CN204594199U - A kind of tunnel cave with accurate dosing device - Google Patents
A kind of tunnel cave with accurate dosing device Download PDFInfo
- Publication number
- CN204594199U CN204594199U CN201520239851.1U CN201520239851U CN204594199U CN 204594199 U CN204594199 U CN 204594199U CN 201520239851 U CN201520239851 U CN 201520239851U CN 204594199 U CN204594199 U CN 204594199U
- Authority
- CN
- China
- Prior art keywords
- base plate
- radiating tube
- preheating section
- furnace zone
- kiln
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P40/00—Technologies relating to the processing of minerals
- Y02P40/60—Production of ceramic materials or ceramic elements, e.g. substitution of clay or shale by alternative raw materials, e.g. ashes
Landscapes
- Furnace Charging Or Discharging (AREA)
Abstract
A kind of tunnel cave with accurate dosing device, there is kiln body, kiln body is successively by preheating section, furnace zone and cooling section composition, radiating tube is folded with respectively between described preheating section and the inside and outside wall of furnace zone, adobe is subject to thermally-stabilised in sintering procedure, improve the quality of brick, be connected by air exhauster between the radiating tube outlet of furnace zone and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section connects bootstrap system, the waste heat of generation is carried out secondary, utilize for three times, reach the object of energy-saving and emission-reduction, track is provided with at the bottom of kiln, floor board framing is established in orbit, track is provided with adobe building mortion away from one end of kiln body, adobe building mortion connects burden agitator, burden agitator is provided with load cell, load cell connection control unit, device for transporting objects attachment feed bin, by the folding of the Weight control material bin door of material, by the burden control of material in exact extension, reduce that pulp furnish is defective causes damage.
Description
Technical field
The utility model relates to kiln association area, particularly relates to a kind of tunnel cave with accurate dosing device.
Background technology
Brickmaking industry is a more traditional industry in China; in the technological process of brickmaking; automaticity is not high; major part is main or rely on manual work to be main, and because the working environment in brickmaking process has particular/special requirement, workman needs to stand severe working environment for a long time in operation process; simultaneously; need a large amount of labours to carry in work flow conversion, workman often can be injured in the process of carrying, inefficiency.
Along with, the increase of cost of labor, production cost is progressively improving, brickmaking operation progressively turns to semi-automatic mechanical work from manual work, but, the mechanical work of these semi-automation also needs human assistance or has special messenger to be responsible for tracking to check, existing tunnel cave is still wasted in the consumption of the energy very much, and due to artificial material proportioning and be heated uneven, product quality is also very unstable, in use due to the base plate of kiln body be partially damaged time, do not have impaired part to need in the lump to change in the lump yet, cause unnecessary waste.
Summary of the invention
The utility model provides a kind of tunnel cave, and object solves prior art problem, provides a kind of batching accurately, is heated evenly, energy-saving and emission-reduction, is convenient for changing the tunnel cave of base plate.
The utility model deal with problems adopt technical scheme be:
A kind of tunnel cave with accurate dosing device, there is kiln body, kiln body is successively by preheating section, furnace zone and cooling section composition, it is characterized in that: the kiln top of described preheating section and furnace zone, form by inner and outer wall at the bottom of left and right sidewall and kiln, radiating tube is folded with respectively between inside and outside wall, be connected by air exhauster between the radiating tube outlet of furnace zone and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section connects bootstrap system, arrival end and the port of export of furnace zone are respectively equipped with gate, gate connection control unit, by the switch of control unit regulating gate, track is provided with at the bottom of described kiln, track is provided with slide rail, base plate is polylith composition, base plate is provided with base plate keyhole, base plate is fixedly connected with slide rail through base plate keyhole by gim peg, gim peg and base plate keyhole match, track is provided with adobe building mortion away from one end of kiln body, adobe building mortion connects burden agitator.
Described burden agitator has device for transporting objects, feed hopper and agitating device, and device for transporting objects is provided with load cell, load cell connection control unit, device for transporting objects attachment feed bin.
Be provided with door between described device for transporting objects and material bin, door connection control unit, how much controlled the folding of door by control unit according to the weight of material.
The beneficial effects of the utility model: because the utility model heat supply is evenly distributed, make adobe in sintering procedure by thermally-stabilised, improve the quality of brick, the waste heat of generation is carried out secondary, utilize for three times, reduce the waste of the energy, to reach the object of energy-saving and emission-reduction, slide rail design also greatly reduces the working strength of workman, decrease the work load of workman, if in use base plate has damage, the base plate of correspondence can be changed according to the particular location damaged by workman, reduce the waste that whole plate is changed, simultaneously, by the folding of the Weight control door of material, by the burden control of material in exact extension, reduce that pulp furnish is defective causes damage.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model furnace zone;
Fig. 2 is the utility model syndeton schematic diagram;
Fig. 3 is a kind of syndeton schematic diagram of the utility model gim peg and keyhole;
Fig. 4 is the another kind of syndeton schematic diagram of the utility model gim peg and keyhole.
In figure: 1, kiln body; 2, preheating section; 3, furnace zone; 4, cooling section; 5, Yao Ding; 6, left side wall; 7, right side wall; 8, at the bottom of kiln; 9, inwall; 10, outer wall; 11, radiating tube; 12, air exhauster; 13, gate; 14, track; 15, slide rail; 16, base plate; 17, ventilating opening; 18, louvre; 19, base plate keyhole; 20, gim peg; 21, slide rail keyhole; 22, adobe building mortion; 23, burden agitator; 24, device for transporting objects; 25, feed hopper; 26, agitating device; 27, load cell.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As Fig. 1, Fig. 2, Fig. 3, a kind of tunnel cave with accurate dosing device shown in Fig. 4, there is kiln body 1, kiln body 1 is successively by preheating section 2, furnace zone 3 and cooling section 4 form, described preheating section 2, furnace zone 3 and cooling section 4 have kiln top 5 respectively, left side wall 6, at the bottom of right side wall 7 and kiln 8, the kiln top 5 of preheating section 2 and furnace zone 3, left side wall 6, at the bottom of right side wall 7 and kiln, 8 form by inwall 9 and outer wall 10, the inwall of described preheating section 2 and furnace zone 3 is provided with louvre 18, the quantity of louvre 18 is multiple, radiating tube 11 is folded with respectively between the inside and outside wall of preheating section 2 and furnace zone 3, described radiating tube 11 coiled coil between inside and outside wall, heat energy connects heat-producing unit (not shown) by the radiating tube entrance of louvre furnace zone 3, be connected by air exhauster 12 between the radiating tube outlet of furnace zone 3 and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section 2 connects bootstrap system (not shown), the arrival end of furnace zone 3 and the port of export are respectively equipped with gate 13, gate 13 connection control unit (not shown), by the switch of control unit regulating gate 13, at the bottom of described kiln, 8 are provided with track 14, track 14 is equipped with slide rail 15, base plate 16 is polylith composition, base plate 16 is provided with base plate keyhole 19, base plate 16 is fixedly connected with slide rail 15 through base plate keyhole 19 by gim peg 20, gim peg 20 and base plate keyhole 19 match, can be hinged between described gim peg 20 and slide rail 15, the length of gim peg 20 is greater than the height of base plate keyhole 19, also can be flexibly connected between gim peg 20 with slide rail 15, described slide rail 15 is provided with slide rail keyhole 21, match with gim peg 20, slide rail keyhole 20 and base plate keyhole 19 are on same vertical line, gim peg 20 is successively through base plate keyhole 19 and slide rail keyhole 21, base plate 16 is fixedly connected with slide rail 15, track 14 is provided with adobe building mortion 22 away from one end of kiln body, adobe building mortion 22 connects burden agitator 23, described burden agitator 23 has device for transporting objects 24, feed hopper 25 and agitating device 26, device for transporting objects 24 is provided with load cell 27, load cell 27 connection control unit (not shown), device for transporting objects 24 attachment feed bin (not shown), door (not shown) is provided with between described device for transporting objects 24 and material bin, door connection control unit (not shown), how much controlled the folding of door according to the weight of material on device for transporting objects 24 by control unit.
The left and right sidewall of described cooling section 4 is provided with ventilating opening 17, and the quantity of ventilating opening is multiple, ventilating opening 17 is hinged with buckle (not shown).
In the course of the work, the weight of material on device for transporting objects 24 is transferred to control unit (not shown) by load cell 27, reception weight of material is analyzed by control unit, if shortage in weight, the door that control unit controls material bin is opened, material is continued to deliver on device for transporting objects 24, enter in agitating device 26 by feed hopper 25, if the weight demands of material on device for transporting objects 24, the door that control unit controls material bin closes, cutting off material enters on device for transporting objects 24, the material of feeding stirs by agitating device 26, the material be stirred is sent in adobe building mortion 22, the adobe be shaped is sent in preheating section 2 by slide rail 15, simultaneously, the heat of generation is delivered to by pipeline in the radiating tube 11 of furnace zone 3 and heat exchange is occurred by heat-producing unit, the temperature in furnace zone 3 is made to increase, roasting is carried out in preheated adobe, gas with furnace zone 3 heat exchange is delivered in the radiating tube of preheating section 2 and is again carried out heat exchange with the air in preheating section 2 by air exhauster 12, and by by slide rail 15 adobe sent in preheating section 2 carry out preheating, after preheating completes, remaining hot gas is recycled to bootstrap system, carry out three times to utilize, simultaneously, gim peg is removed when bottom parts damages time, base plate block can load and unload very easily.
Heat supply heat distribution is even in the course of the work for said structure, make adobe in sintering procedure by thermally-stabilised, improve the quality of brick, the waste heat of generation is carried out secondary, utilize for three times, reduce the waste of the energy, to reach the object of energy-saving and emission-reduction, slide rail design also greatly reduces the working strength of workman, decrease the work load of workman, if in use base plate has damage, the base plate of correspondence can be changed according to the particular location damaged by workman, reduce the waste that whole plate is changed, simultaneously, by the folding of the Weight control door of material, by the burden control of material in exact extension, reduce that pulp furnish is defective causes damage.
Claims (3)
1. one kind has the tunnel cave of accurate dosing device, there is kiln body, kiln body is successively by preheating section, furnace zone and cooling section composition, it is characterized in that: the kiln top of described preheating section and furnace zone, form by inner and outer wall at the bottom of left and right sidewall and kiln, radiating tube is folded with respectively between inside and outside wall, be connected by air exhauster between the radiating tube outlet of furnace zone and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section connects bootstrap system, arrival end and the port of export of furnace zone are respectively equipped with gate, gate connection control unit, by the switch of control unit regulating gate, track is provided with at the bottom of described kiln, track is provided with slide rail, base plate is polylith composition, base plate is provided with base plate keyhole, base plate is fixedly connected with slide rail through base plate keyhole by gim peg, gim peg and base plate keyhole match, track is provided with adobe building mortion away from one end of kiln body, adobe building mortion connects burden agitator.
2. a kind of tunnel cave with accurate dosing device as claimed in claim 1, it is characterized in that: described burden agitator has device for transporting objects, feed hopper and agitating device, device for transporting objects is provided with load cell, load cell connection control unit, device for transporting objects attachment feed bin.
3. a kind of tunnel cave with accurate dosing device as claimed in claim 2, is characterized in that: be provided with door between described device for transporting objects and material bin, door connection control unit how much controlled the folding of door according to the weight of material by control unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520239851.1U CN204594199U (en) | 2015-04-20 | 2015-04-20 | A kind of tunnel cave with accurate dosing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520239851.1U CN204594199U (en) | 2015-04-20 | 2015-04-20 | A kind of tunnel cave with accurate dosing device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204594199U true CN204594199U (en) | 2015-08-26 |
Family
ID=53930345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520239851.1U Expired - Fee Related CN204594199U (en) | 2015-04-20 | 2015-04-20 | A kind of tunnel cave with accurate dosing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204594199U (en) |
-
2015
- 2015-04-20 CN CN201520239851.1U patent/CN204594199U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101811839B (en) | Method for producing cement clinker by calcining chalk | |
CN214218591U (en) | Energy-concerving and environment-protective system of calcining of gypsum | |
CN204369577U (en) | A kind of bentonitic production unit | |
CN204594198U (en) | A kind of portable mobile tunnel cave | |
CN204594199U (en) | A kind of tunnel cave with accurate dosing device | |
CN207793087U (en) | A kind of α types gypsum preparation facilities | |
CN204585512U (en) | A kind of have the tunnel cave automatically regulating output | |
CN205552879U (en) | Cold -resistant resistant merchant concrete mixing station that freezes with aggregate is dried and dustproof function of batching | |
CN204594200U (en) | A kind of tunnel cave | |
CN105384363A (en) | Application method of active lime rotary kiln | |
CN106955237A (en) | A kind of Chinese medicine pretreatment system | |
CN204594202U (en) | A kind of tunnel cave with rotary dobby multistation | |
CN204594201U (en) | A kind of tunnel cave can replacing base plate | |
CN202322647U (en) | Automatic environment-friendly energy-saving lime kiln | |
CN104759305A (en) | Wheat wetting equipment and wheat wetting technology | |
CN209131329U (en) | Battery grid surface drying kiln | |
CN210602696U (en) | Drying device for cement production | |
CN204237567U (en) | A kind of efficient super thick tungsten carbide powder production carbide furnace | |
CN203612962U (en) | Continuous batching device for pot-type calcination furnace | |
CN204244882U (en) | A kind of piggery feed dispenser | |
CN204329539U (en) | A kind of hot-air drying unit | |
CN211999436U (en) | Hot air equipment for sludge drying | |
CN205950994U (en) | Mixing device | |
CN207546274U (en) | A kind of cold and hot batch mixing conveyer | |
CN206828337U (en) | A kind of copper-contained sludge is granulated and the equipment of prebake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150826 Termination date: 20180420 |
|
CF01 | Termination of patent right due to non-payment of annual fee |