CN204645671U - Precast beam install structure - Google Patents

Precast beam install structure Download PDF

Info

Publication number
CN204645671U
CN204645671U CN201520115130.XU CN201520115130U CN204645671U CN 204645671 U CN204645671 U CN 204645671U CN 201520115130 U CN201520115130 U CN 201520115130U CN 204645671 U CN204645671 U CN 204645671U
Authority
CN
China
Prior art keywords
precast beam
hoist engine
steel column
connecting pin
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520115130.XU
Other languages
Chinese (zh)
Inventor
曾玥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongjia County Zhongsen Construction Co. Ltd.
Original Assignee
Chengdu Grace Culture Communication Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Grace Culture Communication Co Ltd filed Critical Chengdu Grace Culture Communication Co Ltd
Priority to CN201520115130.XU priority Critical patent/CN204645671U/en
Application granted granted Critical
Publication of CN204645671U publication Critical patent/CN204645671U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of precast beam install structure, comprise steel column, steel column is positioned on a precast beam, connecting pin is provided with between steel column and precast beam, more than one of connecting pin, and connecting pin is provided with skid resistant course, steel column top extends on precast beam upper surface lateral surface, be connected with a hoist engine through precast beam bottom it, backplate is connected with between hoist engine and precast beam two sides, backplate adopts triangular structure, in hoist engine, adjusting rod is installed, adjusting rod two ends extend on hoist engine two lateral surface, base is connected with bottom hoist engine, be fixedly connected with between base with hoist engine, the built-in pulley structure of base.This precast beam install structure construction speed is fast, bonding strength is high, holistic resistant behavior good, anti-seismic performance is strong, the problem limited by place when efficiently solving precast beam install, installs and dismantles all very convenient.

Description

Precast beam install structure
Technical field
The utility model relates to a kind of mounting structure, particularly a kind of precast beam install structure.
Background technology
Along with the deep development of urbanization process, abundant Appropriate application urban underground space is more and more subject to the attention of relevant all circles, and in urban construction and civilian construction, the underground excavation degree of depth is more and more darker, and Top-Down Construction Method for Deep Foundation Pit is more and more extensive in urban construction application.And prefabricated keeper is as a building operations instrument indispensable in building, receive the concern of constructor equally, utilize prefabricated keeper to be located, certain operating efficiency can be improved, shorten construction period, save construction cost, can position fast when locating precast beam, and adjusting function requires good, assembling and dismounting all require very convenient, but general precast beam install structure is short of its best orientation performance, causes self structure unstable properties.
Utility model content
The technical problems to be solved in the utility model is: overcome the problems referred to above, provides the precast beam install structure that a kind of speed of application is fast, bonding strength is high, holistic resistant behavior is good, anti-seismic performance is strong.
To achieve these goals, the technical solution adopted in the utility model is such: precast beam install structure of the present utility model, comprise steel column, steel column is positioned on a precast beam, connecting pin is provided with between steel column and precast beam, more than one of connecting pin, and connecting pin is provided with skid resistant course, steel column top extends on precast beam upper surface lateral surface, be connected with a hoist engine through precast beam bottom it, backplate is connected with between hoist engine and precast beam two sides, backplate adopts triangular structure, in hoist engine, adjusting rod is installed, adjusting rod two ends extend on hoist engine two lateral surface, base is connected with bottom hoist engine, be fixedly connected with between base with hoist engine, the built-in pulley structure of base.
Further, as a kind of concrete form of structure, between steel column described in the utility model and precast beam, steel floor is also connected with.
Further, as a kind of concrete form of structure, the built-in several steel bar of precast beam described in the utility model.
Further, as a kind of concrete form of structure, connecting pin described in the utility model adopts movable latch structure.
Further, as a kind of concrete form of structure, hoist engine built-in motor described in the utility model.
Further, as a kind of concrete form of structure, adjusting rod described in the utility model adopts telescopic advance lever structure.
Compared with prior art, the utility model has the advantage of: this precast beam install structure construction speed is fast, bonding strength is high, holistic resistant behavior good, anti-seismic performance is strong, the problem limited by place when efficiently solving precast beam install, installs and dismantles all very convenient.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Fig. 1 is structural representation of the present utility model;
In figure: 1. steel column; 2. precast beam; 3. connecting pin; 4. backplate; 5. hoist engine; 6. adjusting rod; 7. base.
Detailed description of the invention
By reference to the accompanying drawings the utility model is described in further detail now.These accompanying drawings are the schematic diagram of simplification, only basic structure of the present utility model are described in a schematic way, and therefore it only shows the formation relevant with the utility model.
The preferred embodiment of the utility model precast beam install structure as shown in Figure 1, comprise steel column 1, steel column 1 is positioned on a precast beam 2, connecting pin 3 is provided with between steel column 1 and precast beam 2, more than one of connecting pin 3, and connecting pin 3 is provided with skid resistant course, steel column 1 top extends on precast beam 2 upper surface lateral surface, be connected with a hoist engine 5 through precast beam 2 bottom it, backplate 4 is connected with between hoist engine 5 and precast beam 2 two sides, backplate 4 adopts triangular structure, adjusting rod 6 is installed in hoist engine 5, adjusting rod 6 two ends extend on hoist engine 5 liang of lateral surfaces, base 7 is connected with bottom hoist engine 5, be fixedly connected with between base 7 with hoist engine 5, the built-in pulley structure of base 7, steel floor is also connected with between described steel column 1 and precast beam 2, the built-in several steel bar of described precast beam 2, described connecting pin 3 adopts movable latch structure, described hoist engine 5 built-in motor, described adjusting rod 6 adopts telescopic advance lever structure.
Precast beam install structure construction speed of the present utility model is fast, bonding strength is high, holistic resistant behavior good, anti-seismic performance is strong, the problem limited by place when efficiently solving precast beam install, installs and dismantles all very convenient.Also be connected with steel floor between described steel column 1 and precast beam 2, enhance its resistance; Improve its anatomical connectivity performance further; Conveniently regulate; Described hoist engine 5 built-in motor, is convenient to provide power supply; Described adjusting rod 6 adopts telescopic advance lever structure, and telescopicing performance is very good.
With above-mentioned according to desirable embodiment of the present utility model for enlightenment, by above-mentioned description, relevant staff in the scope not departing from this utility model technological thought, can carry out various change and amendment completely.The technical scope of this utility model is not limited to the content on manual, must determine its technical scope according to right.

Claims (6)

1. a precast beam install structure, comprise steel column, it is characterized in that: steel column is positioned on a precast beam, connecting pin is provided with between steel column and precast beam, more than one of connecting pin, and connecting pin is provided with skid resistant course, steel column top extends on precast beam upper surface lateral surface, be connected with a hoist engine through precast beam bottom it, backplate is connected with between hoist engine and precast beam two sides, backplate adopts triangular structure, in hoist engine, adjusting rod is installed, adjusting rod two ends extend on hoist engine two lateral surface, base is connected with bottom hoist engine, be fixedly connected with between base with hoist engine, the built-in pulley structure of base.
2. precast beam install structure according to claim 1, is characterized in that: be also connected with steel floor between described steel column and precast beam.
3. precast beam install structure according to claim 1, is characterized in that: the built-in several steel bar of described precast beam.
4. precast beam install structure according to claim 1, is characterized in that: described connecting pin adopts movable latch structure.
5. precast beam install structure according to claim 1, is characterized in that: described hoist engine built-in motor.
6. precast beam install structure according to claim 1, is characterized in that: described adjusting rod adopts telescopic advance lever structure.
CN201520115130.XU 2015-02-25 2015-02-25 Precast beam install structure Active CN204645671U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520115130.XU CN204645671U (en) 2015-02-25 2015-02-25 Precast beam install structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520115130.XU CN204645671U (en) 2015-02-25 2015-02-25 Precast beam install structure

Publications (1)

Publication Number Publication Date
CN204645671U true CN204645671U (en) 2015-09-16

Family

ID=54098429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520115130.XU Active CN204645671U (en) 2015-02-25 2015-02-25 Precast beam install structure

Country Status (1)

Country Link
CN (1) CN204645671U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806026A (en) * 2015-02-25 2015-07-29 成都格瑞思文化传播有限公司 Precast beam mounting structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104806026A (en) * 2015-02-25 2015-07-29 成都格瑞思文化传播有限公司 Precast beam mounting structure

Similar Documents

Publication Publication Date Title
CN203834739U (en) End steel board connection, positioning and assembly type shear wall structure
CN105297978A (en) Prefabricated assembled type steel-concrete combined beam connected through bolt nails
CN204645671U (en) Precast beam install structure
CN207776838U (en) Full-sleeve full-rotation drill counter-force fork device
CN203546944U (en) Assembly type shear wall
CN104806026A (en) Precast beam mounting structure
CN204125931U (en) Foundation pile structure
CN204435421U (en) A kind of assembling manhole
CN103669596B (en) Prefabricated reinforced concrete column beam-to-column joint structure
CN203582323U (en) Radiator fixing device of truck crane
CN206309111U (en) A kind of line bar location and installation component
CN202756000U (en) Airborne temporary support frame
CN203452056U (en) Diversion tunnel gate lifting device
CN204899034U (en) Prefabricated wall post
CN105220707A (en) A kind of continuous casting rise and fall roller hydraulic cylinder be connected and fixed method
CN204940688U (en) Body of wall
CN204662477U (en) Beam foundation structure
CN203855952U (en) Prefabricated locating component
CN104295104B (en) Box-section crane girder high-strength bolt field installation process
CN204530684U (en) Cement-soil stirring pile construction is with lengthening shaft
CN103452128A (en) Method for lifting base plane of power transmission line tower by adopting steel pipe connecting leg
CN203834504U (en) Structure of basement reverse construction method tower crane foundation
CN204023797U (en) A kind of back timber of steel house and the connection fittings of center stand column
CN202610973U (en) Support chord mechanism for steel structure building
CN206052971U (en) A kind of steel column anchor head

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Ye Enbing

Inventor before: Zeng Yue

COR Change of bibliographic data
TR01 Transfer of patent right

Effective date of registration: 20160122

Address after: 325100 Wenzhou, Yongjia City, South Street, industrial zone, the lower tong

Patentee after: Yongjia County Zhongsen Construction Co. Ltd.

Address before: Jinjiang District Jinhua Road Chengdu City, Sichuan province 610000 section of No. 8 Building 1 11 unit 23 floor No. 2336

Patentee before: CHENGDU GRACE CULTURE COMMUNICATION CO., LTD.