CN202544171U - Stone curtain wall dry hanging structure - Google Patents

Stone curtain wall dry hanging structure Download PDF

Info

Publication number
CN202544171U
CN202544171U CN2011205697339U CN201120569733U CN202544171U CN 202544171 U CN202544171 U CN 202544171U CN 2011205697339 U CN2011205697339 U CN 2011205697339U CN 201120569733 U CN201120569733 U CN 201120569733U CN 202544171 U CN202544171 U CN 202544171U
Authority
CN
China
Prior art keywords
hanger
hanging
curtain wall
stone
dry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2011205697339U
Other languages
Chinese (zh)
Inventor
田利军
武国臣
王志学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Bright Curtain Wall Engineering Co., Ltd.
Original Assignee
Shanghai Glass Curtain Wall Machine & Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Glass Curtain Wall Machine & Engineering Co Ltd filed Critical Shanghai Glass Curtain Wall Machine & Engineering Co Ltd
Priority to CN2011205697339U priority Critical patent/CN202544171U/en
Application granted granted Critical
Publication of CN202544171U publication Critical patent/CN202544171U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/24Structural elements or technologies for improving thermal insulation
    • Y02A30/244Structural elements or technologies for improving thermal insulation using natural or recycled building materials, e.g. straw, wool, clay or used tires

Landscapes

  • Finishing Walls (AREA)

Abstract

本实用新型涉及石材幕墙干挂结构,包括横梁、石材板块以及设在横梁和石材板块之间的干挂件,该干挂件包括相互连接的挂座和挂件组成,所述的挂座固定在横梁上,所述的挂件固定在石材板块上,所述的干挂件还包括用于防止挂件侧滑和上下跳动的限位码,该限位码设连接挂座和挂件,所述的挂座上设有调节挂座位置的锯齿片和调节挂件高度的调节螺栓。与现有技术相比,本实用新型具有安装简单、调节方便、结构稳定、成本低等优点。

Figure 201120569733

The utility model relates to a dry-hanging structure of a stone curtain wall, comprising a beam, a stone plate and a dry-hanging piece arranged between the beam and the stone plate. The dry-hanging piece is composed of a hanging seat and a hanging piece connected to each other. , the hanger is fixed on the stone plate, and the dry hanger also includes a limit code for preventing the hanger from sliding sideways and jumping up and down. The limit code is set to connect the hanger and the hanger, and the hanger is provided with There are sawtooth blades for adjusting the position of the hanger and adjusting bolts for adjusting the height of the hanger. Compared with the prior art, the utility model has the advantages of simple installation, convenient adjustment, stable structure and low cost.

Figure 201120569733

Description

The dry-fasten stone curtain wall structure
Technical field
The utility model relates to a kind of stone curtain wall, especially relates to a kind of dried hanging hang structure of stone curtain wall.
Background technology
Along with people's is to the improve of building energy conservation and requirement attractive in appearance, and the architect requires increasingly highly to architectural effect, and personalization more and more highlights, and the use of stone curtain wall in recent years is also more and more.Obviously; Stone material cracks; Stone material does not have silicone sealant between stone material, so the stone material plate at original stone curtain wall node place is easy to because of there not being silicone sealant and the slippage about producing under the effect of imposed load (seismic load); So very difficult in order to be effective, certain potential safety hazard is arranged again.
The utility model content
The purpose of the utility model is exactly for the defective that overcomes above-mentioned prior art existence the dry-fasten stone curtain wall structure that a kind of switching performance is stable, cost is low to be provided.
The purpose of the utility model can realize through following technical scheme:
The dry-fasten stone curtain wall structure; Comprise crossbeam, stone material plate and be located at crossbeam and the stone material plate between dry hanging article, this dry hanging article comprises that interconnective hanging seat and suspension member form, described hanging seat is fixed on the crossbeam; Described suspension member is fixed on the stone material plate; Described dry hanging article also comprises the spacing sign indicating number that is used to prevent suspension member sideslip and bob, and this spacing sign indicating number connects hanging seat and suspension member, and described hanging seat is provided with the sawtooth sheet of regulating the hanging seat position and the adjusting bolt of regulating the suspension member height.
Described suspension member comprise suspension member and following suspension member, described adjusting bolt be located on the hanging seat and butt on suspension member, a described spacing yard end is fixed on the hanging seat, the other end is fixed on down on the suspension member.
Described sawtooth sheet is positioned at the end of hanging seat, and the sawtooth sheet is provided with bolt hole, through being bolted on the crossbeam.
Described bolt hole is an elongated hole.
Described sawtooth sheet top is provided with pad, and screw bolt passes pad and sawtooth sheet screw in crossbeam.
Also be provided with the angle aluminium of assist location on the described crossbeam, this angle aluminium and following suspension member butt.
The junction of the junction of said hanging seat and last suspension member and hanging seat and following suspension member is provided with the nylon filler; Described junction of going up suspension member and stone material plate is provided with silicone and fills glue and silicone rubber cushion block, and the junction of described suspension member down and stone material plate is provided with silicone and fills glue and silicone rubber cushion block.
Compared with prior art, the utlity model has following advantage:
1, the sideslip of horizontal direction and beating of above-below direction can be prevented through spacing sign indicating number, the position adjustments of fore-and-aft direction and above-below direction can be realized through regulating bolt and sawtooth sheet.
2, installation rate is fast, shortens construction period.
3, Stability Analysis of Structures, safe, and compare for improved structure, increase cost hardly.
Description of drawings
Fig. 1 is the structural representation of the utility model;
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the utility model is elaborated.
Embodiment
As shown in Figure 1, the dry-fasten stone curtain wall structure comprises crossbeam 1, stone material plate 2, is located at the dry hanging article between crossbeam 1 and the stone material plate 2, and this dry hanging article comprises hanging seat 3 and the last suspension member 41 that is connected with hanging seat 3, descends suspension member 42.Hanging seat 3 is fixed on the crossbeam 1, and last suspension member 41 is fixed on the stone material plate 2 with following suspension member 42.Be connected with a spacing sign indicating number 5 between hanging seat 3 and the following suspension member 42; One end of this spacing sign indicating number is fixed on the hanging seat 3 through tapping screw, and the other end is fixed on down on the suspension member 42, can effectively prevent the sideslip of horizontal direction and beating of above-below direction; Be provided with the adjusting bolt 6 that to adjust height between hanging seat 3 and the last suspension member 41; This adjusting bolt 6 passes hanging seat 3 from the bottom up, and suspension member 41 on the butt, can change the height of regulating bolt 6 through the screw thread on the hanging seat 3; Thereby the height of suspension member 41 in the adjustment is realized the adjusting of height.The end of hanging seat 3 is a sawtooth sheet 31 that is provided with the zigzag ripple, and sawtooth sheet 31 tops are provided with a pad 32, and bolt 33 passes pad 32 successively and screws in crossbeam 1 with sawtooth sheet 31, and hanging seat 3 is fixed on the crossbeam 1.Wherein, the bolt hole on the hanging seat 3 is an elongated hole, can regulate the position of hanging seat 3 fore-and-aft directions easily.Hanging seat 3 is provided with the nylon filler with the junction of last suspension member 41 and the junction of hanging seat 3 and following suspension member 42; Last suspension member 41 is provided with silicone filling glue and silicone rubber cushion block with the junction of stone material plate 2, and following suspension member 42 is provided with silicone filling glue and silicone rubber cushion block with the junction of stone material plate 2.In addition, also be provided with angle aluminium 11 on the crossbeam 1, this angle aluminium 11 and following suspension member 42 butts play the effect of assist location, and total is more stable.
Can well realize top to bottom, left and right, front and rear omnibearing stereo adjusting through this dried hanging hang structure, in the huge convenience of having brought on the basis that increases cost hardly in the installation processing.

Claims (7)

1.石材幕墙干挂结构,包括横梁、石材板块以及设在横梁和石材板块之间的干挂件,该干挂件包括相互连接的挂座和挂件组成,所述的挂座固定在横梁上,所述的挂件固定在石材板块上,其特征在于,所述的干挂件还包括用于防止挂件侧滑和上下跳动的限位码,该限位码连接挂座和挂件,所述的挂座上设有调节挂座位置的锯齿片和调节挂件高度的调节螺栓。 1. Stone curtain wall dry-hanging structure, including beams, stone plates and dry hanging parts between the beams and stone plates. The above-mentioned hanger is fixed on the stone plate, and it is characterized in that the dry hanger also includes a limit code for preventing the hanger from sliding sideways and jumping up and down. The limit code connects the hanger and the hanger, and the hanger There are sawtooth blades for adjusting the position of the hanger and adjusting bolts for adjusting the height of the pendant. 2.根据权利要求1所述的石材幕墙干挂结构,其特征在于,所述的挂件包括上挂件和下挂件,所述的调节螺栓设在挂座上并抵接上挂件,所述的限位码的一端固定在挂座上,另一端固定在下挂件上。 2. The stone curtain wall dry-hanging structure according to claim 1, characterized in that, said hanger includes an upper hanger and a lower hanger, said adjusting bolt is arranged on the hanger and abuts against the upper hanger, and said limit One end of the bit code is fixed on the hanger, and the other end is fixed on the lower pendant. 3.根据权利要求1或2所述的石材幕墙干挂结构,其特征在于,所述的锯齿片位于挂座的端部,锯齿片上设有螺栓孔。 3. The stone curtain wall dry-hanging structure according to claim 1 or 2, characterized in that, the sawtooth piece is located at the end of the hanging seat, and the sawtooth piece is provided with a bolt hole. 4.根据权利要求3所述的石材幕墙干挂结构,其特征在于,所述的螺栓孔为长形孔。 4. The stone curtain wall dry-hanging structure according to claim 3, characterized in that, the bolt holes are elongated holes. 5.根据权利要求3所述的石材幕墙干挂结构,其特征在于,所述的锯齿片上方设有垫片,通过螺栓依次穿过垫片和锯齿片固定在横梁。 5. The stone curtain wall dry-hanging structure according to claim 3, characterized in that, a gasket is provided above the saw-tooth sheet, and the bolts pass through the gasket and the saw-tooth sheet in sequence and are fixed to the beam. 6.根据权利要求2所述的石材幕墙干挂结构,其特征在于,所述的横梁上还设有辅助定位的角铝,该角铝与下挂件抵接。 6. The stone curtain wall dry-hanging structure according to claim 2, characterized in that, said beam is also provided with an angle aluminum for auxiliary positioning, and the angle aluminum is in contact with the lower hanging piece. 7.根据权利要求2所述的石材幕墙干挂结构,其特征在于,所述挂座与上挂件的连接处以及挂座与下挂件的连接处设有尼龙填充物,所述的上挂件与石材板块的连接处设有硅酮填充胶和硅酮橡胶垫块,所述的下挂件与石材板块的连接处设有硅酮填充胶和硅酮橡胶垫块。  7. The stone curtain wall dry-hanging structure according to claim 2, characterized in that, the connection between the hanging base and the upper hanging part and the connecting part between the hanging base and the lower hanging part are provided with nylon fillers, and the upper hanging part and the lower hanging part are provided with nylon fillers. Silicone filling glue and silicone rubber pads are provided at the joints of the stone plates, and silicone filling glue and silicone rubber pads are provided at the joints between the lower hanger and the stone plates. the
CN2011205697339U 2011-12-30 2011-12-30 Stone curtain wall dry hanging structure Expired - Fee Related CN202544171U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011205697339U CN202544171U (en) 2011-12-30 2011-12-30 Stone curtain wall dry hanging structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011205697339U CN202544171U (en) 2011-12-30 2011-12-30 Stone curtain wall dry hanging structure

Publications (1)

Publication Number Publication Date
CN202544171U true CN202544171U (en) 2012-11-21

Family

ID=47164825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011205697339U Expired - Fee Related CN202544171U (en) 2011-12-30 2011-12-30 Stone curtain wall dry hanging structure

Country Status (1)

Country Link
CN (1) CN202544171U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518235A (en) * 2011-12-30 2012-06-27 上海玻机幕墙工程有限公司 Dry-hang structure for stone curtain wall
CN103290962A (en) * 2012-12-20 2013-09-11 江苏鸿升装饰工程有限公司 Building curtain wall stone dry hanging structure
CN103422577A (en) * 2013-09-24 2013-12-04 四川杜泰建筑节能科技有限公司 Method for preparing fireproof thermal insulating layer and integrated curtain wall of fireproof thermal insulating layer and integrated outer wall decorative sheet of fireproof thermal insulating layer
CN103924764A (en) * 2014-04-28 2014-07-16 苏州美瑞德建筑装饰有限公司 Stone dry hanging mounting system capable of being regulated and controlled

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102518235A (en) * 2011-12-30 2012-06-27 上海玻机幕墙工程有限公司 Dry-hang structure for stone curtain wall
CN103290962A (en) * 2012-12-20 2013-09-11 江苏鸿升装饰工程有限公司 Building curtain wall stone dry hanging structure
CN103422577A (en) * 2013-09-24 2013-12-04 四川杜泰建筑节能科技有限公司 Method for preparing fireproof thermal insulating layer and integrated curtain wall of fireproof thermal insulating layer and integrated outer wall decorative sheet of fireproof thermal insulating layer
CN103422577B (en) * 2013-09-24 2015-11-18 四川杜泰建筑节能科技有限公司 A kind of preparation method of fireproof thermal-insulation layer and one curtain wall, one decorative plate of outer wall
CN103924764A (en) * 2014-04-28 2014-07-16 苏州美瑞德建筑装饰有限公司 Stone dry hanging mounting system capable of being regulated and controlled

Similar Documents

Publication Publication Date Title
WO2011139038A2 (en) Variable fastener for fixing a curtain wall
CN202544171U (en) Stone curtain wall dry hanging structure
CN203308046U (en) Thermal insulation decorative plate hanging buckle assembly
CN104100028B (en) A kind of rod-type back of the body bolt altogether mounts system
CN202401616U (en) Stone pendant
CN103919504A (en) Waterproof base plate of integrated bathroom
CN102518235A (en) Dry-hang structure for stone curtain wall
CN103967188B (en) Special-shaped sculpture modeling ceiling assembled type installation structure
CN201817165U (en) Adjustable guide rail bracket for lifter
CN206233420U (en) A kind of installation system of back-bolt type stone curtain wall
CN203719096U (en) Air conditioner outdoor unit support frame
CN203729477U (en) Integrated suspended ceiling keel assembly
CN204571000U (en) Node installed by a kind of flexible connecting device and side fascia
CN203049873U (en) Vertical panel mounting structure with adjustable height
CN203905254U (en) Prefabricated installation structure for special-shaped sculpture modelling hung ceiling
CN204983519U (en) Novel soft and hard package installation metal pendant
CN205855702U (en) A kind of Elevator weight sensor block assembly
CN203740803U (en) Adjustable guide rail connecting support
CN205276487U (en) Connection structure of light steel prefabricated exterior wall and major structure with adjustable it is three -dimensional
CN204435617U (en) A kind of stone material back of the body bolt point slot type suspension member
CN203361124U (en) Movable sand-protecting barrier
CN203684709U (en) Adjusting device for assembly inclination angle of truss of steel structure
CN202081553U (en) Aluminum profile suspended ceiling
CN203846655U (en) Short-cantilever dry-hanging device of stone curtain wall
CN207739491U (en) A kind of hanging piece structure suitable for the installation of Integral ceiling roof type

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANGHAI BRIGHT CURTAIN WALL ENGINEERING CO., LTD.

Free format text: FORMER NAME: SHANGHAI GLASS CURTAIN WALL MACHINE + ENGINEERING CO., LTD.

CP03 Change of name, title or address

Address after: 201108 room B37, building eleventh, No. 988, spring road, Shanghai, Minhang District, two

Patentee after: Shanghai Bright Curtain Wall Engineering Co., Ltd.

Address before: 201103, 3, 408 Xu Hong Road, Shanghai, Minhang District

Patentee before: Shanghai Glass Curtain Wall Machine & Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121121

Termination date: 20201230