CN204645808U - 水泥杆电缆登杆 - Google Patents

水泥杆电缆登杆 Download PDF

Info

Publication number
CN204645808U
CN204645808U CN201520351621.4U CN201520351621U CN204645808U CN 204645808 U CN204645808 U CN 204645808U CN 201520351621 U CN201520351621 U CN 201520351621U CN 204645808 U CN204645808 U CN 204645808U
Authority
CN
China
Prior art keywords
pole
cable
arm
installation platform
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520351621.4U
Other languages
English (en)
Inventor
杨诚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suwen Electric Energy Technology Co ltd
Original Assignee
Suwen Electric Energy Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suwen Electric Energy Science And Technology Co Ltd filed Critical Suwen Electric Energy Science And Technology Co Ltd
Priority to CN201520351621.4U priority Critical patent/CN204645808U/zh
Application granted granted Critical
Publication of CN204645808U publication Critical patent/CN204645808U/zh
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

本实用新型涉及一种水泥杆电缆登杆,包括杆体、支撑横担、安装平台和引流线,所述支撑横担和安装平台均与杆体垂直,支撑横担位于安装平台的上方,所述支撑横担的一端与杆体固定,支撑横担的另一端悬空,且支撑横担悬空的一端上设有支撑绝缘子,所述安装平台上设置有电缆终端头和避雷器,所述引流线的一端接至架空线路,引流线的另一端向下接至安装平台上的电缆终端头。本实用新型的水泥杆电缆登杆,占地空间小,且耗材较少;在原线路横线路方向新建电缆登杆,避免影响原架空线路电杆受力,缩短原线路停电时间,降低工程造价,便于线路安全运行、检修。

Description

水泥杆电缆登杆
技术领域
本实用新型涉及一种电缆登杆装置,特别涉及一种水泥杆电缆登杆。
背景技术
已建35kV架空线路需增加一回电缆T接线路,如直接将支撑横担、终端头和避雷器平台以及其他附件安装于原线路杆身上,将会严重影响原线路电杆受力,且无法保证导线对杆身的安全距离,不利于线路运行安全。
实用新型内容
本实用新型要解决的技术问题是:为了克服现有增加一回T接线路改造方式的不足,本实用新型提供一种水泥杆电缆登杆。
本实用新型解决其技术问题所采用的技术方案是:一种水泥杆电缆登杆,包括杆体、支撑横担、安装平台和引流线,所述支撑横担和安装平台均与杆体垂直,支撑横担位于安装平台的上方,所述支撑横担的一端与杆体固定,支撑横担的另一端悬空,且支撑横担悬空的一端上设有支撑绝缘子,所述安装平台上设置有电缆终端头和避雷器,所述引流线的一端接至架空线路,引流线的另一端向下接至安装平台上的电缆终端头。
引流线的一端通过T型线夹接至架空线路,引流线的另一端通过支撑绝缘子引下后,通过铜铝过渡设备线夹与电缆终端头连接。
所述电缆终端头附近设有铜排,引流线的一端通过T型线夹接至架空线路,引流线的另一端通过支撑绝缘子引下后,通过铜铝过渡设备线夹与铜排连接,所述铜排与两组电缆终端头连接。当已有线路需增容时,现有电缆登杆的平台无法满足再增加一根电缆时,需专门再立一根电缆登杆,这无疑增加了工程投资,亦不利于安全运行、检修。电缆终端头附近设置铜排后,能够连接两组电缆终端头,满足电缆线路与架空线路输送容量相匹配。
本实用新型的有益效果是,本实用新型的水泥杆电缆登杆,占地空间小,且耗材较少;在原线路横线路方向新建电缆登杆,避免影响原架空线路电杆受力,缩短原线路停电时间,降低工程造价,便于线路安全运行、检修。
附图说明
下面结合附图和实施例对本实用新型进一步说明。
图1是本实用新型的水泥杆电缆登杆实施例1的主视图。
图2是本实用新型的水泥杆电缆登杆实施例1的俯视图。
图3是本实用新型的水泥杆电缆登杆实施例1的侧视图。
图4是图3的A-A剖视图。
图5是本实用新型的水泥杆电缆登杆实施例2的主视图。
图6是本实用新型的水泥杆电缆登杆实施例2的侧视图。
图7是图6的B-B剖视图。
图中1、杆体,2、支撑横担,3、安装平台,4、引流线,5、支撑绝缘子,6、电缆终端头,7、避雷器,8、T型线夹,9、铜铝过渡设备线夹,10、铜排,11、已有杆塔,12、35kV电缆。
具体实施方式
现在结合附图对本实用新型作进一步详细的说明。这些附图均为简化的示意图,仅以示意方式说明本实用新型的基本结构,因此其仅显示与本实用新型有关的构成。
实施例1
如图1-4所示,本实施例的一种水泥杆电缆登杆,包括杆体1、支撑横担2、安装平台3和引流线4,所述支撑横担2和安装平台3均与杆体1垂直,支撑横担2位于安装平台3的上方,所述支撑横担2的一端与杆体1固定,支撑横担2的另一端悬空,且支撑横担2悬空的一端上设有支撑绝缘子5,所述安装平台3上设置有电缆终端头6和避雷器7。
引流线4的一端通过T型线夹8接至架空线路,引流线4的另一端通过支撑绝缘子5引下后,通过铜铝过渡设备线夹9与电缆终端头6连接。
已有杆塔11的35kV架空线路通过本实用新型的水泥杆电缆登杆增加一回电缆T接线路,占地空间小,且耗材较少。施工时将新建水泥杆电缆登杆设置于35kV架空线路横线路方向约3.0m处。
实施例2
如图5-7所示,本实施例的一种水泥杆电缆登杆,包括杆体1、支撑横担2、安装平台3和引流线4,所述支撑横担2和安装平台3均与杆体1垂直,支撑横担2位于安装平台3的上方,所述支撑横担2的一端与杆体1固定,支撑横担2的另一端悬空,且支撑横担2悬空的一端上设有支撑绝缘子5,所述安装平台3上设置有电缆终端头6和避雷器7。
所述电缆终端头6附近设有铜排10,引流线4的一端通过T型线夹8接至架空线路,引流线4的另一端通过支撑绝缘子5引下后,通过铜铝过渡设备线夹9与铜排10连接,所述铜排10与两组电缆终端头6连接。
当已有线路需增容时,现有电缆登杆的平台无法满足再增加一根电缆时,需专门再立一根电缆登杆,这无疑增加了工程投资,亦不利于安全运行、检修。本实施例在电缆终端头6附近设置铜排10后,能够连接两组电缆终端头6,满足电缆线路与架空线路输送容量相匹配。
以上述依据本实用新型的理想实施例为启示,通过上述的说明内容,相关工作人员完全可以在不偏离本项实用新型技术思想的范围内,进行多样的变更以及修改。本项实用新型的技术性范围并不局限于说明书上的内容,必须要根据权利要求范围来确定其技术性范围。

Claims (3)

1.一种水泥杆电缆登杆,其特征在于:包括杆体(1)、支撑横担(2)、安装平台(3)和引流线(4),所述支撑横担(2)和安装平台(3)均与杆体(1)垂直,支撑横担(2)位于安装平台(3)的上方,所述支撑横担(2)的一端与杆体(1)固定,支撑横担(2)的另一端悬空,且支撑横担(2)悬空的一端上设有支撑绝缘子(5),所述安装平台(3)上设置有电缆终端头(6)和避雷器(7),所述引流线(4)的一端接至架空线路,引流线(4)的另一端向下接至安装平台(3)上的电缆终端头(6)。
2.如权利要求1所述的水泥杆电缆登杆,其特征在于:引流线(4)的一端通过T型线夹(8)接至架空线路,引流线(4)的另一端通过支撑绝缘子(5)引下后,通过铜铝过渡设备线夹(9)与电缆终端头(6)连接。
3.如权利要求1所述的水泥杆电缆登杆,其特征在于:所述电缆终端头(6)附近设有铜排(10),引流线(4)的一端通过T型线夹(8)接至架空线路,引流线(4)的另一端通过支撑绝缘子(5)引下后,通过铜铝过渡设备线夹(9)与铜排(10)连接,所述铜排(10)与两组电缆终端头(6)连接。
CN201520351621.4U 2015-05-27 2015-05-27 水泥杆电缆登杆 Expired - Lifetime CN204645808U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520351621.4U CN204645808U (zh) 2015-05-27 2015-05-27 水泥杆电缆登杆

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520351621.4U CN204645808U (zh) 2015-05-27 2015-05-27 水泥杆电缆登杆

Publications (1)

Publication Number Publication Date
CN204645808U true CN204645808U (zh) 2015-09-16

Family

ID=54098568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520351621.4U Expired - Lifetime CN204645808U (zh) 2015-05-27 2015-05-27 水泥杆电缆登杆

Country Status (1)

Country Link
CN (1) CN204645808U (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105680390A (zh) * 2016-03-09 2016-06-15 国家电网公司 一种电缆终端杆及其电气支撑装置
CN105846381A (zh) * 2016-05-31 2016-08-10 国网上海市电力公司 新型全绝缘35kV电缆登杆装置
CN105846382A (zh) * 2016-05-31 2016-08-10 上海电瓷厂有限公司 全绝缘35kV电缆登杆装置
CN106786186A (zh) * 2016-12-26 2017-05-31 上海电力设计院有限公司 用于城市的电缆登杆装置
CN109494490A (zh) * 2018-12-27 2019-03-19 国网上海市电力公司 一种35kV电缆登杆平台全绝缘架空引下线组件
CN117239657A (zh) * 2023-11-14 2023-12-15 中国电建集团河北省电力勘测设计研究院有限公司 海上风电场220kV单回路双根电缆终端塔安装结构
CN117317815A (zh) * 2023-08-17 2023-12-29 国网安徽省电力有限公司来安县供电公司 电线杆间活动式配电台架

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105680390A (zh) * 2016-03-09 2016-06-15 国家电网公司 一种电缆终端杆及其电气支撑装置
CN105846381A (zh) * 2016-05-31 2016-08-10 国网上海市电力公司 新型全绝缘35kV电缆登杆装置
CN105846382A (zh) * 2016-05-31 2016-08-10 上海电瓷厂有限公司 全绝缘35kV电缆登杆装置
CN105846382B (zh) * 2016-05-31 2017-12-26 上海电瓷厂有限公司 全绝缘35kV电缆登杆装置
CN105846381B (zh) * 2016-05-31 2018-01-02 国网上海市电力公司 一种全绝缘35kV电缆登杆装置
CN106786186A (zh) * 2016-12-26 2017-05-31 上海电力设计院有限公司 用于城市的电缆登杆装置
CN109494490A (zh) * 2018-12-27 2019-03-19 国网上海市电力公司 一种35kV电缆登杆平台全绝缘架空引下线组件
CN117317815A (zh) * 2023-08-17 2023-12-29 国网安徽省电力有限公司来安县供电公司 电线杆间活动式配电台架
CN117317815B (zh) * 2023-08-17 2024-05-31 国网安徽省电力有限公司来安县供电公司 电线杆间活动式配电台架
CN117239657A (zh) * 2023-11-14 2023-12-15 中国电建集团河北省电力勘测设计研究院有限公司 海上风电场220kV单回路双根电缆终端塔安装结构

Similar Documents

Publication Publication Date Title
CN204645808U (zh) 水泥杆电缆登杆
CN105406434B (zh) 一种大风区输电线路防风偏的导线悬挂方法
CN203951136U (zh) 架空输电导线与电缆的转接连线装置
CN104242208A (zh) 一种架空输电线路双回电缆终端钢管杆
CN104295147B (zh) 一种适用于变电站出线的构架
CN203260976U (zh) 电缆终端塔
CN206128808U (zh) 一种新型单回路电缆终端塔
CN203787855U (zh) 一种输电线路直线带电提线装置
CN201797251U (zh) 10kV城市电力配网高低杆式架空设备
CN203690799U (zh) 一种带电更换直线转角塔绝缘子串的装置
CN103280758A (zh) 电缆终端塔
CN205046907U (zh) 双回路开断四回电缆引下塔
CN201502207U (zh) 架空线路高压塔杆
CN206346561U (zh) 一种单回路垂直排列耐张塔
CN204651846U (zh) 风力发电厂电缆登塔平台
CN205489247U (zh) 一种用于500kV及以下电压等级的品字型GIS出线布置结构
CN202850574U (zh) 电线杆
CN203589662U (zh) 分段式接地线连接结构
CN203367935U (zh) 一种紧凑型输电线路耐张塔的相间距离优化结构
CN204703578U (zh) 门型构架式电缆登杆
CN205178049U (zh) 变向型接地线装置
CN201623435U (zh) 倒装式二联板
CN204103413U (zh) 输电线路耐张杆吊线串引线防风偏装置
CN203179328U (zh) 直线杆支接带电作业培训装置
CN206128798U (zh) 一种适用于单回架空线路电缆t接的猫头塔

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 213000 No. 3 sail Road, Wujin Economic Development Zone, Jiangsu, Changzhou

Patentee after: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD.

Address before: 213000 Jiangsu city of Changzhou province Wujin Dragon Road Economic Development Zone No. 2

Patentee before: SUWEN ELECTRIC ENERGY TECHNOLOGY CO.,LTD.

CP03 Change of name, title or address
CX01 Expiry of patent term

Granted publication date: 20150916

CX01 Expiry of patent term