CN204649942U - A kind of LED lamp proving installation - Google Patents

A kind of LED lamp proving installation Download PDF

Info

Publication number
CN204649942U
CN204649942U CN201520342002.9U CN201520342002U CN204649942U CN 204649942 U CN204649942 U CN 204649942U CN 201520342002 U CN201520342002 U CN 201520342002U CN 204649942 U CN204649942 U CN 204649942U
Authority
CN
China
Prior art keywords
led lamp
leakage current
detector
terminals
controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520342002.9U
Other languages
Chinese (zh)
Inventor
刘亚敏
李先觉
谭凤林
杨剑
周向辉
雷江涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangneng Hualei Optoelectrical Co Ltd
Original Assignee
Xiangneng Hualei Optoelectrical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangneng Hualei Optoelectrical Co Ltd filed Critical Xiangneng Hualei Optoelectrical Co Ltd
Priority to CN201520342002.9U priority Critical patent/CN204649942U/en
Application granted granted Critical
Publication of CN204649942U publication Critical patent/CN204649942U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measurement Of Resistance Or Impedance (AREA)

Abstract

The utility model provides a kind of LED lamp proving installation to comprise: monitor station, fixator, terminals, LED lamp detector, air switch and controller.Fixator, terminals, LED lamp detector and controller are all arranged on monitor station.Fixator comprises: tool, tool, terminals, LED lamp detector and controller, the order electrical connection successively of tool, terminals, LED lamp detector and controller; LED lamp detector, at least comprise: earth resistance tester, insulating resistance detecting instrument and Leakage Current detector, and earth resistance tester, insulating resistance detecting instrument and Leakage Current detector three take parallel way to be connected between terminals and controller.Controller is provided with earth resistance shelves, megger test shelves and Leakage Current test shelves, earth resistance shelves, megger test shelves are connected with Leakage Current detector with earth resistance tester, insulating resistance detecting instrument respectively with Leakage Current test shelves.

Description

A kind of LED lamp proving installation
Technical field
The utility model relates to technical field of semiconductor illumination, and specifically, the utility model relates to a kind of LED lamp proving installation.
Background technology
LED light source is solid luminescent light source, it is electroluminescent light source, the advantages such as it has that luminescence efficiency is high, long service life, energy saving, environmental protection, low consumption safety, little, lightweight, the easy light modulation of shockproof waterproof, volume, maintenance are few, become the desirable substitute products of the light sources such as conventional light source incandescent lamp, fluorescent light, high/low pressure sodium lamp, gas-discharge lamp, mercury lamp, Halogen lamp LED, become the ideal energy saving environment-friendlylamp lamp of current work, agriculture, business, the indoor and outdoor lighting such as civilian.
After LED enters developing new stage, LED lamp is obviously strengthened by Market Constraint, especially light fixture safe mass problem is subject to each side extensive concern, can obtain Safety Approval even be to a certain extent the stepping-stone to success opening LED lamp market, so claim safety to be also weigh an important indicator of light fitting quality in industry, carrying out security test to LED lamp is guarantee that product meets the direct embodiment of safety requirement.
The safety routine inspection test of existing LED lamp has the multiple Interventions Requested such as Leakage Current, stake resistance, insulation resistance, the test condition of three test items, inspection object has its feature but each portion is identical, can not equivalent substitution mutually, and routine inspection project checks product 100%.Need to be separated into three when conventional sense based on above reason to detect stations and carry out detection operation by the different modes of connection and method of testing successively, need do many covering devices or repeatedly change the mode of connection, this will be that three routine inspection projects increase by three procedures, or an operation does multiple test item, add operating cost undoubtedly, in the weight of street lamp, operation intensity increases, and the problem that may occur test leakage in testing, fail to judge, cause the outflow of defective products, bring the defect of hidden danger to quality.This manual mode of operation, not only inconvenient operation, efficiency are low, and high by artificial affecting error rate, cost of labor is also high.
Utility model content
Utility model relates to a kind of LED lamp proving installation, to solve the problem that LED lamp proving installation in prior art is separately tested the increase of each Interventions Requested operation intensity and easily caused test leakage, fails to judge.
The utility model provides a kind of LED lamp proving installation, comprising: monitor station, fixator, terminals, LED lamp detector, air switch and controller, wherein,
Described fixator, terminals, LED lamp detector and controller are all arranged on described monitor station; Wherein,
Described fixator, comprising: tool, described tool, terminals, LED lamp detector and controller, the order electrical connection successively of described tool, terminals, LED lamp detector and controller;
Wherein, described LED lamp detector, at least comprise: earth resistance tester, insulating resistance detecting instrument and Leakage Current detector, and described earth resistance tester, insulating resistance detecting instrument and Leakage Current detector three take parallel way to be connected between described terminals and controller;
Described controller is provided with earth resistance shelves, megger test shelves and Leakage Current test shelves, described earth resistance shelves, megger test shelves are connected with Leakage Current detector with earth resistance tester, insulating resistance detecting instrument respectively with Leakage Current test shelves;
Described air switch is electrically connected with the terminals of described tool and LED lamp detector respectively, and described air switch is provided with external plug.
Further, wherein, described fixator comprises further: fixed head and masking foil, and described masking foil, fixed head from top to bottom order are arranged on below tool.
Further, wherein, described fixed head is copper coin.
Further, wherein, described tool terminals, comprising: live wire link, zero line link and grounding connection end, wherein,
Described live wire link, is connected with Leakage Current detector with insulating resistance detecting instrument respectively;
Described zero line link, is connected with Leakage Current detector with insulating resistance detecting instrument respectively;
Described grounding connection end, is connected with Leakage Current detector with earth resistance tester, insulating resistance detecting instrument respectively.
Further, wherein, described air switch, detects shelves with Leakage Current detector, live wire link, zero line link and Leakage Current respectively and is electrically connected.
Further, wherein, described earth resistance tester, insulating resistance detecting instrument and Leakage Current detector are respectively arranged with insulating resistance measuring switch, insulating resistance detecting switch and Leakage Current detector switch.
Further, wherein, isolating switch, pilot lamp and hummer is provided with further, wherein,
Described isolating switch, pilot lamp and hummer adopt the mode of series connection to be connected to each other, and are connected between described tool and LED lamp detector after series connection.
Relative to LED lamp proving installation of the prior art, advantage of the present utility model is:
(1) the utility model have employed and is connected in parallel in LED lamp proving installation circuit by testing tools such as earth resistance tester, insulating resistance detecting instrument and Leakage Current detectors, by each test function of gear control realization on controller, provide a kind of proving installation collecting earth resistance, reveal the All-in-One such as circuit test, megger test function.The program can meet the safety routine inspection project of each model LED street lamp, solve and need to increase test station because of the difference of test event, increase the problem of producing carrying street lamp operation intensity, also solve simultaneously may occur in production test leakage, fail to judge and cause the problem that bad LED lamp flows out, ensure that the quality of product.
(2) the LED lamp proving installation that the utility model provides additionally uses the parts such as bakelite, limited block, masking foil, knob switch, isolating switch, pilot lamp, hummer; structure is simple, workable, can prevent test leakage, also has the defencive function such as automatic alarm and automatic short-circuit.
Accompanying drawing explanation
Accompanying drawing described herein is used to provide further understanding of the present application, and form a application's part, the schematic description and description of the application, for explaining the application, does not form the improper restriction to the application.In the accompanying drawings:
Fig. 1 is the structural representation of LED lamp proving installation described in the utility model;
The circuit connection diagram of the LED lamp proving installation that Fig. 2 A provides for the utility model;
Fig. 2 B is the side view of LED lamp proving installation fixator of the present utility model.
Embodiment
As employed some vocabulary to censure specific components in the middle of instructions and claim.Those skilled in the art should understand, and hardware manufacturer may call same assembly with different noun.This specification and claims are not used as with the difference of title the mode distinguishing assembly, but are used as the criterion of differentiation with assembly difference functionally." comprising " as mentioned in the middle of instructions and claim is in the whole text an open language, therefore should be construed to " comprise but be not limited to "." roughly " refer to that in receivable error range, those skilled in the art can solve the technical problem within the scope of certain error, reach described technique effect substantially.In addition, " couple " word and comprise directly any and indirectly electric property coupling means at this.Therefore, if describe a first device in literary composition to be coupled to one second device, then represent described first device and directly can be electrically coupled to described second device, or be indirectly electrically coupled to described second device by other devices or the means that couple.Instructions subsequent descriptions is implement the better embodiment of the application, and right described description is for the purpose of the rule that the application is described, and is not used to the scope limiting the application.The protection domain of the application is when being as the criterion depending on the claims person of defining.
Below in conjunction with accompanying drawing, the application is described in further detail, but not as the restriction to the application.
Embodiment 1:
Composition graphs 1, the present embodiment provides a kind of LED lamp proving installation, comprising: monitor station 1, fixator 2, terminals 3, LED lamp detector 4 and controller 5.
Described fixator 2, terminals 3, LED lamp detector 4 and controller 5 are all arranged on described monitor station 1.Described fixator 2 comprises: tool 21, the order electrical connection successively of described tool 21, terminals 3, LED lamp detector 4 and controller 5.Described LED lamp detector 4 at least comprises: earth resistance tester 41, insulating resistance detecting instrument 42 and Leakage Current detector 43, and described earth resistance tester 41, insulating resistance detecting instrument 42 and Leakage Current detector 43 three adopt mode in parallel to be connected between described terminals 3 and controller 5.
Described fixator 2 also comprises: fixed head 22 and masking foil 23, and described masking foil 23, fixed head 22 from top to bottom order are arranged on below tool.Described fixed head 22 is for being arranged on monitor station 1 by stationary installation, and described masking foil 23 can be good at the not tested person folder damage of protection lamp surface, and has electric conductivity for masking foil, can not affect the measuring ability of pick-up unit.Preferably, described fixed head is copper coin.This programme uses bakelite to make monitor station material, for supporting test light fixture, has insulating effect.Use limited block in this programme, i.e. fixed block, the light fixture of fixing different size, facilitates the detection of different size light fixture.
Preferably, this LED lamp proving installation also comprises: air switch 6, and described air switch 6 detects shelves 53 with the Leakage Current of tool 21, Leakage Current detector 43 and controller 5 respectively and is electrically connected.Described air switch 6 is also provided with external plug 61, and described plug 61 provides electric energy for connecting external power source for whole device.
Described controller 5 is provided with earth resistance shelves 51, megger test shelves 52 and Leakage Current test shelves 53, described earth resistance shelves 51, megger test shelves 52 are connected with Leakage Current detector 43 with earth resistance tester 41, insulating resistance detecting instrument 42 respectively with Leakage Current test shelves 53.
The LED lamp proving installation operation steps of this programme is as follows:
(1), this LED pick-up unit is placed on operator's console;
(2), LED lamp to be measured is arranged on tool, is positioned on the masking foil of fixator, guarantee that contact is good;
(3), by plug be inserted in commercial power socket, switch on power;
(4), controller switches is rotated to the gear needing to detect;
(5), close air switch, lights test LED lamp;
(6), the reading recorded on corresponding detecting instrument, contrast with standard value;
(7), again Rotation Controllers switch to next gear, the test of the next item down can be carried out, after completing this test, continue Rotation Controllers switch and continue follow-up test step;
(8), after all test items all detect and be over, disconnect air switch, take out LED lamp.
Embodiment 2:
Composition graphs 1, Fig. 2 A and Fig. 2 B, the LED lamp proving installation of this programme comprises: monitor station 1, fixator 2, terminals 3, LED lamp detector 4, controller 5 and air switch 6.
Described fixator 2, terminals 3, LED lamp detector 4 and controller 5 are all arranged on described monitor station, described fixator 2 comprises: tool 21, fixed head 22 and masking foil 23, the electrical connection of described tool 21, terminals 3, LED lamp detector 4 and controller 5 order.Described monitor station 1, fixed head 22, masking foil 23 and tool 21 sequence from low to uper part are installed.
Described LED lamp detector 4 comprises: earth resistance tester 41, insulating resistance detecting instrument 42 and Leakage Current detector 43, and described earth resistance tester 41, insulating resistance detecting instrument 42 and Leakage Current detector 43 three adopt mode in parallel to be connected between described terminals 3 and controller 5.
Described controller 5 is provided with earth resistance shelves 51, megger test shelves 52 and Leakage Current test shelves 53, described earth resistance shelves 51, megger test shelves 52 are connected with Leakage Current detector 53 with earth resistance tester 51, insulating resistance detecting instrument 52 respectively with Leakage Current test shelves 53.
Described air switch 6 is electrically connected with described tool 21, LED lamp detector 4 and controller 5 respectively, and described air switch 6 is provided with external plug 61.
Described tool terminals 3 comprise: grounding connection end 31, zero line link 32 and live wire link 33.Described live wire link 33 is connected with Leakage Current detector 43 with insulating resistance detecting instrument 42 respectively; Described zero line link 32 is connected with Leakage Current detector 43 with insulating resistance detecting instrument 42 respectively; Described grounding connection end 31 is connected with Leakage Current detector 43 with earth resistance tester 41, insulating resistance detecting instrument 42 respectively.In parallel and be electrically connected from the different links of tool the independent detection realizing various different detecting instrument respectively and operate, do not interfere with each other by various detecting instrument, ensure the accurate of every test.
Described air switch 6 detects shelves 53 with Leakage Current detector 43, live wire link 33, zero line link 32 and Leakage Current respectively and is electrically connected.
Preferably, described earth resistance tester 41, insulating resistance detecting instrument 42 and Leakage Current detector 43 are respectively arranged with insulating resistance measuring switch 411, insulating resistance detecting switch 421 and Leakage Current detector switch 431.Described air switch 6 is electrically connected with described live wire link 33, zero line link 32 and Leakage Current detector switch 431.
Also isolating switch, pilot lamp and hummer is provided with in the testing circuit of the utility model LED pick-up unit, wherein, described isolating switch, pilot lamp and hummer adopt the mode of series connection to be connected to each other, and are connected between described tool and LED lamp detector after series connection.Described isolating switch is used for auto-cutout protection pick-up unit; Whether described pilot lamp may be used for indicating light fixture to be detected intact; Described hummer has auto-alarm function.
Relative to LED lamp proving installation of the prior art, advantage of the present utility model is:
(1) the utility model have employed and is connected in parallel in LED lamp proving installation circuit by testing tools such as earth resistance tester, insulating resistance detecting instrument and Leakage Current detectors, by each test function of gear control realization on controller, provide a kind of proving installation collecting earth resistance, reveal the All-in-One such as circuit test, megger test function.The program can meet the safety routine inspection project of each model LED street lamp, solve and need to increase test station because of the difference of test event, increase the problem of producing carrying street lamp operation intensity, also solve simultaneously may occur in production test leakage, fail to judge and cause the problem that bad LED lamp flows out, ensure that the quality of product.
(2) the LED lamp proving installation that the utility model provides additionally uses the parts such as bakelite, masking foil, limited block, knob switch, isolating switch, pilot lamp, hummer; structure is simple, workable, can prevent test leakage, also has the defencive function such as automatic alarm and automatic short-circuit.
Above-mentioned explanation illustrate and describes some preferred embodiments of the application, but as previously mentioned, be to be understood that the application is not limited to the form disclosed by this paper, should not regard the eliminating to other embodiments as, and can be used for other combinations various, amendment and environment, and can in application contemplated scope described herein, changed by the technology of above-mentioned instruction or association area or knowledge.And the change that those skilled in the art carry out and change do not depart from the spirit and scope of the application, then all should in the protection domain of the application's claims.

Claims (7)

1. a LED lamp proving installation, is characterized in that, comprising: monitor station, fixator, terminals, LED lamp detector, air switch and controller, wherein,
Described fixator, terminals, LED lamp detector and controller are all arranged on described monitor station; Wherein,
Described fixator, comprising: tool, described tool, terminals, LED lamp detector and controller, the order electrical connection successively of described tool, terminals, LED lamp detector and controller;
Wherein, described LED lamp detector, at least comprise: earth resistance tester, insulating resistance detecting instrument and Leakage Current detector, and described earth resistance tester, insulating resistance detecting instrument and Leakage Current detector three take parallel way to be connected between described terminals and controller;
Described controller is provided with earth resistance shelves, megger test shelves and Leakage Current test shelves, described earth resistance shelves, megger test shelves are connected with Leakage Current detector with earth resistance tester, insulating resistance detecting instrument respectively with Leakage Current test shelves;
Described air switch is electrically connected with the terminals of described tool and LED lamp detector respectively, and described air switch is provided with external plug.
2. LED lamp proving installation according to claim 1, is characterized in that, described fixator comprises further: fixed head and masking foil, and described masking foil, fixed head from top to bottom order are arranged on below tool.
3. LED lamp proving installation according to claim 2, is characterized in that, described fixed head is copper coin.
4. LED lamp proving installation according to claim 1, is characterized in that, described tool terminals, comprising: live wire link, zero line link and grounding connection end, wherein,
Described live wire link, is connected with Leakage Current detector with insulating resistance detecting instrument respectively;
Described zero line link, is connected with Leakage Current detector with insulating resistance detecting instrument respectively;
Described grounding connection end, is connected with Leakage Current detector with earth resistance tester, insulating resistance detecting instrument respectively.
5. LED lamp proving installation according to claim 4, is characterized in that, described air switch, detects shelves be respectively electrically connected with Leakage Current detector, live wire link, zero line link and Leakage Current.
6. LED lamp proving installation according to claim 1, it is characterized in that, described earth resistance tester, insulating resistance detecting instrument and Leakage Current detector are respectively arranged with insulating resistance measuring switch, insulating resistance detecting switch and Leakage Current detector switch.
7. LED lamp proving installation according to claim 1, is characterized in that, is provided with isolating switch, pilot lamp and hummer further, wherein,
Described isolating switch, pilot lamp and hummer adopt the mode of series connection to be connected to each other, and are connected between described tool and LED lamp detector after series connection.
CN201520342002.9U 2015-05-25 2015-05-25 A kind of LED lamp proving installation Expired - Fee Related CN204649942U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520342002.9U CN204649942U (en) 2015-05-25 2015-05-25 A kind of LED lamp proving installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520342002.9U CN204649942U (en) 2015-05-25 2015-05-25 A kind of LED lamp proving installation

Publications (1)

Publication Number Publication Date
CN204649942U true CN204649942U (en) 2015-09-16

Family

ID=54102678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520342002.9U Expired - Fee Related CN204649942U (en) 2015-05-25 2015-05-25 A kind of LED lamp proving installation

Country Status (1)

Country Link
CN (1) CN204649942U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105388332A (en) * 2015-12-14 2016-03-09 江阴乐圩光电股份有限公司 LED aging tester
CN107179454A (en) * 2017-04-25 2017-09-19 通标标准技术服务(上海)有限公司 Efficient safety regulation testing system
CN107422280A (en) * 2017-08-19 2017-12-01 广东天圣高科股份有限公司 A kind of Portable LED lamp detector
CN109597002A (en) * 2018-12-28 2019-04-09 陈清尧 A kind of LED test detection device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105388332A (en) * 2015-12-14 2016-03-09 江阴乐圩光电股份有限公司 LED aging tester
CN105388332B (en) * 2015-12-14 2018-12-04 广州达测仪器有限公司 LED aging tester
CN107179454A (en) * 2017-04-25 2017-09-19 通标标准技术服务(上海)有限公司 Efficient safety regulation testing system
CN107422280A (en) * 2017-08-19 2017-12-01 广东天圣高科股份有限公司 A kind of Portable LED lamp detector
CN109597002A (en) * 2018-12-28 2019-04-09 陈清尧 A kind of LED test detection device
CN109597002B (en) * 2018-12-28 2021-02-26 陈清尧 LED test detection device

Similar Documents

Publication Publication Date Title
CN204649942U (en) A kind of LED lamp proving installation
US9541597B2 (en) Diagnostic testing of an electric meter socket
MX2009012280A (en) Bulb type detector for dimmer circuit and resistance and short circuit detection.
CN108717148A (en) A kind of power distribution automation station aviation plug and cable tester
CN102540063A (en) Testing device for alternating-current relays and testing method thereof
CN204575830U (en) A kind of LED lamp multifunctional detecting device
CN202189273U (en) General tool detection apparatus used for air-conditioning controller test
CN101750588A (en) Detecting device
CN111157885A (en) AC/DC universal relay checking instrument
CN203630312U (en) Direct current motor armature fault detection device
CN106768072B (en) Comprehensive detection circuit, comprehensive detection system and working method of blower
CN102478630A (en) Relay function testing device and testing method thereof
CN206609956U (en) A kind of LED lamp aging equipment
CN205176238U (en) Banks spare testboard
CN206096233U (en) Platform district residual current monitoring alarm device
CN203275566U (en) Single-phase short-circuit fault detector
CN208847828U (en) A kind of power supply product tester
CN107817455A (en) A kind of emergency light detection device
CN111077476B (en) Method for detecting short circuit or electric leakage fault point of equipment
CN105606994A (en) Testing device and testing method for SIU (Integrated Circuit Unit) module of financial self-service equipment
CN104977498A (en) Portable protection apparatus indication lamp detection tool
CN220419499U (en) Inspection equipment for air conditioner main board output circuit
CN102621441B (en) Efficient detector for extinguishment cable
CN215768904U (en) Intermediate relay inspection device
CN102201201B (en) A kind of LED display of intelligence

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

CF01 Termination of patent right due to non-payment of annual fee