CN204590639U - A kind of novel bamboo and wood continuous beam prestress application system - Google Patents

A kind of novel bamboo and wood continuous beam prestress application system Download PDF

Info

Publication number
CN204590639U
CN204590639U CN201420770002.4U CN201420770002U CN204590639U CN 204590639 U CN204590639 U CN 204590639U CN 201420770002 U CN201420770002 U CN 201420770002U CN 204590639 U CN204590639 U CN 204590639U
Authority
CN
China
Prior art keywords
bamboo
backing plate
steering block
wood
steel backing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420770002.4U
Other languages
Chinese (zh)
Inventor
郭楠
贺铁
陈慧慧
左宏亮
张平阳
刘秀侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northeast Forestry University
Original Assignee
Northeast Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northeast Forestry University filed Critical Northeast Forestry University
Priority to CN201420770002.4U priority Critical patent/CN204590639U/en
Application granted granted Critical
Publication of CN204590639U publication Critical patent/CN204590639U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Novel bamboo and wood continuous beam prestress application system, is applicable to the prestressing force bamboo and wood beam of field of civil engineering.It solve current bamboo and wood beam because of mid-span deflection excessive, and the girder span caused is limited, the phenomenon of waste of material.The utility model bamboo and wood beam end places Double U-shaped steel backing plate, ground tackle embeds the end position fixing presstressed reinforcing steel outside Double U-shaped steel backing plate, bamboo and wood beam is provided with bottom steel backing plate and steering block, bottom steel backing plate is connected by screw rod with steering block, steering block offers arc groove, and arc groove fixes the position of presstressed reinforcing steel.When Specific construction, ensure that beam body both sides are close to by reinforcing bar, by rotary screw, steering block is moved up and down, thus drive the presstressed reinforcing steel that is connected with steering block and beam to produce horizontal relative displacement to control Shi Hanzhang.In actual processing, can increase intermediate support as the case may be, change the profile of steering block, be effective object that is remarkable, economic security.

Description

A kind of novel bamboo and wood continuous beam prestress application system
Technical field
The utility model is applicable to the continuous beam of the prestressing force bamboo and wood material of field of civil engineering.
Background technology
In Practical Project, when prestressed simple beam exceedes certain value across footpath, under load action, mid span moment value will increase sharply, and affects the normal use of beam, causes the sectional dimension of beam and deadweight significantly to increase.In order to reduce consumptive material, convenient construction, this patent proposes prestressed continuous beam, by the existence of fulcrum place hogging moment, reduces mid-span deflection, changes moment of flexure line style, and its internal force is distributed than more reasonable with span simply supported beam.The arrangement of the presstressed reinforcing steel that this system adopts is external cloth muscle, and this external tendon does not slacken girder section, does not need reserving hole channel, easy construction, rapidly, is convenient to change, and very easily promotes.
Summary of the invention
For solving the increase of current prestressing force bamboo and wood beam with span, the phenomenons such as mid span moment is larger, the utility model provides a kind of prestress application system, and for solving the problem, the technical scheme adopted is as follows:
This system comprises Double U-shaped steel backing plate, bottom steel backing plate, groove arc steering block, screw rod, presstressed reinforcing steel, ground tackle etc.When Specific construction, multiple intermediate support can be set according to actual conditions, by presstressed reinforcing steel in beam end anchoring, and fix presstressed reinforcing steel position by the groove arc steering block be arranged on beam, ensure line style, by rotary screw, steering block is moved up and down, thus drive the presstressed reinforcing steel that is connected with steering block and beam to produce horizontal relative displacement to control Shi Hanzhang.
A kind of novel bamboo and wood continuous beam prestress application system, comprise Double U-shaped steel backing plate, bottom steel backing plate, groove arc steering block, screw rod, presstressed reinforcing steel and ground tackle, bamboo and wood beam end places Double U-shaped steel backing plate, ground tackle embeds the end position fixing presstressed reinforcing steel outside Double U-shaped steel backing plate, bamboo and wood beam is provided with bottom steel backing plate and steering block, bottom steel backing plate is connected by screw rod with steering block, and steering block offers arc groove, and arc groove fixes the position of presstressed reinforcing steel.Described bamboo and wood beam is flexural member, and flexural member is the flexural member be made up as material of bamboo and wood, cemented bamboo, laminated wood or cemented bamboo wood composite.
The beneficial effect of the utility model patent is:
1. easy construction, accessory are simple.External prestressing tendon, can not weakened members without the need to reserving hole channel, reduces the appearance of concentrated stress.Steering block coordinates stubborn of screw thread can complete stretching process, without the need to unnecessary tensioning equipment.
2. regulation and control are convenient, reliably stressed.When pre-applied force is little, control line style by end billet and steering block, controlled the size of pre-applied force by the rotation of screw rod.
3. adopt continuous beam, maximal bending moment minimizing 60% ~ 85% more corresponding to the simply supported beam under the same terms; Mid-span deflection minimizing 94% ~ 97% more corresponding to simply supported beam.
Accompanying drawing explanation
Fig. 1 is continuous beam stretch-draw prestressing force application system schematic diagram; Fig. 2 is 1-1 section in Fig. 1; Fig. 3 is end anchorage device schematic diagram; Fig. 4 is tensioning equipment side view; Fig. 5 is 1-1 section in Fig. 4.Digitized representation in each figure: 1: bamboo and wood beam; 2-1: Double U-shaped steel backing plate; 2-2: bottom steel backing plate; 3: steering block; 4: screw rod; 5: ground tackle; 6: presstressed reinforcing steel.
Detailed description of the invention
First presstressed reinforcing steel 6 is passed ground tackle 5, utilize pier head machine to carry out hydraulic pressure pier nose and fix reinforcing bar length, place Double U-shaped steel backing plate 2-1 in bamboo and wood beam 1 end afterwards, then ground tackle 5 is embedded outside Double U-shaped steel backing plate 2-1, the end position of fixing presstressed reinforcing steel 6; Bottom steel backing plate 2-2 and steering block 3 are placed on bamboo and wood beam 1 assigned address, control presstressed reinforcing steel 6 line style by the groove of steering block 3, rotated by bolt 4, make steering block 3 drive presstressed reinforcing steel 6 to move up and down, with this Shi Hanzhang.
Embodiment: test group: prestressed continuous beam is of a size of 6000X100X100, comparative group: prestressed simple beam size 6000X100X100.Carry out under equivalent environment loading (2 loading F=10kN, multistage loadings; The modulus of elasticity of timber is 10000Nmm), its internal force and deformation result as follows:
Simply supported beam: because amount of deflection has reached maximum restriction, cannot continue to load, added Maximum bending moment is 0.5kNm continuous beam: Maximum bending moment 4.68kNm, and span centre maximum defluxion is 29mm.
Can obtain thus, when taking amount of deflection as major control factors, continuous beam, compared to simply supported beam, embodies extremely great advantage.

Claims (2)

1. a Novel bamboo, wood continuous beam prestress application system, comprise Double U-shaped steel backing plate (2-1), bottom steel backing plate (2-2), steering block (3), screw rod (4), presstressed reinforcing steel (6) and ground tackle (5), it is characterized in that: bamboo, Double U-shaped steel backing plate (2-1) is placed in wooden frame (1) end, ground tackle (5) embeds the end position of the fixing presstressed reinforcing steel (6) in Double U-shaped steel backing plate (2-1) outside, bamboo, wooden frame (1) is provided with bottom steel backing plate (2-2) and steering block (3), bottom steel backing plate (2-2) is connected by screw rod (4) with steering block (3), (3) offer arc groove to steering block, arc groove fixes the position of presstressed reinforcing steel (6).
2. one according to claim 1 novel bamboo and wood continuous beam prestress application system, it is characterized in that: described bamboo and wood beam (1) is flexural member, flexural member is the flexural member be made up as material of bamboo and wood, cemented bamboo, laminated wood or cemented bamboo wood composite.
CN201420770002.4U 2014-12-09 2014-12-09 A kind of novel bamboo and wood continuous beam prestress application system Expired - Fee Related CN204590639U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420770002.4U CN204590639U (en) 2014-12-09 2014-12-09 A kind of novel bamboo and wood continuous beam prestress application system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420770002.4U CN204590639U (en) 2014-12-09 2014-12-09 A kind of novel bamboo and wood continuous beam prestress application system

Publications (1)

Publication Number Publication Date
CN204590639U true CN204590639U (en) 2015-08-26

Family

ID=53926805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420770002.4U Expired - Fee Related CN204590639U (en) 2014-12-09 2014-12-09 A kind of novel bamboo and wood continuous beam prestress application system

Country Status (1)

Country Link
CN (1) CN204590639U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958315A (en) * 2017-05-17 2017-07-18 东北林业大学 A kind of double limb controllable prestressing force beam string structures of large span
CN107268891A (en) * 2017-06-26 2017-10-20 东北林业大学 A kind of controllable prestressing force laminated wood string continuous beam

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958315A (en) * 2017-05-17 2017-07-18 东北林业大学 A kind of double limb controllable prestressing force beam string structures of large span
CN107268891A (en) * 2017-06-26 2017-10-20 东北林业大学 A kind of controllable prestressing force laminated wood string continuous beam

Similar Documents

Publication Publication Date Title
CN101922237B (en) Connector-type tensioning and anchoring system of reinforced concrete flexural piece with prestress steel strands
CN204311761U (en) A kind of prestressed carbon cloth reinforced concrete column tensioning equipment
CN103161318A (en) Screw thread twist-stretch transverse stretch-draw prestress exerting system of adjustable and controllable bamboo and wooden beam
CN104032891A (en) Prestressed double laminated wood beam
CN204357147U (en) The composite reinforcing structure of prestressed reinforced concrete construction flexural member
CN101696589A (en) Novel combined stone beam
CN204590639U (en) A kind of novel bamboo and wood continuous beam prestress application system
CN104929292B (en) A kind of profiled sheet of use prestressing without bondn and the compoboard of concrete
CN202323717U (en) Cantilever type pre-stress hoop and special tensioning device thereof
CN106320191A (en) Pre-tensioning steel wire and polymer mortar externally-added layer reinforcing device
CN104032832B (en) A kind of post-stressed bamboo-wood structure framework
CN103306495B (en) Wooden construction truncated cylinder reinforced construction method
CN104234191A (en) Stay-cable transformation layer
CN104831640A (en) Construction method for reinforcing device of reinforced concrete bridge and bridge deck slab
CN202047353U (en) Concrete bridge body of expressway or railway and prestressed concrete continuous box girder
CN204385941U (en) Prestressing force buckling restrained brace
CN204357005U (en) Pre-stress FRP bar stretching and anchoring device
CN203867064U (en) Prestressed double-splice laminated wood beam
CN107893538B (en) Tensioning method of in-vivo prestressed glued wood beam
CN207484742U (en) A kind of prestressed building blocks wall between windows
CN102587585A (en) Flat turn regulation pre-tightening type directional clamping anchor
CN105735653A (en) Novel bamboo and wood continuous beam prestressing force exertion system
CN104110100A (en) Steel bar clip pre-stress tensioning anchor block
CN204590314U (en) A kind of novel pre-stressed steel and wood composite shear wall
CN105804425A (en) Construction method for reinforcing T-beam through partially-bonded prestressed FRP

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20161209