CN204585512U - A kind of have the tunnel cave automatically regulating output - Google Patents

A kind of have the tunnel cave automatically regulating output Download PDF

Info

Publication number
CN204585512U
CN204585512U CN201520239746.8U CN201520239746U CN204585512U CN 204585512 U CN204585512 U CN 204585512U CN 201520239746 U CN201520239746 U CN 201520239746U CN 204585512 U CN204585512 U CN 204585512U
Authority
CN
China
Prior art keywords
control unit
water supply
base plate
radiating tube
supply system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520239746.8U
Other languages
Chinese (zh)
Inventor
曹培均
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Heng Xu Harbor Yibin Machinery Co Ltd
Original Assignee
Heng Xu Harbor Yibin Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heng Xu Harbor Yibin Machinery Co Ltd filed Critical Heng Xu Harbor Yibin Machinery Co Ltd
Priority to CN201520239746.8U priority Critical patent/CN204585512U/en
Application granted granted Critical
Publication of CN204585512U publication Critical patent/CN204585512U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Details (AREA)

Abstract

A kind of have the tunnel cave automatically regulating output, there is kiln body, kiln body is successively by preheating section, furnace zone and cooling section composition, radiating tube is folded with respectively between described preheating section and the inside and outside wall of furnace zone, be connected by air exhauster between the radiating tube outlet of furnace zone and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section connects bootstrap system, the waste heat of generation is repeatedly utilized, reach energy-saving and emission-reduction, track is provided with at the bottom of kiln, floor board framing is established in orbit, track is provided with adobe building mortion away from one end of kiln body, adobe building mortion connects burden agitator, burden agitator is provided with automatic water supply system, automatic water supply system connection control unit, control unit controls the switching value of automatic water supply system, burden agitator is provided with load cell, by the folding of Weight control door and the switching value of automatic water supply system of material, by the mixing of material and burden control in exact extension, reduce that pulp furnish is defective causes damage.

Description

A kind of have the tunnel cave automatically regulating output
Technical field
The utility model relates to kiln association area, particularly relates to a kind of tunnel cave with adjustment output automatically.
Background technology
Brickmaking industry is a more traditional industry in China; in the technological process of brickmaking; automaticity is not high; major part is main or rely on manual work to be main, and because the working environment in brickmaking process has particular/special requirement, workman needs to stand severe working environment for a long time in operation process; simultaneously; need a large amount of labours to carry in work flow conversion, workman often can be injured in the process of carrying, inefficiency.
Along with, the increase of cost of labor, produce Chen Ben progressively to improve, brickmaking operation progressively turns to semi-automatic mechanical work from manual work, but, the mechanical work of these semi-automation also needs human assistance or has special messenger to be responsible for tracking to check, existing tunnel cave is still wasted in the consumption of the energy very much, and due to the proportioning of artificial material, material water mixing ratio and be heated uneven, product quality is also very unstable, in use due to the base plate of kiln body be partially damaged time, impaired part is not had to need in the lump to change in the lump yet, cause unnecessary waste.
Summary of the invention
The utility model provides a kind of tunnel cave, and object solves prior art problem, provides a kind of batching accurately, material water mixes, is heated evenly, energy-saving and emission-reduction, be convenient for changing the tunnel cave of base plate.
The utility model deal with problems adopt technical scheme be:
A kind of have the tunnel cave automatically regulating output, there is kiln body, kiln body is successively by preheating section, furnace zone and cooling section composition, it is characterized in that: the kiln top of described preheating section and furnace zone, form by inner and outer wall at the bottom of left and right sidewall and kiln, radiating tube is folded with respectively between inside and outside wall, be connected by air exhauster between the radiating tube outlet of furnace zone and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section connects bootstrap system, arrival end and the port of export of furnace zone are respectively equipped with gate, gate connection control unit, by the switch of control unit regulating gate, track is provided with at the bottom of described kiln, track is provided with slide rail, base plate is polylith composition, base plate is provided with base plate keyhole, base plate is fixedly connected with slide rail through base plate keyhole by gim peg, gim peg and base plate keyhole match, track is provided with adobe building mortion away from one end of kiln body, adobe building mortion connects burden agitator, described burden agitator is provided with automatic water supply system, automatic water supply system connection control unit, control unit controls the switching value of automatic water supply system.
Described burden agitator has device for transporting objects, feed hopper and agitating device, and device for transporting objects is provided with load cell, load cell connection control unit, device for transporting objects attachment feed bin.
Be provided with door between described device for transporting objects and material bin, door connection control unit, how much controlled the folding of door by control unit according to the weight of material.
The switch of described automatic water supply system is electrical ball valve, and control unit controls the switching value of electrical ball valve.
The beneficial effects of the utility model: because the utility model heat supply is evenly distributed, make adobe in sintering procedure by thermally-stabilised, improve the quality of brick, the waste heat of generation is carried out secondary, utilize for three times, reduce the waste of the energy, to reach the object of energy-saving and emission-reduction, slide rail design also greatly reduces the working strength of workman, decrease the work load of workman, if in use base plate has damage, the base plate of correspondence can be changed according to the particular location damaged by workman, reduce the waste that whole plate is changed, simultaneously, by the folding of Weight control door and the switching value of automatic water supply system of material, by the mixing of material and burden control in exact extension, reduce that pulp furnish is defective causes damage.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model furnace zone;
Fig. 2 is the utility model syndeton schematic diagram;
Fig. 3 is a kind of syndeton schematic diagram of the utility model gim peg and keyhole;
Fig. 4 is the another kind of syndeton schematic diagram of the utility model gim peg and keyhole.
In figure: 1, kiln body; 2, preheating section; 3, furnace zone; 4, cooling section; 5, Yao Ding; 6, left side wall; 7, right side wall; 8, at the bottom of kiln; 9, inwall; 10, outer wall; 11, radiating tube; 12, air exhauster; 13, gate; 14, track; 15, slide rail; 16, base plate; 17, ventilating opening; 18, louvre; 19, base plate keyhole; 20, gim peg; 21, slide rail keyhole; 22, adobe building mortion; 23, burden agitator; 24, device for transporting objects; 25, feed hopper; 26, agitating device; 27, load cell; 28, automatic water supply system; 29, electrical ball valve.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in further detail.
As Fig. 1, Fig. 2, Fig. 3, a kind of shown in Fig. 4 have the tunnel cave automatically regulating output, there is kiln body 1, kiln body 1 is successively by preheating section 2, furnace zone 3 and cooling section 4 form, described preheating section 2, furnace zone 3 and cooling section 4 have kiln top 5 respectively, left side wall 6, at the bottom of right side wall 7 and kiln 8, the kiln top 5 of preheating section 2 and furnace zone 3, left side wall 6, at the bottom of right side wall 7 and kiln, 8 form by inwall 9 and outer wall 10, the inwall of described preheating section 2 and furnace zone 3 is provided with louvre 18, the quantity of louvre 18 is multiple, radiating tube 11 is folded with respectively between the inside and outside wall of preheating section 2 and furnace zone 3, described radiating tube 11 coiled coil between inside and outside wall, heat energy connects heat-producing unit (not shown) by the radiating tube entrance of louvre furnace zone 3, be connected by air exhauster 12 between the radiating tube outlet of furnace zone 3 and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section 2 connects bootstrap system (not shown), the arrival end of furnace zone 3 and the port of export are respectively equipped with gate 13, gate 13 connection control unit (not shown), by the switch of control unit regulating gate 13, at the bottom of described kiln, 8 are provided with track 14, track 14 is equipped with slide rail 15, base plate 16 is polylith composition, base plate 16 is provided with base plate keyhole 19, base plate 16 is fixedly connected with slide rail 15 through base plate keyhole 19 by gim peg 20, gim peg 20 and base plate keyhole 19 match, can be hinged between described gim peg 20 and slide rail 15, the length of gim peg 20 is greater than the height of base plate keyhole 19, also can be flexibly connected between gim peg 20 with slide rail 15, described slide rail 15 is provided with slide rail keyhole 21, match with gim peg 20, slide rail keyhole 20 and base plate keyhole 19 are on same vertical line, gim peg 20 is successively through base plate keyhole 19 and slide rail keyhole 21, base plate 16 is fixedly connected with slide rail 15, track 14 is provided with adobe building mortion 22 away from one end of kiln body, adobe building mortion 22 connects burden agitator 23, described burden agitator 23 has device for transporting objects 24, feed hopper 25 and agitating device 26, device for transporting objects 24 is provided with load cell 27, load cell 27 connection control unit (not shown), device for transporting objects 24 attachment feed bin (not shown), door (not shown) is provided with between described device for transporting objects 24 and material bin, door connection control unit (not shown), how much controlled the folding of door according to the weight of material on device for transporting objects 24 by control unit, described burden agitator 23 is provided with automatic water supply system 28, automatic water supply system 28 is provided with electrical ball valve 29, control unit controls the size of current by the folding size controlling electrical ball valve 29 and cut-offs.
The left and right sidewall of described cooling section 4 is provided with ventilating opening 17, and the quantity of ventilating opening is multiple, ventilating opening 17 is hinged with buckle (not shown).
In the course of the work, the weight of material on device for transporting objects 24 is transferred to control unit (not shown) by load cell 27, reception weight of material is analyzed by control unit, if shortage in weight, the door that control unit controls material bin is opened, material is continued to deliver on device for transporting objects 24, enter in agitating device 26 by feed hopper 25, simultaneously, according to the number of material, the folding size that control unit controls electrical ball valve 29 controls the size of current and cut-offs, if the weight demands of material on device for transporting objects 24, the door that control unit controls material bin closes, cutting off material enters on device for transporting objects 24, the material of feeding stirs by agitating device 26, the material be stirred is sent in adobe building mortion 22, the adobe be shaped is sent in preheating section 2 by slide rail 15, simultaneously, the heat of generation is delivered to by pipeline in the radiating tube 11 of furnace zone 3 and heat exchange is occurred by heat-producing unit, the temperature in furnace zone 3 is made to increase, roasting is carried out in preheated adobe, gas with furnace zone 3 heat exchange is delivered in the radiating tube of preheating section 2 and is again carried out heat exchange with the air in preheating section 2 by air exhauster 12, and by by slide rail 15 adobe sent in preheating section 2 carry out preheating, after preheating completes, remaining hot gas is recycled to bootstrap system, carry out three times to utilize, simultaneously, gim peg is removed when bottom parts damages time, base plate block can load and unload very easily.
Heat supply heat distribution is even in the course of the work for said structure, make adobe in sintering procedure by thermally-stabilised, improve the quality of brick, the waste heat of generation is carried out secondary, utilize for three times, reduce the waste of the energy, to reach the object of energy-saving and emission-reduction, slide rail design also greatly reduces the working strength of workman, decrease the work load of workman, if in use base plate has damage, the base plate of correspondence can be changed according to the particular location damaged by workman, reduce the waste that whole plate is changed, simultaneously, by the folding of Weight control door and the switching value of automatic water supply system of material, by the mixing of material and burden control in exact extension, reduce that pulp furnish is defective causes damage.

Claims (4)

1. one kind has the tunnel cave automatically regulating output, there is kiln body, kiln body is successively by preheating section, furnace zone and cooling section composition, it is characterized in that: the kiln top of described preheating section and furnace zone, form by inner and outer wall at the bottom of left and right sidewall and kiln, radiating tube is folded with respectively between inside and outside wall, be connected by air exhauster between the radiating tube outlet of furnace zone and the radiating tube entrance of preheating section, the radiating tube outlet of preheating section connects bootstrap system, arrival end and the port of export of furnace zone are respectively equipped with gate, gate connection control unit, by the switch of control unit regulating gate, track is provided with at the bottom of described kiln, track is provided with slide rail, base plate is polylith composition, base plate is provided with base plate keyhole, base plate is fixedly connected with slide rail through base plate keyhole by gim peg, gim peg and base plate keyhole match, track is provided with adobe building mortion away from one end of kiln body, adobe building mortion connects burden agitator, described burden agitator is provided with automatic water supply system, automatic water supply system connection control unit, control unit controls the switching value of automatic water supply system.
2. a kind of as claimed in claim 1 have the tunnel cave automatically regulating output, it is characterized in that: described burden agitator has device for transporting objects, feed hopper and agitating device, device for transporting objects is provided with load cell, load cell connection control unit, device for transporting objects attachment feed bin.
3. a kind of as claimed in claim 2 have the tunnel cave automatically regulating output, it is characterized in that: between described device for transporting objects and material bin, be provided with door, how many door connection control units, controlled the folding of door according to the weight of material by control unit.
4. a kind of as claimed in claim 1 have the tunnel cave automatically regulating output, and it is characterized in that: the switch of described automatic water supply system is electrical ball valve, control unit controls the switching value of electrical ball valve.
CN201520239746.8U 2015-04-20 2015-04-20 A kind of have the tunnel cave automatically regulating output Expired - Fee Related CN204585512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520239746.8U CN204585512U (en) 2015-04-20 2015-04-20 A kind of have the tunnel cave automatically regulating output

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520239746.8U CN204585512U (en) 2015-04-20 2015-04-20 A kind of have the tunnel cave automatically regulating output

Publications (1)

Publication Number Publication Date
CN204585512U true CN204585512U (en) 2015-08-26

Family

ID=53921706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520239746.8U Expired - Fee Related CN204585512U (en) 2015-04-20 2015-04-20 A kind of have the tunnel cave automatically regulating output

Country Status (1)

Country Link
CN (1) CN204585512U (en)

Similar Documents

Publication Publication Date Title
CN101811839B (en) Method for producing cement clinker by calcining chalk
CN104496204B (en) Energy-saving and high efficient dry method calcium hydroxide production line
CN205076455U (en) Tee bend tripper with automatic material regulatory function of dividing
CN214218591U (en) Energy-concerving and environment-protective system of calcining of gypsum
CN102825664B (en) Double-bin-type aggregate holding hopper for concrete mixing station
CN102022311B (en) Electric energy control method and electric energy control system for dedusting equipment
CN204585512U (en) A kind of have the tunnel cave automatically regulating output
CN204594198U (en) A kind of portable mobile tunnel cave
CN204594199U (en) A kind of tunnel cave with accurate dosing device
CN207793087U (en) A kind of α types gypsum preparation facilities
CN204325148U (en) Energy-saving and high efficient dry method calcium hydroxide production line
CN205552879U (en) Cold -resistant resistant merchant concrete mixing station that freezes with aggregate is dried and dustproof function of batching
CN202254754U (en) Shaft kiln for roasting by comprehensively utilizing heat energy unit temperature field
CN204594200U (en) A kind of tunnel cave
CN105384363A (en) Application method of active lime rotary kiln
CN204594202U (en) A kind of tunnel cave with rotary dobby multistation
CN109278194A (en) A kind of mud storage equipment quantifying conveying function with automatic mixing
CN204594201U (en) A kind of tunnel cave can replacing base plate
CN202322647U (en) Automatic environment-friendly energy-saving lime kiln
CN211999436U (en) Hot air equipment for sludge drying
CN209131329U (en) Battery grid surface drying kiln
CN204237567U (en) A kind of efficient super thick tungsten carbide powder production carbide furnace
CN201288148Y (en) Novel multifuel combustion kiln
CN210602696U (en) Drying device for cement production
CN204329539U (en) A kind of hot-air drying unit

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20180420