CN204590011U - A kind of prestressing force props up hole fender pile - Google Patents

A kind of prestressing force props up hole fender pile Download PDF

Info

Publication number
CN204590011U
CN204590011U CN201520252631.2U CN201520252631U CN204590011U CN 204590011 U CN204590011 U CN 204590011U CN 201520252631 U CN201520252631 U CN 201520252631U CN 204590011 U CN204590011 U CN 204590011U
Authority
CN
China
Prior art keywords
steel
steel plate
extension fixture
hole
prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520252631.2U
Other languages
Chinese (zh)
Inventor
韦宏
姚正钦
王帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ARCHITECTURAL DESIGN RESEARCH INSTITUTE OF SCUT
Original Assignee
ARCHITECTURAL DESIGN RESEARCH INSTITUTE OF SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ARCHITECTURAL DESIGN RESEARCH INSTITUTE OF SCUT filed Critical ARCHITECTURAL DESIGN RESEARCH INSTITUTE OF SCUT
Priority to CN201520252631.2U priority Critical patent/CN204590011U/en
Application granted granted Critical
Publication of CN204590011U publication Critical patent/CN204590011U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of prestressing force and prop up hole fender pile; Comprise the pre-stressed anchorage body of soldier pile pile body, recoverable steel bushing and band expanding end fitting; Recoverable steel bushing mainly comprises seamless steel pipe and end steel plate; Pre-stressed anchorage body with expanding end fitting comprises prestressed cable, extension fixture steel plate, steel strand, movable rotation-shaft, prestressed anchor and steel strand hole; Each block extension fixture steel plate two ends is connected with another block extension fixture steel plate by movable rotation-shaft, and four pieces of extension fixture steel plate first places connect to form quadrangle movable device successively, and quadrangle movable device is between end steel plate and prestressed anchor; Prestressed cable is connected with another prestressed anchor through the prestressed cable hole of the upper and lower side of the prestressed anchor on seamless steel pipe top, seamless steel pipe and quadrangle movable device; The utility model has that structure is simple, easy for installation, reasonable stress, recyclable, the feature of saving steel.

Description

A kind of prestressing force props up hole fender pile
Technical field
The utility model relates to a kind of foundation pit supporting pile, particularly relates to a kind of callable foundation pit supporting pile using prestressing technique.
Background technology
Soldier pile campshed enclosure wall is one of structural system commonly used the most in pattern foundation pit supporting structure.Soldier pile is flexural member under soil pressure effect.For ensureing the bend-carrying capacity of pile body and carrying out of restriction crack, often need in pile body tensile region to configure more tensile reinforcement.And on the other hand, building foundation pit supporting structure is only the construction usage of building foundation and basement, belongs to temporary work.
Existing soldier pile is steel concrete soldier pile, and bear moment of flexure comparatively greatly, the tensile reinforcement of configuration is more, and after basement construction completes, these reinforcing bars have not just been used, and cannot reclaim, be great waste.
Utility model content
The purpose of this utility model is for the deficiencies in the prior art, and provide a kind of critical piece callable, safer and economic prestressing force props up hole fender pile.
The utility model object is achieved through the following technical solutions:
A kind of prestressing force props up hole fender pile, comprises the pre-stressed anchorage body of soldier pile pile body, recoverable steel bushing and band expanding end fitting;
Described recoverable steel bushing mainly comprises seamless steel pipe and end steel plate; End steel plate is provided with in the bottom of seamless steel pipe;
The pre-stressed anchorage body of described band expanding end fitting comprises prestressed cable, extension fixture steel plate, steel strand, movable rotation-shaft, prestressed anchor and steel strand hole; Each block extension fixture steel plate two ends is connected with another block extension fixture steel plate by movable rotation-shaft, four pieces of extension fixture steel plate first places connect to form quadrangle movable device successively, and the middle part of the junction of two blocks, upper end extension fixture steel plate and lower end two blocks of extension fixture steel plates of quadrangle movable device is all provided with prestressed cable hole; Prestressed anchor has two, a top being arranged on seamless steel pipe, and another is arranged on quadrangle movable device lower end, and quadrangle movable device is between end steel plate and prestressed anchor; Prestressed cable is connected with another prestressed anchor through the prestressed cable hole of the upper and lower side of the prestressed anchor on seamless steel pipe top, seamless steel pipe and quadrangle movable device;
The tensile region of soldier pile pile body is provided with the pre-stressed anchorage body of at least one recoverable steel bushing and at least one band expanding end fitting.
For realizing the utility model object further, preferably, two blocks, the upper end of quadrangle movable device extension fixture steel plate or two blocks, lower end extension fixture steel plate are provided with steel strand hole, steel strand two ends are connected with two blocks of extension fixture steel plates respectively by steel strand hole.
Interleaving agent is smeared at seamless steel pipe external surface and extension fixture steel plate.
The diameter stating seamless steel pipe is not less than 3 times of prestressed cable diameter.
The pre-stressed anchorage body of described recoverable steel bushing and band expanding end fitting is multiple.
Relative to prior art, the utility model tool has the following advantages:
(1) the utility model employs prestressing technique, applies precompression, effectively can save the rigidity that nonprestressed reinforcement improves soldier pile simultaneously, carrying out of control critical eigenvalue to the tensile region of soldier pile.
(2) pre-stressed anchorage body of the utility model seamless steel pipe and band expanding end fitting is all recyclable after basement construction completes, and has good economy.
(3) each block extension fixture steel plate two ends of the utility model are connected with another block extension fixture steel plate by movable rotation-shaft, four pieces of extension fixture steel plate first places connect to form quadrangle movable device successively, the ingenious prestressed anchor through seamless steel top of prestressed cable, the prestressed cable hole of the upper and lower side of seamless steel pipe and quadrangle movable device is connected with another prestressed anchor, realize the enlargement and contraction being controlled quadrangle movable device by prestressed cable, while applying precompression to concrete, also recyclable, design ingenious, practical.
Accompanying drawing explanation
Fig. 1 is the pile body structure schematic diagram that prestressing force props up hole fender pile;
Fig. 2 be Fig. 1 A ?A schematic cross-section;
Fig. 3 is the schematic diagram that prestressing force props up when the expanding end of cheating fender pile is shunk;
Fig. 4 is the schematic diagram that prestressing force props up when the expanding end of cheating fender pile is expanded;
Fig. 5 is the top view of expanding end in Fig. 3, Fig. 4;
Fig. 6 is the upward view of expanding end in Fig. 3, Fig. 4;
Fig. 7 is the structural representation of Fig. 3, Fig. 4 medial end portions steel plate.
Fig. 8 is the lateral view of Fig. 7.
Shown in figure: prestressed cable 1, seamless steel pipe 2, end steel plate 3, extension fixture steel plate 4, steel strand 5, movable rotation-shaft 6, prestressed anchor 7, steel strand hole 8, prestressed cable hole 9, soldier pile pile body 11, prestressing force body 12.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail, but embodiment of the present utility model is not limited thereto.
As figure 1 ?shown in 8, a kind of prestressing force props up hole fender pile, comprises the pre-stressed anchorage body of soldier pile pile body 11, recoverable steel bushing and band expanding end fitting;
Recoverable steel bushing mainly comprises seamless steel pipe 2 and end steel plate 3; End steel plate 3 is provided with in the bottom of seamless steel pipe 2; Preferably smear interleaving agent at seamless steel pipe 2 external surface;
Pre-stressed anchorage body with expanding end fitting comprises prestressed cable 1, extension fixture steel plate 4, steel strand 5, movable rotation-shaft 6, prestressed anchor 7 and steel strand hole 8, each block extension fixture steel plate 4 two ends is connected with another block extension fixture steel plate by movable rotation-shaft, four pieces of extension fixture steel plate first places connect to form quadrangle movable device successively, and the middle part of the junction of two blocks, upper end extension fixture steel plate 4 and lower end two blocks of extension fixture steel plates 4 of quadrangle movable device is all provided with prestressed cable hole 9; Prestressed anchor 7 has two, a top being arranged on seamless steel pipe 2, and another is arranged on quadrangle movable device lower end, and quadrangle movable device is between end steel plate 3 and prestressed anchor 7; Prestressed cable 1 is connected with another prestressed anchor through the prestressed cable hole 9 of the upper and lower side of the prestressed anchor on seamless steel pipe 2 top, seamless steel pipe 2 and quadrangle movable device; Preferably on two blocks, the upper end of quadrangle movable device extension fixture steel plate 4 or two blocks, lower end extension fixture steel plate 4, be provided with steel strand hole 8, steel strand 5 two ends are connected with two blocks of extension fixture steel plates 4 respectively by steel strand hole 8.
The tensile region of soldier pile pile body 11 is provided with the pre-stressed anchorage body of at least one recoverable steel bushing and band expanding end fitting.
The pre-stressed anchorage body of the utility model band expanding end fitting controls quadrangle movable device by prestressed cable 1 and expands and shrink, during stretch-draw prestressing force cable wire 1, quadrangle movable device opens under a stretching force and expands and be anchored in surrounding concrete, thus realizes the effect applying precompression to concrete; The pre-stressed anchorage body of steel concrete soldier pile pile body 11 embedding above-mentioned steel bushing and band expanding end fitting in tensile region.
The quadrangle movable device (enlarged footing, Fig. 3, Fig. 4) of the pre-stressed anchorage body with expanding end fitting is shaping by produce in factory, and on plate, perforate is passed through for movable rotation-shaft and prestressed cable.The schematic diagram of enlarged footing steel plate as shown in Figure 4.
During construction, interleaving agent is smeared at the pre-stressed anchorage body and steel bushing external surface of being with expanding end fitting, after soldier pile pore-forming, the quadrangle movable device of band expanding end fitting, prestressed anchor 7, seamless steel pipe 2, prestressed cable 1 are integrally arranged in soldier pile tension side by designing requirement, and hang together with reinforcing cage in stake holes.Hang after-pouring concrete, treated that pile concrete reaches design age post-stress/1.Pre-stressed anchorage body with expanding end fitting outwards expands under the pulling force effect of prestressed cable, embeds in periphery concrete.After power to be tensioned reaches designing requirement, anchoring prestress rope, so far can realize the effect of the utility model to concrete support stake Shi Hanzhang.
When reclaiming pre-stressed anchorage body and the seamless steel pipe 2 of band expanding end fitting, first need that stretch-draw is carried out to prestressed cable 1 and throw off to make prestressed cable and fixture, then take out fixture, loosen prestressed cable.After loosening prestressed cable, quadrangle movable device (enlarged footing) bounces back under the screen resilience of steel strand and the effect of deadweight therein.Then seamless steel pipe 2 and prestressed cable 1 i.e. recyclable prestressed cable 1, seamless steel pipe 2, prestressed anchor 7 and quadrangle movable device is upwards pulled out successively.
During stretch-draw prestressing force cable wire 1, anchoring body end fitting can expand outwardly, and with the prestressed anchor acting in conjunction being positioned at seamless steel pipe 2 top, applies precompression to steel concrete soldier pile.After basement construction completes, loosen prestressed cable, the pre-stressed anchorage body of band expanding end fitting can reclaim together with seamless steel pipe.Anchoring body be connected with prestressed cable and can by prestressed cable 1 control its expands with shrink, during stretch-draw anchoring body open under a stretching force expand and be tightly stuck in surrounding concrete, thus realize applying to concrete precompression effect; The pre-stressed anchorage body of steel concrete soldier pile pile body embedding above-mentioned steel bushing and band expanding end fitting in tensile region.
The wall thickness of the quantity of the pre-stressed anchorage body with expanding end fitting in the utility model and steel plate thickness and size, steel bushing all needs undertaken designing by Practical Project and should meet relevant code requirement to the prestress value of size and applying.
The wall thickness of seamless steel pipe and diameter are selected with reference to " Seamless Steel Structural Tubes (GB ?T8462 ?2008) " according to engineering is actual, and the diameter of seamless steel pipe is not less than 3 times of prestressed cable diameter.The utility model employs prestressing technique, applies precompression, effectively can save the rigidity that nonprestressed reinforcement improves soldier pile simultaneously, carrying out of control critical eigenvalue to the tensile region of soldier pile.The pre-stressed anchorage body of the utility model seamless steel pipe and band expanding end fitting is all recyclable after basement construction completes, and has good economy.Each block extension fixture steel plate two ends of the utility model are connected with another block extension fixture steel plate by movable rotation-shaft, four pieces of extension fixture steel plate first places connect to form quadrangle movable device successively, the prestressed cable hole of the upper and lower side of the ingenious prestressed anchor through seamless steel top of prestressed cable, seamless steel pipe and quadrangle movable device is connected with another prestressed anchor, realize the enlargement and contraction being controlled quadrangle movable device by prestressed cable, while applying precompression to concrete, also recyclable, design ingenious, practical.

Claims (5)

1. prestressing force props up a hole fender pile, it is characterized in that, comprises the pre-stressed anchorage body of soldier pile pile body, recoverable steel bushing and band expanding end fitting;
Described recoverable steel bushing mainly comprises seamless steel pipe and end steel plate; End steel plate is provided with in the bottom of seamless steel pipe;
The pre-stressed anchorage body of described band expanding end fitting comprises prestressed cable, extension fixture steel plate, steel strand, movable rotation-shaft, prestressed anchor and steel strand hole; Each block extension fixture steel plate two ends is connected with another block extension fixture steel plate by movable rotation-shaft, four pieces of extension fixture steel plate first places connect to form quadrangle movable device successively, and the middle part of the junction of two blocks, upper end extension fixture steel plate and lower end two blocks of extension fixture steel plates of quadrangle movable device is all provided with prestressed cable hole; Prestressed anchor has two, a top being arranged on seamless steel pipe, and another is arranged on quadrangle movable device lower end, and quadrangle movable device is between end steel plate and prestressed anchor; Prestressed cable is connected with another prestressed anchor through the prestressed cable hole of the upper and lower side of the prestressed anchor on seamless steel pipe top, seamless steel pipe and quadrangle movable device;
The tensile region of soldier pile pile body is provided with the pre-stressed anchorage body of at least one recoverable steel bushing and at least one band expanding end fitting.
2. prestressing force according to claim 1 props up hole fender pile, it is characterized in that, two blocks, the upper end of quadrangle movable device extension fixture steel plate or two blocks, lower end extension fixture steel plate are provided with steel strand hole, and steel strand two ends are connected with two blocks of extension fixture steel plates respectively by steel strand hole.
3. prestressing force according to claim 1 props up hole fender pile, it is characterized in that, smears interleaving agent at seamless steel pipe external surface and extension fixture steel plate.
4. prestressing force according to claim 1 props up hole fender pile, it is characterized in that, the diameter of described seamless steel pipe is not less than 3 times of prestressed cable diameter.
5. prestressing force according to claim 1 props up hole fender pile, it is characterized in that, the pre-stressed anchorage body of described recoverable steel bushing and band expanding end fitting is multiple.
CN201520252631.2U 2015-04-23 2015-04-23 A kind of prestressing force props up hole fender pile Active CN204590011U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520252631.2U CN204590011U (en) 2015-04-23 2015-04-23 A kind of prestressing force props up hole fender pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520252631.2U CN204590011U (en) 2015-04-23 2015-04-23 A kind of prestressing force props up hole fender pile

Publications (1)

Publication Number Publication Date
CN204590011U true CN204590011U (en) 2015-08-26

Family

ID=53926180

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520252631.2U Active CN204590011U (en) 2015-04-23 2015-04-23 A kind of prestressing force props up hole fender pile

Country Status (1)

Country Link
CN (1) CN204590011U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818716A (en) * 2015-04-23 2015-08-05 华南理工大学建筑设计研究院 Recyclable prestressed pit supporting fender pile
CN115075230A (en) * 2022-06-08 2022-09-20 北京住总集团有限责任公司 Pedestal pile construction method and reinforcement cage used in same

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104818716A (en) * 2015-04-23 2015-08-05 华南理工大学建筑设计研究院 Recyclable prestressed pit supporting fender pile
CN115075230A (en) * 2022-06-08 2022-09-20 北京住总集团有限责任公司 Pedestal pile construction method and reinforcement cage used in same
CN115075230B (en) * 2022-06-08 2024-04-12 北京住总集团有限责任公司 Construction method of pedestal pile and reinforcement cage used in construction method

Similar Documents

Publication Publication Date Title
CN203429641U (en) Single-side supporting formwork reinforcing structure system for building construction
CN111734166A (en) Detachable conversion device and reverse dismantling construction method using same
CN204590011U (en) A kind of prestressing force props up hole fender pile
CN202766972U (en) Circular pier column hoop
CN106930436B (en) Reinforced concrete shear wall with built-in prestressed steel diagonal bracing
CN107119920B (en) A kind of reverse dismounting device and its application method of intensive high-rise
CN106638615A (en) Recyclable prestress pit-supporting fender pile
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN102363957A (en) Post-tensioned pre-stressed compound uplift pile
CN111764578B (en) Reverse construction pile column structure and construction method thereof
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN105178354A (en) Tian-shaped beam column cap and beamless slab structure system
CN105019645A (en) Template system for building concrete structure at earth-taking opening in top-down construction method, and construction method
CN104818716A (en) Recyclable prestressed pit supporting fender pile
CN109944262B (en) Steel cofferdam installation method for reinforcing bridge underwater structure
CN209837061U (en) Device for quickly pressing underwater steel cofferdam of reinforced bridge
CN202467152U (en) Clamp type embedded part structure of shape steel overhanging scaffold
CN206298823U (en) Pass horse
CN212866860U (en) Plugging device is pour in entrance to a cave is reserved to floor
CN110863613B (en) Construction method of unbonded prestressed concrete filled steel tube giant column with built-in plastic drain pipe
CN209011152U (en) Tower crane based on bonded prestressed concrete
CN202745081U (en) Large-size rubble concrete settlement joint template system
CN106988321A (en) A kind of miscellaneous fill foundation ditch bamboo reinforcement support system and its construction method
CN207063331U (en) A kind of post-stressed steel strand wires flat anchorage
CN201546371U (en) Bundled non-bonded prestressed rib anchorage system for large-diameter silo

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant