CN204803766U - Heel post for bridge - Google Patents
Heel post for bridge Download PDFInfo
- Publication number
- CN204803766U CN204803766U CN201520473346.3U CN201520473346U CN204803766U CN 204803766 U CN204803766 U CN 204803766U CN 201520473346 U CN201520473346 U CN 201520473346U CN 204803766 U CN204803766 U CN 204803766U
- Authority
- CN
- China
- Prior art keywords
- bearing
- base
- leading screw
- lead screw
- axle sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000000149 penetrating effect Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 9
- 230000000694 effects Effects 0.000 abstract description 2
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000007858 starting material Substances 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520473346.3U CN204803766U (en) | 2015-07-04 | 2015-07-04 | Heel post for bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520473346.3U CN204803766U (en) | 2015-07-04 | 2015-07-04 | Heel post for bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204803766U true CN204803766U (en) | 2015-11-25 |
Family
ID=54588615
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520473346.3U Expired - Fee Related CN204803766U (en) | 2015-07-04 | 2015-07-04 | Heel post for bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204803766U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524088A (en) * | 2017-08-27 | 2017-12-29 | 贵州新联爆破工程集团有限公司 | One kind adjustment simply supported girder bridge holder device |
-
2015
- 2015-07-04 CN CN201520473346.3U patent/CN204803766U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107524088A (en) * | 2017-08-27 | 2017-12-29 | 贵州新联爆破工程集团有限公司 | One kind adjustment simply supported girder bridge holder device |
CN107524088B (en) * | 2017-08-27 | 2023-06-30 | 保利新联爆破工程集团有限公司 | Support device for adjusting simply supported girder bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201864516U (en) | Lifting appliance special for overhauling isolating switch | |
CN100547382C (en) | Pre-stressed anchorage body fatigue test device | |
CN204803766U (en) | Heel post for bridge | |
CN204400312U (en) | Network cable actinobacillus device | |
CN202672703U (en) | Device for abutting steel pipe vertical rods in steel pipe scaffold | |
CN202023353U (en) | Integral lifting scaffold for building operations | |
CN204825658U (en) | Public road bridge heel post for roof beam | |
CN204825657U (en) | Bridge strutting arrangement | |
CN204571355U (en) | A kind of building operations bracing or strutting arrangement | |
CN204875529U (en) | Public road bridge heel post for roof beam | |
CN203402423U (en) | Device for pushing end portions of steel pipes to be in same vertical plane | |
CN204081529U (en) | Building site building block brick loader | |
CN206437801U (en) | A kind of subway construction bogey | |
CN204875527U (en) | Public road bridge roof beam supports heel post | |
CN205132725U (en) | Screw cable hoisting frame | |
CN204570396U (en) | D type is the traversing door frame of beam just | |
CN203203739U (en) | Novel bearing beam load tester | |
CN105305300A (en) | Device used for replacing tubular bus support porcelain insulator | |
CN203569867U (en) | Locating guide rail device | |
CN203345998U (en) | Bilge well pump lifting device of sewage treatment station | |
CN107815966A (en) | A kind of highway bridge load-bearing pillar | |
CN205502060U (en) | Device in pre -buried power plant dust remover basis rag bolt hole | |
CN204281078U (en) | For the end box-beam structure of the car weight-lifting equipment that navigates | |
CN202899607U (en) | Construction engineering aluminum formwork | |
CN204875528U (en) | Heavy strutting arrangement of public road bridge joist support |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
CB03 | Change of inventor or designer information |
Inventor after: Hong Xiaofang Inventor before: Tian Lihua |
|
COR | Change of bibliographic data | ||
TR01 | Transfer of patent right |
Effective date of registration: 20160205 Address after: The coastal city of Taizhou City, 318000 Jin Shan District of Zhejiang province 3-17 Patentee after: The Dachang Municipal Construction Co. Ltd. Address before: 255400 Zibo City, Linzi Province, Samsung water city 9-2-401 Patentee before: Tian Lihua |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20151125 Termination date: 20160704 |