CN204532048U CN201520076986.0U CN201520076986U CN204532048U CN 204532048 U CN204532048 U CN 204532048U CN 201520076986 U CN201520076986 U CN 201520076986U CN 204532048 U CN204532048 U CN 204532048U
Authority
CN
China
Prior art keywords
power transmission
high voltage
ladder stand
voltage power
transmission post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520076986.0U
Other languages
Chinese (zh)
Inventor
李成法
杨佳友
金克
许建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Tai Chang Development In Science And Technology Co Ltd
Original Assignee
Wenzhou Tai Chang Development In Science And Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Tai Chang Development In Science And Technology Co Ltd filed Critical Wenzhou Tai Chang Development In Science And Technology Co Ltd
Priority to CN201520076986.0U priority Critical patent/CN204532048U/en
Application granted granted Critical
Publication of CN204532048U publication Critical patent/CN204532048U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The operation ladder stand of high voltage power transmission post disclosed in the utility model, comprise along high voltage power transmission post short transverse intermediate connector in one line, intermediate connector and high voltage power transmission post fastening integrally welded, ladder stand is fastenedly connected on intermediate connector in one line, ladder stand is by load-bearing mobile jib and trample secondary bar and form, and tramples secondary bar interleaved and is connected to load-bearing mobile jib both sides.The utility model ladder stand by securing member with and intermediate connector be connected with high voltage power transmission post, the hidden danger that the minimizing weld internal stress that is indirectly connected skewness brings, in addition, the anti-skidding boss that the outer end of trampling secondary bar is established, prevent from axially trampling landing, the prevention spiral chute that the external surface trampling secondary bar is established, prevent circumference from trampling landing, improve security performance and the safety factor of ladder stand, ensure repair personnel's personal safety.

Description

The operation ladder stand of high voltage power transmission post
Technical field
The utility model relates to high-tension electricity conveying king-post manufacturing technology field, is specifically related to a kind of operation ladder stand of high voltage power transmission post.
Background technology
High-tension electricity conveying is in order to reduce the harmful effect of radiation to periphery life crowd, high voltage power transmission king-post all towers on meagrely-populated mountain range, but king-post is easily freezing in high and cold part, in 2008 heavy snow, East China, Central China, the ultra-high-tension power transmission line in the area such as south China is badly damaged, repair personnel steps on tower difficulty, original repairing ladder stand is held, ride and all very easily skid, and between ladder stand with king-post, adopt the connected mode of welding to cause material internal stress skewness, easily burst apart exoneration under the weather conditions of cold, great difficulty is brought to repair personnel, even there is the danger dropped and occur life.
Utility model content
For the deficiencies in the prior art, the utility model provides a kind of operation ladder stand of high voltage power transmission post.
To achieve these goals, the utility model solves the technical scheme that its technical problem adopts: the operation ladder stand of high voltage power transmission post, comprise along high voltage power transmission post short transverse intermediate connector in one line, intermediate connector and high voltage power transmission post fastening integrally welded, ladder stand is fastenedly connected on intermediate connector in one line, ladder stand is by load-bearing mobile jib and trample secondary bar and form, and tramples secondary bar interleaved and is connected to load-bearing mobile jib both sides.
The operation ladder stand of the high voltage power transmission post that the utility model provides further, its load-bearing mobile jib is connected with intermediate connector is fastening by U-shaped stud and hold-down nut, locking nut, load-bearing mobile jib offers the through hole that some transverse directions run through load-bearing mobile jib, described leading portion portion of trampling secondary bar is plugged in described through hole, and is fasteningly welded.
The operation ladder stand of the high voltage power transmission post that the utility model provides further, its rear end of trampling secondary bar is provided with anti-skidding boss, be positioned at the center section part trampling secondary bar to carve on the surface and be provided with prevention spiral chute, described prevention spiral chute is made up of some left-turn spiral anti-slip tanks and right hand helix anti-slip tank.
The operation ladder stand of the high voltage power transmission post that the utility model provides further, its intermediate connector is become to have continuously to the arched member of same direction complications by steel plate bending, described arched member left and right sides wall is corresponding and parallel, the bridge plate connecting left and right sides wall is curved panel or flat board, and the middle part of described curved panel or flat board offers connecting hole.
The beneficial effects of the utility model: the utility model ladder stand by securing member with and intermediate connector be connected with high voltage power transmission post, the hidden danger that the minimizing weld internal stress that is indirectly connected skewness brings, in addition, the anti-skidding boss that the outer end of trampling secondary bar is established, prevent from axially trampling landing, the prevention spiral chute that the external surface trampling secondary bar is established, prevent circumference from trampling landing, improve security performance and the safety factor of ladder stand, ensure repair personnel's personal safety.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the utility model mounting structure schematic diagram;
Fig. 3 is that the utility model tramples secondary bar structural representation.
Detailed description of the invention
The operation ladder stand of the high voltage power transmission post as shown in Fig. 1-Fig. 3, comprise along high voltage power transmission post 1 short transverse intermediate connector 2 in one line, intermediate connector 2 is fastening integrally welded with high voltage power transmission post 1, ladder stand is fastenedly connected on intermediate connector in one line, ladder stand is by load-bearing mobile jib 3 and trample secondary bar 4 and form, and tramples secondary bar 4 interleaved and is connected to load-bearing mobile jib 3 both sides.
Preferably, described load-bearing mobile jib 3 is connected with intermediate connector 2 is fastening by U-shaped stud and hold-down nut, locking nut, load-bearing mobile jib 3 offers the through hole that some transverse directions run through load-bearing mobile jib 3, described in trample secondary bar 4 leading portion portion be plugged in described through hole, and to be fasteningly welded.
Preferably, described in trample secondary bar 4 rear end be provided with anti-skidding boss 5, be positioned at the center section part trampling secondary bar 4 and carve on the surface and be provided with prevention spiral chute 6, described prevention spiral chute 6 is made up of some left-turn spiral anti-slip tanks and right hand helix anti-slip tank.
Preferably, described intermediate connector 2 is become to have continuously to the arched member of same direction complications by steel plate bending, described arched member left and right sides wall is corresponding and parallel, and the bridge plate connecting left and right sides wall is curved panel or flat board, and the middle part of described curved panel or flat board offers connecting hole.
To those skilled in the art, obviously the invention is not restricted to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present invention or essential characteristic, the present invention can be realized in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present invention is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the present invention.

Claims (4)

1. the operation ladder stand of high voltage power transmission post, comprise along high voltage power transmission post short transverse intermediate connector in one line, intermediate connector and high voltage power transmission post fastening integrally welded, it is characterized in that, ladder stand is fastenedly connected on intermediate connector in one line, ladder stand is by load-bearing mobile jib and trample secondary bar and form, and tramples secondary bar interleaved and is connected to load-bearing mobile jib both sides.
2. the operation ladder stand of high voltage power transmission post according to claim 1, it is characterized in that, described load-bearing mobile jib is connected with intermediate connector is fastening by U-shaped stud and hold-down nut, locking nut, load-bearing mobile jib offers the through hole that some transverse directions run through load-bearing mobile jib, described leading portion portion of trampling secondary bar is plugged in described through hole, and is fasteningly welded.
3. the operation ladder stand of high voltage power transmission post according to claim 2, it is characterized in that, described rear end of trampling secondary bar is provided with anti-skidding boss, be positioned at the center section part trampling secondary bar to carve on the surface and be provided with prevention spiral chute, described prevention spiral chute is made up of some left-turn spiral anti-slip tanks and right hand helix anti-slip tank.
4. the operation ladder stand of the high voltage power transmission post according to claim 1 or 2 or 3, it is characterized in that, described intermediate connector is become to have continuously to the arched member of same direction complications by steel plate bending, described arched member left and right sides wall is corresponding and parallel, the bridge plate connecting left and right sides wall is curved panel or flat board, and the middle part of described curved panel or flat board offers connecting hole.
CN201520076986.0U 2015-02-04 2015-02-04 The operation ladder stand of high voltage power transmission post Expired - Fee Related CN204532048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520076986.0U CN204532048U (en) 2015-02-04 2015-02-04 The operation ladder stand of high voltage power transmission post

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520076986.0U CN204532048U (en) 2015-02-04 2015-02-04 The operation ladder stand of high voltage power transmission post

Publications (1)

Publication Number Publication Date
CN204532048U true CN204532048U (en) 2015-08-05

Family

ID=53746071

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520076986.0U Expired - Fee Related CN204532048U (en) 2015-02-04 2015-02-04 The operation ladder stand of high voltage power transmission post

Country Status (1)

Country Link
CN (1) CN204532048U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604375A (en) * 2015-12-24 2016-05-25 广东迪生电力钢构器材有限公司 Chinese character 'tian' shaped terminal tower safe in overhaul
CN111335719A (en) * 2020-02-18 2020-06-26 浙江德宝通讯科技股份有限公司 Communication beautifies tower

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105604375A (en) * 2015-12-24 2016-05-25 广东迪生电力钢构器材有限公司 Chinese character 'tian' shaped terminal tower safe in overhaul
CN111335719A (en) * 2020-02-18 2020-06-26 浙江德宝通讯科技股份有限公司 Communication beautifies tower
CN111335719B (en) * 2020-02-18 2021-05-07 浙江德宝通讯科技股份有限公司 Communication beautifies tower

Similar Documents

Publication Publication Date Title
CN204532048U (en) The operation ladder stand of high voltage power transmission post
CN203278094U (en) Power lines repair special-purpose ladder
CN203103540U (en) Iron tower ground wire connector
CN207988216U (en) A kind of undaform steel plate combined shear wall
CN204577613U (en) The equal return cable of the urban transportation is connected with rail with the swollen nail terminal of compound
CN204327707U (en) A kind of rear tyre bolt
CN202578108U (en) Hinged connecting component used between repair tower column and cross arm
CN202294972U (en) Connecting device for cross beam and longitudinal beam of aluminum lightweight vehicle
CN203720228U (en) Electroprobe connecting rod
CN203006765U (en) Slide wire mounting structure
CN205857874U (en) A kind of tower boots
CN202643239U (en) Forklift
CN202209521U (en) Optimized wave-proof plate structure of liquefied gas tanker
CN204531564U (en) Safe communication tower
CN204597000U (en) The nonmetal earthing device of a kind of mesolow electric power system
CN203920471U (en) C type steel-aluminium composite conducting rail with holes
CN203808493U (en) Lapped anti-slip combined floor plank
CN204243700U (en) A kind of transmission line arrangement
CN203347835U (en) Composite material evacuation platform
CN202225679U (en) Inner tyre-free rim with high-strength wheel rim flanges
CN202401811U (en) Angle-steel-internally-wrapped connecting piece for connection
CN204527197U (en) A kind of railway truck pedal
CN205231694U (en) Shrinkage terminal pipe
CN202541222U (en) Safe vehicle wheel
CN208369167U (en) Power circuit Design assistant intelligent apparatus based on mobile terminal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150805