CN204597311U - A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection - Google Patents

A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection Download PDF

Info

Publication number
CN204597311U
CN204597311U CN201520263107.5U CN201520263107U CN204597311U CN 204597311 U CN204597311 U CN 204597311U CN 201520263107 U CN201520263107 U CN 201520263107U CN 204597311 U CN204597311 U CN 204597311U
Authority
CN
China
Prior art keywords
bus
breaker
power distribution
inlet
distribution equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520263107.5U
Other languages
Chinese (zh)
Inventor
李雪松
杨国富
张北辰
王振蛟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northeast Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201520263107.5U priority Critical patent/CN204597311U/en
Application granted granted Critical
Publication of CN204597311U publication Critical patent/CN204597311U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Gas-Insulated Switchgears (AREA)

Abstract

A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection, power distribution equipment framework adopts full co-ordinative construction, only bus girders is set, circuit breaker is arranged in the bottom, current transformer is arranged in the top of circuit breaker, isolating switch and earthed switch and inlet-outlet sleeve branch bar are arranged in most top layer, the isolating switch of bus breaker unit and earthed switch are connecting side with network interconnecting circuit unit and circuit breaker is arranged vertically, and other isolating switches and earthed switch are all arranged in same straight line with circuit breaker; Adopt jumper pipe bus to connect between inlet-outlet sleeve and voltage transformer, arrange road below outgoing line side jumper pipe bus, arrange lightning arrester under the jumper pipe bus of main transformer inlet wire side, built on stilts line is connected with jumper pipe bus by built on stilts line downlead.The utility model is by the position of adjustment HGIS bus casing, outlet casing tube and breaker unit, simplify power distribution equipment arrangement, reduce framework height, eliminate the intermediate frame post of conventional H GIS power distribution equipment bus girders, decrease the cross dimensions in line direction.

Description

A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection
Technical field
The utility model relates to 500kV ehv power transmission engineering design technology field, more particularly, relates to a kind of 500kV HGIS power distribution equipment new arrangement structure of 3/2 breaker connection.
Background technology
500kV is as the electric pressure of the key electrical network of China's superhigh pressure, and the problems such as its technical advance obtain the concern of vast power industry designer.The Type of equipment that the 500kV outdoor power distribution unit of current China is conventional has four kinds, is respectively porcelain knob breaker, potting breaker, HGIS, GIS.
Because HGIS is in technology, advantage economically, obtained increasingly extensive application in recent years in China, HGIS has that operational reliability is high, adaptive capacity to environment strong, safeguard less, easy for installation, floor space is little, technical-economic index advantages of higher.
The conventional arrangement of 500kV HGIS power distribution equipment of 3/2 breaker connection is: bus adopts suspension type aluminum tube bus, in a complete string, the bus casing of HGIS is arranged in two ends, inlet-outlet sleeve is arranged in the inner side of bus casing, upright to line cross-line in HGIS location arrangements string on bus, by drawing to reach the standard grade interior to HGIS outlet casing tube and string line cross-line is connected.Due to the existence of line cross-line beam in the string of upper strata, need to arrange support column between two groups of buses.In addition according to two groups of inlet-outlet sleeves in string draw reach the standard grade difference time interruption maintenance and outlet casing tube draw the requirement of opposite side pipe bus electrical distance mutually of reaching the standard grade, cause the distance of the 2 groups of adjacent phases of bus in upper strata very large, be generally greater than 20m.
The conventional arrangement complex structure of 500kV HGIS power distribution equipment of 3/2 breaker connection, saving floor space aspect is compared with GIS or there is certain gap, for reducing the occupation of land of existing conventional 3/2 breaker connection 500kV HGIS power distribution equipment, simplify arrangement simultaneously, the utility model proposes a kind of brand-new arrangement.
Utility model content
The purpose of this utility model is to provide a kind of 500kV HGIS power distribution equipment arrangement of 3/2 novel breaker connection
For achieving the above object, the utility model provides a kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection, it is characterized in that: power distribution equipment framework adopts full co-ordinative construction, only bus girders is set, bus breaker unit, bus casing and network interconnecting circuit unit, inlet-outlet sleeve are arranged on two straight lines being parallel to each other, bus casing is arranged in the end of bus breaker unit, and inlet-outlet sleeve is arranged in the outside of bus casing; Each bus breaker unit and network interconnecting circuit unit respectively configure 1 current transformer and 1 isolating switch and earthed switch in the both sides of breaker fracture, arrangement is that circuit breaker is arranged in the bottom, current transformer is arranged in the top of circuit breaker, isolating switch and earthed switch and inlet-outlet sleeve branch bar are arranged in most top layer, the isolating switch of bus breaker unit and earthed switch are connecting side with network interconnecting circuit unit and circuit breaker is arranged vertically, and other isolating switches and earthed switch are all arranged in same straight line with circuit breaker; Adopt jumper pipe bus to connect between inlet-outlet sleeve and voltage transformer, arrange road below outgoing line side jumper pipe bus, arrange lightning arrester under the jumper pipe bus of main transformer inlet wire side, built on stilts line is connected with jumper pipe bus by built on stilts line downlead.
The utility model is by the position of adjustment HGIS bus casing, outlet casing tube and breaker unit, simplify power distribution equipment arrangement, cancel the upper strata cross-line beam of conventional H GIS power distribution equipment, reduce framework height, eliminate the intermediate frame post of conventional H GIS power distribution equipment bus girders, decrease the cross dimensions in line direction.
Accompanying drawing explanation
Fig. 1 is the utility model embodiment floor plan;
Fig. 2 is the utility model embodiment sectional drawing.
1: bus girders, 2: suspension tubular busbar, 3: suspension tubular busbar downlead, 4: bus casing, 5: bus breaker unit, 6: network interconnecting circuit unit, 7: inlet-outlet sleeve branch bar, 8: inlet-outlet sleeve, 9: jumper pipe bus, 10: voltage transformer, 11: lightning arrester, 12: built on stilts line downlead, 13: built on stilts line, 14: circuit breaker, 15: current transformer, 16: isolating switch and earthed switch.
Embodiment
With reference to Fig. 1, Fig. 2, power distribution equipment framework adopts full co-ordinative construction, bus girders 1 is only set, bus breaker unit 5, bus casing 4 and network interconnecting circuit unit 6, inlet-outlet sleeve 8 are arranged on two straight lines being parallel to each other, bus casing 4 is arranged in the end of bus breaker unit 5, and inlet-outlet sleeve 8 is arranged in the outside of bus casing 4, each bus breaker unit 5 and network interconnecting circuit unit 6 respectively configure 1 current transformer 15 and 1 isolating switch and earthed switch 16 in the both sides of circuit breaker 14 fracture, arrangement is that circuit breaker 14 is arranged in the bottom, current transformer 15 is arranged in the top of circuit breaker 14, isolating switch and earthed switch 16 and inlet-outlet sleeve branch bar 7 are arranged in most top layer, the isolating switch of bus breaker unit 5 and earthed switch 16 are connecting side with network interconnecting circuit unit 6 and circuit breaker 14 is arranged vertically, other isolating switches and earthed switch 16 are all arranged in same straight line with circuit breaker 14, jumper pipe bus 9 is adopted to connect between inlet-outlet sleeve 8 and voltage transformer 10, below outgoing line side jumper pipe bus, road is set, arrange lightning arrester 11 under the jumper pipe bus of main transformer inlet wire side, built on stilts line 13 is connected with jumper pipe bus 9 by built on stilts line downlead 12.

Claims (1)

1. the 500kV HGIS power distribution equipment arrangement of a breaker connection, it is characterized in that: power distribution equipment framework adopts full co-ordinative construction, only bus girders is set, bus breaker unit, bus casing and network interconnecting circuit unit, inlet-outlet sleeve are arranged on two straight lines being parallel to each other, bus casing is arranged in the end of bus breaker unit, and inlet-outlet sleeve is arranged in the outside of bus casing; Each bus breaker unit and network interconnecting circuit unit respectively configure 1 current transformer and 1 isolating switch and earthed switch in the both sides of breaker fracture, arrangement is that circuit breaker is arranged in the bottom, current transformer is arranged in the top of circuit breaker, isolating switch and earthed switch and inlet-outlet sleeve branch bar are arranged in most top layer, the isolating switch of bus breaker unit and earthed switch are connecting side with network interconnecting circuit unit and circuit breaker is arranged vertically, and other isolating switches and earthed switch are all arranged in same straight line with circuit breaker; Adopt jumper pipe bus to connect between inlet-outlet sleeve and voltage transformer, arrange road below outgoing line side jumper pipe bus, arrange lightning arrester under the jumper pipe bus of main transformer inlet wire side, built on stilts line is connected with jumper pipe bus by built on stilts line downlead.
CN201520263107.5U 2015-04-28 2015-04-28 A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection Expired - Fee Related CN204597311U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520263107.5U CN204597311U (en) 2015-04-28 2015-04-28 A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520263107.5U CN204597311U (en) 2015-04-28 2015-04-28 A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection

Publications (1)

Publication Number Publication Date
CN204597311U true CN204597311U (en) 2015-08-26

Family

ID=53933425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520263107.5U Expired - Fee Related CN204597311U (en) 2015-04-28 2015-04-28 A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection

Country Status (1)

Country Link
CN (1) CN204597311U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109256685A (en) * 2018-09-25 2019-01-22 中国电力工程顾问集团西南电力设计院有限公司 A kind of 750kV open type distribution device method for arranging
CN109728535A (en) * 2019-03-11 2019-05-07 中国电力工程顾问集团西北电力设计院有限公司 A kind of ehv power transmission GIS breaker double-row type arragement construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109256685A (en) * 2018-09-25 2019-01-22 中国电力工程顾问集团西南电力设计院有限公司 A kind of 750kV open type distribution device method for arranging
CN109728535A (en) * 2019-03-11 2019-05-07 中国电力工程顾问集团西北电力设计院有限公司 A kind of ehv power transmission GIS breaker double-row type arragement construction
CN109728535B (en) * 2019-03-11 2024-05-14 中国电力工程顾问集团西北电力设计院有限公司 Double-row arrangement structure of ultra-high voltage power transmission and transformation GIS circuit breaker

Similar Documents

Publication Publication Date Title
CN105298201B (en) Transmission line cable termination solid draws lower device
CN204190176U (en) The new arrangement of the female HGIS power distribution equipment of hanging tubular
CN204088899U (en) The vertical wire outlet structure of Novel outdoor GIS power distribution equipment
CN203839722U (en) 220kV transformer station of indoor GIS overhear outlet cable
CN201509016U (en) Power distribution device structure of outdoor HGIS equipment
CN202978006U (en) Ultrahigh voltage intelligent substation medium-voltage side HGIS power distribution device
CN104821490A (en) 500 kV HGIS power distribution device arrangement structure
CN204597311U (en) A kind of 500kV HGIS power distribution equipment arrangement of 3/2 breaker connection
CN103904564A (en) High-voltage distribution device with double breakers used for single bus segmentation and application thereof
CN201838925U (en) 500KV open type high-voltage distribution device with breaker-and-a-half single-row arrangement
CN202721351U (en) A double-layer outgoing line structure of a 220kV HGIS power distribution unit
CN110994369B (en) Combined equipment configuration structure of shared casing on HGIS bus side
CN203617560U (en) Double-bus single-row layout AIS power distribution unit layout structure of transformer substation
CN203617561U (en) Transformer station double-bus and double-row arrangement AIS power distribution device arrangement structure
CN203014185U (en) Line connecting structure for crossed matching of incoming lines and outgoing lines of 500kV power distribution device
CN105914590A (en) GIS transformer station distribution wire outlet system
CN205489250U (en) GIS distribution device arrangement structure that business turn over line framework merges
CN104538850A (en) Three-phase tube bus vertical structure of 1000 kV transformer substation
CN201846015U (en) GIS (global information system) power distribution unit adopting one and half breaker connection
CN104505758A (en) Configuration method of 110kV outdoor flexible busbar improved half-high distribution device
CN103701045B (en) A kind of transformer station double-bus dually arrayed AIS power distribution equipment arrangement
CN107611783A (en) The back-to-back arrangement of brace type bus
CN204190186U (en) The compact HGIS three-row power distribution equipment of single tube post framework pattern is entirely combined based on 220kV
CN207282908U (en) The 500kV power distribution equipments arranged using half c-type
CN204230648U (en) Based on the outdoor power distribution unit of Novel tank-type circuit breaker

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826