CN204590371U CN201520226412.7U CN201520226412U CN204590371U CN 204590371 U CN204590371 U CN 204590371U CN 201520226412 U CN201520226412 U CN 201520226412U CN 204590371 U CN204590371 U CN 204590371U
Authority
CN
China
Prior art keywords
concrete post
fixed
brackets
wood composite
girder steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520226412.7U
Other languages
Chinese (zh)
Inventor
邵志刚
林海龙
顾峰
周文赟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd SUZHOU LION
Original Assignee
CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd SUZHOU LION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd SUZHOU LION filed Critical CONSTRUCTION AND INSTALLATION ENGINEERING Co Ltd SUZHOU LION
Priority to CN201520226412.7U priority Critical patent/CN204590371U/en
Application granted granted Critical
Publication of CN204590371U publication Critical patent/CN204590371U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of large formula building steel and wood composite sets of brackets on top of the columns structure, comprise concrete post, eaves portion and rafter portion, described concrete post is fixed with girder steel, described girder steel is made up of horizontal part and oblique portion, described horizontal part is interval with and instead hangs screw rod, described eaves portion is provided with screw vent, and the described anti-screw rod that hangs is connected and fixed through screw vent and eaves portion, and described rafter portion and oblique portion are fixed.The utility model effectively can solve the difficult problem that concrete post cannot be connected with each timber compoment, can avoid the destruction of Tenon simultaneously, come off, enhance anti-seismic performance, and have construction technology simple, the feature that cost is low, extends the application life of building.

Description

Large formula building steel and wood composite sets of brackets on top of the columns structure
Technical field
The utility model relates to a kind of architectural support structure, is specifically related to a kind of sets of brackets on top of the columns structure, particularly relates to a kind of large formula building steel and wood composite sets of brackets on top of the columns structure.
Background technology
Chinese ancient architecture, with the moulding of the structural system of uniqueness, consummate technology and grace and deep cultural connotation, makes it stand erect among building jungle just as one piece of flag.But the modern imitations building wooden combined structure system that substantially be concrete, due to the performance difference of stiffening member (concrete) and flexible member (timber), concrete mode of failure, connected mode are all different.Therefore, the former eaves portion timber compoment based on mortise-tenon joint encircles (axial bracket arm), bucket six liters of arches (encircleing slowly) as struggled against three liters, cross arch (China's arch), order arch, public attention are held high, cloud cluster, with purlin a tree, used in making timber for boats, how well-set linking together is our worth problem studied with concrete for cornice purlin, eave-rafter etc.
Summary of the invention
Goal of the invention of the present utility model is to provide a kind of large formula building steel and wood composite sets of brackets on top of the columns structure, effectively can solve the difficult problem that concrete post cannot be connected with each timber compoment, the destruction of Tenon can be avoided simultaneously, come off, enhance anti-seismic performance, there is construction technology simple, the feature that cost is low, extends the application life of building.
To achieve the above object of the invention, the technical solution adopted in the utility model is: a kind of large formula building steel and wood composite sets of brackets on top of the columns structure, comprise concrete post, eaves portion and rafter portion, described concrete post is fixed with girder steel, described girder steel is made up of horizontal part and oblique portion, described horizontal part is interval with instead hang screw rod, and described eaves portion is provided with screw vent, the described anti-screw rod that hangs is connected and fixed through screw vent and eaves portion, and described rafter portion and oblique portion are fixed.
In technique scheme, described concrete post is provided with built-in fitting, and described girder steel and concrete post are connected and fixed by built-in fitting.
Further technical scheme, horizontal part and the oblique portion angle of described girder steel are 26.5 degree.
Because technique scheme is used, the utility model compared with prior art has following advantages:
1. the utility model by setting up girder steel on concrete post, effectively can solve the difficult problem that concrete post cannot be connected with each timber compoment, enhance the rigidity of node simultaneously, improve safety and the durability of structure.
2. the utility model instead hangs screw rod by arranging at the horizontal part of girder steel, is fixedly connected with in eaves portion with girder steel, turn avoid the destruction of Tenon, comes off, enhance anti-seismic performance while being effectively connected.
3. the utility model construction technology is simple, and cost is lower, while the application life effectively extending building, decreases maintenance cost when building uses.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model in embodiment one.
Wherein: 1, concrete post; 2, eaves portion; 3, rafter portion; 4, horizontal part; 5, oblique portion; 6, anti-screw rod is hung.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is further described:
Embodiment one: shown in Figure 1, a kind of large formula building steel and wood composite sets of brackets on top of the columns structure, comprise concrete post 1, eaves portion 2 and rafter portion 3, described concrete post is fixed with girder steel, described girder steel is made up of horizontal part 4 and oblique portion 5, described horizontal part is interval with instead hang screw rod 6, and described eaves portion is provided with screw vent, the described anti-screw rod that hangs is connected and fixed through screw vent and eaves portion, and described rafter portion and oblique portion are fixed.
In the present embodiment, described concrete post is provided with built-in fitting, and described girder steel and concrete post are connected and fixed by built-in fitting.
Horizontal part and the oblique portion angle of described girder steel are 26.5 degree.

Claims (3)

1. a large formula building steel and wood composite sets of brackets on top of the columns structure, comprise concrete post, eaves portion and rafter portion, it is characterized in that: described concrete post is fixed with girder steel, described girder steel is made up of horizontal part and oblique portion, described horizontal part is interval with and instead hangs screw rod, described eaves portion is provided with screw vent, and the described anti-screw rod that hangs is connected and fixed through screw vent and eaves portion, and described rafter portion and oblique portion are fixed.
2. one according to claim 1 large formula building steel and wood composite sets of brackets on top of the columns structure, it is characterized in that: described concrete post is provided with built-in fitting, described girder steel and concrete post are connected and fixed by built-in fitting.
3. one according to claim 1 large formula building steel and wood composite sets of brackets on top of the columns structure, is characterized in that: horizontal part and the oblique portion angle of described girder steel are 26.5 degree.
CN201520226412.7U 2015-04-15 2015-04-15 Large formula building steel and wood composite sets of brackets on top of the columns structure Expired - Fee Related CN204590371U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520226412.7U CN204590371U (en) 2015-04-15 2015-04-15 Large formula building steel and wood composite sets of brackets on top of the columns structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520226412.7U CN204590371U (en) 2015-04-15 2015-04-15 Large formula building steel and wood composite sets of brackets on top of the columns structure

Publications (1)

Publication Number Publication Date
CN204590371U true CN204590371U (en) 2015-08-26

Family

ID=53926537

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520226412.7U Expired - Fee Related CN204590371U (en) 2015-04-15 2015-04-15 Large formula building steel and wood composite sets of brackets on top of the columns structure

Country Status (1)

Country Link
CN (1) CN204590371U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049766A (en) * 2016-05-30 2016-10-26 中国建筑第八工程局有限公司 Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN108360667A (en) * 2018-03-07 2018-08-03 刘路清 A kind of novel sets of brackets on top of the columns of corrosion resistant easy access

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049766A (en) * 2016-05-30 2016-10-26 中国建筑第八工程局有限公司 Combined eave system with large-span steel structure and bracket system wood structure and construction method of combined eave structure
CN106049766B (en) * 2016-05-30 2018-06-29 中国建筑第八工程局有限公司 The combination eaves system and its construction method of large span steel structure and sets of brackets on top of the columns timber structure
CN108360667A (en) * 2018-03-07 2018-08-03 刘路清 A kind of novel sets of brackets on top of the columns of corrosion resistant easy access
CN108360667B (en) * 2018-03-07 2019-11-22 永康市简零贸易有限公司 A kind of sets of brackets on top of the columns of corrosion resistant easy access

Similar Documents

Publication Publication Date Title
CN204590371U (en) Large formula building steel and wood composite sets of brackets on top of the columns structure
CN201991226U (en) Flange template support structure
CN205688782U (en) A kind of corner steel girder erection structure of boat scaffold
CN204781925U (en) Aluminium frame template socket joint formula strutting arrangement
CN204342306U (en) A kind of novel roofing crane foundation
CN207268022U (en) A kind of three-dimensional network structure
CN204212385U (en) Scaffold strengthened by truss
CN204456813U (en) A kind of single support operation platform for elevator hoistways
CN103397697A (en) Sunlight room
CN205259426U (en) Connection structure between roof truss and roof truss
CN202787847U (en) Ultra-high unit type wooden keel model for hollow wall body
CN205242981U (en) Concrete construction operation platform
CN201602026U (en) Non-support wintry warm type greenhouse
CN203188647U (en) Concrete and wood composite structure for old and tender props of archaizing building
CN204919818U (en) Archaize building's railing and eave connection structure
CN204112602U (en) A kind of compound rest controlling cast-in-situ floor reinforcement cover
CN204850436U (en) A collapsible angel position control device for build by laying bricks or stones on inclined plane
CN103661906B (en) A kind of detachable folding chimney
CN205077697U (en) Reverse support system structure of block mount formula furred ceiling
CN204676709U (en) For the connector of house roof truss structure and the syndeton of house roof truss
CN204754419U (en) Outdoor canopy of combination formula of quick assembly disassembly
CN204510470U (en) A kind of stretch-draw string arch factory building
CN203008376U (en) Crossing high-altitude type steel-concrete truss formwork
CN202969896U (en) Scaffold wall-connecting structure
CN103184767A (en) Detachable and integrated cylindrical shell structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150826