CN204551441U - A kind of permanent seal cooling uplift pile - Google Patents

A kind of permanent seal cooling uplift pile Download PDF

Info

Publication number
CN204551441U
CN204551441U CN201520244458.1U CN201520244458U CN204551441U CN 204551441 U CN204551441 U CN 204551441U CN 201520244458 U CN201520244458 U CN 201520244458U CN 204551441 U CN204551441 U CN 204551441U
Authority
CN
China
Prior art keywords
reinforcing bar
sleeve pipe
steel plate
concrete
bearing steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520244458.1U
Other languages
Chinese (zh)
Inventor
马玉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520244458.1U priority Critical patent/CN204551441U/en
Application granted granted Critical
Publication of CN204551441U publication Critical patent/CN204551441U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of permanent seal cooling uplift pile, comprise the cylinder put by many reinforcing bars and concrete casting, many reinforcing bars are distributed on the inside of cylinder ringwise, the bottom of described cylinder is provided with a pressure-bearing steel plate, pressure-bearing steel plate is provided with multiple fixing hole, and on above-mentioned each reinforcing bar, all cover has sleeve pipe, and is fixed by sleeve pipe and fixing hole, the inner side of each reinforcing bar and sleeve pipe is provided with multistage Reinforced Hoop, and outside is provided with spiral hoop; This uplift pile arranges pressure-bearing steel plate by bottom, time stressed, and reinforcing bar tension; the pulling force of reinforcing bar passes to concrete by pressure-bearing steel plate, thus makes concrete compression, avoids producing pulling force; simultaneously; sleeve pipe outside reinforcing bar can protect reinforcing bar to exempt from the erosion of external environment, and improve the durability of reinforcing bar further, this structure gives full play to reinforcing bar and the concrete strength of materials; can free from flaw carry out when concrete is stressed; there is good endurance, the advantages such as cost is low, remarkable in economical benefits.

Description

A kind of permanent seal cooling uplift pile
Technical field
The utility model relates to the uplift pile that a kind of architecture industry bears pulling force, especially relates to a kind of permanent seal cooling uplift pile.
Background technology
Along with the fast development of China's urban construction, the exploitation of the underground space is more and more paid attention to, and also give the design of engineering simultaneously, constructing brings many new technical problems, wherein, basement anti-floating problem is particularly outstanding.Due to the effect of buoyancy force of underground water, basement bottom board can produce protuberance in various degree, also can cause building uneven floating time serious, affects the normal use of building.The Anti-floating design of existing engineering mainly comprises anchor slab lex fundamentalis, increases the methods such as deadweight and uplift pile, and wherein uplift pile is due to high, the easy construction of stability, applied widely and be widely used.
When conventional uplift pile works, reinforcing bar bears pulling force, and transmit pulling force by adhesion stress between reinforcing bar and concrete, make concrete also bear pulling force, thus make concrete work with cracking, durability is poor; In order to control the crack width of uplift pile, generally need stiffener, thus cause increasing of construction costs.
Utility model content
For solving the problem, the utility model proposes a kind of stressed time free from flaw, good endurance, the low permanent seal cooling uplift pile of cost.
The technical scheme that the utility model adopts is: a kind of permanent seal cooling uplift pile, comprise the cylinder put by many reinforcing bars and concrete casting, many reinforcing bars are distributed on the inside of cylinder ringwise, the bottom of described cylinder is provided with a pressure-bearing steel plate, pressure-bearing steel plate is provided with multiple fixing hole, and on above-mentioned each reinforcing bar, all cover has sleeve pipe, and is fixed by sleeve pipe and fixing hole, the inner side of each reinforcing bar and sleeve pipe is provided with multistage Reinforced Hoop, and outside is provided with spiral hoop.
Further, described Reinforced Hoop is provided with more than three groups, and arranges in equidistant.
Compared with prior art, it has following beneficial effect to the utility model:
Permanent seal cooling uplift pile of the present utility model arranges pressure-bearing steel plate by bottom, time stressed, and reinforcing bar tension; the pulling force of reinforcing bar passes to concrete by pressure-bearing steel plate, thus makes concrete compression, avoids producing pulling force; simultaneously; sleeve pipe outside reinforcing bar can protect reinforcing bar to exempt from the erosion of external environment, and improve the durability of reinforcing bar further, this structure gives full play to reinforcing bar and the concrete strength of materials; can free from flaw carry out when concrete is stressed; there is good endurance, the advantages such as cost is low, remarkable in economical benefits.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model;
Fig. 2 is sectional drawing of the present utility model;
Fig. 3 is pressure-bearing steel plate structure figure of the present utility model.
1-reinforcing bar; 2-cylinder; 3-pressure-bearing steel plate; 4-fixing hole; 5-sleeve pipe; 6-Reinforced Hoop; 7-spiral hoop.
Detailed description of the invention
A kind of permanent seal cooling uplift pile as shown in Figure 1 to Figure 3, comprise the cylinder 2 put by many reinforcing bars 1 and concrete casting, many reinforcing bars 1 are distributed on the inside of cylinder 2 ringwise, the bottom of described cylinder 2 is provided with a pressure-bearing steel plate 3, pressure-bearing steel plate 3 is provided with multiple fixing hole 4, and on above-mentioned each reinforcing bar 1, all cover has sleeve pipe 5, and is fixed by sleeve pipe 5 and fixing hole 4, each reinforcing bar 1 is provided with multistage Reinforced Hoop 6 with the inner side of sleeve pipe 5, and outside is provided with spiral hoop 7.
Wherein, described Reinforced Hoop 6 is provided with more than three groups, and arranges in equidistant.
Permanent seal cooling uplift pile of the present utility model arranges pressure-bearing steel plate by bottom, time stressed, and reinforcing bar tension; the pulling force of reinforcing bar passes to concrete by pressure-bearing steel plate, thus makes concrete compression, avoids producing pulling force; simultaneously; sleeve pipe outside reinforcing bar can protect reinforcing bar to exempt from the erosion of external environment, and improve the durability of reinforcing bar further, this structure gives full play to reinforcing bar and the concrete strength of materials; can free from flaw carry out when concrete is stressed; there is good endurance, the advantages such as cost is low, remarkable in economical benefits.
Embodiment recited above is only be described preferred embodiment of the present utility model, not limits design of the present utility model and scope.Under the prerequisite not departing from the utility model design concept; the various modification that this area ordinary person makes the technical solution of the utility model and improvement; protection domain of the present utility model all should be dropped into; the technology contents of the utility model request protection, all records in detail in the claims.

Claims (2)

1. a permanent seal cooling uplift pile, comprise the cylinder (2) put by many reinforcing bars (1) and concrete casting, many reinforcing bars (1) are distributed on the inside of cylinder (2) ringwise, it is characterized in that: the bottom of described cylinder (2) is provided with a pressure-bearing steel plate (3), pressure-bearing steel plate (3) is provided with multiple fixing hole (4), on above-mentioned each reinforcing bar (1), all cover has sleeve pipe (5), and fixed by sleeve pipe (5) and fixing hole (4), each reinforcing bar (1) is provided with multistage Reinforced Hoop (6) with the inner side of sleeve pipe (5), and outside is provided with spiral hoop (7).
2. permanent seal cooling uplift pile according to claim 1, is characterized in that: described Reinforced Hoop (6) is provided with more than three groups, and arranges in equidistant.
CN201520244458.1U 2015-04-22 2015-04-22 A kind of permanent seal cooling uplift pile Expired - Fee Related CN204551441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520244458.1U CN204551441U (en) 2015-04-22 2015-04-22 A kind of permanent seal cooling uplift pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520244458.1U CN204551441U (en) 2015-04-22 2015-04-22 A kind of permanent seal cooling uplift pile

Publications (1)

Publication Number Publication Date
CN204551441U true CN204551441U (en) 2015-08-12

Family

ID=53826574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520244458.1U Expired - Fee Related CN204551441U (en) 2015-04-22 2015-04-22 A kind of permanent seal cooling uplift pile

Country Status (1)

Country Link
CN (1) CN204551441U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062312A (en) * 2021-03-31 2021-07-02 山东建筑大学 Reinforcing method for anti-floating pile burst pile

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062312A (en) * 2021-03-31 2021-07-02 山东建筑大学 Reinforcing method for anti-floating pile burst pile
CN113062312B (en) * 2021-03-31 2022-10-25 山东建筑大学 Reinforcing method for anti-floating pile burst pile

Similar Documents

Publication Publication Date Title
CN207109563U (en) Bridge ultra-high performance concrete protection against erosion denudes structure
CN101476370A (en) Hollow interlayer stainless steel tube concrete structure
CN203546946U (en) Novel double-steel-plate concrete composite shear wall
CN103541504A (en) Special-shaped section steel tube recycled concrete core column
CN104018620A (en) Sea sand concrete bending member
CN106677338A (en) Anti-seismic building structure provided with steel frame and crossed central support with link beams
CN205223836U (en) Be used for fine sleeve of glass of pier stud reinforcement under water
CN203939180U (en) Marine sand concrete flexural member
CN103541501A (en) Special-shaped section steel rib recycled concrete column
CN203531922U (en) High-toughness nodular cast iron and reinforced concrete combined tunnel wall plate
CN203362176U (en) Tunnel segment
CN204551441U (en) A kind of permanent seal cooling uplift pile
CN102635246A (en) Bearing wall reinforcing body and method for reinforcing bearing wall by using same
CN204530422U (en) A kind of for the syndeton of FRP pipe concrete arch ring with basis
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN104612142A (en) Integral abutment bridge structure based on composite flexible piles and construction method thereof
CN202945816U (en) Brickwork wall between windows and reinforced by high-ductility fiber concrete
CN104179190A (en) Composite pile foundation for offshore wind power and construction method thereof
CN104088399A (en) Cross-shaped steel pipe-steel rib recycled concrete combination column
CN103015631A (en) Built-in polyvinyl chloride (PVC) pipe enhanced square steel pipe concrete combined column
CN102535650A (en) Device for connecting composite wallboard and floor slab
CN201212126Y (en) Reinforced concrete lining masonry combined main arch ring bridge
CN210134332U (en) UHPC steel pipe concrete superposed lattice column structure
CN104328735B (en) Regeneration concrete Z-type pier stud
CN201952799U (en) Fiber reinforced composite deepwater composite pile

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20160422