CN204552077U - A kind of early dismantling head structure for aluminum alloy mould plate - Google Patents

A kind of early dismantling head structure for aluminum alloy mould plate Download PDF

Info

Publication number
CN204552077U
CN204552077U CN201520079553.0U CN201520079553U CN204552077U CN 204552077 U CN204552077 U CN 204552077U CN 201520079553 U CN201520079553 U CN 201520079553U CN 204552077 U CN204552077 U CN 204552077U
Authority
CN
China
Prior art keywords
support plate
aluminum alloy
side plates
early dismantling
dismantling head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201520079553.0U
Other languages
Chinese (zh)
Inventor
杨柏洪
林文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Guangya Aluminum Model Co Ltd
Original Assignee
Foshan Guangya Aluminum Model Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Guangya Aluminum Model Co Ltd filed Critical Foshan Guangya Aluminum Model Co Ltd
Priority to CN201520079553.0U priority Critical patent/CN204552077U/en
Application granted granted Critical
Publication of CN204552077U publication Critical patent/CN204552077U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本实用新型公开了一种用于铝合金模板的早拆头结构,其特征在于:包括水平设置的支撑板和位于支撑板四周垂直于支撑板设置的前后侧板和左右侧板,位于支撑板的底部设有一端顶靠在支撑板底部且垂直于支撑板的支撑管,前后侧板和左右侧板上均设有若干连接孔。此用于铝合金模板的早拆头结构通过支撑板直接接触顶部水泥板结构,通过支撑板四周的左右侧板或者前后侧板来与周边的承梁结构或者铝合金模板结构来连接,通过螺栓穿过左右侧板或者前后侧板内设置的圆孔,即可实现早拆头与铝合金模板结构的固定,此结构可方便早拆头的安装和拆卸,使早拆头的使用更为简单,此实用新型用于建筑模板结构领域。

The utility model discloses an early dismantling head structure for an aluminum alloy formwork, which is characterized in that it comprises a support plate arranged horizontally, and front and rear side plates and left and right side plates which are arranged around the support plate and are perpendicular to the support plate. There is a support tube with one end against the bottom of the support plate and perpendicular to the support plate at the bottom of the support plate, and a number of connection holes are provided on the front and rear side plates and the left and right side plates. The early demolition head structure used for aluminum alloy formwork directly contacts the top cement board structure through the support plate, and connects with the surrounding bolster structure or aluminum alloy formwork structure through the left and right side plates or front and rear side plates around the support plate, and through bolts Through the round holes set in the left and right side panels or the front and rear side panels, the early dismantling head can be fixed to the aluminum alloy formwork structure. This structure can facilitate the installation and disassembly of the early dismantling head, making the use of the early dismantling head easier , the utility model is used in the field of building formwork structures.

Description

一种用于铝合金模板的早拆头结构An early dismantling head structure for aluminum alloy formwork

技术领域 technical field

本实用新型涉及建筑模板领域,特别是涉及一种用于铝合金模板的早拆头结构。 The utility model relates to the field of building templates, in particular to an early dismantling head structure for aluminum alloy templates.

背景技术 Background technique

早拆模板技术通过早拆头、撑杆和横梁等组成竖向支撑,在布置早拆撑杆时,使原设计的楼板强度处于撑杆间距小于2m的受力状态,在常温下,楼板混凝土浇筑2~4天后,混凝土强度达到设计强度的50%以上即可拆模,此时保留部分早拆头和撑杆,拆除全部模板、横梁和部分撑杆。当混凝土强度达到足以在全跨度条件下承受自重和施工荷载时,则可拆除保留的部分早拆头和撑杆。 The early demolition formwork technology consists of vertical supports such as early demolition heads, struts and beams. When the early demolition struts are arranged, the strength of the originally designed floor is in a stress state where the spacing between the struts is less than 2m. At room temperature, the floor concrete After 2 to 4 days of pouring, the formwork can be removed when the concrete strength reaches more than 50% of the design strength. At this time, some early demolition heads and braces are reserved, and all formwork, beams and part of the braces are removed. When the strength of the concrete is sufficient to bear the self-weight and construction load under the condition of full span, the retained part of the early dismantling head and braces can be removed.

早拆摸板体系是在确保现浇钢筋混凝土结构施工安全度不受影响、符合施工规范要求、保证施工安全及工程质量的前提下,加快材料周转,减少投入,提高功效,加快施工进度,缩短工期,使之具有显著的经济效益和良好的社会效益的一种先进的施工技术。在工期紧迫且楼层尺寸比较标准的建筑上有比较广阔的使用空间。 The early demolition template system is to speed up material turnover, reduce investment, improve efficiency, speed up construction progress, and shorten It is an advanced construction technology with significant economic benefits and good social benefits. There is a relatively wide space for use in buildings with tight construction schedules and relatively standard floor sizes.

但是早拆模板体系在使用中,往往由于早拆头设计不合理而导致装卸困难、紧固过程繁琐费力或节点强度不够等问题,严重制约了早拆模板体系在使用中的实用性。 However, in the use of the early demolition formwork system, the unreasonable design of the early demolition head often leads to problems such as difficult loading and unloading, tedious and laborious fastening process, or insufficient joint strength, which seriously restricts the practicability of the early demolition formwork system in use.

实用新型内容 Utility model content

    为解决上述问题,本实用新型提供一种装卸容易、使用简单的用于铝合金模板的早拆头结构。 In order to solve the above problems, the utility model provides an early dismantling head structure for aluminum alloy templates that is easy to assemble and disassemble, and simple to use.

本实用新型解决其技术问题所采用的技术方案是: The technical scheme that the utility model solves its technical problem adopts is:

一种用于铝合金模板的早拆头结构,其特征在于:包括水平设置的支撑板和位于支撑板四周垂直于支撑板设置的前后侧板和左右侧板,位于支撑板的底部设有一端顶靠在支撑板底部且垂直于支撑板的支撑管,前后侧板和左右侧板上均设有若干连接孔。 An early dismantling head structure for aluminum alloy formwork, characterized in that it includes a support plate arranged horizontally, front and rear side plates and left and right side plates arranged around the support plate perpendicular to the support plate, and one end is provided at the bottom of the support plate The support pipe leans against the bottom of the support plate and is perpendicular to the support plate, and several connecting holes are arranged on the front and rear side plates and the left and right side plates.

进一步作为本实用新型技术方案的改进,支撑管为圆管或者方管。 As a further improvement of the technical solution of the utility model, the support pipe is a round pipe or a square pipe.

进一步作为本实用新型技术方案的改进,前后侧板和左右侧板与支撑板1间均通过焊接进行固定连接。 As a further improvement of the technical solution of the utility model, the front and rear side plates, the left and right side plates and the support plate 1 are all fixedly connected by welding.

进一步作为本实用新型技术方案的改进,前后侧板和左右侧板的两侧均设有弧形凸边。 As a further improvement of the technical solution of the utility model, both sides of the front and rear side panels and the left and right side panels are provided with arc-shaped convex edges.

本实用新型的有益效果:此用于铝合金模板的早拆头结构通过支撑板直接接触顶部水泥板结构,通过支撑板四周的左右侧板或者前后侧板来与周边的承梁结构或者铝合金模板结构来连接,通过螺栓穿过左右侧板或者前后侧板内设置的圆孔,即可实现早拆头与铝合金模板结构的固定,此结构可方便早拆头的安装和拆卸,使早拆头的使用更为简单。 Beneficial effects of the utility model: the structure of the early dismantling head used for the aluminum alloy formwork directly contacts the top cement board structure through the support plate, and is connected with the surrounding beam structure or aluminum alloy through the left and right side plates or front and rear side plates around the support plate. The template structure is connected, and the bolts pass through the round holes set in the left and right side plates or the front and rear side plates to realize the fixing of the early dismantling head and the aluminum alloy formwork structure. The use of the detachable head is simpler.

附图说明 Description of drawings

下面结合附图对本实用新型作进一步说明: Below in conjunction with accompanying drawing, the utility model is further described:

图1是本实用新型实施例整体结构三维示意图; Fig. 1 is a three-dimensional schematic diagram of the overall structure of the utility model embodiment;

图2是本实用新型实施例整体结构主视图。 Fig. 2 is a front view of the overall structure of the embodiment of the utility model.

具体实施方式 Detailed ways

参照图1、图2,本实用新型为一种用于铝合金模板的早拆头结构,其特征在于:包括水平设置的支撑板1和位于支撑板1四周垂直于支撑板1设置的前后侧板11和左右侧板12,位于支撑板1的底部设有一端顶靠在支撑板1底部且垂直于支撑板1的支撑管2,前后侧板11和左右侧板12上均设有若干连接孔13。 Referring to Fig. 1 and Fig. 2, the utility model is an early dismantling head structure for aluminum alloy formwork, which is characterized in that it includes a support plate 1 arranged horizontally and a front and rear side arranged vertically to the support plate 1 around the support plate 1 The plate 11 and the left and right side plates 12 are located at the bottom of the support plate 1 and are provided with a support tube 2 with one end against the bottom of the support plate 1 and perpendicular to the support plate 1. The front and rear side plates 11 and the left and right side plates 12 are all provided with a number of connections. Hole 13.

此用于铝合金模板的早拆头结构通过支撑板1直接接触顶部水泥板结构,通过支撑板1四周的左右侧板12或者前后侧板11来与周边的承梁结构或者铝合金模板结构来连接,通过螺栓穿过左右侧板12或者前后侧板11内设置的圆孔,即可实现早拆头与铝合金模板结构的固定,此结构可方便早拆头的安装和拆卸,使早拆头的使用更为简单。 This early dismantling head structure for aluminum alloy formwork directly contacts the top cement board structure through the support plate 1, and is connected with the surrounding bolster structure or aluminum alloy formwork structure through the left and right side plates 12 or front and rear side plates 11 around the support plate 1. The bolts pass through the round holes provided in the left and right side plates 12 or the front and rear side plates 11 to realize the fixing of the early dismantling head and the aluminum alloy template structure. This structure can facilitate the installation and disassembly of the early dismantling head, making the early dismantling headers are simpler to use.

作为本实用新型优选的实施方式,支撑管2为圆管或者方管。 As a preferred embodiment of the present invention, the support pipe 2 is a round pipe or a square pipe.

作为本实用新型优选的实施方式,前后侧板11和左右侧板12与支撑板1间均通过焊接进行固定连接。 As a preferred embodiment of the present invention, the front and rear side plates 11 , the left and right side plates 12 and the support plate 1 are all fixedly connected by welding.

作为本实用新型优选的实施方式,前后侧板11和左右侧板12的两侧均设有弧形凸边14。 As a preferred embodiment of the present invention, both sides of the front and rear side panels 11 and the left and right side panels 12 are provided with arc-shaped convex edges 14 .

此早拆头结构的前后侧板11和左右侧板12上有直径等于连接铝合金模板上孔直径的圆孔,圆孔的位置与连接铝合金模板上圆孔位置相匹配。 The front and rear side plates 11 and the left and right side plates 12 of this early dismantling structure have round holes with a diameter equal to the hole diameter on the connected aluminum alloy formwork, and the positions of the round holes match the position of the round holes on the connected aluminum alloy formwork.

形成支撑管2的圆管或方管与支撑板1的底部牢固焊接,必要时亦可增加加劲板以增强支撑管2与支撑板1间的连接强度,支撑管2的外径与相连撑管的尺寸相匹配。 The round tube or square tube forming the support tube 2 is firmly welded to the bottom of the support plate 1. If necessary, a stiffening plate can be added to enhance the connection strength between the support tube 2 and the support plate 1. The outer diameter of the support tube 2 and the connected support tube size matches.

此早拆头结构通过前后侧板11或者左右侧板12上的圆孔与铝合金模板连接,构造简单、操作方便,可有效增加铝合金模板的拆装效率和模板的周转使用率。 This early dismantling structure is connected to the aluminum alloy formwork through the round holes on the front and rear side plates 11 or the left and right side plates 12. The structure is simple and easy to operate, which can effectively increase the efficiency of disassembly and assembly of the aluminum alloy formwork and the turnover rate of the formwork.

当然,本发明创造并不局限于上述实施方式,熟悉本领域的技术人员在不违背本实用新型精神的前提下还可作出等同变形或替换,这些等同的变型或替换均包含在本申请权利要求所限定的范围内。 Of course, the present invention is not limited to the above-mentioned embodiments. Those skilled in the art can also make equivalent modifications or replacements without violating the spirit of the present utility model. These equivalent modifications or replacements are all included in the claims of this application. within the limited range.

Claims (4)

1. the early dismantling head structure for aluminum alloy mould plate, it is characterized in that: comprise horizontally disposed gripper shoe (1) and be positioned at the front and back side plate (11) and left side plate (12) that described gripper shoe (1) surrounding arranges perpendicular to gripper shoe (1), the bottom being positioned at described gripper shoe (1) is provided with one end and leans in gripper shoe (1) bottom and perpendicular to the stay pipe (2) of gripper shoe (1), described front and back side plate (11) and left side plate (12) be equipped with some connecting holes (13).
2. the early dismantling head structure for aluminum alloy mould plate according to claim 1, is characterized in that: described stay pipe (2) is pipe or square tube.
3. the early dismantling head structure for aluminum alloy mould plate according to claim 1, is characterized in that: described front and back side plate (11) and being all fixed by welding between left side plate (12) with gripper shoe (1) are connected.
4. according to the early dismantling head structure for aluminum alloy mould plate in claims 1 to 3 described in any one, it is characterized in that: the both sides of described front and back side plate (11) and left side plate (12) are equipped with arc chimb (14).
CN201520079553.0U 2015-02-04 2015-02-04 A kind of early dismantling head structure for aluminum alloy mould plate Expired - Lifetime CN204552077U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520079553.0U CN204552077U (en) 2015-02-04 2015-02-04 A kind of early dismantling head structure for aluminum alloy mould plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520079553.0U CN204552077U (en) 2015-02-04 2015-02-04 A kind of early dismantling head structure for aluminum alloy mould plate

Publications (1)

Publication Number Publication Date
CN204552077U true CN204552077U (en) 2015-08-12

Family

ID=53827206

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520079553.0U Expired - Lifetime CN204552077U (en) 2015-02-04 2015-02-04 A kind of early dismantling head structure for aluminum alloy mould plate

Country Status (1)

Country Link
CN (1) CN204552077U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592964A (en) * 2016-12-23 2017-04-26 湖南立拓建设有限公司 Quick release apparatus for formwork
CN115288425A (en) * 2022-08-22 2022-11-04 晟通科技集团有限公司 Early-dismantling formwork and formwork system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592964A (en) * 2016-12-23 2017-04-26 湖南立拓建设有限公司 Quick release apparatus for formwork
CN115288425A (en) * 2022-08-22 2022-11-04 晟通科技集团有限公司 Early-dismantling formwork and formwork system

Similar Documents

Publication Publication Date Title
CN206337811U (en) A kind of skyscraper aluminum alloy pattern plate structure
CN203594213U (en) Flexible assembling and disassembling bearing truss
CN106193588B (en) A kind of method pouring building post-cast strip and pour mould
CN103334587B (en) Wood bamboo matter horizontal shuttering Quick assembling-disassembling structure and method thereof
CN204552077U (en) A kind of early dismantling head structure for aluminum alloy mould plate
CN104477791B (en) Novel tower crane attached wall attachment lattice bracing frame auxiliary device
CN204357112U (en) Dual-shear force wall deformation slit formwork constructing structure
CN205742554U (en) A kind of steel column and the Mixed Architecture of beams of concrete
CN206092027U (en) A supporting structure for tunnel steel bow member
CN104018655B (en) A kind of assembly type monomer bracing frame
CN206385806U (en) A kind of stair template supporting construction
CN110017141A (en) A kind of ultra-deep shaft concrete ring grid beam quick template supporting system and its construction method
CN205976477U (en) Formula of sinking bathroom hangs mould device
CN205330152U (en) A steel form for concrete placement
CN204402038U (en) A kind of aluminum alloy mould plate connects tobacco pipe
CN210316538U (en) Aluminum mold supporting system for floor lower extension lintel
CN205421712U (en) Reinforced concrete embeds channel steel structure
CN207453296U (en) A kind of gutter strut
CN203361652U (en) Rapid assembly and disassembly structure of horizontal wood-bamboo formworks
CN206971730U (en) A kind of construction formwork of transmission line foundation column
CN205259215U (en) Open trench tunnel open type major structure side wall bailey frame formwork
CN203834675U (en) High-strength steel structure building
CN205189169U (en) Crooked diagonal bracing frame shear wall structure
CN107780644B (en) Operation platform for elevator shaft construction and use method thereof
CN206034905U (en) Board combination design mould falls in bathroom

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant