CN204645100U - The steel sheet pile guard system in Tidal zone and fluctuation of water table district - Google Patents

The steel sheet pile guard system in Tidal zone and fluctuation of water table district Download PDF

Info

Publication number
CN204645100U
CN204645100U CN201520209490.6U CN201520209490U CN204645100U CN 204645100 U CN204645100 U CN 204645100U CN 201520209490 U CN201520209490 U CN 201520209490U CN 204645100 U CN204645100 U CN 204645100U
Authority
CN
China
Prior art keywords
steel sheet
sheet pile
packing material
guard system
armor plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520209490.6U
Other languages
Chinese (zh)
Inventor
熊建波
岑文杰
高鑫
范志宏
彭良聪
温永向
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd
China Harbour Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
Original Assignee
CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd
China Harbour Engineering Co Ltd
CCCC Fourth Harbor Engineering Institute Co Ltd
Guangzhou Harbor Engineering Quality Inspection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd, GUANGZHOU SIHANG MATERIAL TECHNOLOGY Co Ltd, China Harbour Engineering Co Ltd, CCCC Fourth Harbor Engineering Institute Co Ltd, Guangzhou Harbor Engineering Quality Inspection Co Ltd filed Critical CCCC FOURTH HARBOR GEOTECHNICAL ENGINEERING Co Ltd
Priority to CN201520209490.6U priority Critical patent/CN204645100U/en
Application granted granted Critical
Publication of CN204645100U publication Critical patent/CN204645100U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model discloses the steel sheet pile guard system in a kind of Tidal zone and fluctuation of water table district, it has one and keeps the armor plate of a determining deviation with steel sheet pile external surface, armor plate offers some installing holes, run through in installing hole and have bolt, bolt to be positioned at inside and outside installing hole both sides respectively thread connection have inner position nut and outside fix nut, the position that steel sheet pile external surface corresponds to each installing hole is welded with hold-down nut, bolt thread is connected in hold-down nut and makes to protect the filling chamber forming anticorrosion packing material between deck plate and steel sheet pile external surface, bottom and the side in the filling chamber of anticorrosion packing material sealed by encapsulant, anticorrosion packing material is filled with in the filling chamber of anticorrosion packing material, anticorrosion packing material after solidification and the common integrant steel sheet pile guard system of armor plate.The utility model Bound moisture inferior segment adopts coating or anti-corrosion method such as coating associating sacrificial anode, impressed current protection etc. can realize the general protection of steel sheet pile.

Description

The steel sheet pile guard system in Tidal zone and fluctuation of water table district
Technical field
The utility model relates to the steel sheet pile guard system in a kind of Tidal zone and fluctuation of water table district, belong to especially a kind of safeguard procedures and the construction method being applicable to steel sheet pile quaywall steel sheet pile fluctuation of water table district and Lang Jian district in harbour engineering anticorrosion technique field, the steel sheet pile being in marine environment can be protected reliably, improve the overall durability of such harbour.
Technical background
Steel sheet pile quaywall is one of the most frequently used dock structure form, and its main substructure is steel sheet pile, and the durability of steel sheet pile determines application life and the safety in utilization of harbour.The current anti-corrosion method for steel sheet pile mainly contains the combination of three class methods such as coating, sacrificial anode and impressed current and these three class methods.Wherein sacrificial anode and this two classes anti-corrosion method of impressed current can only for districts under water; Steel sheet pile coating antiseptic cannot realize all standing in addition, and because of the restriction of pitching pile construction technology, coating antiseptic cannot be carried out in snap close position.This means that the snap close position of fluctuation of water table district and Lang Jian district steel sheet pile becomes steel sheet pile corrosion-resistant blind area.Easily cause this region non-uniform corrosion, affect the overall durability of steel sheet pile quaywall.
Utility model content
In order to solve above-mentioned practical problem, overcome in prior art and cannot implement effective corrosion-resistant problem to fluctuation of water table district and Lang Jian district position steel sheet pile, there is provided a kind of simple and reasonable, easy installation and reliable a kind of Tidal zone and the steel sheet pile guard system in fluctuation of water table district.
To achieve these goals, the utility model have employed following technical scheme: the steel sheet pile guard system in a kind of Tidal zone and fluctuation of water table district, it has one and keeps the armor plate of a determining deviation with steel sheet pile external surface, armor plate offers some installing holes, run through in installing hole and have bolt, bolt to be positioned at inside and outside installing hole both sides respectively thread connection have inner position nut and outside fix nut, the position that steel sheet pile external surface corresponds to each installing hole is welded with hold-down nut, bolt thread is connected in hold-down nut and makes to protect the filling chamber forming anticorrosion packing material between deck plate and steel sheet pile external surface, bottom and the side in the filling chamber of anticorrosion packing material sealed by encapsulant, anticorrosion packing material is filled with in the filling chamber of anticorrosion packing material, anticorrosion packing material after solidification and the common integrant steel sheet pile guard system of armor plate.
Preferably, described armor plate is glass fiber reinforced plastic armor plate.
Described armor plate is shaped according to the external surface shape of steel sheet pile.
The thickness in the filling chamber of described anticorrosion packing material determined by the distance between inner position nut and hold-down nut.
The utility model overcomes the problem that steel sheet pile is difficult to install armor, by being drilled with a series of installing hole not affecting antiseptic effect on armor plate, and adopt welding manner that nut is fixed on steel sheet pile external surface in advance, to realize the object of installing armor on steel sheet pile, installation process causes damage to steel sheet pile itself hardly.Thus overcome traditional anti-corrosion method and cannot spatter steel sheet pile to fluctuation of water table district and wave; especially the effective etch-proof difficult problem at snap close position, Bound moisture inferior segment adopts coating or anti-corrosion method such as coating associating sacrificial anode, impressed current protection etc. can realize the general protection of steel sheet pile.The utility model is also considered in water, subaqueous construction operation limitation is large, need the labour intensity as far as possible reducing constructor, comprise minimizing weight, simplify installation steps, exempt machinery to coordinate as far as possible, the prefabricated job placement of the overwhelming majority is completed in glass fiber armor processing space, thus realizes implementing armor installation to steel plate pile under the condition without the need to building operation platform.
Accompanying drawing explanation
Fig. 1 is that the utility model steel sheet pile guard system installs phantom drawing;
Fig. 2 is that the utility model steel sheet pile guard system installs elevation;
Fig. 3 is that the utility model steel sheet pile guard system installs sectional drawing;
Fig. 4 is steel sheet pile guard system implementation process decomposing schematic representation;
Fig. 5 is the A enlarged drawing of Fig. 3.
In figure, steel sheet pile 1, glass fiber armor plate 2, screw rod 3, anticorrosion packing material 4, hold-down nut 5, inner position nut 6, outside fix nut 7, polyurethane seal filler strip 8, installing hole 9.
Detailed description of the invention
Below in conjunction with concrete accompanying drawing and embodiment, the utility model is described in further detail.
As Fig. 1 ~ 5 are depicted as steel sheet pile guard system of the present utility model, it has the glass fiber armor plate 2 mating with steel sheet pile 1 outer surface profile and be drilled with equally spaced installing hole 9 in advance, run through in installing hole 9 and have bolt 3, bolt 3 to be positioned at inside and outside installing hole 9 both sides respectively thread connection have inner position nut 6 and outside fix nut 7.Said inner side refers to the side of glass fiber armor plate towards steel sheet pile 1 herein, and outside is then the side of steel sheet pile dorsad.The position that steel sheet pile 1 external surface corresponds to each installing hole is welded with hold-down nut 5, bolt 3 thread connection make to protect in hold-down nut 5 to keep constant between deck plate and steel sheet pile external surface distance to form the filling chamber of anticorrosion packing material, bottom and the side in the filling chamber of anticorrosion packing material sealed by encapsulant, anticorrosion packing material is filled with, the anticorrosion packing material after solidification and the common integrant steel sheet pile guard system of glass fiber armor plate in the filling chamber of anticorrosion packing material.
Anticorrosion packing material can adopt such as: underwater epoxy grouting agent or cement-based mortar or under water pea gravel concreten or polyurathamc etc., specifically can determine according to the situation of locality.
Steel sheet pile guard system of the present utility model can pass through to implement with step:
(1) steel sheet pile 1 protected as required and residing tidal situation thereof, design the protection domain of steel sheet pile armor, the filling thickness of anticorrosion packing material and the pitch requirements of installing hole;
(2) size of the steel sheet pile protected as required and appearance profile, make glass fiber armor plate 2;
(3) on glass fiber armor plate, series installation hole 9 is bored;
(4) hold-down nut 5 by diver's Underwater Welding at steel sheet pile 1 external surface, its position and spacing corresponding with the installing hole 9 on glass fiber armor plate 2.;
(5) screw rod 3 thread connection in hold-down nut 5;
(6) thread connection inner position nut 6 on screw rod, in inner position nut 6 precession screw rod 3, regulate the position of inner position nut 6 according to the construction thickness requirement of anticorrosion packing material 4, and ensure that the distance between inner position nut 6 and hold-down nut 5 is consistent;
(7) installing hole 9 of glass fiber armor plate 2 is socketed on screw rod 3; And fix outside fix nut 7 in the opposite side thread connection of glass fiber armor plate, make glass fiber protect the filling chamber forming anticorrosion packing material between deck plate and steel sheet pile 1 external surface;
(8) seal on the base in the filling chamber of anticorrosion packing material and side polyurethane seal filler strip 8;
(9) adopt the filling chamber of mode to anticorrosion packing material of machine perfusion or artificial to carry out pouring construction, after anticorrosion packing material 4 solidifies, form overall steel sheet pile armor guard system with armor plate.
General recommendations carries out overall steel sheet pile armor protection to steel sheet pile Lang Jian district and fluctuation of water table district, if condition restriction also only can carry out the steel sheet pile armor protection of local for snap close position, its construction method is identical with above-mentioned construction method.

Claims (4)

1. the steel sheet pile guard system in a Tidal zone and fluctuation of water table district, it is characterized in that: have one and keep the armor plate of a determining deviation with steel sheet pile external surface, armor plate offers some installing holes, run through in installing hole and have bolt, bolt to be positioned at inside and outside installing hole both sides respectively thread connection have inner position nut and outside fix nut, the position that steel sheet pile external surface corresponds to each installing hole is welded with hold-down nut, bolt thread is connected in hold-down nut and makes to protect the filling chamber forming anticorrosion packing material between deck plate and steel sheet pile external surface, bottom and the side in the filling chamber of anticorrosion packing material sealed by encapsulant, anticorrosion packing material is filled with in the filling chamber of anticorrosion packing material, anticorrosion packing material after solidification and the common integrant steel sheet pile guard system of armor plate.
2. steel sheet pile guard system according to claim 1, is characterized in that: described armor plate is glass fiber reinforced plastic armor plate.
3. steel sheet pile guard system according to claim 1, is characterized in that: described armor plate is shaped according to the external surface shape of steel sheet pile.
4. steel sheet pile guard system according to claim 1, is characterized in that: the thickness in the filling chamber of described anticorrosion packing material determined by the distance between inner position nut and hold-down nut.
CN201520209490.6U 2015-04-07 2015-04-07 The steel sheet pile guard system in Tidal zone and fluctuation of water table district Expired - Fee Related CN204645100U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520209490.6U CN204645100U (en) 2015-04-07 2015-04-07 The steel sheet pile guard system in Tidal zone and fluctuation of water table district

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520209490.6U CN204645100U (en) 2015-04-07 2015-04-07 The steel sheet pile guard system in Tidal zone and fluctuation of water table district

Publications (1)

Publication Number Publication Date
CN204645100U true CN204645100U (en) 2015-09-16

Family

ID=54097858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520209490.6U Expired - Fee Related CN204645100U (en) 2015-04-07 2015-04-07 The steel sheet pile guard system in Tidal zone and fluctuation of water table district

Country Status (1)

Country Link
CN (1) CN204645100U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846850A (en) * 2015-04-07 2015-08-19 中交四航工程研究院有限公司 Steel sheet pile protection system for tidal range area and water level fluctuation area and construction method thereof
CN109610487A (en) * 2018-11-30 2019-04-12 福建建中建设科技股份有限公司 A kind of Larsen steel sheet-pile cofferdam and its construction method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104846850A (en) * 2015-04-07 2015-08-19 中交四航工程研究院有限公司 Steel sheet pile protection system for tidal range area and water level fluctuation area and construction method thereof
CN109610487A (en) * 2018-11-30 2019-04-12 福建建中建设科技股份有限公司 A kind of Larsen steel sheet-pile cofferdam and its construction method

Similar Documents

Publication Publication Date Title
CN204645110U (en) Concrete pipe base durability repair system
CN101906781B (en) Hooping type steel sheet pile cofferdam platform and integrated construction method depending on cofferdam platform
CN204645100U (en) The steel sheet pile guard system in Tidal zone and fluctuation of water table district
CN204780979U (en) Install steel -pipe pile basis of anti horizontal force of iron tower fast
CN104846850A (en) Steel sheet pile protection system for tidal range area and water level fluctuation area and construction method thereof
CN203412598U (en) Cable-tunnel composite lining waterproof structure
CN106088758B (en) A kind of bilayer assembled underground granary
CN203229927U (en) Treatment structure for dam body upstream face superficial layer temperature crack
CN202969414U (en) Bridge-culvert foundation
CN203625861U (en) Elastic sealing type sluice gate structure with service life prolonged
CN206607675U (en) A kind of basement composite external wall anti-cracking and seepage control structure construction
CN103556609B (en) A kind of life extension type elastic seal sluice gate structure
CN205975597U (en) Regional transmission tower improved generation bored concrete pile basis is used for corroding
US20230313481A1 (en) Stabbing system for installing offshore jacket structure and installation method of offshore jacket structure using the same
CN206189966U (en) Circular underground granary of slot -in type prefabricated assembled of inside and outside equal steel plated
CN106088762B (en) A kind of prefabricated assembled round underground granary of insertion slot type encased steel plate
CN206035044U (en) Prefabricated assembled underground granary of plastic cover echelonment
CN209874074U (en) Porous inclined plane slip casting embedded pipe
JP5284218B2 (en) Monopile foundation construction method and joint pipe
CN203361116U (en) Drilling construction platform
CN204491647U (en) A kind of hanging caisson device
CN206941638U (en) Offshore wind farm stake cladding vaseline coats anticorrosion structure
CN206189414U (en) Circular underground granary of slot -in type prefabricated bulkhead of outer steel plated
CN206034482U (en) Circular prefabricated assembled underground granary of interior steel plated
CN206035043U (en) Prefabricated assembled rectangle underground granary of outer steel plated echelonment

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150916

CF01 Termination of patent right due to non-payment of annual fee