CN206337229U - A kind of mesohigh lock hopper rushes pressure relief system - Google Patents

A kind of mesohigh lock hopper rushes pressure relief system Download PDF

Info

Publication number
CN206337229U
CN206337229U CN201621384394.6U CN201621384394U CN206337229U CN 206337229 U CN206337229 U CN 206337229U CN 201621384394 U CN201621384394 U CN 201621384394U CN 206337229 U CN206337229 U CN 206337229U
Authority
CN
China
Prior art keywords
coal
deslagging
lock hopper
valve
buffering bucket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621384394.6U
Other languages
Chinese (zh)
Inventor
王凤彬
刘海建
隋盈鑫
尹志敏
李开军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinneng Energy Co Ltd
Original Assignee
Xinneng Energy Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinneng Energy Co Ltd filed Critical Xinneng Energy Co Ltd
Priority to CN201621384394.6U priority Critical patent/CN206337229U/en
Application granted granted Critical
Publication of CN206337229U publication Critical patent/CN206337229U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P20/00Technologies relating to chemical industry
    • Y02P20/10Process efficiency

Landscapes

  • Filtering Of Dispersed Particles In Gases (AREA)

Abstract

Pressure relief system is rushed the utility model discloses a kind of mesohigh lock hopper, including feed bin, coal buffering bucket, coal lock hopper, gasification furnace, deslagging buffering bucket, deslagging lock hopper, lock hopper filter, recycling can, deslagging sluicing pressure pipe, coal sluicing pressure pipe and impact tube, feed bin, coal buffering bucket, coal lock hopper, gasification furnace, deslagging buffering bucket and deslagging lock hopper pass sequentially through valve connection, the gas injection port of coal buffering bucket is connected with the gas injection port of coal lock hopper by coal balance pipe, and deslagging buffering bucket is connected with deslagging lock hopper by deslagging balance pipe.Gasification furnace sluicing pressure is carried out using the utility model, part storage is carried out to the pressure release gas of coal buffering bucket, deslagging lock hopper by recycling can, the discharge of pressure release gas is reduced, is effectively reduced the discharge capacity of gases at high pressure, greatly improves efficiency of energy utilization;And venting duration is greatly saved, improve operating efficiency.

Description

A kind of mesohigh lock hopper rushes pressure relief system
Technical field:
The utility model belongs to chemical technology field, more particularly to a kind of mesohigh lock hopper rushes pressure relief system.
Background technology:
In the pressurized coal gasification device such as fixed bed, air flow bed, it is required to complete feed coal (fine coal/block using lock hopper Coal) continuous pressure conveying or cinder discharge.Because gasification furnace is press device, in transferring raw material coal or tapping process, To realize the conveying between material high-low pressure, lock hopper needs that sluicing press operation is repeated.
It is conventional to be using lock hopper coal process:After feed coal (fine coal/lump coal) is full of in lock hopper, in order to which normal pressure will be in The coal of environment is added in gasification furnace, need to be carried out punching press to lock hopper, its pressure is slightly above gasification furnace pressure;When lock hopper completes coal Afterwards, pressure release is generally carried out by way of gas in lock hopper is discharged, a feeding cycle is completed.
It is conventional to be using lock hopper deslagging process:Lock hopper is pressurized to and gasification furnace uniform pressure, the then gas in gasification furnace Slugging is first discharged into lock hopper under gravity, finally discharges the gas in lock hopper, and pressure release is complete to normal pressure heel row slag discharging Into a deslagging circulation.
The volume of lock hopper is typically not less than 6Nm3, conventional coal lock hopper and dreg-locking hopper system, not reclaim pressure release gas, Directly discharge and cause huge waste, need the pressurization gas of extraneous supply large-minded in punching press in addition, gas compression work( Consumption is high, requires high for compressor, so as to add production cost and investment;Further, since the direct pressure release of high-pressure system, pressure difference Pressure relief valve is easily damaged caused by big, causes production accident, and serious causes system shutdown.Further, since pressure release gas exists Substantial amounts of dust can be taken during discharge out of, certain dust prevention need to be taken, it will usually filter dedusting is used, this requires pressure release Can not be too fast, the situation that otherwise filter core is easily broken, situation for causing the system decompression time longer occurs for this.
Utility model content:
The purpose of this utility model is to provide a kind of saving energy and the short mesohigh lock hopper sluicing pressure system of venting duration System.
The purpose of this utility model is implemented by following technical scheme, and a kind of mesohigh lock hopper rushes pressure relief system, it include according to The secondary feed bin connected by valve, coal buffering bucket, coal lock hopper, gasification furnace, deslagging buffering bucket and deslagging lock hopper, the coal The gas injection port of buffering bucket is connected with the gas injection port of the coal lock hopper by the coal balance pipe provided with coal balanced valve, the row The gas injection port of slag buffering bucket is connected with the gas injection port of the deslagging lock hopper by the deslagging balance pipe provided with deslagging balanced valve;
It also includes lock hopper filter, recycling can, coal sluicing pressure pipe, deslagging sluicing pressure pipe and impact tube, the punching press Pipe is connected with the high-pressure air source of on-site;Air inlet of the gas injection port of the coal buffering bucket also with the lock hopper filter passes through Coal sluicing pressure pipe connection provided with coal sluicing pressure valve, atmospheric valve, institute are provided with the air inlet of the lock hopper filter The exhaust outlet for stating lock hopper filter is connected with blow-down pipe;
One end of the deslagging sluicing pressure pipe is connected with the gas injection port of the deslagging buffering bucket, the deslagging sluicing pressure pipe The coal sluicing pressure pipe between the other end and the coal sluicing pressure valve and the lock hopper filter is connected, the deslagging punching Relief tube is provided with deslagging sluicing pressure valve;
It also includes recovery tube, and one end of the recovery tube connects with the recycling can, the other end of the recovery tube and Coal sluicing pressure pipe connection between the sluicing pressure valve and the lock hopper filter;
The coal sluicing between one end of the impact tube and the coal sluicing pressure valve and the lock hopper filter Pressure pipe is connected, and the impact tube is provided with ram valve.
Advantage of the present utility model:Gasification furnace sluicing pressure is carried out using the utility model, coal buffered by recycling can Bucket, the pressure release gas of deslagging lock hopper carry out part storage, reduce the discharge of pressure release gas, are effectively reduced the discharge capacity of gases at high pressure, Greatly improve efficiency of energy utilization;And venting duration is greatly saved, improve operating efficiency.
Brief description of the drawings:
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art Or the accompanying drawing to be used needed for description of the prior art is briefly described, it should be apparent that, drawings in the following description are only It is some embodiments of the present utility model, for those of ordinary skill in the art, is not paying the premise of creative work Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the utility model structural representation.
In figure:Feed bin 1, coal buffering bucket 2, coal lock hopper 3, gasification furnace 4, deslagging buffering bucket 5, deslagging lock hopper 6, lock hopper mistake Filter 7, recycling can 8, deslagging sluicing pressure pipe 9, coal sluicing pressure pipe 10, impact tube 11, coal balanced valve 12, coal balance pipe 13, deslagging balanced valve 14, deslagging balance pipe 15, coal sluicing pressure valve 16, atmospheric valve 17, blow-down pipe 18, recovery valve 19, recovery tube 20, deslagging sluicing pressure valve 21, ram valve 22.
Embodiment:
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Embodiment 1:
A kind of mesohigh lock hopper rushes pressure relief system, and it includes feed bin 1, coal buffering bucket 2, coal lock hopper 3, gasification furnace 4, row Slag buffering bucket 5, deslagging lock hopper 6, lock hopper filter 7, recycling can 8, deslagging sluicing pressure pipe 9, coal sluicing pressure pipe 10, impact tube 11, feed bin 1, coal buffering bucket 2, coal lock hopper 3, gasification furnace 4, deslagging buffering bucket 5 and deslagging lock hopper 6 pass sequentially through valve company Connect, the gas injection port of coal buffering bucket 2 is connected with the gas injection port of coal lock hopper 3 by the coal balance pipe 13 provided with coal balanced valve 12 Logical, the gas injection port of deslagging buffering bucket 5 is connected with the gas injection port of deslagging lock hopper 6 by the deslagging balance pipe 15 provided with deslagging balanced valve 14 It is logical;
The gas injection port of coal buffering bucket 2 also passes through adding provided with coal sluicing pressure valve 16 with the air inlet of lock hopper filter 7 Coal sluicing pressure pipe 10 is connected, and atmospheric valve 17, the exhaust outlet of lock hopper filter 7 and emptying are provided with the air inlet of lock hopper filter 7 Pipe 18 is connected;
One end of deslagging sluicing pressure pipe 9 is connected with the gas injection port of deslagging buffering bucket 5, the other end of deslagging sluicing pressure pipe 9 with Coal sluicing pressure pipe 10 between coal sluicing pressure valve 16 and lock hopper filter 7 is connected, and deslagging sluicing pressure pipe 9 is rushed provided with deslagging Relief valve 21;
It also includes recovery tube 20, and one end of recovery tube 20 is connected with recycling can 8, and the other end and the coal of recovery tube 20 are rushed Coal sluicing pressure pipe 10 between relief valve 16 and lock hopper filter 7 is connected;
One end of impact tube 11 is connected with the high-pressure air source of on-site, the other end and the coal sluicing pressure valve 16 of impact tube 11 Coal sluicing pressure pipe 10 between lock hopper filter 7 is connected, and impact tube 11 is provided with ram valve 22.
The course of work:
Coal and deslagging, coal lock hopper 3 and deslagging buffering bucket 5 and the pressure in gasification furnace 4 are carried out using the utility model All the time approach, the coal and deslagging of gasification furnace 4 are only realized by the sluicing pressure of coal buffering bucket 2 and deslagging lock hopper 6.
1st, gasification furnace coal process
1.1 coal buffering bucket splicings
When coal buffering bucket 2 needs pressure release, coal sluicing pressure valve 16 and recovery valve 19 are opened, recycling can 8 is buffered with coal Bucket 2 carries out pressure balance;When pressure is identical, recovery valve 19 is closed, atmospheric valve 17, system external circle pressure release to normal pressure is opened Afterwards, atmospheric valve 17 is closed, the pressure leak process of coal buffering bucket 2 is completed.
When coal buffering bucket 2 needs splicing, the valve between coal buffering bucket 2 and feed bin 1 is opened, coal buffering bucket 2 starts Splicing, occurs to the high charge level of coal buffering bucket 2, the valve closed between coal buffering bucket 2 and feed bin 1, the splicing of coal buffering bucket 2 Complete.
1.2 coal lock hopper splicings
First to the punching press of coal buffering bucket 2, recovery valve 19 and coal sluicing pressure valve 16 are first opened, is deposited first with recycling can 8 The source of the gas of storage carries out punching press to coal buffering bucket 2, when pressure is identical, closes recovery valve 19 and coal sluicing pressure valve 16, opens Ram valve 22, continues to the punching press of coal buffering bucket 2, until the pressure of coal buffering bucket 2 is identical with the pressure of coal lock hopper 3, or The pressure of a little higher than coal lock hopper 3, closes ram valve 22, and the punching course of coal buffering bucket 2 terminates.
Coal balanced valve 12 is then opened, pressure balance is carried out to coal buffering bucket 2 and coal lock hopper 3;Coal is opened to delay Valve between punching bucket 2 and coal lock hopper 3, coal is noted into coal lock hopper 3, after the high charge level of coal lock hopper 3 occurs, and closes coal Valve between buffering bucket 2 and coal lock hopper 3, the splicing process of coal lock hopper 3 is completed.
2nd, gasification furnace tapping process
2.1 gasification furnace slag discharges
When gasification furnace 4 needs deslagging, the valve between gasification furnace 4 and deslagging lock hopper 5 is opened, deslagging buffering bucket 5 starts to connect Material, occurs to the high charge level of deslagging buffering bucket 5, and the valve closed between gasification furnace 4 and deslagging lock hopper 5 completes the deslagging mistake of gasification furnace 4 Journey.
2.2 deslagging buffering bucket deslagginves
When deslagging buffering bucket 5 needs deslagging, need first to the punching press of deslagging lock hopper 6.
Recovery valve 19 and deslagging sluicing pressure valve 21 are first turned on, deslagging lock hopper 6 is rushed using the source of the gas in recycling can 8 Pressure, until its pressure balance;Close recovery valve 19, open ram valve 22 punching press is continued to it, to deslagging lock hopper 6 in pressure with Pressure in deslagging buffering bucket 5 is essentially identical, closes deslagging sluicing pressure valve 21 and ram valve 22, and the punching course of deslagging lock hopper 6 is complete Into;
Open deslagging balanced valve 14 and the valve between deslagging buffering bucket 5 and deslagging lock hopper 6, to deslagging buffering bucket 5 in slag It is all drained, close deslagging balanced valve 14 and the valve between deslagging buffering bucket 5 and deslagging lock hopper 6, the deslagging mistake of deslagging buffering bucket 5 Journey terminates.
2.3 deslagging lock hopper deslagginves
First turn on deslagging sluicing pressure valve 21 and recovery valve 19, recycling can 8 starts punching press, until with the pressure of deslagging lock hopper 6 After balance, recovery valve 19 is closed, atmospheric valve 17 is opened, continued after pressure release to normal pressure, deslagging sluicing pressure valve 21 and atmospheric valve is closed 17, the pressure leak process of deslagging lock hopper 6 is completed;
The residual cake valve of the bottom of deslagging lock hopper 6 is opened, to the bottom of closing deslagging lock hopper 6 after the whole emptyings of the inside slag of deslagging lock hopper 6 The residual cake valve in portion, the tapping process of deslagging lock hopper 6 is completed.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modifications, equivalent substitutions and improvements made etc. should be included in the utility model Protection domain within.

Claims (1)

1. a kind of mesohigh lock hopper rushes pressure relief system, it includes feed bin, coal buffering bucket, the coal lock for passing sequentially through valve connection Bucket, gasification furnace, deslagging buffering bucket and deslagging lock hopper, the gas injection port of the coal buffering bucket and the gas injection port of the coal lock hopper lead to Cross the coal balance pipe provided with coal balanced valve to connect, the gas injection port of the deslagging buffering bucket and the gas injection port of the deslagging lock hopper Connected by the deslagging balance pipe provided with deslagging balanced valve;
Characterized in that, it also includes lock hopper filter, recycling can, coal sluicing pressure pipe, deslagging sluicing pressure pipe and impact tube;Institute State air inlet of the gas injection port of coal buffering bucket also with the lock hopper filter and pass through the coal provided with coal sluicing pressure valve Sluicing pressure pipe is connected, and atmospheric valve, the exhaust outlet of the lock hopper filter and emptying are provided with the air inlet of the lock hopper filter Pipe is connected;
One end of the deslagging sluicing pressure pipe is connected with the gas injection port of the deslagging buffering bucket, the deslagging sluicing pressure pipe it is another End is connected with the coal sluicing pressure pipe between the coal sluicing pressure valve and the lock hopper filter, the deslagging sluicing pressure Pipe is provided with deslagging sluicing pressure valve;
It also includes recovery tube, and one end of the recovery tube connects with the recycling can, the other end of the recovery tube with it is described Coal sluicing pressure pipe connection between sluicing pressure valve and the lock hopper filter;
The coal sluicing pressure pipe between the impact tube and the coal sluicing pressure valve and the lock hopper filter is connected, institute Impact tube is stated provided with ram valve.
CN201621384394.6U 2016-12-16 2016-12-16 A kind of mesohigh lock hopper rushes pressure relief system Active CN206337229U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621384394.6U CN206337229U (en) 2016-12-16 2016-12-16 A kind of mesohigh lock hopper rushes pressure relief system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621384394.6U CN206337229U (en) 2016-12-16 2016-12-16 A kind of mesohigh lock hopper rushes pressure relief system

Publications (1)

Publication Number Publication Date
CN206337229U true CN206337229U (en) 2017-07-18

Family

ID=59302262

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621384394.6U Active CN206337229U (en) 2016-12-16 2016-12-16 A kind of mesohigh lock hopper rushes pressure relief system

Country Status (1)

Country Link
CN (1) CN206337229U (en)

Similar Documents

Publication Publication Date Title
CN110016530B (en) Blast furnace gas full-dry purification system and process flow thereof
CN205062095U (en) Blast furnace furnace roof material jar diffuses gas purifying, recovery system
US8512439B2 (en) Method for feeding a burden to a blast furnace
CN202417889U (en) Natural gas compressor and recovery system
CN202765845U (en) Pneumatic dust conveying device
CN103333983A (en) Converter primary flue gas dry dedusting and cinder pneumatic transmission system
CN102888477A (en) Top even pressure gas recovery device and technology for blast furnace and technology
CN105782718A (en) Multi-level supercharging waste gas recycling system
CN206337229U (en) A kind of mesohigh lock hopper rushes pressure relief system
CN211255968U (en) Pressure-equalizing gas self-cleaning purifying and full-recovering device for blast furnace top charging bucket
CN209680278U (en) Non-carbonized compressed air loop circuit air-flow crushing LITHIUM BATTERY lithium hydroxide system
CN103060500B (en) Blast furnace top pressure equalizing and releasing process and device with pressure equalized goal gas recycling function
CN104263866B (en) The gas purification of furnace top material tank for blast furnace pressure-equalizing and discharging, utilize system and technique
CN103333984A (en) Converter primary exhaust gas dry dedusting coarse ash pneumatic conveying system
CN103332660B (en) Nitrogen recycling device
CN203923225U (en) Force to reclaim the device of blast furnace out-spreading coal gas
CN207608569U (en) A kind of online plugging device for replacing blast furnace bucket pressure equalizing blow off valve
CN203174122U (en) Blast furnace roof pressure equalizing diffusion device with equalizing gas recovery function
CN203373375U (en) Primary smoke dry method dedusting cinder pneumatic transmission system of revolving furnace
CN202729345U (en) Pneumatic dedusting system
CN206337230U (en) A kind of lock hopper sluicing presses cleaning system
CN204690022U (en) A kind of blast furnace top pressure-equalizing bleeding gas recovering device
CN103388045A (en) Pneumatic transmission system for dry dedusting of thick ash in converter gas
CN203373374U (en) Pneumatic conveying system for coarse ash in dry dedusting of primary flue gas of converters
CN204097501U (en) The gas purification of furnace top material tank for blast furnace pressure-equalizing and discharging, utilize system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant