CN2046522U - Ensemble lifting scaffold - Google Patents

Ensemble lifting scaffold Download PDF

Info

Publication number
CN2046522U
CN2046522U CN 88216513 CN88216513U CN2046522U CN 2046522 U CN2046522 U CN 2046522U CN 88216513 CN88216513 CN 88216513 CN 88216513 U CN88216513 U CN 88216513U CN 2046522 U CN2046522 U CN 2046522U
Authority
CN
China
Prior art keywords
scaffold
bearing
tripod
load
building
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 88216513
Other languages
Chinese (zh)
Inventor
曾绍强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zeng Shaoqiang
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 88216513 priority Critical patent/CN2046522U/en
Publication of CN2046522U publication Critical patent/CN2046522U/en
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses an ensemble lifting scaffold. The figure 2 shows that (1) is an external scaffolding with ordinary steel tubes which have the same height with three buildings; a bottom is provided with a support truss which is lapped around a building (7); the support truss is supported on a weight-bearing triangular frame (5) in static time, and the (5) is fixed on the (7) via weight-bearing screw bolts (6). The higher three step scaffold provided with (1) needs to be higher than one layer of main body and as the scaffold of the layer. After (9) is completed, the scaffold can be lifted with one layer height as a body. In dynamic state, the lifting power from a plate lifting unit (13), lead screw (14), and hanger rod (16) supported on the triangular frame (10) of the lifting unit can make the whole scaffold lift in synchronization. The composite structure solves the trouble that short scaffold can be used for bearing the high-layer scaffold.

Description

Ensemble lifting scaffold
The utility model relates to a kind of building scaffold
The construction external scaffolding of known general high-rise building adopts merogenesis to set up the overall height steel tube outer scaffold, and joint out-mould scaffold is chosen the steel corbel supporting to solve stability problem by building on it.Or hang and block the formula scaffold, utilize high-rise crane gear to hang, construction lacks the sense of security and can not establish one's own system.Or segmented promotes out-mould scaffold, promotes complicated and destroyed the globality of scaffold.
The utility model provides a kind of integral hoisting construction exterior wall scaffold to the public.With one with three layers of building with high, connect the exterior wall scaffold that forms by common pin hand steel pipe and fastener, with the truss principal that is located at this scaffold bottom, and the load-bearing tripod.Utilize many common buildings lift slab facility, the scaffold that this is short carries out integral body and promotes.Promote a layer height, finish one deck structure construction.Until being promoted to maximum layer, finish major project.Integral-scaffold is descended, finish the decoration of exterior wall engineering.Replace the overall height steel tube outer scaffold with it.
Concrete structure of the present utility model provides from accompanying drawing.Fig. 1 is a layout plan, and Fig. 2 is a sectional drawing, and Fig. 3 is a front elevation view.Its structure following (1) sells product external scaffold for ordinary steel, set up all around around building (7), its height is high together with three one storey buildings, be provided with six layers of scaffold floor (2), railing (3) is arranged at its top, the three layers of pin hand in top use for satisfying construction, the bamboo rough bamboo mat (4) that there is safety net periphery and bottom and completely encloses, and the three layers of sole in bottom are the hoisting scaffold operating platform.All identical with upper part with the common steel tube scaffold.This scaffold is bearing on the load-bearing tripod (5) that is welded by shaped steel, and (5) are fastened on the building (7) by load-bearing bolt (6).About useful common steel tube in scaffold bottom and fastener set up the truss principal (8) that forms, truss inside (8) is located to be provided with the elevator tripod (10) that is welded by shaped steel and move the doorframe of forming with common steel pipe and fastener (11) smoothly up and down between the most following two-layer scaffold, and (10) are fastened on the building (7) by bolt (12).Common electronic Lift-slab machine (13) is installed on (10), divides some groups around building, and corresponding with (5), (13) mobilizable lifting wire bond (14) is up and down arranged, movable joint (15), its end of suspension rod (16) is fastening with (5), forms the double acting supporting-point.(this partly is a Lift-slab machine common apparatus for building).When (7) up constructing, the every layer of hole (17) of all must boxing out.Dynamically during hoisting scaffold, unclamp (6), (14) dextrorotation (1) is risen, the directive wheel (18) that is fixed on (1) rises with (7) guiding, and whole scaffold promotes a step and is the half storey height.Fastening (6).(19) be its operating platform, scaffold this moment (1) when climbing machine for static state unclamps (12), makes (14) derotation, and (10) and (13) up finishes one and go on foot and climb machine repeatedly once, has risen the lifting of a layer height, and fastening (12) carry out the last layer building operations.The weight of scaffold this moment (1) and the load of constructing operation thereof all are bearing on (5) and (10), and pass on the building (7) by (6) and (12).(9) be one deck to be constructed, the maximum layer of so constructing.Anti-its road after major project is finished and going successively lands whole out-mould scaffold, finishes the decoration of exterior wall engineering.(20) be interim fastening breaker bolt.
The utility model has the advantages that: set up a shorter common steel tube exterior wall scaffold that three layers of building height are arranged, satisfy the construction of high-rise with the method that promotes, thereby greatly saved steel pipe and fastener, and steel pipe and fastener all are the versatile materials of construction. Lifting machinery has then utilized common building lift slab facility, makes the lift slab facility enlarge purposes. The two combination makes external wall scaffold for high building that new construction method arranged.
In order to realize above-mentioned integral hoisting scaffold, the best way is the building constructor that is had lift slab facility and life-slab construction economy by a family.Realize this imagination with this scientific research project of integral hoisting scaffold.

Claims (5)

1, a kind of integral hoisting scaffold, by steel pipe scaffold (1), truss principal (8), load-bearing tripod (5), Lift-slab machine (13), elevator tripod (10), directive wheel (18) critical piece is formed, it is characterized in that a whole exterior wall scaffold (1) that three layers of building height are arranged being formed by connecting with general fastener with the general pin hand steel pipe of building operations, when static state, by load-bearing tripod (5), be fastened on the building (7) by load-bearing bolt (6), use when dynamic as the pin hand in when construction, through being fixed in the lifting energy of structural elevator tripod of architecture enclosing (10) and common Lift-slab machine (13), a kind of combining structure that this external scaffolding is risen overally or descend.
2, combining structure as claimed in claim 1, it is characterized in that: with building (7) as lead, the directive wheel (18) that is fixed on the external scaffolding (1) is close on (7), when scaffold (1) lifting or decline, all is close on (7) and carries out.
3, combining structure according to claim 1, it is characterized in that: at the hoisting scaffold movement segment, adopted some groups of common buildings to use Lift-slab machine (3) through wire bond (14), hang the anastomosis of weldering (16), make external scaffolding (1), load-bearing tripod (5) rises simultaneously or descends, and the weight supporting of the whole out-mould scaffold of this moment promotes on the tripod (10) at some groups.
4, combining structure as claimed in claim 1, it is characterized in that: when scaffold (1) is static state, untie the set bolt (12) of elevator tripod (10) and building (7), start Lift-slab machine (13), finish and climb the machine stage, the weight of whole external scaffolding this moment (1) all is bearing on the load-bearing tripod (5).
5, combining structure as claimed in claim 1, it is characterized in that: when scaffold does not promote, when static, whole external scaffolding (1) and on the operation load all be bearing on load-bearing tripod (5) and the elevator tripod (10) by two truss principals (8) of scaffold bottom.
CN 88216513 1988-12-19 1988-12-19 Ensemble lifting scaffold Expired - Lifetime CN2046522U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 88216513 CN2046522U (en) 1988-12-19 1988-12-19 Ensemble lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 88216513 CN2046522U (en) 1988-12-19 1988-12-19 Ensemble lifting scaffold

Publications (1)

Publication Number Publication Date
CN2046522U true CN2046522U (en) 1989-10-25

Family

ID=4849130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 88216513 Expired - Lifetime CN2046522U (en) 1988-12-19 1988-12-19 Ensemble lifting scaffold

Country Status (1)

Country Link
CN (1) CN2046522U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100351481C (en) * 2004-04-23 2007-11-28 金刚工业株式会社 Guide device for ascend type erecting bed

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100351481C (en) * 2004-04-23 2007-11-28 金刚工业株式会社 Guide device for ascend type erecting bed

Similar Documents

Publication Publication Date Title
CN112982669B (en) Eccentric annular large-cantilever prestressed steel structural system and construction method thereof
EP0866189A1 (en) A method of lifting structure from above to below
CN211524016U (en) Double-working-surface guide frame climbing type working platform and system
WO2010115350A1 (en) Main work construction method for reinforced concrete building and building construction machine
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN1044841A (en) Building construction system
CN107401113A (en) Stiff skeleton straining beam structure and construction method built in a kind of high pier
CN107399656B (en) Outdoor elevator and construction method thereof
CN114197634B (en) Construction method of high-rise conjoined large steel structure installation monitoring system
CN206233541U (en) A kind of interior top external climbing mould bases operation platform for construction of super highrise building
CN210735910U (en) Self-lifting hoisting equipment suitable for assembly type additional elevator construction
CN1020645C (en) Integral elevating system for out-mould scaffold of super-high buildings
CN2046522U (en) Ensemble lifting scaffold
CN216787874U (en) Large-scale ring type truss hoisting structure in large-span high altitude
CN216616216U (en) Large-scale high-rise steel truss disjunctor structure
CN109879179A (en) A kind of assembling type steel structure tower crane platform
CN2187637Y (en) Electric lifting integral scaffolding
CN2175805Y (en) Integrated lifting scaffold capable of being segmented
CN113789926A (en) Assembled full-prefabricated staircase and assembled staircase building
CN212336673U (en) Scaffold and scaffold subassembly suitable for have flange structure wall body
CN2276046Y (en) Divided multistage automatic climbing external scaffold
JP3040309B2 (en) Construction method of multi-layer suspension structure
CN110965757A (en) Scaffold applicable to wall with flanging structure and construction method thereof
CN2033034U (en) Electric mould-lifting device for face headframe
CN216665073U (en) Monitoring and lifting structure for complex partition lifting steel structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C15 Extension of patent right duration from 15 to 20 years for appl. with date before 31.12.1992 and still valid on 11.12.2001 (patent law change 1993)
RN01 Renewal of patent term
C53 Correction of patent for invention or patent application
COR Change of bibliographic data

Free format text: CORRECT: PATENTEE ADDRESS; FROM: GUANGXI FOURTH CONSTRUCTION COMPANY, PING SHAN, GUILIN, GUANGXI ZHUANG AUTONOMOUS REGION TO: ROOM 11A201, JINLONG HOUSING ESTATE, NANHANG ROAD, HAIKOU CITY, HAINAN PROVINCE, 570001

CP03 Change of name, title or address

Address after: 570001 11A201 room, Jinlong Village, South China Road, Hainan, Haikou

Patentee after: Zeng Shaoqiang

Address before: The Guangxi Zhuang Autonomous Region Guilin Pingshan Guangxi fourth construction company

Patentee before: Zeng Shaoqiang

C17 Cessation of patent right
CX01 Expiry of patent term