The novel cooling water circulatory system
Technical field
The utility model relates to cooling water recirculation system, is specifically related to a kind of for the water-cooled novel cooling water circulatory system of workshop appliance.
Background technology
At injection workshop, recirculated cooling water plays very important effect, the devices such as its main feeding cold water machine, injection machine cooler and barrel cooler carry out heat exchange, to reach Shooting Technique to temperature controlled requirement, ensure the normal operation of Hydraulic System for Injection Moulding Machine.In order to reduce the energy consumption of system, the cooling water recirculation system of appropriate design injection workshop is most important.
Current most of injection machine workshop provides cooling circulating water by a supply-water pump or with each injection machine in two to several supply-water pumps backward injection workshop in parallel simultaneously, because each injection machine is in the form of series connection, so the power usually occurred due to supply-water pump is less than normal, or the deviation of the resistance of ducting, cause the cooling water flow apart from supply-water pump injection machine far away inadequate, the hydraulic oil of Hydraulic System for Injection Moulding Machine is caused to can not get cooling timely and cause mechanical disorder, or the situation having its electric control system of the injection machine of temperature protection to enter guard mode when there is hydraulic oil oil temperature more than 55 degrees Celsius and shut down.In addition, if injection mold can not get circulating cooling timely, can make extend thus reduce production efficiency the cool time of production technology, make the plastic product in production produce defect and even scrap.According to supply-water pump that is high-power, large discharge in actual production, then energy resource consumption is excessive, and production cost improves, and when especially only having one or several injection machine work in workshop, then causes energy waste as run powerful supply-water pump.
Summary of the invention
The utility model is excessive mainly for workshop proximal pressure in existing cooling recirculation system, remote pressure is unstable, need multiple stage water pump to supply water simultaneously, the defect that energy consumption is large, invent a kind of novel cooling water circulatory system, pipeline has been planned again, changes parallel connection into by series connection, make far-end hydraulic pressure consistent with near-end hydraulic pressure, realize voltage stabilizing and save the object of energy consumption.
Above-mentioned technical problem of the present utility model is implemented by the following technical programs: a kind of novel cooling water circulatory system, comprise the pond for retaining, for the water pump of pumps water, the water equipment in workshop, for the pipeline of water delivery, it is characterized in that, described pond comprises sedimentation basin and purification water pool, the water inlet end of water pump A is connected to purification water pool, the water side of water pump A connects a refrigerator by pipeline, refrigerator connects main water pipeline, some laterals in parallel on main water pipeline, lateral is connected with water equipment respectively, simultaneously, lateral is in parallel with primary flow pipe again, described water pump A and every platform water equipment pass through main water pipeline, lateral, primary flow pipe road forms parallel-connection structure, primary flow pipe road connects air-cooler A, air-cooler A connects sedimentation basin by pipeline.
As preferably, described sedimentation basin comprises the different sedimentation basin of several precipitated grades.
As preferably, described sedimentation basin is arranged to first stage precipitation tank, second-level settling pond, three grades of sedimentation basins, be communicated with successively by high efficiency particulate air filter between sedimentation basin, described purification water pool is near three grades of sedimentation basins, and three grades are communicated with by high efficiency particulate air filter between sedimentation basin with purification water pool.
As preferably, described air-cooler A is connected to first stage precipitation tank by pipeline.
As preferably, have the water inlet end of another water pump B to be connected to purification water pool, the refrigerator described in the water side of water pump B is connected by pipeline, refrigerator is connected with another air-cooler B by pipeline again, and air-cooler B is connected to second-level settling pond or purification water pool by pipeline.
In sum, the utility model compared with prior art tool have the following advantages:
The utility model is planned again to pipeline, changes parallel connection into by series connection, makes far-end hydraulic pressure consistent with near-end hydraulic pressure, realizes voltage stabilizing, and, only just can meet water supply requirement with a water pump or two water pumps, save energy consumption; The utility model feed cistern with higher water level to lower than the water pump of water level and main water pipeline supply low pressure water source, abundant reduction water pump draw resistance, and eliminate the air that may enter in pipeline and water pump, and then provide maximum cooling water flow to water cooling system, reach good cooling effect.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of the utility model cooling water recirculation system;
Fig. 2 is the parallel-connection structure schematic diagram between the utility model workshop appliance and water pump.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further illustrated.
Embodiment 1:
As shown in Figure 1, 2, a kind of novel cooling water circulatory system, comprise at least one purification water pool 1 for retaining and multiple sedimentation basin, sedimentation basin is divided into first stage precipitation tank 21, second-level settling pond 22, three grades of sedimentation basins 23 according to precipitation degree difference, purification water pool 1 is near three grades of sedimentation basins 23, be communicated with by high efficiency particulate air filter between sedimentation basin at different levels, between three grades of sedimentation basins 23 and purification water pool 1, high efficiency particulate air filter is monthly changed once according to water quality situation; The water inlet end of water pump A3 is connected to purification water pool 1, and purification water pool 1 is in higher water level, and water pump A3 is lower than water level about 600 millimeters.
The water side of water pump A3 connects a refrigerator 5 by pipeline 40, refrigerator 5 connects main water pipeline 41, some laterals 42 in parallel on main water pipeline 41, lateral 42 is connected with water equipment 6 respectively, simultaneously, lateral 42 is in parallel with primary flow pipe road 43 again, then water pump A3 and every platform water equipment 6 form parallel-connection structure by main water pipeline 41, lateral 42, primary flow pipe road 43, primary flow pipe road 43 connects air-cooler A7, and air-cooler A7 connects first stage precipitation tank 21 by pipeline 40.
Also have the water inlet end of another water pump B8 to be connected to purification water pool 1, the water side of water pump B8 connects described refrigerator 5 by pipeline 40, and refrigerator 5 is connected with another air-cooler B9 by pipeline 40 again, and air-cooler B9 is connected to purification water pool 1 by pipeline 40.
The circulating path of water is: water pump A draws water from purification water pool, water along pipeline, through refrigerator cooling after, water at low temperature enters workshop main water pipeline along with pipeline, then arrives water equipment along lateral, completes after cooling, high-temperature water flows out from lateral again, import primary flow pipe road, first lower the temperature through air-cooler A, then enter first stage precipitation tank, subsequently successively through second-level settling pond, three grades of sedimentation basins, the most laggard purification water pool of water after fully precipitating, recycles; Because when refrigerator works, itself also can generate heat, cool for herein is provided external adding water alignment, cooling route is: water pump B draws water from purification water pool, water is along pipeline, through refrigerator, after refrigerator cooling, again along with pipeline backflow enters purification water pool, water after fully precipitating and filtering finally also enters purification water pool, recycles.
Specific embodiment described in literary composition is only to the explanation for example of the utility model spirit.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment, but can't depart from spirit of the present utility model or surmount the scope that appended claims defines.