CN204530465U - High pier bridge pier shaft internal inspection system - Google Patents

High pier bridge pier shaft internal inspection system Download PDF

Info

Publication number
CN204530465U
CN204530465U CN201520029873.5U CN201520029873U CN204530465U CN 204530465 U CN204530465 U CN 204530465U CN 201520029873 U CN201520029873 U CN 201520029873U CN 204530465 U CN204530465 U CN 204530465U
Authority
CN
China
Prior art keywords
platform
pier
pier shaft
inspection system
ring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520029873.5U
Other languages
Chinese (zh)
Inventor
艾宗良
游冰
陈思孝
张剑
戴胜勇
刘俊
李锐
于洋
陈建峰
彭长长
蔡超
方杰
钟亚伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Eryuan Engineering Group Co Ltd CREEC
Original Assignee
China Railway Eryuan Engineering Group Co Ltd CREEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Eryuan Engineering Group Co Ltd CREEC filed Critical China Railway Eryuan Engineering Group Co Ltd CREEC
Priority to CN201520029873.5U priority Critical patent/CN204530465U/en
Application granted granted Critical
Publication of CN204530465U publication Critical patent/CN204530465U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

High pier bridge pier shaft internal inspection system, to realize the Quick overhaul to each position of high pier, reduces maintainer's labour intensity, increases the safety of upkeep operation.Be included in the ring-shaped platform that longitudinal separation in the internal cavities of pier shaft is arranged, and be arranged on pier shaft outside by Dun Ding to the external channel of the superiors' ring-shaped platform.In the internal cavities of described pier shaft, above the superiors' ring-shaped platform, be provided with pre-buried platform, this pre-buried platform arranges elevating mechanism, and elevating mechanism acts on the lift platform be positioned at below pre-buried platform.

Description

High pier bridge pier shaft internal inspection system
Technical field
The utility model relates to bridge, particularly one high pier bridge pier shaft internal inspection system.
Background technology
The existing maintenance being generally confined to top of bridge pier cap additional position for railway height pier internal check facility at present, refuge platform that is inner by case beam or T beam enters top of bridge pier cap, overhauls it.For some high piers, generally have employed the mode of establishing People's Bank of China's ladder, overhaul in pier.This maintenance mode is very high to the physical fitness requirement of maintainer, but also has certain danger, and overhaul efficiency is low, and difficulty is larger.This is badly in need of exploitation, and a kind of in order to save inspection personnel's muscle power, safety is high, improves checking efficiency and simple and convenient, solves for a long time without the problem of dynamic maintenance, and can check facility in conjunction with the railway height pier of ring-shaped platform and bridge pier outer tunnel in original pier.
Utility model content
The purpose of this utility model is to provide a kind of high pier bridge pier shaft internal inspection system, to realize the Quick overhaul to each position of high pier, reduces maintainer's labour intensity, increases the safety of upkeep operation.
The utility model height pier bridge pier shaft internal inspection system, be included in the ring-shaped platform that in the internal cavities of pier shaft, longitudinal separation is arranged, and be arranged on pier shaft outside by Dun Ding to the external channel of the superiors' ring-shaped platform, it is characterized in that: in the internal cavities of described pier shaft, pre-buried platform is provided with above the superiors' ring-shaped platform, this pre-buried platform arranges elevating mechanism, and elevating mechanism acts on the lift platform be positioned at below pre-buried platform.
The beneficial effects of the utility model are, significantly reduce the labour intensity of maintainer, increase the safety of upkeep operation, and simple to operate, operate steadily, can realize the Quick overhaul to each position of high pier.
Accompanying drawing explanation
This manual comprises following four width accompanying drawings:
Fig. 1 is the pier internal structure schematic diagram of the utility model the utility model height pier bridge pier shaft internal inspection system;
Fig. 2 is the schematic diagram of the outer cat ladder of pier and channel setting position in the utility model height pier bridge pier shaft internal inspection system;
Fig. 3 is the connected mode schematic diagram of elevating mechanism in the utility model height pier bridge pier shaft internal inspection system and lift platform;
Fig. 4 is the top view of elevating mechanism in the utility model height pier bridge pier shaft internal inspection system.
Component name shown in figure and corresponding mark: pier shaft 10, internal cavities 11, ring-shaped platform 12, passway 13, cat ladder 14, pre-buried platform 15; Lift platform 20, direct current generator 21, reductor 22, reel 23, steel cable 24, man-operated mechanism 25.
Detailed description of the invention
Now in conjunction with the accompanying drawings and embodiments the utility model is further described.
See figures.1.and.2, high pier bridge pier shaft internal inspection system of the present utility model, is included in the ring-shaped platform 12 that longitudinal separation in the internal cavities 11 of pier shaft 10 is arranged, and be arranged on pier shaft 10 outside by Dun Ding to the external channel of the superiors' ring-shaped platform 12.In the internal cavities 11 of described pier shaft 10, be provided with pre-buried platform 15 above the superiors' ring-shaped platform 12, this pre-buried platform 15 arranges elevating mechanism, and elevating mechanism acts on the lift platform 20 be positioned at below pre-buried platform 15.Inspection personnel can carry checkout facility, and externally passage enters the superiors' ring-shaped platform 12, then enters lift platform 20, by the ring-shaped platform 12 of elevating mechanism decline lift platform 20 to lower floor.After inspection, inspection personnel by the action of elevating mechanism, can make lift platform 20 arrive the ring-shaped platform 12 at top fast, leaves lift platform 20, thus complete the examination and maintenance carried out bridge pier inside quickly and safely.
With reference to Fig. 3 and Fig. 4, described elevating mechanism comprises direct current generator 21, reductor 22 and two reels be arranged in parallel 23, direct current generator 21 and reductor 22 are in transmission connection, the output shaft of reductor 22 is in transmission connection by pinion unit and two reels 23, and the lower end being wound on the steel cable 24 on two reels 23 is fixedly connected with lift platform 20.When direct current generator 21 runs, two reels 21 carry out rotation simultaneously makes lift platform 20 steadily be elevated.Described elevating mechanism also comprises the man-operated mechanism 25 be in transmission connection with direct current generator 21, when electrical system breaks down, can manually mechanism 25 drive lift platform 20 to arrive home.
With reference to Fig. 2, described external channel comprises the cat ladder 14 being arranged on pier shaft 10 outside, and is opened in the passway 13 on pier shaft 10 sidewall.
Some principles of the above the utility model height pier bridge pier shaft internal inspection system that just explains through diagrams, be not the utility model to be confined to shown in and in described concrete structure and the scope of application, therefore every corresponding modify of being likely utilized and equivalent, all belong to the scope of the claims that the utility model is applied for.

Claims (4)

1. high pier bridge pier shaft internal inspection system, be included in the ring-shaped platform (12) that in the internal cavities (11) of pier shaft (10), longitudinal separation is arranged, and be arranged on pier shaft (10) outside by Dun Ding to the external channel of the superiors' ring-shaped platform (12), it is characterized in that: in the internal cavities (11) of described pier shaft (10), the top of the superiors' ring-shaped platform (12) is provided with pre-buried platform (15), this pre-buried platform (15) arranges elevating mechanism, elevating mechanism acts on the lift platform (20) being positioned at pre-buried platform (15) below.
2. high pier bridge pier shaft internal inspection system as claimed in claim 1, it is characterized in that: described elevating mechanism comprises direct current generator (21), reductor (22) and two reels be arranged in parallel (23), direct current generator (21) and reductor (22) are in transmission connection, the output shaft of reductor (22) is in transmission connection by pinion unit and two reels (23), and the lower end being wound on the steel cable (24) on two reels (23) is fixedly connected with lift platform (20).
3. high pier bridge pier shaft internal inspection system as claimed in claim 1, is characterized in that: described elevating mechanism also comprises the man-operated mechanism (25) be in transmission connection with direct current generator (21).
4. high pier bridge pier shaft internal inspection system as claimed in claim 1, it is characterized in that: described external channel comprises the cat ladder (14) being arranged on pier shaft (10) outside, and is opened in the passway (13) on pier shaft (10) sidewall.
CN201520029873.5U 2015-01-16 2015-01-16 High pier bridge pier shaft internal inspection system Active CN204530465U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520029873.5U CN204530465U (en) 2015-01-16 2015-01-16 High pier bridge pier shaft internal inspection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520029873.5U CN204530465U (en) 2015-01-16 2015-01-16 High pier bridge pier shaft internal inspection system

Publications (1)

Publication Number Publication Date
CN204530465U true CN204530465U (en) 2015-08-05

Family

ID=53744487

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520029873.5U Active CN204530465U (en) 2015-01-16 2015-01-16 High pier bridge pier shaft internal inspection system

Country Status (1)

Country Link
CN (1) CN204530465U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855644A (en) * 2022-03-25 2022-08-05 浙江恒炜建设集团有限公司 Bridge main tower structure convenient to maintain and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114855644A (en) * 2022-03-25 2022-08-05 浙江恒炜建设集团有限公司 Bridge main tower structure convenient to maintain and construction method thereof

Similar Documents

Publication Publication Date Title
US9303627B2 (en) Guide wire tension loss sensor
CN202054588U (en) Hydraulic lift-type platform for overhaul and maintenance of GW-6 disconnecting links
CN102992197B (en) Earth electrode field cover plate hoisting device
CN201785175U (en) Hoisting basket for high-voltage steel tower
CN204530465U (en) High pier bridge pier shaft internal inspection system
CN103288002B (en) Simple combination door frame high-altitude weight hanging apparatus
CN106253133B (en) A kind of wire coaster
CN203284126U (en) Simple composite gantry high-altitude weight hoisting device
CN204530511U (en) A kind of high pier bridge pier shaft internal inspection system
CN204849774U (en) A simple and easy device for well casing sinks to be put
CN204662259U (en) High pier bridge pier shaft intelligence internal inspection system
CN204689420U (en) A kind of deployable and collapsible inspection platform for hoisting crane
CN201737637U (en) Portable hoisting apparatus
CN203800449U (en) Overhaul platform of equipment on transformer station pillar
CN201322661Y (en) Test device of tension precision of switch machine
CN202578023U (en) Two-person pole righting machine
CN201722079U (en) Hoisting equipment for lifting and sliding steel beam units or steel trusses
CN105155420B (en) A kind of pre-tensioning system precast beam integral tension system
CN203079643U (en) High-altitude hoisting apparatus
CN206598961U (en) Multifunctional small-waterplane boat guide pile hydraulic lifting system
CN201772997U (en) Portable ladder detecting device
CN105207119B (en) Electrified span construction method for high-voltage wires and protective device of construction
CN203218786U (en) Electric field entering and exiting tool for hot-line work of long span transmission tower
CN104110155B (en) A kind of thin-wall steel tube shaft tower and processing thereof and construction method
CN103420263A (en) Prefabricated plate hoisting tool

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant