CN204658398U - Portable dam collector - Google Patents

Portable dam collector Download PDF

Info

Publication number
CN204658398U
CN204658398U CN201520323653.3U CN201520323653U CN204658398U CN 204658398 U CN204658398 U CN 204658398U CN 201520323653 U CN201520323653 U CN 201520323653U CN 204658398 U CN204658398 U CN 204658398U
Authority
CN
China
Prior art keywords
insulation board
insulating tape
collector
magnet
portable dam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520323653.3U
Other languages
Chinese (zh)
Inventor
朱斌
李季
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of Jiangsu Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Jiangsu Electric Power Co Ltd
Taizhou Power Supply Co of Jiangsu Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Jiangsu Electric Power Co Ltd, Taizhou Power Supply Co of Jiangsu Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201520323653.3U priority Critical patent/CN204658398U/en
Application granted granted Critical
Publication of CN204658398U publication Critical patent/CN204658398U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Professional, Industrial, Or Sporting Protective Garments (AREA)

Abstract

The utility model discloses a kind of portable dam collector, comprise one first insulation board, one second insulation board, insulating tape and the first magnet, described insulating tape is ordered on the first described insulation board and the second described insulation board, the first described magnet is embedded between described insulating tape and the first insulation board, the insulating tape be connected with the bottom of the second described insulation board swells and forms multiple hanging ring, and the first described insulation board is connected by described insulating tape with the second described insulation board.The advantage of portable dam collector of the present utility model is: with magnet, can adsorb multiple erecting tools, picks and places erecting tools all more convenient; Can be adsorbed on the switch board be made up of ferromagnetic material common in power industry or bracing frame, can also hang on switch board or bracing frame, thus can be placed on from installation personnel position more smoothly, the continuity of installation exercise can be improved, improve the efficiency of installation exercise.

Description

Portable dam collector
Technical field
The utility model relates to power industry installing area, more precisely a kind of portable dam collector.
Background technology
When power industry carries out installation exercise, conventional tool kind is more, and in prior art, multiple conventional instrument is placed in normal color collecting bag storage, but this mode causes installation personnel to require a great deal of time ransacks instrument, have impact on the continuity of installation exercise, efficiency is lower.
Utility model content
The utility model mainly solves the technical problem existing for prior art, thus provides a kind of with magnet, can adsorb multiple erecting tools, pick and place erecting tools all more convenient; Can be adsorbed on the switch board be made up of ferromagnetic material common in power industry or bracing frame, can also hang on switch board or bracing frame, thus can be placed on from installation personnel position more smoothly, the continuity of installation exercise can be improved, improve the portable dam collector of the efficiency of installation exercise.
Above-mentioned technical problem of the present utility model is mainly solved by following technical proposals:
A kind of portable dam collector, comprise one first insulation board, one second insulation board, insulating tape and the first magnet, described insulating tape is ordered on the first described insulation board and the second described insulation board, the first described magnet is embedded between described insulating tape and the first insulation board, the insulating tape be connected with the bottom of the second described insulation board swells and forms multiple hanging ring, and the first described insulation board is connected by described insulating tape with the second described insulation board.
As the utility model preferred embodiment, the both sides that the first described insulation board given prominence to by described insulating tape form a band shape and draw ear.
As the utility model preferred embodiment, described portable dam collector also comprises two primary and secondaries and pastes and two the second magnet, two described primary and secondaries paste and are connected with the upper end of the first described insulation board, and the upper end that described primary and secondary pastes is connected with the second described magnet.
As the utility model preferred embodiment, described portable dam collector also comprises two hooks, and the upper end that described primary and secondary pastes is connected with described hook.
The advantage of portable dam collector of the present utility model is: with magnet, can adsorb multiple erecting tools, picks and places erecting tools all more convenient; Can be adsorbed on the switch board be made up of ferromagnetic material common in power industry or bracing frame, can also hang on switch board or bracing frame, thus can be placed on from installation personnel position more smoothly, the continuity of installation exercise can be improved, improve the efficiency of installation exercise.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the perspective view of portable dam collector of the present utility model;
Fig. 2 is the perspective view at another visual angle of portable dam collector in Fig. 1;
Fig. 3 is the right view of the portable dam collector in Fig. 1;
Wherein:
1, the first insulation board; 2, the second insulation board; 3, insulating tape; 4, the first magnet;
5, hanging ring; 6, band shape draws ear; 7, primary and secondary pastes; 8, the second magnet; 9, link up with.
Detailed description of the invention
Below in conjunction with accompanying drawing, preferred embodiment of the present utility model is described in detail, to make advantage of the present utility model and feature can be easier to be readily appreciated by one skilled in the art, thus more explicit defining is made to protection domain of the present utility model.
The advantage of portable dam collector of the present utility model is: with magnet, can adsorb multiple erecting tools, picks and places erecting tools all more convenient; Can be adsorbed on the switch board be made up of ferromagnetic material common in power industry or bracing frame, can also hang on switch board or bracing frame, thus can be placed on from installation personnel position more smoothly, the continuity of installation exercise can be improved, improve the efficiency of installation exercise.
As shown in Figure 1-Figure 3, a kind of portable dam collector, comprise one first insulation board 1,1 second insulation board 2, insulating tape 3 and the first magnet 4, this insulating tape 3 is ordered on this first insulation board 1 and this second insulation board 2, this first magnet 4 is embedded between this insulating tape 3 and first insulation board 1, the insulating tape 3 be connected with the bottom of this second insulation board 2 swells and forms multiple hanging ring 5, and this first insulation board 1 is connected by this insulating tape 3 with this second insulation board 2.This first magnet 4 not only can adsorb the erecting tools that ferromagnetic material is made, can also be adsorbed on switch board or bracing frame that use ferromagnetic material common in power industry makes, thus make this portable dam collector can be placed on position more smoothly, the instrument that nonferromagnetic material is made, can be placed in this hanging ring 5; This first insulation board 1 is connected by insulating tape 3 with this second insulation board 2, makes it can doubling mutually, thus after can doubling being protected, the instrument between this first insulation board 1 and this second insulation board 2.
The both sides that this first insulation board 1 given prominence to by this insulating tape 3 form a band shape and draw ear 6.This portable dam collector is adsorbed on after on switch board or bracing frame, because attraction is comparatively large, cannot more conveniently be taken off, and arranges after this band shape draws ear 6, more conveniently can take off this portable dam collector, operate comparatively laborsaving.
This portable dam collector also comprises two primary and secondaries and pastes 7 and two the second magnet 8, and these two primary and secondaries paste 7 and are connected with the upper end of this first insulation board 1, and the upper end of this primary and secondary subsides 7 is connected with this second magnet 8.Arrange this primary and secondary paste 7 and this second magnet 8 can increase the area that this portable dam collector and switch board or bracing frame adsorb, enable more firm being connected with switch board or bracing frame of this portable dam collector, the length that primary and secondary pastes can regulate, and more conveniently can regulate the height of this first insulation board 1 and this second insulation board 2; After this first insulation board 1 and this second insulation board 2 doubling, use this primary and secondary to paste 7 and can also play the object of fixing this first insulation board 1 and this second insulation board 2 with this second magnet 8.
This portable dam collector also comprises two hooks 9, and the upper end of this primary and secondary subsides 7 is connected with this hook 9.During installation exercise, sometimes also can encounter around without ferrimagnet, thus this portable dam collector cannot be used to adsorb fixing situation, this hook 9 is set user can be allowed can to hang up this portable dam collector.
Below be only the mentality of designing of some embodiments of the present utility model, when system allows, the utility model can expand to external more functional module simultaneously, thus expands its function to greatest extent.
The above, be only detailed description of the invention of the present utility model, but protection domain of the present utility model is not limited thereto, and any change of expecting without creative work or replacement, all should be encompassed within protection domain of the present utility model.Therefore, the protection domain that protection domain of the present utility model should limit with claims is as the criterion.

Claims (4)

1. a portable dam collector, it is characterized in that: comprise one first insulation board (1), one second insulation board (2), insulating tape (3) and the first magnet (4), described insulating tape (3) is ordered on described the first insulation board (1) and described the second insulation board (2), described the first magnet (4) is embedded between described insulating tape (3) and the first insulation board (1), the insulating tape (3) be connected with the bottom of described the second insulation board (2) swells and forms multiple hanging ring (5), described the first insulation board (1) is connected by described insulating tape (3) with described the second insulation board (2).
2. portable dam collector according to claim 1, is characterized in that: the both sides of outstanding described the first insulation board (1) of described insulating tape (3) form a band shape and draw ear (6).
3. portable dam collector according to claim 1, it is characterized in that: described portable dam collector also comprises two primary and secondaries and pastes (7) and two the second magnet (8), two described primary and secondaries paste (7) and are connected with the upper end of described the first insulation board (1), and the upper end that described primary and secondary pastes (7) is connected with described the second magnet (8).
4. portable dam collector according to claim 3, it is characterized in that: described portable dam collector also comprises two hooks (9), the upper end that described primary and secondary pastes (7) is connected with described hook (9).
CN201520323653.3U 2015-05-19 2015-05-19 Portable dam collector Expired - Fee Related CN204658398U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520323653.3U CN204658398U (en) 2015-05-19 2015-05-19 Portable dam collector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520323653.3U CN204658398U (en) 2015-05-19 2015-05-19 Portable dam collector

Publications (1)

Publication Number Publication Date
CN204658398U true CN204658398U (en) 2015-09-23

Family

ID=54128829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520323653.3U Expired - Fee Related CN204658398U (en) 2015-05-19 2015-05-19 Portable dam collector

Country Status (1)

Country Link
CN (1) CN204658398U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104875172A (en) * 2015-05-19 2015-09-02 国家电网公司 Portable tool holder

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104875172A (en) * 2015-05-19 2015-09-02 国家电网公司 Portable tool holder

Similar Documents

Publication Publication Date Title
CN104875172A (en) Portable tool holder
CN204658398U (en) Portable dam collector
CN204138045U (en) Power cord winding and unwinding devices and fan
CN204088248U (en) Fuse box structure
CN204216362U (en) A kind of U-shaped multi-function jack
CN204517314U (en) A kind of trough type bridge frame
CN104051916A (en) Extension socket with annular winding groove
CN205070324U (en) Self -adhesion is fixed to be detained suitable for interim power consumption circuit of building site is built on stilts
CN204681024U (en) The assembled terminal box of electrician
CN203607781U (en) Square wiring duct capable of wiring in order
CN203166256U (en) Safe power strip
CN201690075U (en) Wall socket with winding board
CN202616484U (en) Wall information panel with elevation angle type information interface
CN206650215U (en) A kind of Multifunctional transformable insert row
CN204067762U (en) A kind of socket with annular kinking groove
CN206567176U (en) Terminal box fixing tool fixture
CN203321983U (en) Rod body connecting tool for insulating rod
CN204558697U (en) Being flexible coupling of a kind of direction-changeable
CN204852618U (en) Wire checkpost
CN203932583U (en) A kind of two output formula video/audio wire joints
CN205791290U (en) EMUs cable protection cushion collar
CN206040493U (en) Safety knife switch
CN203871800U (en) Electrician wire pipe joint
CN202127152U (en) Multifunctional wiring board
CN203218650U (en) General power plug

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150923