CN204551499U - A kind ofly build the secondary weir structure on barged-in fill - Google Patents
A kind ofly build the secondary weir structure on barged-in fill Download PDFInfo
- Publication number
- CN204551499U CN204551499U CN201520161913.1U CN201520161913U CN204551499U CN 204551499 U CN204551499 U CN 204551499U CN 201520161913 U CN201520161913 U CN 201520161913U CN 204551499 U CN204551499 U CN 204551499U
- Authority
- CN
- China
- Prior art keywords
- fill
- barged
- weir
- pan soil
- build
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
The utility model relates to a kind ofly builds the secondary weir structure on barged-in fill, it is characterized in that: comprise directly on saturated dredger soft soil, along existing one-level sub-weir length direction hydraulic reclamation, the pan soil belt with one fixed width, the volume displaced of saturated dredger soft soil within the scope of pan soil belt can be realized, the filled geotube layer laid on pan soil belt top, on the sub-weir of clay that filled geotube layer is built, hydraulic reclamation pan soil can be directly adopted to build.Compared with prior art, the utility model has the advantage of: this form of structure is saved and laid reinforcement cushion, backfills medium coarse sand, sets the basement process operations such as plastic draining board, working procedure is simple, with low cost, barged-in fill can be constructed without the need to carrying out airing, greatly can improve efficiency of construction, the comprehensive utilization benefit that large-scale strand inhales ship can be improved.
Description
Technical field
The utility model relates to a kind of building and is building the sub-weir of the secondary on barged-in fill structure.
Background technology
Barged-in fill builds cofferdam, difficulty is very big, it is main because barged-in fill moisture content is large, bearing capacity is very low, in order to reach the object of build, often need to wait for certain airing time, and then geo-grid 1 ' is laid on barged-in fill, the reinforcement cushions such as bamboo basketry 2 ', shown in participation Fig. 1, and then fill out on reinforcement cushion and establish certain thickness sand cushion 3 ', to meet mechanical execution requirement, and then sand cushion and be provided with reinforcement cushion barged-in fill in plug band drain 4 ' and carry out basement process, last lay filled geotube 5 ' being inserted through above the sand cushion of band drain again, thus formation embankment.
Adopt such form of structure, often need the airing time of wait one section of barged-in fill, and working procedure is many, interference large, construction speed is very restricted.
Utility model content
Technical problem to be solved in the utility model provides a kind of working procedure simple for above-mentioned prior art, the secondary weir structure of building on barged-in fill with low cost.
The utility model solves the problems of the technologies described above adopted technical scheme: a kind ofly build the secondary weir structure on barged-in fill, it is characterized in that: comprise directly on saturated dredger soft soil, along existing one-level sub-weir length direction hydraulic reclamation, the pan soil belt with one fixed width, the filled geotube layer laid on pan soil belt top, on the sub-weir of clay that filled geotube layer is built.
The outside side of described pan soil belt is skewed, and inhales ship direct hydraulic reclamation seabed pan soil by large-scale strand and formed
The section of described filled geotube layer is trapezoidal.
The section on the sub-weir of described clay also in trapezoidal, and adopts the pan soil of hydraulic reclamation to build.。
Compared with prior art, the utility model has the advantage of: this form of structure is saved and laid reinforcement cushion, backfills medium coarse sand, sets the basement process operations such as plastic draining board, working procedure is simple, with low cost, barged-in fill can be constructed without the need to carrying out airing, greatly can improve efficiency of construction, the comprehensive utilization benefit that large-scale strand inhales ship can be improved.Pan soil belt realizes the volume displaced of saturated dredger soft soil in coverage, and clay weir in top also can adopt the pan soil of hydraulic reclamation directly to build.
Accompanying drawing explanation
Fig. 1 is the profile of the form of structure of building the sub-weir of secondary in prior art on barged-in fill.
Fig. 2 is the profile of the secondary weir structure of building in the utility model embodiment on barged-in fill.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the utility model is described in further detail.
The structure of building the sub-weir of secondary on barged-in fill as shown in Figure 2, it comprise directly on saturated dredger soft soil, along existing one-level sub-weir length direction hydraulic reclamation, the pan soil belt 1 with one fixed width, the filled geotube layer 2 laid on pan soil belt 1 top, builds the sub-weir 3 of clay at filled geotube layer.The outside side of pan soil belt 1 is skewed, and inhales ship direct hydraulic reclamation seabed pan soil by large-scale strand and formed, and outside inner side and the sub-weir of one-level, 4 fit, and therefore pan soil belt 1 realizes the volume displaced of saturated dredger soft soil in coverage.The section of filled geotube layer 2 is trapezoidal, and the section on the sub-weir of clay 3 is also in trapezoidal, and clay weir bottom width is less than filled geotube layer top width.
Claims (4)
1. build the secondary weir structure on barged-in fill for one kind, it is characterized in that: comprise directly on saturated dredger soft soil, along existing one-level sub-weir length direction hydraulic reclamation, the pan soil belt with one fixed width, the filled geotube layer laid on pan soil belt top, on the sub-weir of clay that filled geotube layer is built.
2. according to claim 1ly build the secondary weir structure on barged-in fill, it is characterized in that: the outside side of described pan soil belt is skewed, and inhale ship direct hydraulic reclamation seabed pan soil by large-scale strand and formed.
3. according to claim 1ly build the secondary weir structure on barged-in fill, it is characterized in that: the section of described filled geotube layer is trapezoidal.
4. according to claim 1ly build the secondary weir structure on barged-in fill, it is characterized in that: the section on the sub-weir of described clay also in trapezoidal, and adopts the pan soil of hydraulic reclamation to build.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520161913.1U CN204551499U (en) | 2015-03-20 | 2015-03-20 | A kind ofly build the secondary weir structure on barged-in fill |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520161913.1U CN204551499U (en) | 2015-03-20 | 2015-03-20 | A kind ofly build the secondary weir structure on barged-in fill |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204551499U true CN204551499U (en) | 2015-08-12 |
Family
ID=53826632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520161913.1U Active CN204551499U (en) | 2015-03-20 | 2015-03-20 | A kind ofly build the secondary weir structure on barged-in fill |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204551499U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193059A (en) * | 2016-07-01 | 2016-12-07 | 中交上航局航道建设有限公司 | A kind of fill method of shoal sludge solidification separation levee |
-
2015
- 2015-03-20 CN CN201520161913.1U patent/CN204551499U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106193059A (en) * | 2016-07-01 | 2016-12-07 | 中交上航局航道建设有限公司 | A kind of fill method of shoal sludge solidification separation levee |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105908862B (en) | A kind of production method of masonry shell in 3D printing reinforced masonry shear wall | |
CN102704463A (en) | Vacuum pre-compaction and electro-osmosis combined reinforcing device and method for muck foundation | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN103806437B (en) | Double-layer vacuum preloading and hydraulic reclamation soft foundation processing method | |
CN102051875B (en) | Method for reinforcing deep silt foundation | |
CN103132539A (en) | Construction method of underground continuous wall connector cutting | |
CN204456064U (en) | A kind of without sand booster-type soft base Quick drainage system | |
CN204590122U (en) | A kind of groover hydraulic grab with correction push pedal | |
CN204551499U (en) | A kind ofly build the secondary weir structure on barged-in fill | |
CN203939032U (en) | A kind of for upper lower the formula deep footing groove enclosing structure of wall of ground consisting of hard rock | |
CN204326032U (en) | A kind of concrete dam internal drainage gallery structure | |
CN104929129A (en) | Concrete cover-weight consolidation grouting method for non-cover-weight combination of different holes through guide pipes | |
CN204199246U (en) | One rolls rock-fill concrete gravity dam structure | |
CN104110025A (en) | Horizontal drainage consolidation method through blow filling of soft soil | |
CN202830952U (en) | Novel soft soil foundation structure | |
CN204212180U (en) | A kind of reinforcing cage for basement plugging dewatering well | |
CN204212168U (en) | A kind of dam water-retaining structure utilizing solution cavity to combine to build a dam | |
CN202530438U (en) | Drainage system for reinforcing deep silt foundation | |
CN202247921U (en) | Precast dewatering well | |
CN207176617U (en) | A kind of arc buttress type structure | |
CN204676519U (en) | A kind of plastic draining board with through-flow channel | |
CN204266211U (en) | A kind of bamboo case arch gravity retaining wall formula pattern foundation pit supporting structure | |
CN204282302U (en) | A kind of arch dam induced module block structure | |
CN204024174U (en) | A kind of anti-uplift pressure pond | |
CN205314091U (en) | Slip casing by pressure boundling of administering shallow layer landslide shaped steel tubular pile structure that declines |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170327 Address after: 200002 Shanghai City, Huangpu District Zhongshan East Road No. 13 Patentee after: Shanghai Waterway Bureau Co., Ltd., China Traffic Address before: Along the road 315200 in Zhejiang province Ningbo City Zhenhai District No. 221 Patentee before: SDC Waterway Construction Co., Ltd. |