CN204570443U - A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance - Google Patents

A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance Download PDF

Info

Publication number
CN204570443U
CN204570443U CN201420859080.1U CN201420859080U CN204570443U CN 204570443 U CN204570443 U CN 204570443U CN 201420859080 U CN201420859080 U CN 201420859080U CN 204570443 U CN204570443 U CN 204570443U
Authority
CN
China
Prior art keywords
storage bin
absorption band
stress absorption
cement concrete
applicable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201420859080.1U
Other languages
Chinese (zh)
Inventor
刘志胜
张翛
张艳聪
刘志岗
朱金鹏
林超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Original Assignee
Shanxi Province Transport Science Research Institute
Shanxi Jiaoke Highway Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Province Transport Science Research Institute, Shanxi Jiaoke Highway Survey and Design Institute filed Critical Shanxi Province Transport Science Research Institute
Priority to CN201420859080.1U priority Critical patent/CN204570443U/en
Application granted granted Critical
Publication of CN204570443U publication Critical patent/CN204570443U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model provides a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance, is made up of traction control part, charge part and cloth making part; Described traction element comprises hand rod, the first rim brake, the second rim brake, the first bracing wire, the second bracing wire and scroll wheel and forms; Described charge part comprises the first storage bin, the second storage bin is formed; Described cloth making part comprises cloth support and floating bar.The utility model has taken into full account the convenience of the architectural characteristic of stress absorption band, material behavior, construction.Heated to storage bin by temperature controller control heater, proof stress absorption band binding material maintains suitable construction temperature; Utilize the assistance equipment moving of scroll wheel.When the utility model is to Old cement concrete Paving Bituminous Concrete, the process of fracture has good practicality, effectively can alleviate composite pavement crack reflection problem, guarantee the long-life of composite pavement.

Description

A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance
Technical field
The utility model belongs to field of road, relates to highway construction maintenance of equipment, is specifically related to a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance.
Background technology
China Higher level Highway Main will adopt bituminous concrete and cement concrete two kinds of road structure forms.In recent years, cement, price of steel product continued downturn, caused cement concrete pavement again to attract the sight of builders gradually, and especially in middle traffic section, cement concrete becomes the first-selection of design, construction.Cement concrete pavement along with considerable part is close or exceed design period, though what have does not reach design period, because the sharp increase of the traffic volume, automobile shafts carry heavy-duty and the aspect such as design, construction day by day, there is pavement damage, using character declines, and have impact on the normal operation of road.Therefore, transformation old concrete road surface, adapts to new transportation condition with method that is economic, that be suitable for and has seemed very important.The composite pavement that old concrete road surface overlays asphalt concrete surface layer is a kind of typical old concrete road surface reinforcement, and the road structure of this form can absorb the advantage of bi-material, " coupling hardness with softness ".
The subject matter that Cement Concrete Pavement bitumen layer relates to is reflection crack, and the reflection of lower floor crack or seam can cause the cracking of overlay or surface layer.In order to keep a complete driving surface, keeping the globality of overlay, must prevent and control this crack.Shanxi Research Institute of Communication proposes stress absorption band technology for the crack reflection in Deteriorated concrete pavement Re-paving transformation, alleviates the New asphalt mixture layer cracking disease that crack reflection causes to a great extent.At present, stress absorption band construction machinery is artificial hand, manually stress absorption carrying material is brushed to pavement crack place by instruments such as hairbrush.This method efficiency is low, and stress absorption carrying material is scattered more, and waste of material is serious.In addition, painting tool does not have firing equipment, and stress absorption band viscosity of material is large, and in construction, adhesive aggregation is on painting device gradually, and operation is inconvenience very.
For the problems referred to above, the utility model has considered high viscosity, the convenience for construction of stress-absorbed material, develops a kind of stress absorption band paving equipment for maintenance of surface, can carry out stress absorption belt construction easily, improve efficiency of construction, reduce the waste of material.
Utility model content
For the shortcoming that existing stress absorption band form of construction work and instrument exist, the purpose of this utility model is, provides a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance.This equipment takes into full account the convenience of the architectural characteristic of stress absorption band, material behavior, construction, can carry out stress making efficiently in regard to Cement Concrete Pavement engineering.
The technical scheme that the utility model adopts is as follows:
Be applicable to a stress absorption band paving equipment for cement concrete pavement maintenance, be made up of traction control part, charge part and cloth making part; Described traction element comprises hand rod, the first rim brake, the second rim brake, the first bracing wire, the second bracing wire and scroll wheel and forms; Described charge part comprises the first storage bin, the second storage bin is formed; Described cloth making part comprises cloth support and floating bar.
First storage bin and the second storage bin all contain portable plate, return spring, heater, temperature controller; First storage bin is connected by storage bin support with the second storage bin.
First rim brake, the second rim brake are fixed on hand rod, and hand rod is connected with the second storage bin, and the first rim brake pulls portable plate to control the unlatching of the second storage bin by the first bracing wire, promote portable plate control the closed of the second storage bin by spring; Second rim brake pulls portable plate to control the unlatching of the first storage bin by the second bracing wire, promotes portable plate control the closed of the first storage bin by spring.
External power supply, temperature controller, heater connect, and whether the temp probe of temperature controller controls external power supply to heating installation power supply.
Fine cloth support is connected with the second storage bin, and fine cloth support supplies the rotation of cloth, making; Play truss to be connected with the second storage bin, become the radian of 30-90 ° for cloth.
Floating bar is connected with the second storage bin, and floating bar hook is connected with the first storage bin, and floating bar can be hanging on floating bar hook.
Scroll wheel is connected with the second storage bin, for whole equipment moving.
All mixing plant is provided with in first storage bin, the second storage bin.
Compared with prior art, the utility model has the advantage of:
The utility model has taken into full account the convenience of the architectural characteristic of stress absorption band, material behavior, construction.Storage bin is divided into upper and lower two parts, keeps binding material to the parcel of fiber; Heated to storage bin by temperature controller control heater, proof stress absorption band binding material maintains suitable construction temperature; Utilize the assistance equipment moving of scroll wheel.When the utility model is to Old cement concrete Paving Bituminous Concrete, the process of fracture has good practicality, effectively can alleviate composite pavement crack reflection problem, guarantee the long-life of composite pavement.
Accompanying drawing explanation
Fig. 1 is a kind of using state schematic diagram being applicable to the stress absorption band paving equipment of cement concrete pavement maintenance of the present utility model;
Fig. 2 is a kind of overall structure schematic diagram being applicable to the stress absorption band paving equipment of cement concrete pavement maintenance of the present utility model;
Fig. 3 is a kind of storage bin structural representation being applicable to the stress absorption band paving equipment of cement concrete pavement maintenance of the present utility model;
Fig. 4 is a kind of rim brake structural representation being applicable to the stress absorption band paving equipment of cement concrete pavement maintenance of the present utility model.
Description of reference numerals is as follows: 1-first rim brake, 2-second rim brake, 3-hand rod, 4-first bracing wire, 5-second bracing wire, 6-first storage bin, the floating bar hook of 7-, 8-storage bin support, 9-cloth support, 10-second storage bin, 11-scroll wheel, 12-plays truss, the floating bar of 13-, 14-return spring, 15-portable plate, 16-external power supply, 17-temperature controller, 18-temperature controller temp probe, 19-heater, 20-cloth.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the utility model is described in detail.
Be applicable to a stress absorption band paving equipment for cement concrete pavement maintenance, as shown in Figure 1,2,3, 4, be made up of traction control part, charge part and cloth making part; Described traction element comprises rim brake 2, first bracing wire 4, second bracing wire 5 of hand rod 3, first rim brake 1, second and scroll wheel 11 is formed; Described charge part comprises the first storage bin 6, second storage bin 10 and forms; Described cloth making part comprises cloth support 9 and floating bar 13.
First storage bin 6 and the second storage bin 10 all contain portable plate 15, return spring 14, heater 19, temperature controller 17; First storage bin 6 is connected by storage bin support 8 with the second storage bin 10.
First rim brake 1, second rim brake 2 is fixed on hand rod 3, hand rod 3 is connected with the second storage bin 10, first rim brake 1 pulls portable plate 15 to control the unlatching of the second storage bin 10 by the first bracing wire 4, promotes portable plate 15 control the closed of the second storage bin 10 by spring 14; Second rim brake 2 pulls portable plate 15 to control the unlatching of the first storage bin 6 by the second bracing wire 5, promotes portable plate 15 control the closed of the first storage bin 6 by spring 14.
External power supply 16, temperature controller 17, heater 19 connect, and whether the temp probe 18 of temperature controller 17 controls external power supply 16 and power to heater 19.
Fine cloth support 9 is connected with the second storage bin 10, and fine cloth support 9 supplies the rotation of cloth 20, making; Play truss 12 to be connected with the second storage bin 10, for the radian of cloth 20 one-tenth 30-90 °.
Floating bar 13 is connected with the second storage bin 10, and floating bar hook 7 is connected with the first storage bin 6, and floating bar can be hanging on floating bar hook 7.
Scroll wheel 11 is connected with the second storage bin 10, for whole equipment moving.
All mixing plant is provided with in first storage bin 6, second storage bin 10.
Traction control part links storage bin by hand rod, is supported the movement of whole equipment by the scroll wheel below storage bin, and whether the blanking that the stress absorption band controlling storage bin and storage bin by rim brake bonds;
In charge part, rim brake bracing wire can pull portable plate to make the material of storage bin downstream to road surface, and the displacement that spring can make activity be unlikely to draw is excessive and set back, and whether temperature controller coordinates external power supply to heating installation power supply;
Cloth making part is by glass-fiber-fabric stent support web-like fiber cloth, and play truss and ensure that cloth becomes certain grooved to ensure that bituminous binder is not scattered from cloth edge, floating pole pair bituminous binder and cloth flatten.
The utility model has taken into full account the convenience for construction of stress absorption band, two-layer construction is divided by stress absorption band binding material, ensure that cloth is not destroyed by construction machinery, to the integrality keeping stress absorption band, play the functional all significant of stress absorption band.
Above-mentioned detailed description of the invention is a preferred embodiment of the present utility model; be not for limiting enforcement of the present utility model and right; all equivalences made according to the content described in the utility model patent protection scope change and modify, and all should be included in the utility model patent claim.

Claims (7)

1. be applicable to a stress absorption band paving equipment for cement concrete pavement maintenance, it is characterized in that: be made up of traction control part, charge part and cloth making part; Described traction element comprises hand rod (3), the first rim brake (1), the second rim brake (2), the first bracing wire (4), the second bracing wire (5) and scroll wheel (11) and forms; Described charge part comprises the first storage bin (6), the second storage bin (10) is formed; Described cloth making part comprises cloth support (9) and floating bar (13).
2. a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance according to claim 1, is characterized in that: the first storage bin (6) and the second storage bin (10) all contain portable plate (15), return spring (14), heater (19), temperature controller (17); First storage bin (6) is connected by storage bin support (8) with the second storage bin (10).
3. a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance according to claim 1, it is characterized in that: the first rim brake (1), the second rim brake (2) are fixed on hand rod (3), hand rod (3) is connected with the second storage bin (10), first rim brake (1) pulls portable plate (15) to control the unlatching of the second storage bin (10) by the first bracing wire (4), promotes portable plate (15) control the closed of the second storage bin (10) by spring (14); Second rim brake (2) pulls portable plate (15) to control the unlatching of the first storage bin (6) by the second bracing wire (5), promotes portable plate (15) control the closed of the first storage bin (6) by spring (14).
4. a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance according to claim 1, is characterized in that: fine cloth support (9) is connected with the second storage bin (10), and fine cloth support (9) supplies the rotation of cloth (20), making; Play truss (12) to be connected with the second storage bin (10), become the radian of 30-90 ° for cloth (20).
5. a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance according to claim 1, it is characterized in that: floating bar (13) is connected with the second storage bin (10), floating bar hook (7) is connected with the first storage bin (6), and floating bar can be hanging on floating bar hook (7).
6. a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance according to claim 1, is characterized in that: scroll wheel (11) is connected with the second storage bin (10), for whole equipment moving.
7. a kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance according to claim 1, is characterized in that: the first storage bin (6), the second storage bin are all provided with mixing plant in (10).
CN201420859080.1U 2014-12-30 2014-12-30 A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance Withdrawn - After Issue CN204570443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420859080.1U CN204570443U (en) 2014-12-30 2014-12-30 A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420859080.1U CN204570443U (en) 2014-12-30 2014-12-30 A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance

Publications (1)

Publication Number Publication Date
CN204570443U true CN204570443U (en) 2015-08-19

Family

ID=53863107

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420859080.1U Withdrawn - After Issue CN204570443U (en) 2014-12-30 2014-12-30 A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance

Country Status (1)

Country Link
CN (1) CN204570443U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480845A (en) * 2014-12-30 2015-04-01 山西省交通科学研究院 Stress absorption band paving equipment applicable to maintenance of cement concrete pavement
CN117090110A (en) * 2023-10-17 2023-11-21 山西交科公路工程咨询监理有限公司 Highway road surface planarization check out test set

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104480845A (en) * 2014-12-30 2015-04-01 山西省交通科学研究院 Stress absorption band paving equipment applicable to maintenance of cement concrete pavement
CN117090110A (en) * 2023-10-17 2023-11-21 山西交科公路工程咨询监理有限公司 Highway road surface planarization check out test set
CN117090110B (en) * 2023-10-17 2023-12-22 山西交科公路工程咨询监理有限公司 Highway road surface planarization check out test set

Similar Documents

Publication Publication Date Title
CN203602983U (en) Road pavement structure
CN204570443U (en) A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance
CN104480845B (en) A kind of stress absorption band paving equipment being applicable to cement concrete pavement maintenance
CN205917579U (en) Novel asphalt pavement laying machine equipment
CN204626187U (en) A kind of tunnel skid resistance pavement
CN205115945U (en) Double -deck synchronous surface dressing stress absorption structure
CN105178128B (en) Force intertransmission type interlocking block and preparation method thereof
CN202323617U (en) Super-sticky seal coat for asphalt pavement
CN204475132U (en) Intelligent car for repairing pits in asphalt roads
CN102852065A (en) Pavement paving equipment for mine roadways
CN204080584U (en) Road surface structure
CN203639777U (en) Road pavement structure
CN204940044U (en) A kind of permanent seal cooling road structure being applicable to very heavy traffic
CN203583379U (en) Repairing structure of old bridge face pavement layer
CN103321121A (en) Long-service-life asphalt pavement structure based on uniform settlement
CN202925415U (en) Steel bridge surface paving boundary processing structural layer
CN203188083U (en) Anti-sliding tunnel pavement
CN206986654U (en) A kind of Heavy Traffic pavement structure
CN202898935U (en) Repair-type highly wear-resistant expressway road surface
CN104153271B (en) Road surface structure
CN203559320U (en) Semi-rigid base asphalt pavement
CN114717901B (en) Full-thickness asphalt pavement structure with steel wire mesh reinforced asphalt concrete as base layer
CN203144860U (en) Anti-cracking sticker for road construction
CN220468530U (en) Road surface structure for road repair
CN204356610U (en) The road structure that a kind of artificial stone plate lays

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150819

Effective date of abandoning: 20160316

C25 Abandonment of patent right or utility model to avoid double patenting