CN204571355U - A kind of building operations bracing or strutting arrangement - Google Patents
A kind of building operations bracing or strutting arrangement Download PDFInfo
- Publication number
- CN204571355U CN204571355U CN201520067224.4U CN201520067224U CN204571355U CN 204571355 U CN204571355 U CN 204571355U CN 201520067224 U CN201520067224 U CN 201520067224U CN 204571355 U CN204571355 U CN 204571355U
- Authority
- CN
- China
- Prior art keywords
- axle sleeve
- rhizoid thick
- top board
- base plate
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
A kind of building operations bracing or strutting arrangement, comprise base plate and top board, the upper surface of described base plate is vertically fixed with two rhizoid thick sticks by bearing, two rhizoid thick sticks are equipped with gear, described gear is provided with chain, wherein a rhizoid thick stick is provided with negative pulley wheel, described negative pulley wheel is connected with the drive pulley on motor by belt, female axle sleeve is established in the upper end of described leading screw, the top of described axle sleeve is connected with the soffit of top board, the utility model has the following advantages: top board can be risen by coordinating of leading screw and axle sleeve or to be fallen by the utility model, guarantee constructor is in a best construction location constantly, not only save the muscle power of constructor, and improve efficiency of construction.
Description
Technical field
The utility model relates to a kind of building operations bracing or strutting arrangement.
Background technology
In the architectural process of low layer villa cluster or rural building, the process that usual needs are built interim support to build a wall and whitewashed, but the height of support used in current work progress immobilizes, arbitrarily can not regulate as required, make whole work progress very inconvenient.
Summary of the invention
The purpose of this utility model is to provide a kind of building operations bracing or strutting arrangement, solves existing working bracing frame and can not regulate the problem affecting efficiency of construction.
Described object is achieved by the following scheme: a kind of building operations bracing or strutting arrangement, comprise base plate and top board, the upper surface of described base plate is vertically fixed with two rhizoid thick sticks by bearing, two rhizoid thick sticks are equipped with gear, described gear is provided with chain, and wherein a rhizoid thick stick is provided with negative pulley wheel, and described negative pulley wheel is connected with the drive pulley on motor by belt, female axle sleeve is established in the upper end of described leading screw, and the top of described axle sleeve is connected with the soffit of top board.
The utility model has the following advantages: top board can be risen by coordinating of leading screw and axle sleeve or to be fallen by the utility model, guarantee constructor is in a best construction location constantly, not only save the muscle power of constructor, and improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Wherein, 1-base plate, 2-top board, 3-bearing, 4-leading screw, 5-gear, 6-chain, 7-negative pulley wheel, 8-motor, 9-drive pulley, 10-axle sleeve.
Detailed description of the invention
The utility model is elaborated preferred embodiment below in conjunction with accompanying drawing.
A kind of building operations bracing or strutting arrangement, comprise base plate 1 and top board 2, the upper surface of described base plate 1 is vertically fixed with two rhizoid thick sticks 4 by bearing 3, two rhizoid thick sticks 4 are equipped with gear 5, described gear 5 is provided with chain 6, and wherein a rhizoid thick stick 4 is provided with negative pulley wheel 7, and described negative pulley wheel 7 is connected with the drive pulley 9 on motor 8 by belt, female axle sleeve 10 is established in the upper end of described leading screw 4, and the top of described axle sleeve 10 is connected with the soffit of top board 2.
Bearing 3 is arranged in bearing support, bearing support is embedded on base plate 1, the bottom of leading screw 4 is arranged in bearing 3, negative pulley wheel 7 all welds with leading screw 4 with gear 5, motor 8 is connected with power line by the switch on connecting line, motor 8 is set to main story and reversion by circuit, starter motor 8, drive pulley 9 on motor 8 drives negative pulley wheel 7 to rotate, while wherein a rhizoid thick stick 4 rotates, another rhizoid thick stick 4 is driven to rotate, by axle sleeve 10 jack-up on leading screw 4 or falling simultaneously when two rhizoid thick sticks 4 rotate by the chain 6 on gear 5.
Present embodiment does not just limit its protection domain to the exemplary illustrated of this patent; those skilled in the art can also carry out local to it and change; as long as no the Spirit Essence exceeding this patent, be all considered as the equivalent replacement to this patent, all at the protection domain of this patent.
Claims (1)
1. a building operations bracing or strutting arrangement, comprise base plate (1) and top board (2), it is characterized in that: the upper surface of described base plate (1) is vertically fixed with two rhizoid thick sticks (4) by bearing (3), two rhizoid thick sticks (4) are equipped with gear (5), described gear (5) is provided with chain (6), wherein a rhizoid thick stick (4) is provided with negative pulley wheel (7), described negative pulley wheel (7) is connected with the drive pulley (9) on motor (8) by belt, female axle sleeve (10) is established in the upper end of described leading screw (4), the top of described axle sleeve (10) is connected with the soffit of top board (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520067224.4U CN204571355U (en) | 2015-01-30 | 2015-01-30 | A kind of building operations bracing or strutting arrangement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520067224.4U CN204571355U (en) | 2015-01-30 | 2015-01-30 | A kind of building operations bracing or strutting arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204571355U true CN204571355U (en) | 2015-08-19 |
Family
ID=53864014
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520067224.4U Expired - Fee Related CN204571355U (en) | 2015-01-30 | 2015-01-30 | A kind of building operations bracing or strutting arrangement |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204571355U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121210A (en) * | 2016-08-16 | 2016-11-16 | 中建三局第建设工程有限责任公司佛山市分公司 | A kind of spiral automatic jacking device of push rod and building external scaffolding building method |
CN107575708A (en) * | 2017-07-18 | 2018-01-12 | 响水县恒泰纺织有限公司 | A kind of textile machine support frame |
CN111794111A (en) * | 2020-07-20 | 2020-10-20 | 梁云招 | Supporting equipment for bridge construction |
-
2015
- 2015-01-30 CN CN201520067224.4U patent/CN204571355U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106121210A (en) * | 2016-08-16 | 2016-11-16 | 中建三局第建设工程有限责任公司佛山市分公司 | A kind of spiral automatic jacking device of push rod and building external scaffolding building method |
CN107575708A (en) * | 2017-07-18 | 2018-01-12 | 响水县恒泰纺织有限公司 | A kind of textile machine support frame |
CN111794111A (en) * | 2020-07-20 | 2020-10-20 | 梁云招 | Supporting equipment for bridge construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204571355U (en) | A kind of building operations bracing or strutting arrangement | |
CN204691194U (en) | The adjustable bracing frame of a kind of building operations | |
CN204475812U (en) | The adjustable bracing frame of a kind of building operations | |
CN204552044U (en) | A kind of building-supporting device | |
CN204552043U (en) | A kind of building operations bracing frame | |
CN204278179U (en) | A T-shaped extrusion machine for light partition plate of l-shaped | |
CN204492131U (en) | A kind of building operations eyelid retractor | |
CN204531334U (en) | A kind of building-supporting device | |
CN204552042U (en) | A kind of building-supporting frame | |
CN204727468U (en) | A kind of translational device for crane slings | |
CN204097132U (en) | Without chain single-shaft-rotation slag scraper | |
CN204073357U (en) | Physical culture long-jump teaching sand pit collating unit | |
CN205558220U (en) | Ceramic tile mechanical float | |
CN209277004U (en) | The hyperbola abnormal shape pier steel form of speed of application can be improved | |
CN204260953U (en) | One is Portable Automatic stands up care implement | |
CN202064617U (en) | Portable rubber flat-plate vibrator | |
CN204803766U (en) | Heel post for bridge | |
CN201030624Y (en) | Improvement of artificial stone engraving machine | |
CN204357624U (en) | The two-tube air pressure generator of river energy | |
CN204266123U (en) | A kind of ascending/decending bracing or strutting arrangement for bridge construction | |
CN204687001U (en) | A kind of automation board cutting machine | |
CN204163350U (en) | A kind of cement trowelling machine | |
CN204386966U (en) | A kind of multi-functional full-automatic pusher | |
CN204691674U (en) | A kind of packaged type auger | |
CN203716471U (en) | Plastering machine for slopes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20160130 |
|
EXPY | Termination of patent right or utility model |