (11) is positioned at rear end, and the described second piston rod promoting cylinder (15) can be slidably fitted in passage (16).
3. metal tube load transfer device according to claim 2, is characterized in that: described pipe fitting apparatus for placing comprises a supporting plate (7), circular discs (8) and a rotary cylinder (9); Described groove (5) is made up of the first groove (5.1) running through whole circular discs (8) and the second groove (5.2) of being located at supporting plate (7) surperficial side; Described circular discs (8) energy normal-running fit is in supporting plate (7); Described rotary cylinder (9) is fixed on supporting plate (7) bottom, and the rotating shaft of described rotary cylinder (9) is connected with the center-point of circular discs (8).
4. metal tube load transfer device according to claim 3, is characterized in that: described stay bearing plate (10) and supporting plate (7) are an entirety; Described stay bearing plate (10) is also provided with a semi-circular recesses (18), and described semi-circular recesses (18) is connected with the second groove (5.2).
5. metal tube load transfer device according to claim 4, it is characterized in that: described control monitor unit comprises a support (20) and be arranged on stay bearing plate (10) and is arranged on camera (21) on support (20), and described camera (21) is towards the top in semi-circular recesses (18).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520407593.3U CN204675256U (en) | 2015-06-12 | 2015-06-12 | Metal tube load transfer device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520407593.3U CN204675256U (en) | 2015-06-12 | 2015-06-12 | Metal tube load transfer device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204675256U true CN204675256U (en) | 2015-09-30 |
Family
ID=54174967
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520407593.3U Expired - Fee Related CN204675256U (en) | 2015-06-12 | 2015-06-12 | Metal tube load transfer device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204675256U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109049964A (en) * | 2018-08-03 | 2018-12-21 | 浙江铜加工研究院有限公司 | The mechanism to be expected and Word-carving machine of Word-carving machine |
CN109160197A (en) * | 2018-08-03 | 2019-01-08 | 浙江铜加工研究院有限公司 | The feeding mechanism of Word-carving machine |
-
2015
- 2015-06-12 CN CN201520407593.3U patent/CN204675256U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109049964A (en) * | 2018-08-03 | 2018-12-21 | 浙江铜加工研究院有限公司 | The mechanism to be expected and Word-carving machine of Word-carving machine |
CN109160197A (en) * | 2018-08-03 | 2019-01-08 | 浙江铜加工研究院有限公司 | The feeding mechanism of Word-carving machine |
CN109160197B (en) * | 2018-08-03 | 2023-09-08 | 浙江铜加工研究院有限公司 | Feeding mechanism of character rolling machine |
CN109049964B (en) * | 2018-08-03 | 2024-01-26 | 浙江铜加工研究院有限公司 | Material waiting mechanism of character rolling machine and character rolling machine |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104477625B (en) | Breeches pipe autoloader | |
CN204675318U (en) | Metal tube conveyer | |
CN104663848B (en) | Prawn back-opening and head-removing device | |
CN204675256U (en) | Metal tube load transfer device | |
CN105000363A (en) | Automatic conveying device and method for raw material copper bars of fire extinguisher valves | |
CN104401711A (en) | Lever-type separation device applied to iron workpieces | |
CN204223982U (en) | A kind of roll transfer device | |
CN102363468A (en) | Suction cup-adjusting mechanism for double-turning single-station glass sheet loaders | |
CN204847308U (en) | Automatic conveyor of fire extinguisher valve raw materials bar copper | |
CN204038426U (en) | A kind of pay-off of selecting materials of load end of circuit breaker | |
CN103662784A (en) | Bearing ball screening feeding device | |
CN203652749U (en) | Round member charging apparatus | |
CN204737329U (en) | Pipe fitting conveying equipment | |
CN204384282U (en) | A kind of packaging for foodstuff conveyer | |
CN202518477U (en) | Disordered cigarette detection device in cigarette conveying channel | |
CN206963860U (en) | A kind of Tilapia mossambica of safe operation removes dirty device | |
CN204297487U (en) | Automatic blanking device | |
CN106964573A (en) | A kind of color selector separation chamber ash retention equipment | |
CN203889610U (en) | Columnar product feed mechanism | |
CN206886096U (en) | A kind of pad feeding-distribution device | |
CN204569772U (en) | Magnetic captures, shift and collect the device of detonator | |
CN204124403U (en) | Tablet reversion device for piling sheets structure | |
CN205237450U (en) | Metalwork positive and negative screening assembly quality | |
CN103466131A (en) | Automatic needling device of acupuncture needle packing machine | |
CN107117475A (en) | A kind of fishing net arranges packet receiving device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150930 Termination date: 20190612 |