CN204590378U - The erecting device of height top Integral ceiling - Google Patents

The erecting device of height top Integral ceiling Download PDF

Info

Publication number
CN204590378U
CN204590378U CN201420863903.8U CN201420863903U CN204590378U CN 204590378 U CN204590378 U CN 204590378U CN 201420863903 U CN201420863903 U CN 201420863903U CN 204590378 U CN204590378 U CN 204590378U
Authority
CN
China
Prior art keywords
triangular keel
rise
low layer
module
keel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420863903.8U
Other languages
Chinese (zh)
Inventor
沈正华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fsilon Building Material Technology Co Ltd
Original Assignee
Fsilon Building Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fsilon Building Material Technology Co Ltd filed Critical Fsilon Building Material Technology Co Ltd
Priority to CN201420863903.8U priority Critical patent/CN204590378U/en
Application granted granted Critical
Publication of CN204590378U publication Critical patent/CN204590378U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to the erecting device of a kind of height top Integral ceiling.In prior art, usual concordant setting between suspended ceiling module, causes product appearance homogeneity serious, lacks innovation.The utility model provides a kind of bag girder construction for Integral ceiling, comprises main joist, high-rise triangular keel, suspension hook, high-rise module and modules at lower layers; It is characterized in that: also comprise swash plate module, low layer triangular keel and the linkage for being connected high-rise triangular keel and low layer triangular keel, the top of described linkage is connected on high-rise triangular keel, described low layer triangular keel is connected to the bottom of linkage, described modules at lower layers is connected on low layer triangular keel, described swash plate module one end is connected on high-rise triangular keel, and the other end is connected on low layer triangular keel.The utility model structure is simple, reasonable in design, easy for installation, height adjustable, novel structure.

Description

The erecting device of height top Integral ceiling
Technical field
The utility model relates to the erecting device of a kind of height top Integral ceiling, belongs to Integral ceiling field.
Background technology
Integral ceiling of the prior art, comprise main joist, hanging piece, triangular keel and suspended ceiling module etc., triangular keel is hung on main joist by hanging piece, thus just suspended ceiling module can be connected on triangular keel.In prior art, because the height of triangular keel is consistent, thus usual concordant setting between suspended ceiling module, causes product appearance homogeneity serious, lacks innovation.And if Integral ceiling to be made the height roof construction of oblique top formula, then need to make larger change to structure, and install inconvenience, cost is corresponding rising also.
Therefore, in view of above problem, be necessary to propose one more reasonable, the erecting device of height top Integral ceiling easy for installation, to meet the demand of user.
Utility model content
The purpose of this utility model is to overcome above shortcomings in prior art, and provides a kind of reasonable in design, easy for installation, height adjustable, the erecting device of the height top Integral ceiling of novel structure.
The technical scheme in the invention for solving the above technical problem is: the erecting device of this height top Integral ceiling, comprise main joist, high-rise triangular keel, suspension hook, high-rise module and modules at lower layers, described suspension hook to hang on main joist and the mounting groove comprised for installing high-rise triangular keel, described high-rise triangular keel is arranged in the mounting groove of suspension hook, and described high-rise module card is connected on high-rise triangular keel; It is characterized in that: also comprise swash plate module, low layer triangular keel and the linkage for being connected high-rise triangular keel and low layer triangular keel, the top of described linkage is connected on high-rise triangular keel, described low layer triangular keel is connected to the bottom of linkage, described modules at lower layers is connected on low layer triangular keel, described swash plate module one end is connected on high-rise triangular keel, and the other end is connected on low layer triangular keel.The utility model utilizes swash plate module in conjunction with high-rise module and modules at lower layers, and novel structure, can realize the variation of Integral ceiling; Modules at lower layers is lifted by low layer triangular keel, and low layer triangular keel is connected on high-rise triangular keel by linkage, structure is simple, cost is lower, and low layer triangular keel is identical with high-rise triangular keel structure, both are general, and high-rise module is also identical with the structure of modules at lower layers in addition, both are general, thus further save cost.
Linkage described in the utility model comprises a suspension member, No. two suspension members and the screw mandrel for being connected a suspension member and No. two suspension members, a described suspension member and No. two suspension members are all adjustable is connected on screw mandrel, a described suspension member offers a draw-in groove, a described suspension member is hung on high-rise triangular keel by one draw-in groove, described No. two suspension members offer No. two draw-in grooves, and described low layer triangular keel is fed through No. two draw-in grooves and is hung on No. two suspension members.Because a suspension member all can regulate by relative screw mandrel with No. two suspension members, the thus height of adjustable low layer triangular keel, more convenient to install and aligning.
The utility model also comprises the hanging apparatus for installing main joist, described hanging apparatus comprises the expansion bolt for being fixed to ceiling, the adjusting rod be connected with expansion bolt and the installation portion for installing main joist, top and the expansion bolt of described screw mandrel are fixed, its underpart and the adjustable connection of installation portion.Installation portion its position on adjusting rod adjustable, the thus height of adjustable main keel, makes the height adjustable of whole integrated ceiling system.
Swash plate module described in the utility model is provided with left clamping wall arranged in parallel and right clamping wall, the inside wall of left clamping wall has left clamping muscle, the inside wall of right clamping wall has right clamping muscle, described right clamping wall to insert in high-rise triangular keel and by right clamping muscle and high-rise triangular keel clamping, and described left clamping wall to insert in low layer triangular keel and by left clamping muscle and the clamping of low layer triangular keel.Swash plate module is connected with low layer triangular keel and high-rise triangular keel with right clamping wall respectively by its left clamping wall, the inclination realizing swash plate module is installed, one end of swash plate module is corresponding with modules at lower layers, and the other end is corresponding with high-rise module, realizes modules at lower layers and is connected with the transition of high-rise module.
No. two suspension members described in the utility model comprise left arm and right arm, No. two draw-in grooves that described left arm is corresponding with right arm offering respectively position.During lifting low layer triangular keel, the uniform force of left arm and right arm, not yielding, and the installation of low layer triangular keel is more firm.
The utility model also comprises link block, described link block is symmetrically arranged with two groups of junction plates, described junction plate have mutually to its upper fillet and lower fillet, the setting concordant with the side of high-rise module of described upper fillet, described lower fillet aligns with the side of swash plate module surface thereof.Link block, for being arranged on the corner of two pieces of swash plate modules, connects these two pieces of swash plate modules and corresponding high-rise module for transition two.
The utility model compared with prior art, has the following advantages and effect: structure is simple, and reasonable in design, novel structure, can realize the variation of Integral ceiling; Modules at lower layers is lifted by low layer triangular keel, and low layer triangular keel is connected on high-rise triangular keel by linkage, structure is simple, cost is lower, and low layer triangular keel is identical with high-rise triangular keel structure, both are general, and high-rise module is also identical with the structure of modules at lower layers in addition, both are general, thus further save cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of the erecting device of height top Integral ceiling in the utility model embodiment.
Fig. 2 is the scheme of installation of the erecting device of height top Integral ceiling.
Fig. 3 is the enlarged diagram at A place in Fig. 1.
Fig. 4 is the enlarged diagram at B place in Fig. 1.
Fig. 5 is the main TV structure schematic diagram of No. two suspension members.
Fig. 6 is the left view of Fig. 2.
Fig. 7 is the perspective view of link block.
Fig. 8 is the structural representation of hanging apparatus.
Detailed description of the invention
Below in conjunction with accompanying drawing, also by embodiment, the utility model is described in further detail, and following examples are that the utility model is not limited to following examples to explanation of the present utility model.
Embodiment 1.
See Fig. 1 to Fig. 8, the erecting device of the height top Integral ceiling in the present embodiment comprises main joist 1, high-rise triangular keel 2, suspension hook 3, high-rise module 4, modules at lower layers 5, swash plate module 6, low layer triangular keel 7, linkage 8, hanging apparatus 9, link block 10.
Suspension hook 3 in the present embodiment to hang on main joist 1 and the mounting groove 31 comprised for installing high-rise triangular keel 2, suspension hook 3 can move freely adjustment along main joist 1 direction, mounting groove 31 is in inverted triangle shape and to lower open mouth, high-rise triangular keel 2 is arranged in the mounting groove 31 of suspension hook 3, high-rise module 4 is connected on high-rise triangular keel 2, high-rise module 4 is prior art with the clamping of high-rise triangular keel 2, thus repeats no more.The top of the linkage 8 in the present embodiment is connected on high-rise triangular keel 2, low layer triangular keel 7 is connected to the bottom of linkage 8, modules at lower layers 5 is connected on low layer triangular keel 7, and swash plate module 6 one end is connected on high-rise triangular keel 2, and the other end is connected on low layer triangular keel 7.The present embodiment utilizes swash plate module 6 in conjunction with high-rise module 4 and modules at lower layers 5, and novel structure, can realize the variation of Integral ceiling; Modules at lower layers 5 is lifted by low layer triangular keel 7, and low layer triangular keel 7 is connected on high-rise triangular keel 2 by linkage 8, structure is simple, cost is lower, and low layer triangular keel 7 is identical with high-rise triangular keel 2 structure, both are general, and high-rise module 4 is also identical with the structure of modules at lower layers 5 in addition, both are general, thus further save cost.
Linkage 8 in the present embodiment comprises a suspension member 81, No. two suspension members 82 and the screw mandrel 83 for being connected a suspension member 81 and No. two suspension members 82, a suspension member 81 and No. two suspension members 82 are all adjustable is connected on screw mandrel 83, a suspension member 81 offers a draw-in groove 811, a suspension member 81 is hung on high-rise triangular keel 2 by one draw-in groove 811, No. two suspension members 82 offer No. two draw-in grooves 821, low layer triangular keel 7 is fed through No. two draw-in grooves 821 and is hung on No. two suspension members 82.Because a suspension member 81 and No. two suspension members 82 all can regulate by relative screw mandrel 83, the thus height of adjustable low layer triangular keel 7, more convenient to install and aligning.
Hanging apparatus 9 in the present embodiment comprises the expansion bolt 91 for being fixed to ceiling, the adjusting rod 92 be connected with expansion bolt 91 and the installation portion 93 for installing main joist 1, the top of screw mandrel 83 and expansion bolt 91 are fixed, its underpart and the adjustable connection of installation portion 93.Installation portion 93 its position on adjusting rod 92 adjustable, the thus height of adjustable main keel 1, makes the height adjustable of whole integrated ceiling system.Adjusting rod 92 in the present embodiment is that be threaded two groups of nuts on adjusting rod 92, and these two groups of nuts can regulate the position of installation portion 93 and locate, and because this is prior art, thus repeat no more with the regulative mode of installation portion 93.
Swash plate module 6 in the present embodiment is provided with left clamping wall 61 arranged in parallel and right clamping wall 62, the inside wall of left clamping wall 61 has left clamping muscle 611, the inside wall of right clamping wall 62 has right clamping muscle 621, right clamping wall 62 to insert in high-rise triangular keel 2 and by right clamping muscle 621 and the clamping of high-rise triangular keel 2, and left clamping wall 61 to insert in low layer triangular keel 7 and by left clamping muscle 611 and low layer triangular keel 7 clamping.Swash plate module 6 is connected with low layer triangular keel 7 and high-rise triangular keel 2 with right clamping wall 62 respectively by its left clamping wall 61, the inclination realizing swash plate module 6 is installed, one end of swash plate module 6 is corresponding with modules at lower layers 5, the other end is corresponding with high-rise module 4, realizes modules at lower layers 5 and is connected with the transition of high-rise module 4.Swash plate module 6 in the present embodiment respectively with the connection of high-rise triangular keel 2 and low layer triangular keel 7, identical with inserting mode of the prior art, thus high-rise triangular keel 2 and low layer triangular keel 7 are all general with prior art.
No. two suspension members 82 in the present embodiment comprise left arm 822 and right arm 823, No. two draw-in grooves 821 that left arm 822 is corresponding with right arm 823 offering respectively position.During lifting low layer triangular keel 7, the uniform force of left arm 822 and right arm 823, not yielding, and the installation of low layer triangular keel 7 is more firm.
Link block 10 in the present embodiment is symmetrically arranged with two groups of junction plates 101, junction plate 101 have mutually to its upper fillet 102 and lower fillet 103, the concordant setting of side of upper fillet 102 and high-rise module 4, lower fillet 103 aligns with the side of swash plate module 6 surface thereof.As shown in Figure 2, link block 10, for being arranged on the corner of two pieces of swash plate modules 6, connects these two pieces of swash plate modules 6 and corresponding high-rise module 4 for transition two.The upper fillet 102 of link block 10 has clamping muscle, clamping muscle can with the clamping of high-rise triangular keel 2, its snap fit is identical with the snap fit of high-rise triangular keel 2 with high-rise module 4, thus repeats no more herein.
In addition, it should be noted that, the specific embodiment described in this manual, the shape, institute's title of being named etc. of its parts and components can be different, and the above content described in this manual is only to the utility model structure and the explanation of accompanying drawing example.The equivalence change that structure, feature and principle described in all foundation the utility model inventional idea are done or simple change, be included in the protection domain of the utility model patent.The utility model person of ordinary skill in the field can make various amendment or supplements or adopt similar mode to substitute to described specific embodiment; only otherwise depart from structure of the present utility model or surmount this scope as defined in the claims, protection domain of the present utility model all should be belonged to.

Claims (6)

1. the erecting device of a height top Integral ceiling, comprise main joist, high-rise triangular keel, suspension hook, high-rise module and modules at lower layers, described suspension hook to hang on main joist and the mounting groove comprised for installing high-rise triangular keel, described high-rise triangular keel is arranged in the mounting groove of suspension hook, and described high-rise module card is connected on high-rise triangular keel; It is characterized in that: also comprise swash plate module, low layer triangular keel and the linkage for being connected high-rise triangular keel and low layer triangular keel, the top of described linkage is connected on high-rise triangular keel, described low layer triangular keel is connected to the bottom of linkage, described modules at lower layers is connected on low layer triangular keel, described swash plate module one end is connected on high-rise triangular keel, and the other end is connected on low layer triangular keel.
2. the erecting device of height top according to claim 1 Integral ceiling, it is characterized in that: described linkage comprises a suspension member, No. two suspension members and the screw mandrel for being connected a suspension member and No. two suspension members, a described suspension member and No. two suspension members are all adjustable is connected on screw mandrel, a described suspension member offers a draw-in groove, a described suspension member is hung on high-rise triangular keel by one draw-in groove, described No. two suspension members offer No. two draw-in grooves, and described low layer triangular keel is fed through No. two draw-in grooves and is hung on No. two suspension members.
3. the erecting device of height top according to claim 2 Integral ceiling, it is characterized in that: also comprise the hanging apparatus for installing main joist, described hanging apparatus comprises the expansion bolt for being fixed to ceiling, the adjusting rod be connected with expansion bolt and the installation portion for installing main joist, top and the expansion bolt of described screw mandrel are fixed, its underpart and the adjustable connection of installation portion.
4. the erecting device of height top according to claim 1 and 2 Integral ceiling, it is characterized in that: described swash plate module is provided with left clamping wall arranged in parallel and right clamping wall, the inside wall of left clamping wall has left clamping muscle, the inside wall of right clamping wall has right clamping muscle, described right clamping wall to insert in high-rise triangular keel and by right clamping muscle and high-rise triangular keel clamping, and described left clamping wall to insert in low layer triangular keel and by left clamping muscle and the clamping of low layer triangular keel.
5. the erecting device of height top according to claim 2 Integral ceiling, is characterized in that: described No. two suspension members comprise left arm and right arm, No. two draw-in grooves that described left arm is corresponding with right arm offering respectively position.
6. the erecting device of height top according to claim 1 Integral ceiling, it is characterized in that: also comprise link block, described link block is symmetrically arranged with two groups of junction plates, described junction plate have mutually to its upper fillet and lower fillet, the setting concordant with the side of high-rise module of described upper fillet, described lower fillet aligns with the side of swash plate module surface thereof.
CN201420863903.8U 2014-12-31 2014-12-31 The erecting device of height top Integral ceiling Expired - Fee Related CN204590378U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420863903.8U CN204590378U (en) 2014-12-31 2014-12-31 The erecting device of height top Integral ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420863903.8U CN204590378U (en) 2014-12-31 2014-12-31 The erecting device of height top Integral ceiling

Publications (1)

Publication Number Publication Date
CN204590378U true CN204590378U (en) 2015-08-26

Family

ID=53926544

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420863903.8U Expired - Fee Related CN204590378U (en) 2014-12-31 2014-12-31 The erecting device of height top Integral ceiling

Country Status (1)

Country Link
CN (1) CN204590378U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184060A (en) * 2018-08-23 2019-01-11 浙江绿宇装饰有限公司 The tower-shaped ceiling structure of Thistle board and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109184060A (en) * 2018-08-23 2019-01-11 浙江绿宇装饰有限公司 The tower-shaped ceiling structure of Thistle board and construction method

Similar Documents

Publication Publication Date Title
CN205560000U (en) Pipeline hanger
CN201362562Y (en) Position-adjusting supporting foot disc of crane
CN204590378U (en) The erecting device of height top Integral ceiling
CN202544171U (en) Stone curtain wall dry hanging structure
CN205662758U (en) Multi -functional external clothes hanger that dries in air
CN202390988U (en) Detachable cross-shaped disc type keel structure
CN204435617U (en) A kind of stone material back of the body bolt point slot type suspension member
CN204714326U (en) A kind of adjustable sheet material suspension hook
CN203361124U (en) Movable sand-protecting barrier
CN202170583U (en) Curtain wall plate back hanging system
CN201653669U (en) Exciter support
CN203244124U (en) Multifunctional book end
CN202303242U (en) Lamp transfer frame
CN204889112U (en) Lift table of adjustable length
CN201635228U (en) Novel flash rack ceiling system
CN204232824U (en) Adjustable type is linked up with
CN204929786U (en) A kind of multiplex Flowerpot for balcony
CN205610535U (en) Seaming type roofing photovoltaic supporting structure
CN208862538U (en) A kind of power transmission device facilitating adjusting
CN202370126U (en) Building board wall system using support type connection structure
CN203022202U (en) Keel lifting piece
CN205812945U (en) Tracery wall
CN203439918U (en) Fixture for lifting coil
CN201621835U (en) Lift air-conditioning outdoor unit fixed frame
CN202234595U (en) Adjustable coat hanger

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826

Termination date: 20161231

CF01 Termination of patent right due to non-payment of annual fee