CN204645104U - Steel pipe pile test pile casing isolation roller - Google Patents
Steel pipe pile test pile casing isolation roller Download PDFInfo
- Publication number
- CN204645104U CN204645104U CN201520203579.1U CN201520203579U CN204645104U CN 204645104 U CN204645104 U CN 204645104U CN 201520203579 U CN201520203579 U CN 201520203579U CN 204645104 U CN204645104 U CN 204645104U
- Authority
- CN
- China
- Prior art keywords
- roller
- casing
- riser
- groove
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to a kind of steel pipe pile test pile casing isolation roller, and comprise riser, stiffener and roller, riser end face has groove, and groove floor matches with the roller bearing of roller; Two stiffeners are welded on the outer both sides of groove; The radius sum of the high and roller of riser is than the spacing be less than between interior casing and outer casing.The utility model riser radius sum ratio that is high and roller is less than spacing between inside and outside casing, and roller contacts both sides with pile lining and leaves excess room; Roller in a groove can transverse shifting, for roller and inside and outside casing contact surface provide larger activity space.Effectively can avoid filling holding card phenomenon, ensure the validity of test pile.Roller can be placed when transferring interior casing 1 temporarily, convenient transport.The utility model can provide blanketing effect, can ensure test pile reliability again.
Description
Technical field
The utility model relates to a kind of steel pipe pile test pile casing isolation roller.Be mainly used in highway bridge, railroad bridge and building harbour etc. to need to do in the field of steel pipe pile, drilled pile test pile.
Background technology
Test pile usually needs according to different soil layers, determines different test pile depth and places.In the soil layer not needing to do bearing capacity of foundation soil, adopt isolation roller to carry out inside and outside casing separation.In steel pipe pile or bored pile test pile process, normal needs arranges spacer assembly between casing in steel pile casting and test pile, but usually causes roller stuck because scarfing cinder is clean or casing circularity is defective and lost efficacy.
The roller of plain bolt and steel plate cutting that utilizes of usual employing can not adapt to the change of casing circularity, and can not provide the excess room required for roller displacement, test pile reliability is little.
Summary of the invention
The purpose of this utility model is for above-mentioned present situation, aims to provide one and can provide blanketing effect, can ensure again the steel pipe pile test pile casing isolation roller of test pile reliability.
The implementation of the utility model object is, steel pipe pile test pile casing isolation roller, and comprise riser, stiffener and roller, riser end face has groove, and groove floor matches with the roller bearing of roller; Two stiffeners are welded on the outer both sides of groove; The radius sum of the high and roller of riser is than the spacing be less than between interior casing and outer casing.
The utility model riser radius sum ratio that is high and roller is less than spacing between inside and outside casing, and roller contacts both sides with pile lining and leaves excess room; Roller in a groove can transverse shifting, for roller and inside and outside casing contact surface provide larger activity space.Effectively can avoid filling holding card phenomenon, ensure the validity of test pile.Roller can be placed when transferring interior casing 1 temporarily, convenient transport.
The utility model can provide blanketing effect, can ensure test pile reliability again.
Accompanying drawing explanation
Fig. 1 installs mode elevational schematic view of the present utility model;
Fig. 2 installs lateral side view of the present utility model;
Fig. 3 is riser and the stiffener structural representation of roller;
Fig. 4 is special roller structure schematic diagram of the present utility model.
Detailed description of the invention
With reference to the accompanying drawings in detail the utility model is described in detail.
With reference to Fig. 1, Fig. 2, Fig. 3 and Fig. 4, the utility model comprises riser 3, stiffener 4 and roller 5, and riser end face has groove, and groove floor matches with the roller bearing 6 of roller 5; Two stiffeners are welded on the outer both sides of groove; The radius sum of the high and roller of riser is than the spacing be less than between interior casing 1 and outer casing 2.
Riser 3 cross section is trapezoidal, and bottom surface is welded on interior casing 1.Roller 5 is cast steel roller.The degree of depth of riser 3 end face institute recessing is greater than the twice of roller bearing diameter, and roller in a groove can transverse shifting, for the contact surface of roller and outer casing 2 and interior casing 1 all provides larger excess room.Effectively can avoid filling holding card phenomenon, ensure the validity of test pile.
Adopt the utility model, first shaping interior casing 1, riser machined grooves.First riser is welded to interior casing surface, and rear welding stiffener 4 is in the outer both sides of riser groove and pass through fillet weld seam with interior casing.
Produce in factory roller 5.After test pile drilling via formations, transfer outer casing 2, interior casing 1 adopts loop wheel machine to weld section by section and transfers, and is highly about to prevent in roller 5 to groove when entering outer casing 2, continues to transfer interior casing 1 when scroll wheel positions arrives outer casing 2.Carry out adjusting and settling without the need to pair roller 5 in test pile process.
The utility model riser radius sum ratio that is high and roller is less than spacing between inside and outside casing, and roller contacts both sides with pile lining and leaves excess room; Roller in a groove can transverse shifting, for roller and inside and outside casing contact surface provide larger activity space.Effectively can avoid filling holding card phenomenon, ensure the validity of test pile.Roller can be placed when transferring interior casing 1 temporarily, convenient transport.
The utility model can provide blanketing effect, can ensure test pile reliability again.
Claims (4)
1. steel pipe pile test pile casing isolation roller, it is characterized in that: comprise riser, stiffener and roller, riser end face has groove, and groove floor matches with the roller bearing of roller; Two stiffeners are welded on the outer both sides of groove; The radius sum of the high and roller of riser is than the spacing be less than between interior casing and outer casing.
2. the isolation roller of the steel pipe pile test pile casing required by right 1, is characterized in that: riser (3) cross section is trapezoidal, comprises the arcing outer edges that it adapts to different casing diameters.
3. the isolation roller of the steel pipe pile test pile casing required by patent 1, is characterized in that: the degree of depth of riser (3) end face institute recessing is greater than the twice of roller bearing diameter.
4. the isolation roller of the steel pipe pile test pile casing required by patent 1, is characterized in that: roller (5) is cast steel roller.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520203579.1U CN204645104U (en) | 2015-04-07 | 2015-04-07 | Steel pipe pile test pile casing isolation roller |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520203579.1U CN204645104U (en) | 2015-04-07 | 2015-04-07 | Steel pipe pile test pile casing isolation roller |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204645104U true CN204645104U (en) | 2015-09-16 |
Family
ID=54097862
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520203579.1U Active CN204645104U (en) | 2015-04-07 | 2015-04-07 | Steel pipe pile test pile casing isolation roller |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204645104U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107050971A (en) * | 2017-03-30 | 2017-08-18 | 通山新知力环保设备机械厂(普通合伙) | Roller is filtered in a kind of press filtration for belt type sludge filter press |
-
2015
- 2015-04-07 CN CN201520203579.1U patent/CN204645104U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107050971A (en) * | 2017-03-30 | 2017-08-18 | 通山新知力环保设备机械厂(普通合伙) | Roller is filtered in a kind of press filtration for belt type sludge filter press |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201705365U (en) | Duct piece structure of shield tunnel through mouth | |
US10030792B2 (en) | Underground steel-concrete structure pipeline with spiral composite reinforcement ring on inner wall and manufacturing method thereof | |
CN103061782A (en) | Large-section earth pressure balancing rectangular jacking pipe joint of motor vehicle tunnel and method for constructing large-section earth pressure balancing rectangular jacking pipe | |
CN207363606U (en) | A kind of drilling machine sliding system | |
CN204645104U (en) | Steel pipe pile test pile casing isolation roller | |
CN104930260B (en) | Method for assembling whole adjusters of super-large diameter pressure steel pipes | |
CN204002832U (en) | A kind of shield tunnel portal structure | |
CN103382843B (en) | The construction equipment preventing push-bench and tube coupling from rotating with pull bar and construction method | |
CN103649417A (en) | Composite steel sheet pile, underground continuous wall, and reuse method of composite steel sheet pile | |
CN104110265A (en) | Thixotropic slurry grouting system for large-section rectangular pipe-jacking pipeline | |
CN103485333A (en) | Corrugated hollow steel pipe friction pile and construction method thereof | |
CN202831000U (en) | Fixed tower crane overall moving mechanism | |
CN204312088U (en) | A kind of pin-connected panel push pipe tunnel segment structure | |
CN204608810U (en) | For the shaft structure of slagging tap in Excavation of High And Steep Slopes engineering | |
CN103382842B (en) | A kind of construction method preventing push-bench and tube coupling from rotating | |
CN104653222B (en) | Prefabricated evacuation platform for shield interval tunnel | |
CN203050736U (en) | Waterproof earth pressure balance rectangular jacking pipe joint for large-section motor vehicle tunnel | |
CN107420120B (en) | Supporting device and method for roadway roof with impact tendency | |
CN206298093U (en) | A kind of new rising rail changing device | |
CN104562916A (en) | Node structure for connecting corrugated steel web and concrete | |
CN103388479B (en) | The construction equipment preventing push-bench and tube coupling from rotating with drag-line and construction method | |
CN203066987U (en) | Dislocation-prevention and large section earth pressure balance rectangular jacking pipe joint for motor vehicle tunnel | |
CN204703531U (en) | For the slipping-shoe device of Construction of Steel Structure | |
CN207064868U (en) | The horizontal directional drilling of extra long distance passes through the water supply line structure of complex barrier | |
CN107419710B (en) | Pre-burying process of tunnel lining concrete grouting pipe |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |