CN204530801U - Foundation pile pulling resistance testing device - Google Patents

Foundation pile pulling resistance testing device Download PDF

Info

Publication number
CN204530801U
CN204530801U CN201520257518.3U CN201520257518U CN204530801U CN 204530801 U CN204530801 U CN 204530801U CN 201520257518 U CN201520257518 U CN 201520257518U CN 204530801 U CN204530801 U CN 204530801U
Authority
CN
China
Prior art keywords
gripper shoe
screw rod
testing device
fixed
resistance testing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520257518.3U
Other languages
Chinese (zh)
Inventor
陆云龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Tianxin Power Engineering Detection Co Ltd
Original Assignee
Guangdong Tianxin Power Engineering Detection Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Tianxin Power Engineering Detection Co Ltd filed Critical Guangdong Tianxin Power Engineering Detection Co Ltd
Priority to CN201520257518.3U priority Critical patent/CN204530801U/en
Application granted granted Critical
Publication of CN204530801U publication Critical patent/CN204530801U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Foundation pile pulling resistance testing device, comprises uplift pile, crossbeam and jack, and this foundation pile pulling resistance testing device also comprises anchor ear and bracing frame, and anchor ear is set in the external surface of uplift pile and is fixedly connected with uplift pile; Bracing frame comprises the first gripper shoe and connecting rod, and the upper end of connecting rod is fixed in the first gripper shoe, and the lower end of connecting rod is fixed on the external surface of anchor ear; The cylinder body of jack is fixed on crossbeam, and the free end of jack is upwards resisted against the soffit of the first gripper shoe.Foundation pile pulling resistance testing device of the present utility model, uplift pile just can pull up by the free end of jack by the first gripper shoe jack-up in the process risen, and complete whole pullout tests, whole process avoids the use of concrete and rebar, simplify process of the test, cost-saving; In addition, the first gripper shoe of employing carries the power of jack applying, strengthens the anti-pulling capacity of whole device, and structure is simple, swift to operate.

Description

Foundation pile pulling resistance testing device
Technical field
The utility model relates to Foundation Design technical field, is specifically related to foundation pile pulling resistance testing device.
Background technology
Carrying out in Building Construction, the structure being positioned under ground portion can be subject to buoyancy upwards under the effect of water, for eliminate the impact on monolithic architecture framework of this buoyancy and the stake of beating uplift pile, as anchoring pile, anti-floating pile etc.Commercially now all insert several reinforcing bars in the hollow part of uplift pile for the pullout tests of uplift pile, then tamp with concrete, and reserve the reinforcing bar of certain length, after its consolidation, the reinforcement welding exposed is completed pullout tests at foundation pile pulling resistance testing device.But this foundation pile pulling resistance testing device needs fill concrete, troublesome poeration and cost is high; The reinforcing bar adopted in addition also also exists the shortcoming that structure is insecure, bearing capacity is inadequate, easily occurs situation about pulling, affects the carrying out of pullout tests.
Utility model content
For the deficiencies in the prior art, the purpose of this utility model is to provide foundation pile pulling resistance testing device, and syndeton is simple, swift to operate, improves whole device anti-pulling capacity, test can be completed on request.
For achieving the above object, the utility model adopts following technical scheme:
Foundation pile pulling resistance testing device, comprises uplift pile, crossbeam and jack, and this foundation pile pulling resistance testing device also comprises anchor ear and bracing frame, and anchor ear is set in the external surface of uplift pile and is fixedly connected with uplift pile; Bracing frame comprises the first gripper shoe and connecting rod, and the upper end of connecting rod is fixed in the first gripper shoe, and the lower end of connecting rod is fixed on the external surface of anchor ear; The cylinder body of jack is fixed on crossbeam, and the free end of jack is upwards resisted against the soffit of the first gripper shoe.
Preferably, bracing frame also comprises and is arranged at the second gripper shoe below the first gripper shoe and parallel with the first gripper shoe; Connecting rod comprises the first screw rod and the second screw rod, and the upper end of the first screw rod is fixed in the first gripper shoe, and the lower end of the first screw rod is fixed in the second gripper shoe; The upper end of the second screw rod is fixed in the second gripper shoe, and the lower end of the second screw rod is fixed on the external surface of anchor ear.
Preferably, the upper end cross-under of the first screw rod in the first gripper shoe in and be locked in the first gripper shoe by one first nut assembly, the lower end cross-under of the first screw rod is in the second gripper shoe and be locked in the second gripper shoe by one second nut assembly.
Preferably, the upper end of the second screw rod to be connected in the second gripper shoe and to be locked in the second gripper shoe by one the 3rd nut assembly.
Preferably, the lower end of the second screw rod is welded in the external surface of anchor ear.
Preferably, anchor ear is docked by the left hoop plate all in semi-annular shape and right hoop plate and is formed.
Preferably, left hoop plate offers multiple first screwed holes along the arrangement of oneself height direction, right hoop plate offers multiple second screwed hole corresponding with the first screwed hole, in the first screwed hole, cross-under has the bolt be bolted in the second screwed hole.
The beneficial effects of the utility model are:
Compared to prior art, foundation pile pulling resistance testing device of the present utility model, directly anchor ear is set at the external surface of uplift pile, be connected with the first gripper shoe on bracing frame by connecting rod fixing on anchor ear, so, uplift pile only need just can pull up by the free end of jack by the first gripper shoe jack-up in the process risen, complete whole pullout tests, whole process avoids the use of concrete and rebar, simplifies process of the test, cost-saving; In addition, the first gripper shoe of employing carries the power of jack applying, strengthens the anti-pulling capacity of whole device, and structure is simple, swift to operate.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model;
Fig. 2 is hooping structure schematic diagram of the present utility model.
Wherein, 100, uplift pile; 200, crossbeam; 300, jack; 410, the first gripper shoe; 420, the first screw rod; 421, the first nut assembly; 422, the second nut assembly; 430, the second gripper shoe; 500, anchor ear; 510, the second screw rod; 511, the 3rd nut assembly; 520, left hoop plate; 521, the first screwed hole; 530, right hoop plate; 531, the second screwed hole.
Detailed description of the invention
Below, by reference to the accompanying drawings and detailed description of the invention, the utility model is described further:
Foundation pile pulling resistance testing device as shown in Figure 1, 2, comprise uplift pile 100, crossbeam 200, jack 300, anchor ear 500 and bracing frame, anchor ear 500 is sleeved on the external surface of uplift pile 100, and is fixedly connected with uplift pile 100; In addition, this bracing frame comprises the first gripper shoe 410 and connecting rod, and make the upper end of this connecting rod be fixed in the first gripper shoe 410, the lower end of connecting rod is fixed on anchor ear 500; Meanwhile, the cylinder body of above-mentioned jack 300 is fixed on crossbeam 200, the free end of jack 300 is made can upwards to support in the lower surface of the first gripper shoe 410, so, when carrying out pullout tests, start jack 300, by the first gripper shoe 410 jack-up, just the anchor ear 500 be connected with the first gripper shoe 410 by connecting rod can be taken up, and be fixed together due to anchor ear 500 and uplift pile 100, this uplift pile 100 also can be pulled up along with anchor ear 500 together.
Concrete, in the present embodiment, above-mentioned bracing frame also can comprise the second gripper shoe 430, and this second gripper shoe 430 is positioned at the below of the first gripper shoe 410 and be arranged in parallel with the first gripper shoe 410, in addition, above-mentioned connecting rod specifically comprises the first screw rod 420 and the second screw rod 510, the upper end of this first screw rod 420 is fixed in the first gripper shoe 410, and the lower end of the first screw rod 420 is fixed in the second gripper shoe 430, in addition, the upper end of this second screw rod 510 is made to be fixed in the second gripper shoe 430, the lower end of the second screw rod 510 is fixed on the external surface of anchor ear 500, jack 300 by the first gripper shoe 410 upwards jack-up time, the second gripper shoe 430 connected by the first screw rod 420 can be driven upwards movable, under the effect of the second gripper shoe 430, the anchor ear 500 connected by the second screw rod 510 can along with being upwards pulled up together, the support frame structure consisted of two screw rods and two gripper shoes can be more stable, in addition, second gripper shoe 430 can make the stressed more even of whole device, improve the anti-pulling capacity of whole device.
Further, the upper end cross-under of the first screw rod 420 in the first gripper shoe 410, and arranges one first nut assembly 421 in the upper end of the first screw rod 420, in order to by the upper end locking of the first screw rod 420 in the first gripper shoe 410.Same, the lower end cross-under of the first screw rod 420, in the second gripper shoe 430, arranges one second nut assembly 422 in the lower end of the first screw rod 420 accordingly, in order to be locked in the second gripper shoe 430 lower end of the first screw rod 420.Pass through said structure, two gripper shoes and two screw rods are fixed in the mode be spirally connected, facilitates the installation and removal of whole device on the one hand, on the other hand, being fixed by the mode be spirally connected to make total more stable, not easily occurs situation about getting loose when carrying out pullout tests.
More excellent, the upper end of above-mentioned second screw rod 510 also cross-under in the second gripper shoe 430, and one the 3rd nut assembly 511 is set in the upper end of the second screw rod 510, by the upper end locking of the second screw rod 510 in the second gripper shoe 430, further can reinforce the syndeton of whole device like this.Further, the lower end of the second screw rod 510 is welded on the external surface of anchor ear 500, the lower end of the second screw rod 510 is fixed on anchor ear 500.
Certainly, above-mentioned connecting rod is directly replaced with a screw rod and also can be reached the effect above-mentioned anchor ear 500 and the first gripper shoe 410 coupled together; In addition, the fixed form of above-mentioned first screw rod 420 and the first gripper shoe 410 and the fixed form of the second screw rod 510 and the second gripper shoe 430 all can adopt and be welded and fixed.
Preferably, above-mentioned anchor ear 500 can be docked by the left hoop plate 520 all in semi-annular shape and right hoop plate 530 and be formed, and when being fixed in uplift pile 100 by anchor ear 500, can rotate according to the size of resistance to plucking plate, convenient installation.Further, left hoop plate 520 offers multiple first screwed hole 521, multiple second screwed hole 531 corresponding with the first screwed hole 521 is offered accordingly on right hoop plate 530, the short transverse of these screwed holes all along hoop plate is evenly distributed, so in the first screwed hole 521, cross-under has the bolt be bolted in the second screwed hole 531, just left hoop plate 520 can be fixedly connected with right hoop plate 530, left and right hoop plate 530 be fixed in the mode be spirally connected, easy disassembly.Certainly, hoop plate 530 in left and right also can adopt welding to be fixed.
Foundation pile pulling resistance testing device in the present embodiment, whole device adopts the mode be spirally connected to be fixed, easy disassembly on the one hand, and can reinforce the connection structure on the other hand, prevents the phenomenon that gets loose.In addition, whole pullout tests process, by the free end of jack 300 by the first gripper shoe 410 upwards jack-up, thus drive the anchor ear 500 being fixed on connecting rod lower end upwards movable, and then the uplift pile 100 be fixed together with anchor ear 500 is pulled up, whole process operation is simple, without the need to fill concrete and reinforcing bar, cost-saving.
To one skilled in the art, according to technical scheme described above and design, other various corresponding change and deformation can be made, and all these change and deformation all should belong within the protection domain of the utility model claim.

Claims (7)

1. foundation pile pulling resistance testing device, comprises uplift pile, crossbeam and jack, it is characterized in that, this foundation pile pulling resistance testing device also comprises anchor ear and bracing frame, and anchor ear is set in the external surface of uplift pile and is fixedly connected with uplift pile; Bracing frame comprises the first gripper shoe and connecting rod, and the upper end of connecting rod is fixed in the first gripper shoe, and the lower end of connecting rod is fixed on the external surface of anchor ear; The cylinder body of jack is fixed on crossbeam, and the free end of jack is upwards resisted against the soffit of the first gripper shoe.
2. foundation pile pulling resistance testing device as claimed in claim 1, is characterized in that, bracing frame also comprises and is arranged at the second gripper shoe below the first gripper shoe and parallel with the first gripper shoe; Connecting rod comprises the first screw rod and the second screw rod, and the upper end of the first screw rod is fixed in the first gripper shoe, and the lower end of the first screw rod is fixed in the second gripper shoe; The upper end of the second screw rod is fixed in the second gripper shoe, and the lower end of the second screw rod is fixed on the external surface of anchor ear.
3. foundation pile pulling resistance testing device as claimed in claim 2, it is characterized in that, the upper end cross-under of the first screw rod in the first gripper shoe in and be locked in the first gripper shoe by one first nut assembly, the lower end cross-under of the first screw rod is in the second gripper shoe and be locked in the second gripper shoe by one second nut assembly.
4. foundation pile pulling resistance testing device as claimed in claim 2, is characterized in that, the upper end of the second screw rod to be connected in the second gripper shoe and to be locked in the second gripper shoe by one the 3rd nut assembly.
5. foundation pile pulling resistance testing device as claimed in claim 2, it is characterized in that, the lower end of the second screw rod is welded in the external surface of anchor ear.
6. foundation pile pulling resistance testing device as claimed in claim 1, is characterized in that, anchor ear is docked by the left hoop plate all in semi-annular shape and right hoop plate and formed.
7. foundation pile pulling resistance testing device as claimed in claim 6, it is characterized in that, left hoop plate offers multiple first screwed holes along the arrangement of oneself height direction, right hoop plate offers multiple second screwed hole corresponding with the first screwed hole, in the first screwed hole, cross-under has the bolt be bolted in the second screwed hole.
CN201520257518.3U 2015-04-24 2015-04-24 Foundation pile pulling resistance testing device Active CN204530801U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520257518.3U CN204530801U (en) 2015-04-24 2015-04-24 Foundation pile pulling resistance testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520257518.3U CN204530801U (en) 2015-04-24 2015-04-24 Foundation pile pulling resistance testing device

Publications (1)

Publication Number Publication Date
CN204530801U true CN204530801U (en) 2015-08-05

Family

ID=53744827

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520257518.3U Active CN204530801U (en) 2015-04-24 2015-04-24 Foundation pile pulling resistance testing device

Country Status (1)

Country Link
CN (1) CN204530801U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775457A (en) * 2015-04-24 2015-07-15 广东天信电力工程检测有限公司 Base pile pulling-resistant test device
CN110258670A (en) * 2019-07-10 2019-09-20 启东市建筑设计院有限公司 A kind of large-tonnage foundation pile pulling resistance testing device and its test method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775457A (en) * 2015-04-24 2015-07-15 广东天信电力工程检测有限公司 Base pile pulling-resistant test device
CN110258670A (en) * 2019-07-10 2019-09-20 启东市建筑设计院有限公司 A kind of large-tonnage foundation pile pulling resistance testing device and its test method

Similar Documents

Publication Publication Date Title
CN202323962U (en) Composite supporting structure of drainage pipe pile and soil nailing wall
CN204530801U (en) Foundation pile pulling resistance testing device
CN104775457A (en) Base pile pulling-resistant test device
CN212002238U (en) Unilateral formwork construction equipment of basement outer wall
CN201817814U (en) Adjustable fixed support of vertical surface sheet steel form
CN201649071U (en) Unstressing cast-in-place pile
CN203640077U (en) Helical-hoop-reinforcement-reined flexure-preventing energy-consumption support component
CN202787296U (en) Foundation structure of anchor pole blower fan
CN204780945U (en) Enlarged footing anchor bolt support structure
CN204385762U (en) A kind of Rock Bolt Foundation structure
CN201411704Y (en) Reinforced concrete foundation or pile cap
CN203639900U (en) Hollow pile
CN204282394U (en) A kind of blower foundation and the prestressing force assembly for blower foundation
CN211621726U (en) Foundation ditch side slope support steel pipe soil nail pullout force detection device
CN207685877U (en) A kind of single pile resistance to plucking static test resistance to plucking hand basket
CN104532873A (en) Rock anchor rod foundation structure
CN200955150Y (en) Driven post-slip-casting hollow anchoring rod
CN204040436U (en) For the self-balancing steel builder's jack of overlength cantilevered structure framed bent construction
CN215669547U (en) Foundation pit supporting structure for building construction
CN205161337U (en) Warmhouse booth skeleton convenient to dismantle
CN202055556U (en) Reinforcing bearing wall structure
CN203808064U (en) Prestressed reinforced concrete threaded pipe pile
CN203755455U (en) Super high-rise core tube and outer frame beam post-cast joint
CN203475827U (en) Adjustable type reinforced integral beam double-top support
CN215717489U (en) Reinforced steel structure of concrete floor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant