CN204644385U - Coal-gas recovering equipment in furnace top material tank for blast furnace - Google Patents

Coal-gas recovering equipment in furnace top material tank for blast furnace Download PDF

Info

Publication number
CN204644385U
CN204644385U CN201520284150.XU CN201520284150U CN204644385U CN 204644385 U CN204644385 U CN 204644385U CN 201520284150 U CN201520284150 U CN 201520284150U CN 204644385 U CN204644385 U CN 204644385U
Authority
CN
China
Prior art keywords
gas
valve
coal
blast furnace
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520284150.XU
Other languages
Chinese (zh)
Inventor
沈惠冲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINYUAN VALVE INDUSTRY Co Ltd JIANGSU
Original Assignee
XINYUAN VALVE INDUSTRY Co Ltd JIANGSU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINYUAN VALVE INDUSTRY Co Ltd JIANGSU filed Critical XINYUAN VALVE INDUSTRY Co Ltd JIANGSU
Priority to CN201520284150.XU priority Critical patent/CN204644385U/en
Application granted granted Critical
Publication of CN204644385U publication Critical patent/CN204644385U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The utility model discloses the coal-gas recovering equipment in a kind of furnace top material tank for blast furnace, comprise the diffusion mouth of blast furnace top equipment, the diffusion mouth of blast furnace top equipment is arranged on by the pipeline of normally open valve gate control, and normally open valve arranges the parallel port be made up of with the auxiliary line comprising gas fan rapid switching valve behind the door; Described auxiliary line comprises gas fan, in the front and back of gas fan, arrange a valve respectively, and this parallel port is connected with the coal-gas recovering dust-removal system at rear; Furnace roof batch can is connected with time equalizing valve of on purified gas pipeline, and furnace roof batch can is connected with the secondary equalizing valve on coal gas gas-holder pipeline; Furnace roof batch can is provided with the material loading valve of charging and the baiting valve to the blanking of blast furnace burner hearth.The utility model is rational in infrastructure, environmental protection, easy to use, safe.

Description

Coal-gas recovering equipment in furnace top material tank for blast furnace
Technical field
The utility model relates to the coal-gas recovering equipment in a kind of furnace top material tank for blast furnace.
Background technology
Furnace charge in furnace top material tank for blast furnace enters after in blast furnace chamber, and be filled with dust-laden coal gas in batch can, must be disposed within very short time, the method for prior art is directly discharged in air, pollutes large.
Summary of the invention
The purpose of this utility model is to provide a kind of rational in infrastructure, the coal-gas recovering equipment in environmental protection, convenience, safe furnace top material tank for blast furnace.
Technical solution of the present utility model is:
Coal-gas recovering equipment in a kind of furnace top material tank for blast furnace, it is characterized in that: the diffusion mouth comprising blast furnace top equipment, the diffusion mouth of blast furnace top equipment is arranged on by the pipeline of normally open valve gate control, and normally open valve arranges the parallel port be made up of with the auxiliary line comprising gas fan rapid switching valve behind the door; Described auxiliary line comprises gas fan, in the front and back of gas fan, arrange a valve respectively, and this parallel port is connected with the coal-gas recovering dust-removal system at rear; Furnace roof batch can is connected with time equalizing valve of on purified gas pipeline, and furnace roof batch can is connected with the secondary equalizing valve on coal gas gas-holder pipeline; Furnace roof batch can is provided with the material loading valve of charging and the baiting valve to the blanking of blast furnace burner hearth.
Coal gas gas-holder pipeline arranges gas compressor; Furnace roof batch can is provided with the material loading valve of charging and the baiting valve to the blanking of blast furnace burner hearth.
The utility model is rational in infrastructure, environmental protection, easy to use, safe.Secondary all pressure high pressure gas substitutes the technique (coal gas reservoir pressure 0.8MPa) of high pressure nitrogen.Thus ensure that the purity of gas recovery, namely ensure the calorific value of coal gas, do not affect subsequent technique demand.In order to meet blast furnace smelting process requirement, so add the auxiliary line of valve and gas fan composition, fast the residual gas in batch can be transported to furnace roof emission coal gas and reclaim dust-removal system, ensure in short period of time that the pressure in furnace roof batch can is standard atmospheric pressure, allows furnace charge enter batch can smoothly by material loading valve.Also coal-gas recovering, the dust removal problem of emergency diffusion mouth is solved in the lump.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is the structural representation of the utility model embodiment.
Embodiment
The coal-gas recovering equipment of a kind of furnace top material tank for blast furnace 14 li, comprise the diffusion mouth 7 of blast furnace top equipment 5, the diffusion mouth of blast furnace top equipment is arranged on the pipeline that controlled by normally open valve door 6, arranges the parallel port be made up of with the auxiliary line comprising gas fan 9 rapid switching valve 11 after normally open valve door 6; Described auxiliary line comprises gas fan 9, in the front and back of gas fan, arrange a valve 8,10 respectively, and this parallel port is connected with the coal-gas recovering dust-removal system 12 at rear; Furnace roof batch can 14 is connected with an equalizing valve 3 on purified gas (from dry-method bag-type house outlet) pipeline, and furnace roof batch can is connected with the secondary equalizing valve 4 on coal gas gas-holder 2 pipeline.Coal gas gas-holder pipeline arranges gas compressor 1.Furnace roof batch can 14 is provided with the material loading valve 15 of charging and the baiting valve 16 to the blanking of blast furnace burner hearth.
Coal-gas recovering method:
(1) be arranged on by the diffusion mouth of blast furnace top equipment by the pipeline of normally open valve gate control, normally open valve arranges the parallel port be made up of with the auxiliary line comprising gas fan rapid switching valve behind the door; Described auxiliary line comprises gas fan, in the front and back of gas fan, arrange a valve respectively, and this parallel port is connected with the coal-gas recovering dust-removal system at rear; Furnace roof batch can is connected with time equalizing valve of on purified gas pipeline, and furnace roof batch can is connected with the secondary equalizing valve on coal gas gas-holder pipeline;
(2) open the material loading valve of furnace roof batch can, after furnace charge delivers to furnace roof batch can specified amount by handling equipment, close material loading valve; Open an equalizing valve, be pressurized to furnace chamber pressure by furnace roof batch can, as pressure is inadequate, then opens secondary equalizing valve again, be pressurized to prescribed value to furnace roof batch can, then open baiting valve, allow furnace charge enter furnace chamber;
(3) furnace charge in furnace roof batch can enters after in blast furnace chamber through baiting valve, is filled with dust-laden coal gas, is opened by rapid switching valve in furnace roof batch can, enters furnace roof emission coal gas and reclaims dust-removal system, carry out dust removal process after the several seconds; Then gas fan is started, synchronously open the valve be arranged on described auxiliary line before and after gas fan, and close rapid switching valve, after remaining for batch can gas pressure is extracted into normal atmosphere rapidly, close the valve before gas fan on auxiliary line, gas fan 9 quits work, then closes the valve on auxiliary line after gas fan;
(4) open material loading valve, repeat above step poly-, namely blast furnace enters the circulation of smelting.

Claims (2)

1. the coal-gas recovering equipment in a furnace top material tank for blast furnace, it is characterized in that: the diffusion mouth comprising blast furnace top equipment, the diffusion mouth of blast furnace top equipment is arranged on by the pipeline of normally open valve gate control, and normally open valve arranges the parallel port be made up of with the auxiliary line comprising gas fan rapid switching valve behind the door; Described auxiliary line comprises gas fan, in the front and back of gas fan, arrange a valve respectively, and this parallel port is connected with the coal-gas recovering dust-removal system at rear; Furnace roof batch can is connected with time equalizing valve of on purified gas pipeline, and furnace roof batch can is connected with the secondary equalizing valve on coal gas gas-holder pipeline; Furnace roof batch can is provided with the material loading valve of charging and the baiting valve to the blanking of blast furnace burner hearth.
2. the coal-gas recovering equipment in furnace top material tank for blast furnace according to claim 1, is characterized in that: coal gas gas-holder pipeline arranges gas compressor; Furnace roof batch can is provided with the material loading valve of charging and the baiting valve to the blanking of blast furnace burner hearth.
CN201520284150.XU 2015-05-06 2015-05-06 Coal-gas recovering equipment in furnace top material tank for blast furnace Active CN204644385U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520284150.XU CN204644385U (en) 2015-05-06 2015-05-06 Coal-gas recovering equipment in furnace top material tank for blast furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520284150.XU CN204644385U (en) 2015-05-06 2015-05-06 Coal-gas recovering equipment in furnace top material tank for blast furnace

Publications (1)

Publication Number Publication Date
CN204644385U true CN204644385U (en) 2015-09-16

Family

ID=54097146

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520284150.XU Active CN204644385U (en) 2015-05-06 2015-05-06 Coal-gas recovering equipment in furnace top material tank for blast furnace

Country Status (1)

Country Link
CN (1) CN204644385U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104789721A (en) * 2015-05-06 2015-07-22 江苏鑫沅阀业有限公司 Method for recycling coal gas in material tank on top of blast furnace and special device
CN111809010A (en) * 2020-06-19 2020-10-23 中钢设备有限公司 Blast furnace top gas pressure-equalizing bleeding system and control method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104789721A (en) * 2015-05-06 2015-07-22 江苏鑫沅阀业有限公司 Method for recycling coal gas in material tank on top of blast furnace and special device
CN111809010A (en) * 2020-06-19 2020-10-23 中钢设备有限公司 Blast furnace top gas pressure-equalizing bleeding system and control method thereof

Similar Documents

Publication Publication Date Title
CN104073581B (en) Force to reclaim process and the device of blast furnace out-spreading coal gas
CN102864257A (en) Pressure-equalizing and bleeding method for injecting furnace roof tank coal gas by using high-pressure gas
CN101892336A (en) Coal-gas recovering process and device of charging, equalizing and bleeding of blast furnace
CN204644385U (en) Coal-gas recovering equipment in furnace top material tank for blast furnace
CN205062095U (en) Blast furnace furnace roof material jar diffuses gas purifying, recovery system
CN103122398A (en) Smoke self-circulation preheating coal dust injection technology and device
CN110317911B (en) Method for quickly introducing coal gas after blast furnace overhaul and mid-term delivery
CN102888477A (en) Top even pressure gas recovery device and technology for blast furnace and technology
CN104789721A (en) Method for recycling coal gas in material tank on top of blast furnace and special device
CN203923225U (en) Force to reclaim the device of blast furnace out-spreading coal gas
CN201737956U (en) Recycling device for gas in blast-furnace charging and uniform-pressure diffusing process
CN215404318U (en) Non-diffusion recovery system for blast furnace top pressure-equalizing gas
CN104263866A (en) System and process for purifying and utilizing equalized diffuse gas of blast furnace top charging bucket
CN102395689B (en) Method for feeding a burden to a blast furnace
CN209555276U (en) A kind of blast furnace bucket exhaust apparatus
CN203586731U (en) Drying system for limestone powder
CN104197354A (en) Recycling system of biomass stokehole dust
CN204097501U (en) The gas purification of furnace top material tank for blast furnace pressure-equalizing and discharging, utilize system
CN102586518A (en) Method for carrying out voltage-sharing bleeding on furnace top of blast furnace by using nitrogen
CN114807474B (en) Pressure equalizing and diffusing method for charging tank at top of blast furnace and charging system of blast furnace
CN216786176U (en) Blast furnace top parallel double-material-tank pressure-reducing environment-friendly diffusing structure
CN113621746B (en) Environment-friendly recovery process method for residual gas generated in material distribution of blast furnace in parallel tanks
CN102337366A (en) Roller extrusion air bag type blast furnace top pressure-equalizing bleeding gas recovering device
CN206337229U (en) A kind of mesohigh lock hopper rushes pressure relief system
CN204365050U (en) A kind of sack cleaner and coal-grinding induction system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant