CN204615305U - Mechatronics bridge - Google Patents

Mechatronics bridge Download PDF

Info

Publication number
CN204615305U
CN204615305U CN201520223214.5U CN201520223214U CN204615305U CN 204615305 U CN204615305 U CN 204615305U CN 201520223214 U CN201520223214 U CN 201520223214U CN 204615305 U CN204615305 U CN 204615305U
Authority
CN
China
Prior art keywords
pipeline
bridge
skid
cable
mechatronics
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520223214.5U
Other languages
Chinese (zh)
Inventor
董德建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN JINKE CRYOGENIC ENGINEERING CO LTD
Original Assignee
SICHUAN JINKE CRYOGENIC ENGINEERING CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN JINKE CRYOGENIC ENGINEERING CO LTD filed Critical SICHUAN JINKE CRYOGENIC ENGINEERING CO LTD
Priority to CN201520223214.5U priority Critical patent/CN204615305U/en
Application granted granted Critical
Publication of CN204615305U publication Critical patent/CN204615305U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of mechatronics bridge, mechatronics bridge, comprise cable bridge, the frame supporter of pipeline that termination, two ends is provided with skid-mounted device connecting pipe of pipeline, band pedestal jockey, frame supporter comprises rectangular frame, at least two support bars be arranged in turn along rectangular frame length or Width on rectangular frame, and rectangular frame is separated at least three subframes by least two support bars; Cable bridge is fixedly installed in frame supporter along support bar setting direction, and pipeline is fixedly installed in the frame supporter of cable bridge side along support bar setting direction, and pipeline is fixedly connected on the support bar of frame supporter by pipeline fixing device; Cable bridge be provided with cable quick connector and control cable quick connector.The utility model is the mechatronics bridge for skid factory or skid mounted equipment, strengthens skid factory or the field erected convenience of skid mounted equipment further, improves efficiency of construction and construction quality.

Description

Mechatronics bridge
Technical field
The utility model relates to cable bearer technical field, is specifically related to a kind of mechatronics bridge.
Background technology
Along with industrial development, setting position and the dimensions of each assembly of factory are relatively fixing, and Module Manufacture Technology is also ripe gradually.In this context, according to setting position and the function of assembly, at pre-fabricated factory, one group of assembly combination of building factory is integrated on a chassis and forms skid module (hereinafter referred to as sled block), then in-site installation is transported to, during installation, movement, in place only need of sled block use crowbar just can realize, and the factory adopting aforesaid way to carry out manufacturing and installing is called for short skid factory.For the equipment that design is ripe, also can carry out combination in factory to its assembly integrated, form each function sled block, then by each sled block whole Transporting to on-the-spot, the employing mode of playing with building blocks is installed, and the equipment adopting aforesaid way to carry out manufacturing and installing is called for short skid mounted equipment.
Skid factory or skid mounted equipment, the assembling of its sled block integratedly completes in pre-fabricated factory, therefore, relative to the mode of field combinations assembly, each assembly of sled block to be fixedly connected with quality higher, the transport of sled block is more convenient.Meanwhile, relative to non-skid mounted equipment, the quantities of the in-site installation operation of skid mounted equipment is less, and construction period is shorter, construction cost is lower.Because skid factory or skid mounted equipment have the plurality of advantages that legacy equipment has, as little in site operation amount, engineering construction efficiency, construction investment, be convenient to operation maintenance, recycling is worth high, plurality of advantages, therefore, skidization design, manufacture and installation become the ripe facilities and equipment prevailing model of design gradually.
Crane span structure is the main tool of cable distribution, and it is widely used in the cable distribution of building and industrial equipment.Because skid factory or skid mounted equipment belong to emerging technology, the mechatronics bridge for skid factory or skid mounted equipment is also just in the starting stage, therefore, needs a kind of mechatronics bridge for skid factory or skid mounted equipment.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of mechatronics bridge for skid factory or skid mounted equipment, thus strengthen skid factory or the field erected convenience of skid mounted equipment further, reduce construction work amount, improve efficiency of construction and construction quality.
The technical scheme that the utility model technical solution problem adopts is:
Mechatronics bridge, comprise cable bridge, the frame supporter of pipeline that termination, two ends is provided with skid-mounted device connecting pipe of pipeline, band pedestal jockey, frame supporter comprises rectangular frame, at least two support bars be arranged in turn along rectangular frame length or Width on rectangular frame, and rectangular frame is separated at least three subframes by least two support bars; Cable bridge is fixedly installed in frame supporter along support bar setting direction, and pipeline is fixedly installed in the frame supporter of cable bridge side along support bar setting direction, and pipeline is fixedly connected on the support bar of frame supporter by pipeline fixing device; Cable bridge be provided with cable quick connector and control cable quick connector.
Further, subframe direction is diagonally provided with brace.
Further, pipeline is at least two, and at least two pipelines are set in parallel in frame supporter.
Further, skid-mounted device connecting pipe of pipeline is metal hose.
Further, pipeline fixing device is U-bolt.
Further, pedestal jockey is be arranged on the hole for the expansion bolt on support bar or rectangular frame.
Connection cable wiring between the skid-mounted device assembly that mechatronics bridge of the present utility model is applicable to skid factory or skid mounted equipment and connecting tube stringing.
Compared with prior art, the beneficial effects of the utility model are:
1, mechatronics bridge of the present utility model, by power cable and quick connector, control cable and quick connector unification are integrated into cable bridge, cable bridge has the power cable between unified planning skid-mounted device and controls the technical role of cable wiring, thus realize power cable between skid factory or skid mounted equipment and control being routed in pre-fabricated factory and just completing of cable, in skid factory or skid mounted equipment anabolic process, no longer carry out loaded down with trivial details field wiring; Fluid line termination, two ends being provided with the process fluid medium of skid-mounted device connecting pipe of pipeline is unified is integrated into cable bridge, in skid factory or skid mounted equipment anabolic process, no longer carries out loaded down with trivial details stringing operation; See on the whole, this practical each assembly is interrelated technically, use cooperatively interacts, thus the power cable realized between skid-mounted device and control cable unified planning wiring, process fluid medium pipeline unified planning stringing between skid-mounted device, and wiring and stringing all complete in standardized pre-fabricated factory, entirety is transported to scene and installs again, thus guarantee structural stability and the reliability of mechatronics bridge of the present utility model, just there is no site-assembled inconvenience, also help the recycling of mechatronics bridge yet.
2, mechatronics bridge of the present utility model, because direction diagonally arranges brace on subframe, thus improves rigidity and the structural stability of frame supporter further; Be set in parallel in frame supporter owing to adopting by least two pipelines, the installation space that every root pipeline takies is less, and same frame supporter can arrange more pipeline, thus improves versatility of the present utility model further; Owing to adopting metal hose as skid-mounted device connecting pipe of pipeline, thus improve ease for use of the present utility model and operability further; Owing to adopting U-bolt as pipeline fixing device, thus improve the fixed effect of pipeline further, reduce the fixed cost of pipeline further; Owing to arranging expansion bolt on cement pedestal, directly frame supporter is fixedly connected on cement pedestal by hole for the expansion bolt, thus improves further of the present utility model convenience is set.
Accompanying drawing explanation
Fig. 1 is the structural representation of mechatronics bridge of the present utility model.
Fig. 2 is the connected mode schematic diagram that pipeline of the present utility model is fixedly connected with the support channel-section steel of steel construction.
Reference numeral in Fig. 1 to Fig. 2 is expressed as: 1-frame supporter, 2-cable bridge, 3-pipeline, 101-rectangular frame, 102-support bar, 103-subframe, 104-brace, 201-cable quick connector, 202-controls cable quick connector, 301-skid-mounted device connecting pipe of pipeline, 401-U type bolt.
Embodiment
Below in conjunction with drawings and Examples, the utility model is further illustrated.
As shown in Figure 1 and Figure 2, mechatronics bridge of the present utility model, comprise cable bridge 2, the frame supporter 1 of pipeline 3 that termination, two ends is provided with skid-mounted device connecting pipe of pipeline 301, band pedestal jockey, frame supporter 1 comprises rectangular frame 101, at least two support bars 102 be arranged in turn along rectangular frame 101 length or Width on rectangular frame 101, and rectangular frame 101 is separated at least three subframes 103 by least two support bars 102; Cable bridge 2 is fixedly installed in frame supporter 1 along support bar 102 setting direction, pipeline 3 is fixedly installed in the frame supporter 1 of cable bridge 2 side along support bar 102 setting direction, and pipeline 3 is fixedly connected on the support bar 102 of frame supporter 1 by pipeline fixing device; Cable bridge 2 be provided with cable quick connector 201 and control cable quick connector 202.
As shown in Figure 1, those skilled in the art, the specification of the space structure determination rectangular frame 101 between the skid-mounted device that pipeline 3 connects and cable connects as required, support bar 102, cable bridge 2, pipeline 3, skid-mounted device connecting pipe of pipeline 301, the specification of rectangular frame 101 and support bar 102 is determined, the specification of frame supporter 1 is also just corresponding to be determined.In conjunction with pipeline 3 interface layout, cable interface layout, the control cable interface layout of two skid-mounted devices, determine cable bridge 2, the layout of pipeline 3 in frame supporter 1, according to the specification of the specification determination pipeline fixing device of pipeline 3, according to the specification of pedestal arranging frame supporter 1, the feature of syndeton and syndeton layout determine the pedestal jockey be arranged on bottom frame supporter 1, because pedestal is generally cement pedestal, if have pre-buried anchor slab in cement pedestal, then pedestal jockey is steel column, steel column is welded to connect on the rectangular frame 101 or support bar 102 of frame supporter 1, if do not have in cement pedestal pre-buriedly to bury anchor slab, then the expansion bolt connecting part with hole for the expansion bolt is set at rectangular frame 101 or support bar 102, preferably directly on support bar 102 or rectangular frame 101, offer hole for the expansion bolt, frame supporter 1 is installed on pedestal subsequently through expansion bolt.
Said frame bearing 1 for arranging cable bridge 2, pipeline 3, and bears the weight of cable bridge 2, pipeline 3.Rectangular frame 101 and the support bar 102 of frame supporter 1 adopt industry profile, as channel-section steel, I-shaped steel & aluminum section steel are made, when guaranteeing that frame supporter 1 has good structural stability, in order to reduce the cost of manufacture of frame supporter 1, preferred scheme is, adopts channel-section steel to make rectangular frame 101 and support bar 102.
Above-mentioned pipeline 3 and skid-mounted device connecting pipe of pipeline 301 are for building the fluid passage of the process fluid medium outside skid-mounted device, the metal tube that pipeline 3 and skid-mounted device pipeline 3 adopt this area conventional or plastic pipe, the shape of pipeline 3 can be line style, also can be L-type, line style pipeline 3 connects for the pipeline 3 realized between two relative skid-mounted devices, L-type pipeline 3 connects for the pipeline 3 realized between two adjacent skid-mounted devices, and same frame supporter 1 can use line style pipeline 3 and L-type pipeline 3 simultaneously.For the ease of overcoming pipeline 3, skid-mounted device connecting pipe of pipeline 301 designs and step-up error, usually adopts the metal hose with certain flexibility as skid-mounted device connecting pipe of pipeline 301.Skid-mounted device connecting pipe of pipeline 301 and pipeline 3 have suitable syndeton, as screw connection structure, socket syndeton, socket connection structure, if adopt metal hose as skid-mounted device connecting pipe of pipeline 301, between skid-mounted device connecting pipe of pipeline 301 and pipeline 3, also clamp connection structure can be adopted.
Above-mentioned cable bridge 2 is for realizing power cable between skid-mounted device and controlling the switching of cable, cable bridge 2 is generally square tube shape hollow structure, there is in cable bridge 2 wire structures of power cable and control cable, for the ease of wiring, bottom support body ascender line cable crane span structure 2 axis of cable bridge 2 offers through notch, the periphery of cable bridge 2 is provided with cable quick connector 201 and controls cable quick connector 202, for the ease of using cable quick connector 201 or controlling cable quick connector 202, preferred scheme is, cable quick connector 201 and control cable quick connector 202 are arranged on the top of cable bridge 2.
Above-mentioned pipeline fixing device is used for pipeline 3 to be fixed on support bar 102.Pipeline fixing device can be U-bolt 401, also can be U-tube folder, if adopt U-bolt 401 as pipeline fixing device, when then implementing, support bar 102 is also provided with the bolt hole suitable with U-bolt 401, if adopt U-tube folder as pipeline fixing device, when then implementing, support bar 102 is also provided with the bolt hole that the bolt hole that presss from both sides with U-tube is suitable, if pipeline 3 is metallic conduit 3, then U-tube folder can be welded to connect with the connected mode of support bar 102.In order to reduce the assembly of pipeline fixing device, improve fixed efficiency and the fixed mass of pipeline 3, preferred scheme is, pipeline fixing device is U-bolt 401.
It is more than the selection implementation process of each assembly of the utility model mechatronics bridge.
During enforcement, as shown in Figure 1, those skilled in the art make every limit component and at least two support bars 102 of rectangular frame 101 with industry profile, the connected mode on the adjacent both sides of rectangular frame 101 can be welded to connect, also can be threaded, in order to strengthen the tightness of connection, preferential scheme is, the adjacent both sides of rectangular frame 101 arrange mutually adaptive interface arrangment, first adopt the connected mode be fixed to make rectangular frame 101, then adopt the mode being welded to connect and being threaded to reinforce rectangular frame 101 further; Along rectangular frame 101 length or Width, support bar 102 is arranged in rectangular frame 101 in turn again, the two ends of support bar 102 and the connected mode on rectangular frame 101 limit can be welded to connect, also can be threaded, in order to strengthen the connection tightness of support bar 102 and rectangular frame 101 limit, preferred scheme is, rectangular frame 101 limit arranges interface arrangment, support bar 102 is fixed on rectangular frame 101, then adopts the mode being welded to connect and being threaded to reinforce the connection further a little; Again pedestal jockey is set bottom frame supporter 1, normally hole for the expansion bolt, frame supporter 1 can be made by above-mentioned steps.
During enforcement, as shown in Figure 1, those skilled in the art, in frame supporter 1, select a position as the setting position of cable bridge 2 along support bar 102 setting direction, cable bridge 2 is fixedly installed in frame supporter 1, then in cable bridge 2 side, along the setting position of support bar 102 setting direction determination pipeline 3 on support bar 102, screw vent is drilled with in the both sides of this setting position, adopt U-bolt 401 or U-tube folder that pipeline 3 is fixed on support bar 102, in the both sides of pipeline 3, skid-mounted device connecting pipe of pipeline 301 is set, as metal hose; The periphery support body of cable bridge 2 is laid cable quick connector 201 and controls cable quick connector 202, power cable or control cable are laid in cable bridge 2, and with corresponding cable quick connector 201 with control cable quick connector 202 and be electrically connected, pedestal jockey is set in the bottom of frame supporter 1, as being welded to connect expansion bolt connecting part.Mechatronics bridge of the present utility model is can be made into by above-mentioned steps.Because skid factory or skid mounted equipment adopt systematization modularized design, the skid-mounted device forming skid factory or skid mounted equipment is relative in structure with setting position to be determined, therefore, mechatronics bridge of the present utility model can be prefabricated in the factory, entirety is transported to scene and installs again, thus guarantee structural stability and the reliability of mechatronics bridge of the present utility model, the also inconvenience brought of corresponding minimizing assembled in situ.
During use, directly by pedestal jockey, mechatronics bridge is fixedly connected on cement pedestal, again skid-mounted device connecting pipe of pipeline 301 is connected with skid-mounted device pipeline 3 interface, directly cable quick connector 201 is connected the cable socket of skid-mounted device, control cable quick connector 202 is connected the cable receptacles of the control cable of skid-mounted device, just can complete the connection between electrical connection bridge and skid-mounted device.When carrying out place resettlement, pull up cable quick connector 201 and control cable quick connector 202, skid-mounted device connecting pipe of pipeline 301 and skid-mounted device pipeline 3 interface are removed annexation, releasing pedestal jockey is fixedly connected with relation with cement pedestal, mechatronics bridge is transported to new place, and the secondary that just can realize mechatronics bridge utilizes.
It is more than basic embodiment of the present utility model.As can be seen from above-mentioned implementation process, by power cable and quick connector, control cable and quick connector unification are integrated into cable bridge 2, cable bridge 2 has the power cable between unified planning skid-mounted device and controls the technical role of cable wiring, thus realize power cable between skid factory or skid mounted equipment and control being routed in pre-fabricated factory and just completing of cable, in skid factory or skid mounted equipment anabolic process, no longer carry out loaded down with trivial details field wiring; The fluid line 3 termination, two ends being provided with the process fluid medium of skid-mounted device connecting pipe of pipeline 301 is unified is integrated into cable bridge 2, in skid factory or skid mounted equipment anabolic process, no longer carries out loaded down with trivial details stringing operation; See on the whole, this practical each assembly is interrelated technically, use cooperatively interacts, thus the power cable realized between skid-mounted device and control cable unified planning wiring, process fluid medium pipeline 3 unified planning stringing between skid-mounted device, and wiring and stringing all complete in standardized pre-fabricated factory, entirety is transported to scene and installs again, thus guarantee structural stability and the reliability of mechatronics bridge of the present utility model, just there is no site-assembled inconvenience, also help the recycling of mechatronics bridge yet.
In order to strengthen the structural stability of frame supporter 1, the utility model is further improved on basic embodiment basis, and as shown in Figure 1, the first preferred implementation of the present utility model is, subframe 103 direction is diagonally provided with brace 104.
During enforcement, on subframe 103, direction diagonally arranges brace 104, and can all arrange brace 104 on whole subframe 103, also can arrange brace 104 on parton framework 103, those skilled in the art are depending on actual needs.Brace 104 and subframe 103 form two triangular structures, and triangular structure has good Static stiffness and structural stability, thus improve rigidity and the structural stability of frame supporter 1 further.
In order to make frame supporter 1, more pipeline 3 can be set, the utility model is further improved on basic embodiment or the first preferred implementation basis, second preferred implementation of the present utility model is, pipeline 3 is at least two, and at least two pipelines 3 are set in parallel in frame supporter 1.
During enforcement, adopt and be set in parallel in frame supporter 1 by least two pipelines 3, the installation space that every root pipeline 3 takies is less.Therefore, same frame supporter 1 can arrange more pipeline 3, thus improves versatility of the present utility model further.
For the ease of using skid-mounted device connecting pipe of pipeline 301, pipeline 3 and skid-mounted device pipeline 3 interface are coupled together, the basis of the utility model any one execution mode in basic embodiment, the first execution mode, the 3rd preferred implementation is further improved, 3rd preferred implementation of the present utility model is that skid-mounted device connecting pipe of pipeline 301 is metal hose.
During enforcement, adopt metal hose as skid-mounted device connecting pipe of pipeline 301, metal hose has certain flexibility, connection degree of difficulty between the skid-mounted device connecting pipe of pipeline 301 that can effectively overcome due to Design and manufacture error band and skid-mounted device pipeline 3 interface, thus improve ease for use of the present utility model and operability further.
For the ease of pipeline 3 being fixed on support bar 102 by pipeline fixing device, as shown in Figure 2, the basis of the utility model any one execution mode in basic embodiment, the first to the 3rd preferred implementation is further improved, 4th preferred implementation of the present utility model is that pipeline fixing device is U-bolt 401.
During enforcement, support bar 102 is arranged and the corresponding bolt hole of U-bolt 401, just by U-bolt 401, pipeline 3 can be fixed on support bar 102.U-bolt 401 is standard component general in industry, and use cost is lower, has good structural strength and the rigidity of structure simultaneously, thus improves the fixed effect of pipeline 3 further, reduces the fixed cost of pipeline 3 further.
For the ease of frame supporter 1 is fixed on pedestal, the basis of the utility model any one execution mode in basic embodiment, first to fourth preferred implementation is further improved, 5th preferred implementation of the present utility model is, pedestal jockey is be arranged on the hole for the expansion bolt on support bar 102 or rectangular frame 101.
During enforcement, cement pedestal arranges expansion bolt, directly frame supporter 1 is fixedly connected on cement pedestal by hole for the expansion bolt, thus improve further of the present utility model convenience is set.
It is more than the implementation process of mechatronics bridge of the present utility model.As can be seen from above-mentioned implementation process, mechatronics bridge of the present utility model achieves the same planning wiring of connection cable between the skid-mounted device assembly of skid factory or skid mounted equipment, the same planning stringing of connecting tube 3, and complete wiring and stringing operation at standardized pre-fabricated factory, entirety is transported to scene and installs again, thus guarantee structural stability and the reliability of mechatronics bridge of the present utility model, the also inconvenience brought of corresponding minimizing assembled in situ.

Claims (6)

1. mechatronics bridge, it is characterized in that, comprise cable bridge (2), the frame supporter (1) of pipeline (3) that termination, two ends is provided with skid-mounted device connecting pipe of pipeline (301), band pedestal jockey, described frame supporter (1) comprises rectangular frame (101), at least two support bars (102) be arranged in turn along rectangular frame (101) length or Width on rectangular frame (101), and rectangular frame (101) is separated at least three subframes (103) by least two described support bars (102); Described cable bridge (2) is fixedly installed in frame supporter (1) along support bar (102) setting direction, described pipeline (3) is fixedly installed in the frame supporter (1) of cable bridge (2) side along support bar (102) setting direction, and described pipeline (3) is fixedly connected on the support bar (102) of frame supporter (1) by pipeline fixing device; Described cable bridge (2) be provided with cable quick connector (201) and control cable quick connector (202).
2. mechatronics bridge according to claim 1, is characterized in that, described subframe (103) direction is diagonally provided with brace (104).
3. mechatronics bridge according to claim 1, is characterized in that, described pipeline (3) is at least two, and at least two described pipelines (3) are set in parallel in frame supporter (1).
4. according to the mechatronics bridge in claims 1 to 3 described in any one claim, it is characterized in that, described skid-mounted device connecting pipe of pipeline (301) is metal hose.
5. according to the mechatronics bridge in claims 1 to 3 described in any one claim, it is characterized in that, described pipeline fixing device is U-bolt (401).
6. according to the mechatronics bridge in claims 1 to 3 described in any one claim, it is characterized in that, described pedestal jockey is for being arranged on the hole for the expansion bolt on support bar (102) or rectangular frame (101).
CN201520223214.5U 2015-04-14 2015-04-14 Mechatronics bridge Expired - Fee Related CN204615305U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520223214.5U CN204615305U (en) 2015-04-14 2015-04-14 Mechatronics bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520223214.5U CN204615305U (en) 2015-04-14 2015-04-14 Mechatronics bridge

Publications (1)

Publication Number Publication Date
CN204615305U true CN204615305U (en) 2015-09-02

Family

ID=53967829

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520223214.5U Expired - Fee Related CN204615305U (en) 2015-04-14 2015-04-14 Mechatronics bridge

Country Status (1)

Country Link
CN (1) CN204615305U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107940109A (en) * 2017-12-05 2018-04-20 中国建筑第八工程局有限公司 A kind of pipeline support structure and its installation method based on wall

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107940109A (en) * 2017-12-05 2018-04-20 中国建筑第八工程局有限公司 A kind of pipeline support structure and its installation method based on wall

Similar Documents

Publication Publication Date Title
CN103410353B (en) Garage steel framework and mounting process
CN102444204B (en) Support beam structure capable of extending span and reducing height of ceiling structure and installing method thereof
CN104018675B (en) A kind of construction method of shear wall concrete blinding
CN103510625A (en) Top-bottom T-shaped steel type node for connecting H-shaped steel beam with rectangular tubular column through unilateral bolts
CN202570872U (en) Cold bending correction device for steel pipe rods
CN106193402B (en) Girder truss integrated form flooring module and its installation method
CN113137000A (en) Reticulated shell arch-shaped steel structure and construction method thereof
CN204112525U (en) Band perps precast shear wall structure in strong concrete precast frame
CN103104038A (en) Rectangular tubular column jointing inner sleeve bolt connection node
CN105040880A (en) Roof steel structure and construction method thereof
CN103216030A (en) Method for splicing and connecting precast reinforced concrete floor slabs within span
CN109702387B (en) Method for manufacturing steel structure of tower column lining of cable-stayed bridge
CN204615305U (en) Mechatronics bridge
CN205476068U (en) Interim strutting arrangement of fusiformis space truss
CN104060841B (en) Large-span steel girder construction method of installation
CN105484402A (en) Combined GRC (glass-fiber reinforced composite) wallboard, GRC panel and GRC curtain wall
CN102011432B (en) Novel polygonal combined steel pipe
KR100812248B1 (en) Prefabrication steel bar arrangement structure
CN103104034A (en) Connected node of end plate type H-shaped steel beam and rectangular pipe column split bolt
CN206600005U (en) The positioning component and positioner of reserved joint bar in shear wall
CN203145481U (en) Manufacturing and positioning device of variable-angle steel pipe column splicing ear plate
CN103104035A (en) Bolt connection node of rectangular tubular column splicing externally-sleeved connection piece
CN205377210U (en) Composite cable bridge -rack
CN103510626A (en) Top-bottom angle iron type node for connecting H-shaped steel beam with rectangular tubular column through unilateral bolts
CN203656365U (en) Combination-type transition cable leading cage based on cable leading towards lower bridge surface

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150902

Termination date: 20170414

CF01 Termination of patent right due to non-payment of annual fee