CN204570691U - Force the tubular diesel pile hammer of cooling cylinder inner chamber - Google Patents

Force the tubular diesel pile hammer of cooling cylinder inner chamber Download PDF

Info

Publication number
CN204570691U
CN204570691U CN201520271017.0U CN201520271017U CN204570691U CN 204570691 U CN204570691 U CN 204570691U CN 201520271017 U CN201520271017 U CN 201520271017U CN 204570691 U CN204570691 U CN 204570691U
Authority
CN
China
Prior art keywords
cylinder
lower cylinder
inner chamber
pile hammer
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520271017.0U
Other languages
Chinese (zh)
Inventor
余有存
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520271017.0U priority Critical patent/CN204570691U/en
Application granted granted Critical
Publication of CN204570691U publication Critical patent/CN204570691U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a kind of tubular diesel pile hammer forcing cooling cylinder inner chamber, it comprises lower cylinder, the cylinder body of this lower cylinder is provided with fuel pump and suction and exhaust ports, this fuel pump is connected with atomizer, suction and exhaust ports leads to outer wall of cylinder block from the inboard wall of cylinder block of lower cylinder, and lower cylinder block is provided with the air inlet leading to inner chamber, the air inlet quantity that lower cylinder casing wall is arranged at least one, air inlet is connected with one end of gas pipeline, and the gas pipeline other end is connected with band pressurized air source.The utility model provides the pressure inner chamber Wind-cooling type tubular diesel pile hammer that a kind of countercylinder inside cavity forces to disperse heat, countercylinder cavity inner wall carries out forcing cooling, effectively controls cylinder temperature rise.

Description

Force the tubular diesel pile hammer of cooling cylinder inner chamber
Technical field
The utility model relates to the tubular diesel pile hammer for construction work pile foundation construction, particularly relates to the pressure cooling of tubular diesel pile hammer cylinder chamber.
Background technology
Tubular diesel pile hammer (hereinafter referred to as cylinder hammer) is a kind of pile driving equipment of construction work pile foundation construction, and due to it, to have impact force large, and operating efficiency is high, and range of applicability is wide, advantages such as easy maintenance and being used widely.Cylinder hammer is the energy utilizing fuel oil (diesel oil) blast to produce, and upwardly upper piston, produces potential energy, then fall, and produces impact force, realizes the construction equipment of paddle type mill piling.In recent years along with the development of China's economic construction, the needs of the particularly foundation construction such as modern marine engineering, bridge spanning the sea, oil drilling platform and marine wind electric field, tubular diesel pile hammer is more and more towards the future development maximized.
Cylinder hammer construction operation starts, upper piston comes off and free-falling from undercarriage, when upper piston falls through the suction and exhaust ports of lower cylinder, start to compress the air be closed in lower cylinder, make diesel oil atomization be splashed in combustion chamber when upper piston head impact lower piston shock surface, stake is laid simultaneously; Mist of oil in combustion chamber mixes with compressed air is lighted blast, the explosive force produced continues stake down to beat, and upper piston upsprings and skips to certain altitude under explosive force effect simultaneously, and then upper piston falls again, so move in circles, realize piling construction operation.
In above process, diesel combustion explodes the amount of heat produced, and the inner chamber exterior surface of the lower cylinder block mainly hammered into shape by cylinder is distributed, and to burn the balance of interior temperature to keep lower cylinder.The cooling heat dissipation structure of current cylinder hammer is be provided with multi-disc fin in the bottom of lower cylinder external surface mostly, lower cylinder carries out heat convection by these fin and air, but the radiating effect of this natural air cooled structure is very undesirable, one is to meet intensity, the casing wall thickness of lower cylinder is all very thick, and inner chamber heat is not easily transmitted to external surface; Two is the impacts being subject to external condition, the factors such as following cylinder ambient air temperature is higher, wind speed is less.And lower cylinder heat can not leave in time, the hurried rising of cavity temperature in cylinder block must be made to cause many harm, first descend cylinder temperature too high, cylinder can be caused to hammer fuel oil advanced ignition into shape, upper piston and lower piston can not bump against, and fuel oil explosion energy can not be converted to period of validity the percussion to stake, and piling efficiency is significantly declined, even cause and cannot normally work, after having to stop piling waiting for the cooling of cylinder hammer hammer body, row is started shipment again.With cylinder temperature is too high at present, the Frotteurism of cylinder inner wall and piston space not only can be caused to be deteriorated, and cylinder block material intensity reduces, plasticity increases, wearing and tearing aggravation, the high temperature and high pressure gas produced that explodes acts on lower cylinder inner wall, piston end surface, cause cylinder inner wall surface, piston face cavitation erosion, aggravate its corrosive damage, the local melting of cylinder, piston can be caused time serious and pull, even form Cylinder sticking, have a strong impact on the application life of cylinder hammer.Especially along with the increase day by day of stake diameter and length, blow energy is more and more higher, and cylinder hammer tonnage is also higher, increasing of the continuous hammer number of every pile, and cylinder temperature raises faster.The tubular diesel pile hammer of current natural air cooled mode has been difficult to meet basic engineering construction and has require that.
Utility model content
For the above-mentioned deficiency existing for prior art, the pressure inner chamber Wind-cooling type tubular diesel pile hammer that technical problem to be solved in the utility model is to provide a kind ofly forces to disperse heat from casing housing inside, countercylinder cavity inner wall carries out forcing cooling, effectively controls cylinder temperature rise.
In order to solve the problems of the technologies described above, the utility model can force inner chamber cooling type tubular diesel pile hammer, comprise lower cylinder, the cylinder body of this lower cylinder is provided with fuel pump and suction and exhaust ports, this fuel pump is connected with atomizer, suction and exhaust ports leads to outer wall of cylinder block from the inboard wall of cylinder block of lower cylinder, the cylinder body outer peripheral face of described lower cylinder is provided with the air inlet communicated with inner chamber, this air inlet one end and cylinder inner wall through, the other end communicates with gas pressure source with pressure, pressed gas is forced to be blown into cylinder chamber by the above-mentioned air inlet communicated with inwall by gas pressure source, inner chamber heat is discharged from lower cylinder suction pore by pressed gas.The quantity of the air inlet that above-mentioned and lower cylinder block inwall communicates at least one.
In said structure, owing to being blown into pressed gas directly to inner chamber outside lower cylinder, not only take away rapidly inner chamber heat, improve heat exchange efficiency, add the cooling capacity of lower cylinder, and blown away the residual gas of inner chamber, improve air change rate and the diesel combustion quality of fresh air, add explosive force and piling efficiency.In addition, according to pile hammer and the length of cylinder block working time, heat number and the height of environment temperature, by controlling to be blown into the pressure of gas, to open the quantity of air inlet, to control and stablize the temperature rise of time cylinder and pile hammer thereof.
Owing to adopting the technical solution of the utility model, its cooling effect by the impact of pile hammer ambient temperature, does not make pile hammer can work continuously for a long time in various construction environment.Distributing in time rapidly of cylinder block heat, not only ensure that normal ignition and the steady operation of pile hammer, and reduces the fault rate of pile hammer, extend application life.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the tubular diesel pile hammer that the utility model can force inner chamber to cool is described in further detail.
Fig. 1 is the structural diagrams intention that the utility model can force a kind of detailed description of the invention of tubular diesel pile hammer cooling lower cylinder chamber;
Fig. 2 is a kind of structural representation of A-A section in structure shown in Fig. 1;
Fig. 3 is the structural diagrams intention that the utility model can force to cool the another kind of detailed description of the invention of tubular diesel pile hammer of lower cylinder chamber;
Fig. 4 is a kind of structural representation of B-B section in structure shown in Fig. 3;
Fig. 5 is the structural diagrams intention that the utility model can force another detailed description of the invention of tubular diesel pile hammer cooling lower cylinder chamber;
Fig. 6 is a kind of structural representation of C-C section in structure shown in Fig. 5.
In figure, 1-is with pressurized air source, 2-guide strip, 3-guide peg, 4-fuel pump, cylinder under 5-, 6-suction and exhaust ports, 7-atomizer, 8-fin, 9-air inlet, 10-gas pipeline.
Detailed description of the invention
In the tubular diesel pile hammer shown in Fig. 1, Fig. 2, the cylinder body of the lower cylinder 5 in tubular structure is provided with the fuel pump 4 be connected with atomizer 7, lower cylinder 5 is provided with guide strip 2, this guide strip 2 sliding bearing is on guide peg 3; Lower cylinder 5 cylinder body lower outer surface is provided with fin 8 in the form of a ring; The cylinder body of lower cylinder 5 is also provided with the suction and exhaust ports 6 for air-breathing and exhaust, and this suction and exhaust ports 6 leads to outer wall of cylinder block from the inboard wall of cylinder block of lower cylinder 5; This suction and exhaust ports 6 is connected with gas pipeline 10, and gas pipeline 10 is connected with band pressurized air source 1.
The quantity at least 2 of the suction and exhaust ports 6 of lower cylinder 5 in the present embodiment, gas pipeline 10 is connected with at least one suction and exhaust ports 6 in lower cylinder 5, suction and exhaust ports 6 can not be blocked completely when gas pipeline 10 is connected with suction and exhaust ports 6, such suction and exhaust ports 6 had both remained original function, simultaneously again as gas passage pressed gas being blown into lower cylinder 5 inner chamber.With pressurized air source 1, pressed gas is blown into the inner chamber of lower cylinder 5 by suction and exhaust ports 6 by gas pipeline 10.
In the tubular diesel pile hammer shown in Fig. 3, Fig. 4, increase air inlet 9 at lower cylinder 5 periphery wall, this air inlet 9 internal orifice communicates with lower cylinder 5 inner chamber, and air inlet 9 collar extension is connected with gas pipeline 10, and gas pipeline 10 is connected with band pressurized air source 1; Air inlet 9 has a certain degree with the inwall of lower cylinder 5, and air inlet 9 quantity is no less than 1; Its quantity prioritizing selection is 1 ~ 8.With pressurized air source 1, pressed gas is blown into the inner chamber of lower cylinder 5 by air inlet 9 by gas pipeline 10.Other structure is same as the previously described embodiments.
In the tubular diesel pile hammer shown in Fig. 5, Fig. 6, increase by 2 air inlets 9 at lower cylinder 5 periphery wall, the internal orifice of these 2 air inlets 9 communicates with lower cylinder 5 inner chamber, and collar extension is all connected with gas pipeline 10, and gas pipeline 10 is connected with band pressurized air source 1; 2 air inlets 9 all have a certain degree with the inwall of lower cylinder 5, but angle direction is contrary.With pressurized air source 1, pressed gas is blown into the inner chamber of lower cylinder 5 by 2 air inlets 9 by gas pipeline 10.Other structure is same as the previously described embodiments.
Above-mentionedly enumerated preferred embodiments more of the present utility model, but the utility model is not limited thereto, it can also make many improvement and conversion.As: in the lower cylinder 5 of utilization, the ready-made hole communicated with inner chamber or passage are to inner chamber input pressure gas; realize the cooling etc. to cylinder inner cavity; therefore; as long as be provided with air inlet 9 at lower cylinder body 5; the pressed gas exported by pressure source 1 is input to lower cylinder chamber by air inlet 9; to the pressure cooling structure that pile hammer and cylinder block thereof are carried out, all fall in protection domain of the present utility model.

Claims (5)

1. can force the tubular diesel pile hammer of cooling cylinder inner chamber for one kind, comprise lower cylinder (5), the cylinder body of this lower cylinder (5) is provided with fuel pump (4) and suction and exhaust ports (6), this fuel pump (4) is connected with atomizer (7), suction and exhaust ports (6) leads to outer wall of cylinder block from the inboard wall of cylinder block of lower cylinder (5), it is characterized in that: lower cylinder (5) cylinder body is provided with the air inlet (9) leading to inner chamber, lower cylinder (5) casing wall at least arranges an air inlet (9).
2. tubular diesel pile hammer according to claim 1, is characterized in that: described air inlet (9) and suction and exhaust ports (6) are all arranged on the cylinder body of lower cylinder (5).
3. tubular diesel pile hammer according to claim 1, is characterized in that: described air inlet (9) is suction and exhaust ports (6).
4. the tubular diesel pile hammer according to claim 1,2 or 3, it is characterized in that: described air inlet (9) is connected with one end of gas pipeline (10), gas pipeline (10) other end is connected with band pressurized air source (1).
5. tubular diesel pile hammer according to claim 1, is characterized in that: described lower cylinder (5) casing wall enterprising pore (9) quantity 1 ~ 8.
CN201520271017.0U 2015-04-27 2015-04-27 Force the tubular diesel pile hammer of cooling cylinder inner chamber Expired - Fee Related CN204570691U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520271017.0U CN204570691U (en) 2015-04-27 2015-04-27 Force the tubular diesel pile hammer of cooling cylinder inner chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520271017.0U CN204570691U (en) 2015-04-27 2015-04-27 Force the tubular diesel pile hammer of cooling cylinder inner chamber

Publications (1)

Publication Number Publication Date
CN204570691U true CN204570691U (en) 2015-08-19

Family

ID=53863354

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520271017.0U Expired - Fee Related CN204570691U (en) 2015-04-27 2015-04-27 Force the tubular diesel pile hammer of cooling cylinder inner chamber

Country Status (1)

Country Link
CN (1) CN204570691U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576414A (en) * 2020-05-23 2020-08-25 无锡信仁通用机械有限公司 Diesel oil pile hammer convenient to casing cooling

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111576414A (en) * 2020-05-23 2020-08-25 无锡信仁通用机械有限公司 Diesel oil pile hammer convenient to casing cooling

Similar Documents

Publication Publication Date Title
CN102434271B (en) Double-stroke reciprocating piston type fuel and vapor engine
CN204570691U (en) Force the tubular diesel pile hammer of cooling cylinder inner chamber
CN104854326A (en) Unburned fuel venting in internal combustion engines
CN202936793U (en) Water cooling drum-type diesel pile hammer
CN101182714A (en) High efficiency diesel pile hammer and gas piston structure thereof
CN102797258B (en) Cylindrical diesel pile hammer with forced cooling function
CN216936166U (en) Reversing valve assembly device of hydraulic breaking hammer
CN105274990B (en) A kind of circulating water cooling system of diesel hammer
CN203717108U (en) Precombustion generator
CN106149719A (en) Force the tubular diesel pile hammer of cooling cylinder chamber
CN203962074U (en) A kind of Novel diesel engine delivery valve seat device
CN104179180A (en) Integrated lower cylinder with ribbed water chamber and tubular diesel pile hammer with same
CN207143945U (en) Cartridge type grows nested diesel pile hammer
CN204627734U (en) Petrol engine forces cooling structure and petrol engine thereof
CN208266872U (en) The big energy hydraulic pile hammer of high frequency
CN205025625U (en) Festival oil piston
CN206205985U (en) Two stroke engine scavenging pressurizing and lubricating device
CN204025219U (en) With the integrated type lower cylinder of water cavity convex tendon
CN204551468U (en) With the tubular diesel hammer lower cylinder in air-cooled chamber
CN206987972U (en) A kind of sealing piston
CN207145363U (en) Lower cylinder is hammered into shape with the tubular diesel for intersecting radiator structure
CN217236443U (en) Intelligent pneumatic decoking device of chain grate machine based on automatic control
CN201300716Y (en) Wind scooper structure for vehicle engine
CN204755053U (en) Energy -concerving and environment -protective type vertical type air -cooled diesel engine's of low machine temperature organism
CN103909499B (en) Gasoline engine breakup pick

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150819

Termination date: 20160427