CN204540031U - Asparagus factorial praluction workshop - Google Patents

Asparagus factorial praluction workshop Download PDF

Info

Publication number
CN204540031U
CN204540031U CN201520008698.1U CN201520008698U CN204540031U CN 204540031 U CN204540031 U CN 204540031U CN 201520008698 U CN201520008698 U CN 201520008698U CN 204540031 U CN204540031 U CN 204540031U
Authority
CN
China
Prior art keywords
asparagus
mushroom room
air inlet
workshop
factorial praluction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520008698.1U
Other languages
Chinese (zh)
Inventor
张鹏
熊炳辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yu Xing Agricultural Science And Technology Co Ltd Of Fujian Province
Original Assignee
Yu Xing Agricultural Science And Technology Co Ltd Of Fujian Province
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yu Xing Agricultural Science And Technology Co Ltd Of Fujian Province filed Critical Yu Xing Agricultural Science And Technology Co Ltd Of Fujian Province
Priority to CN201520008698.1U priority Critical patent/CN204540031U/en
Application granted granted Critical
Publication of CN204540031U publication Critical patent/CN204540031U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

The utility model relates to a kind of Asparagus factorial praluction workshop, and in order to solve, workshop inner air flow is smooth, heat-insulating property is bad and the problems such as height that consume energy.Asparagus factorial praluction workshop, comprise the space be made up of exterior wall, described space is divided into several mushroom room by interior wall and can arrives at the passage of each mushroom room, and the top of described passage is provided with furred ceiling, forms a ventilating duct between the top in this furred ceiling and described space; Described exterior wall offers exhausting window, and described ventilating duct is by this exhausting window and workshop ft connection; Described mushroom room offers the exhaust outlet be communicated with described ventilating duct; Described mushroom room is by an air inlet pipe and described channel connection, and the gas outlet of described air inlet pipe is positioned at described mushroom room, and described mushroom room is built with temperature-adjusting device, and the gas outlet of described air inlet pipe is communicated with described thermostatic air inlet.

Description

Asparagus factorial praluction workshop
Technical field
The utility model relates to a kind of mushroom class workshop, refers to Asparagus factorial praluction workshop especially.
Background technology
The factory building that people build is all generally build with reinforced concrete to form, exhaust outlet is offered so that air circulation in room in factory building, when cultivating growing plants under some out-of-season plant or non-normal temperature, the temperature of temperature control equipment to indoor is needed to control, due to indoor large with the outdoor temperature difference, need more powerful device, energy consumption is large.
Utility model content
The utility model proposes a kind of Asparagus factorial praluction workshop, the problem such as to solve in prior art that workshop inner air flow is smooth, heat-insulating property is bad and power consumption is high.
The technical solution of the utility model is achieved in that
Asparagus factorial praluction workshop, comprise the space be made up of exterior wall, described space is divided into several mushroom room by interior wall and can arrives at the passage of each mushroom room, and the top of described passage is provided with furred ceiling, forms a ventilating duct between the top in this furred ceiling and described space; Described exterior wall offers exhausting window, and described ventilating duct is by this exhausting window and workshop ft connection;
Described mushroom room offers the exhaust outlet be communicated with described ventilating duct; Described mushroom room is by an air inlet pipe and described channel connection, and the gas outlet of described air inlet pipe is positioned at described mushroom room, and described mushroom room is built with temperature-adjusting device, and the gas outlet of described air inlet pipe is communicated with described thermostatic air inlet.
Further, described exterior wall is sticked to form by exterior wall body and heat-insulation layer.
Further, described interior wall is sticked to form by interior wall body and heat-insulation layer.
Further, described furred ceiling is the dividing plate that heat exchange is good.
Further, described temperature-adjusting device is refrigeration unit.
Further, described gas outlet is made up of the several ventholes be opened on air inlet tube wall.
Further, the air inlet place cover of described air inlet pipe has filter screen, and described filter screen is micronic dust screen pack.
Further, also comprise several support column, top and the described top of space of described support column are welded and fixed.
Further, also comprise temperature sensing device, described temperature sensing device is located in described mushroom room.
From above-mentioned to description of the present utility model, compared to the prior art, the utility model tool has the following advantages:
Air is outside admission passage from workshop, then enters in mushroom room from air inlet pipe, and after temperature-adjusting device, temperature is adjusted to a certain scope, flows to ventilating duct afterwards from exhaust outlet, then from exhausting window discharge chamber, forms good circulating ventilation; Because the gas temperature of discharging in mushroom room is lower, furred ceiling is again the dividing plate that heat exchange is good, while exhaust, effective heat exchange can be carried out between ventilating duct and passage, reduce the temperature in passage, the gas temperature entering mushroom room is reduced, realize economize energy through passage, reduce energy consumption cost, improve Business Economic Benefit.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the cutaway view in the utility model Asparagus factorial praluction workshop.
Fig. 2 be in Fig. 1 A to the partial sectional view in face.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making the every other embodiment obtained under creative work prerequisite, all belong to the scope of the utility model protection.
As shown in Figure 1 and Figure 2, a kind of Asparagus factorial praluction workshop, comprise the space 2 be made up of exterior wall 1, described space 2 is divided into several mushroom room 4 by interior wall 3 and can arrives at the passage 5 of each mushroom room 4, described mushroom room 4 is communicated with described passage 5 by door 13, the top of described passage 5 is provided with furred ceiling 6, and described furred ceiling 6 is the dividing plate that heat exchange is good, such as iron plate, aluminium sheet, plastic plate; A ventilating duct 7 is formed between this furred ceiling 6 and the top in described space 2; Described exterior wall 1 offers exhausting window 8, and described ventilating duct 7 is by this exhausting window 8 and workshop ft connection.
Described mushroom room 4 offers the exhaust outlet 9 be communicated with described ventilating duct 7; Described mushroom room 4 is communicated with described passage 5 by an air inlet pipe 10, the gas outlet of described air inlet pipe 10 is positioned at described mushroom room 4, the air inlet 11 place cover of described air inlet pipe 10 has filter screen, and described filter screen is micronic dust screen pack, can filter out the impurity such as the micronic dust in air.
Described mushroom room 4 is built with temperature-adjusting device, the gas outlet of described air inlet pipe 10 is communicated with described thermostatic air inlet, described temperature-adjusting device is refrigeration unit, described gas outlet is made up of the several ventholes be opened on air inlet pipe 10 wall, can the temperature in mushroom room 4 be more uniformly made to reach a certain temperature sooner, also comprise temperature sensing device 12, described temperature sensing device 12 is located in described mushroom room 4, when a certain temperature of temperature departure, temperature sensing device 12 inspires temperature-adjusting device and automatically regulates temperature, the temperature in mushroom room 4 is made to remain on a certain temperature.
Described exterior wall 1 is sticked to form by exterior wall body and heat-insulation layer, described interior wall 3 is sticked to form by interior wall body and heat-insulation layer, described heat-insulation layer is polystyrene foam plate, rock wool, aluminosilicate material, polyurethane foam etc., temperature in mushroom room 4 is not easily exchanged with factory building external heat, the long point of temperature retention time, saves the energy.
Also comprise several support column (not shown), top and described space 2 welded top of described support column fixedly make workshop more firm.
Air is outside admission passage from workshop, then enters in mushroom room 4, after temperature-adjusting device from the air inlet 11 of air inlet pipe 10, temperature is adjusted to a certain scope, flow to ventilating duct 7 from exhaust outlet 9 afterwards, then from exhausting window 8 discharge chamber, form good circulating ventilation; Because the gas temperature of discharging in mushroom room 4 is lower, furred ceiling 6 is again the dividing plate that heat exchange is good, while exhaust, effective heat exchange can be carried out between ventilating duct 7 and passage 5, reduce the temperature in passage 5, the gas temperature entering mushroom room 4 is reduced, realize economize energy through passage 5, reduce energy consumption cost, improve Business Economic Benefit.
The space of each mushroom room 4 in described Asparagus factorial praluction workshop arranges it is the same.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (9)

1. Asparagus factorial praluction workshop, it is characterized in that, comprise the space be made up of exterior wall, described space is divided into several mushroom room by interior wall and can arrives at the passage of each mushroom room, the top of described passage is provided with furred ceiling, forms a ventilating duct between the top in this furred ceiling and described space; Described exterior wall offers exhausting window, and described ventilating duct is by this exhausting window and workshop ft connection;
Described mushroom room offers the exhaust outlet be communicated with described ventilating duct; Described mushroom room is by an air inlet pipe and described channel connection, and the gas outlet of described air inlet pipe is positioned at described mushroom room, and described mushroom room is built with temperature-adjusting device, and the gas outlet of described air inlet pipe is communicated with described thermostatic air inlet.
2. Asparagus factorial praluction workshop according to claim 1, it is characterized in that, described exterior wall is sticked to form by exterior wall body and heat-insulation layer.
3. Asparagus factorial praluction workshop according to claim 1 and 2, it is characterized in that, described interior wall is sticked to form by interior wall body and heat-insulation layer.
4. Asparagus factorial praluction workshop according to claim 1 and 2, is characterized in that, described furred ceiling is the dividing plate that heat exchange is good.
5. Asparagus factorial praluction workshop according to claim 1 and 2, is characterized in that, described temperature-adjusting device is refrigeration unit.
6. Asparagus factorial praluction workshop according to claim 1 and 2, is characterized in that, described gas outlet is made up of the several ventholes be opened on air inlet tube wall.
7. Asparagus factorial praluction workshop according to claim 1 and 2, is characterized in that, the air inlet place cover of described air inlet pipe has filter screen, and described filter screen is micronic dust screen pack.
8. Asparagus factorial praluction workshop according to claim 1 and 2, is characterized in that, also comprise several support column, and top and the described top of space of described support column are welded and fixed.
9. Asparagus factorial praluction workshop according to claim 1 and 2, it is characterized in that, also comprise temperature sensing device, described temperature sensing device is located in described mushroom room.
CN201520008698.1U 2015-01-07 2015-01-07 Asparagus factorial praluction workshop Expired - Fee Related CN204540031U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520008698.1U CN204540031U (en) 2015-01-07 2015-01-07 Asparagus factorial praluction workshop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520008698.1U CN204540031U (en) 2015-01-07 2015-01-07 Asparagus factorial praluction workshop

Publications (1)

Publication Number Publication Date
CN204540031U true CN204540031U (en) 2015-08-12

Family

ID=53815225

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520008698.1U Expired - Fee Related CN204540031U (en) 2015-01-07 2015-01-07 Asparagus factorial praluction workshop

Country Status (1)

Country Link
CN (1) CN204540031U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105052560A (en) * 2015-09-17 2015-11-18 福建省裕兴农业科技有限公司 Temperature control system applied to enoki mushroom production workshop and usage thereof
CN105557298A (en) * 2015-09-17 2016-05-11 福建省裕兴农业科技有限公司 Intelligent regulation and control production workshop for flammulina velutipes

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105052560A (en) * 2015-09-17 2015-11-18 福建省裕兴农业科技有限公司 Temperature control system applied to enoki mushroom production workshop and usage thereof
CN105557298A (en) * 2015-09-17 2016-05-11 福建省裕兴农业科技有限公司 Intelligent regulation and control production workshop for flammulina velutipes

Similar Documents

Publication Publication Date Title
CN103307696B (en) Energy-saving type sill embedded air exchanger
CN105735678B (en) Energy-saving light steel prefabricated house
CN106359163A (en) Underground ventilated premixing chicken house
CN102644994A (en) Large-scale underground space frequency conversion combined ventilation system
CN104508389A (en) Ventilating wall system for conserving energy
CN204540031U (en) Asparagus factorial praluction workshop
RU2680681C1 (en) Greenhouse for growing plants
KR101388178B1 (en) Sunlight protect of light and heat for double-glazed to device access
JP2009084936A (en) Thermal insulation dwelling house and ventilation system
KR101294247B1 (en) Heat exchanger with structure of expanded poly propylene
CN2937285Y (en) Modular function device of double-layer curtain wall
CN204629910U (en) A kind of ventilating sound-proof device
CN202085567U (en) Device for adjusting temperature of fattening house
KR101482995B1 (en) air-conditioner and storehouses for farm products with basements and circulation path in ground, the inside or outside air circulating by the path
CN106196378A (en) The constant temperature and humidity air-conditioning system of clean operating room independent temperature-humidity control
JP2016188567A (en) Ventilation system and house
CN206873675U (en) A kind of integrated wall with door and window combined system for being bumped into air-conditioning equipment
KR102200234B1 (en) Curtain wall
CN203685522U (en) Heat exchange system for air compressor rooms
CN206073388U (en) A kind of blast pipe assembled post a tree, used in making timber for boats air-conditioning construction modelled after an antique
CN205954828U (en) Super energy -conserving building system
KR101670082B1 (en) Indoor Ventilation system using the soil heat
CN201652728U (en) Ground air exchange columnar supply-air outlet
CN104153525A (en) Fine adjustment type passive solar air conditioner and building integrated application system
CN203985190U (en) A kind of Combined section bar planting container

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150812

Termination date: 20180107

CF01 Termination of patent right due to non-payment of annual fee