CN105155420B - Integral tensioning system for pre-tensioning prefabricated beam slab - Google Patents

Integral tensioning system for pre-tensioning prefabricated beam slab Download PDF

Info

Publication number
CN105155420B
CN105155420B CN201510545305.5A CN201510545305A CN105155420B CN 105155420 B CN105155420 B CN 105155420B CN 201510545305 A CN201510545305 A CN 201510545305A CN 105155420 B CN105155420 B CN 105155420B
Authority
CN
China
Prior art keywords
gooseneck
essence
steel plate
brace rod
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510545305.5A
Other languages
Chinese (zh)
Other versions
CN105155420A (en
Inventor
杨志
黄东寅
徐小飞
丁训秀
徐显攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Original Assignee
China Construction First Group Corp Ltd
China Construction Municipal Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction First Group Corp Ltd, China Construction Municipal Engineering Corp Ltd filed Critical China Construction First Group Corp Ltd
Priority to CN201510545305.5A priority Critical patent/CN105155420B/en
Publication of CN105155420A publication Critical patent/CN105155420A/en
Application granted granted Critical
Publication of CN105155420B publication Critical patent/CN105155420B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention belongs to a pre-tensioning method precast beam slab integral tensioning system which consists of a pedestal, a steel strand, a jack and a tensioning oil pump and comprises a middle structure, a left side structure and a right side structure. The pedestal of the middle structure is arranged between two L-shaped butted force transmission columns, a steel hinge line for preparing a pre-tensioning method precast beam plate is arranged on the pedestal, and the steel cross beam at the anchoring end and the steel cross beam at the tensioning end are respectively positioned at the outer ends of two sides of the force transmission columns. And a steel plate is arranged between the steel beam at the anchoring end of the left side structure and the side surface of the force transmission column at the corresponding side, and one end of each fine-rolled threaded connecting rod, which is provided with anchoring limiting steel and is positioned at the end of the anchoring limiting steel plate, of the outer side surface of the steel beam at the anchoring end penetrates through each through hole on the anchoring limiting steel plate to be connected with each nut. The other end of each fine-rolling threaded connecting rod penetrates through the steel beam of the anchoring end to be positioned outside the pedestal, and an anchoring end connector is arranged on the steel beam of the anchoring end. The invention has the advantages of simple and practical structure, good efficiency and quality, low production cost, safe use and good use effect.

Description

A kind of pre-tensioning system precast beam integral tension system
Technical field
The invention belongs to a kind of pre-tensioning system precast beam integral tension system.
Background technology
At present, in highway in China bridge construction, pretensioned prestressed hollow slab beam, with its low cost, builds whole height Low, safety and durability, can be with factorial praluction, simple structure is light and handy, is used widely the advantages of easy construction.Actual The preparation of substantial amounts of pretensioned prestressed hollow slab beam in construction is all carried out prefabricated using tower structure, carries out integral tension, Its advantage is once to produce multi-disc beam slab, steady quality, can accelerate bridge construction progress, and construction technology is through for many years also increasingly Ripe.But, steel hinge line is directly anchored at gooseneck both sides and carries out tensioning, the steel hinge line after one side tensioning can not repeat profit With causing a large amount of wastes of steel hinge line;Another aspect tool clamping piece often flies out and causes security incident to happen occasionally, also simultaneously It is difficult to ensure that the efficiency of pre-tensioning system precast beam integral tension and quality.
Content of the invention
It is an object of the invention to provide a kind of pre-tensioning system precast beam integral tension system, have simple and practical, effect Rate and quality are good, low production cost, using the good advantage of safety and using effect.
For this reason, the present invention is made up of pedestal, steel hinge line, jack and stretching oil pump, pre-tensioning system precast beam is integrally opened Pull system includes central structure, left side structure and right side structure:
Central structure, pedestal is arranged in the middle of the force-transmitting pole of two L-shaped docking, and it is prefabricated that pedestal is provided with preparation pre-tensioning system The steel hinge line of beam slab, anchored end gooseneck and stretching end gooseneck are located at the both sides outer end of force-transmitting pole respectively;
Left side structure, is provided with steel plate, anchored end gooseneck between the side of the force-transmitting pole of anchored end gooseneck and respective side Lateral surface be provided with anchoring spacing steel plate, anchor spacing steel plate on correspondence each essence prick whorl brace rod position be provided with for each essence prick spiral shell The perforation that stricture of vagina connecting rod passes through, the one end pricking whorl brace rod positioned at each essence anchoring spacing steel plate end passes through and anchors spacing steel plate On each perforation be connected with respective nut, each essence prick whorl brace rod the other end pass through anchored end gooseneck be located at pedestal outside Side and which is provided with anchoring terminal adapter, the termination that essence pricks whorl brace rod is correspondingly arranged with the termination of the steel hinge line of corresponding end;
Right side structure, is provided with steel plate, stretching end gooseneck between the side of the force-transmitting pole of stretching end gooseneck and respective side Lateral surface be provided with the first spacing steel plate, on the first spacing steel plate, each first essence of correspondence is pricked whorl brace rod position and is provided with for each the One essence pricks the perforation that whorl brace rod passes through, and one end that each first essence positioned at the first spacing steel plate end pricks whorl brace rod passes through Each perforation on first spacing steel plate is connected with respective first attaching nut, and the other end that each first essence pricks whorl brace rod is worn Cross stretching end gooseneck to be located at outside pedestal and which is provided with the first adapter, each first attaching nut passes through respective second even Connect device and connect one end that each second essence pricks whorl brace rod, the other end that each second essence pricks whorl brace rod is placed through the first limit Each corresponding perforation on movable gooseneck and the second spacing steel plate outside the steel plate of position is connected with the second attaching nut, movable gooseneck It is located on track with the lower end of the second spacing steel plate, set between the both ends of the both ends of movable gooseneck and stretching end gooseneck There is the jack being controlled by stretching oil pump.
It is provided with equal power steel plate between described jack and the movable gooseneck holding.Described force-transmitting pole is L-shaped.
Described anchored end gooseneck, stretching end gooseneck, movable gooseneck and pedestal centrage are located along the same line. Described track is parallel with force-transmitting pole, axis.In the described centrage of anchored end gooseneck, stretching end gooseneck Heart line, the centrage of movable gooseneck, the centrage of steel hinge line, the centrage of anchoring terminal adapter, essence prick whorl brace rod and First, second essence pricks the centrage of centrage, the centrage of jack and first, second adapter of whorl brace rod, anchoring The centrage of the centrage of spacing steel plate and first, second spacing steel plate is all at grade.Described essence is pricked threaded The radical that bar, the first essence bundle whorl brace rod, the second essence prick whorl brace rod is identical with the radical of steel hinge line
Said structure has reached the purpose of the present invention.
The present invention have simple and practical, efficiency and quality good, low production cost, good using safety and using effect Advantage.Produce the cost savings 30% of pre-tensioning system precast beam according to the measuring and calculating present invention compared with legacy equipment, efficiency and quality are superior to Legacy equipment, safe and reliable.
Brief description
Fig. 1 is the structural representation of the present invention.
Fig. 2 is the structural representation of side of the present invention.
Specific embodiment
As depicted in figs. 1 and 2, a kind of pre-tensioning system precast beam integral tension system, by pedestal 2, steel hinge line 3, jack 19 and stretching oil pump 20 formed.Pre-tensioning system precast beam integral tension system includes central structure, left side structure and right side knot Structure:
Central structure, pedestal is arranged in the middle of the force-transmitting pole 1 of two L-shaped docking.It is pre- that pedestal is provided with preparation pre-tensioning system The steel hinge line of beam slab processed.Anchored end gooseneck 13 and stretching end gooseneck 14 are respectively positioned at the both sides outer end of force-transmitting pole.
Left side structure, is provided with steel plate 21, the work of steel plate between the side of the force-transmitting pole of anchored end gooseneck 13 and respective side With being uniform conductive power.The lateral surface of anchored end gooseneck is provided with the spacing steel plate 16 of anchoring, is the thick steel plate of 2cm.Anchoring limit On the steel plate of position, each essence corresponding to the side is pricked whorl brace rod 10 position and is provided with the perforation passing through for each essence bundle whorl brace rod.It is located at The each essence anchoring spacing steel plate end pricks one end of whorl brace rod through each perforation anchoring on spacing steel plate and respective nut 6 Connect.The other end that each essence pricks whorl brace rod passes through anchored end gooseneck to be located at outside pedestal and which is provided with anchored end connection Device 4.The termination that essence pricks whorl brace rod is correspondingly arranged with the termination of the steel hinge line of corresponding end.
Right side structure, is provided with steel plate 22, the work of steel plate between the side of the force-transmitting pole of stretching end gooseneck 14 and respective side With being uniform conductive power.The lateral surface of stretching end gooseneck is provided with the first spacing steel plate 17.Corresponding each on first spacing steel plate First essence is pricked whorl brace rod 11 position and is provided with the perforation passing through for each first essence bundle whorl brace rod.Positioned at the first spacing steel plate One end that each first essence at end pricks whorl brace rod passes through each perforation and respective first attaching nut on the first spacing steel plate Connect 7, the other end that each first essence pricks whorl brace rod passes through stretching end gooseneck to be located at outside pedestal and which is provided with first Adapter 5.Each first attaching nut connects, by respective second adapter 8, one end that each second essence pricks whorl brace rod 12, The other end that each second essence pricks whorl brace rod is placed through the movable gooseneck 15 outside the first spacing steel plate and the second spacing steel Each corresponding perforation on plate 18 is connected with the second attaching nut 9.The lower end of movable gooseneck and the second spacing steel plate is located at track On 24.It is provided with the jack being controlled by stretching oil pump 20 between the both ends of the both ends of movable gooseneck and stretching end gooseneck 19.First, second spacing steel plate is the thick steel plate of 2cm.First essence pricks the termination of whorl brace rod and the steel hinge line of corresponding end Termination is correspondingly arranged.
It is provided with equal power steel plate 23, so that uniform conductive power between described jack and the movable gooseneck holding.
Described force-transmitting pole is L-shaped, assembly can be facilitated to enclose and be located at pedestal periphery.
Described anchored end gooseneck, stretching end gooseneck, movable gooseneck and pedestal centrage are located along the same line. Described track is parallel with force-transmitting pole, axis.In the described centrage of anchored end gooseneck, stretching end gooseneck Heart line, the centrage of movable gooseneck, the centrage of steel hinge line, the centrage of anchoring terminal adapter, essence prick whorl brace rod and First, second essence pricks the centrage of centrage, the centrage of jack and first, second adapter of whorl brace rod, anchoring The centrage of the centrage of spacing steel plate and first, second spacing steel plate is all at grade.Described essence is pricked threaded The radical that bar, the first essence bundle whorl brace rod, the second essence prick whorl brace rod is identical with the radical of steel hinge line
During use, it is connected with the left side termination of each steel hinge line on pedestal one by one with each anchoring terminal adapter, uses First adapter is connected with the right side termination of each steel hinge line on pedestal one by one.Tighten each nut, first, second connection Nut, can additionally use small-sized centre-hole jack and withstand at stretching end gooseneck, one by one to single tendon stretch steel strand wires applying power To its primary stress, after control stress for prestressing is stable, then anchor good corresponding first attaching nut one by one.Connect first, Two essences prick whorl brace rod and the second attaching nut.Start stretching oil pump, jack is by movable gooseneck and the second spacing steel plate And second attaching nut ejection, drive second essence prick whorl brace rod, first essence prick whorl brace rod to steel strand wires applying power, It is pulled to maximum proof stress, after holding lotus 5min, tighten each first attaching nut 7.The then beam slab concreting on pedestal Afterwards, when being not less than 7 days 80% and age that concrete strength is not less than design strength grade point, you can put and open.Jack is delayed Slow gradation oil return is to zero.Repeat above action, lower groove cored slab construction can be carried out.
In a word, the present invention have simple and practical, efficiency and quality good, low production cost, using safety and using effect Really good advantage.

Claims (6)

1. a kind of pre-tensioning system precast beam integral tension system, is made up of pedestal, steel hinge line, jack and stretching oil pump, its It is characterised by:Pre-tensioning system precast beam integral tension system includes central structure, left side structure and right side structure,
Central structure, pedestal is arranged in the middle of the force-transmitting pole of two L-shaped docking, and pedestal is provided with preparation pre-tensioning system precast beam Steel hinge line, anchored end gooseneck and stretching end gooseneck are located at the both sides outer end of force-transmitting pole respectively;
Left side structure, is provided with steel plate, outside anchored end gooseneck between the side of the force-transmitting pole of anchored end gooseneck and respective side Side is provided with the spacing steel plate of anchoring, and on the spacing steel plate of anchoring, each essence of correspondence is pricked whorl brace rod position and is provided with for each essence bundle screw thread even The perforation that extension bar passes through, the one end pricking whorl brace rod positioned at each essence anchoring spacing steel plate end passes through and anchors on spacing steel plate Each perforation is connected with respective nut, each essence prick the other end of whorl brace rod through anchored end gooseneck outside pedestal and Which is provided with anchoring terminal adapter, the termination that essence pricks whorl brace rod is correspondingly arranged with the termination of the steel hinge line of corresponding end;
Right side structure, is provided with steel plate, outside stretching end gooseneck between the side of the force-transmitting pole of stretching end gooseneck and respective side Side is provided with the first spacing steel plate, and on the first spacing steel plate, each first essence of correspondence is pricked whorl brace rod position and is provided with for each first essence Prick the perforation that whorl brace rod passes through, one end that each first essence positioned at the first spacing steel plate end pricks whorl brace rod passes through first Each perforation on spacing steel plate is connected with respective first attaching nut, and the other end that each first essence pricks whorl brace rod passes through to be opened Pull end gooseneck is located at outside pedestal and which is provided with the first adapter, and each first attaching nut passes through respective second adapter Connect one end that each second essence pricks whorl brace rod, the other end that each second essence pricks whorl brace rod is placed through the first spacing steel Each corresponding perforation on movable gooseneck outside plate and the second spacing steel plate is connected with the second attaching nut, movable gooseneck and the The lower end of two spacing steel plates be located at track on, be provided between the both ends of the both ends of movable gooseneck and stretching end gooseneck by The jack that stretching oil pump controls.
2. a kind of pre-tensioning system precast beam integral tension system according to claim 1 it is characterised in that:Described is very heavy It is provided with equal power steel plate between top and the movable gooseneck holding.
3. a kind of pre-tensioning system precast beam integral tension system according to claim 1 it is characterised in that:Described anchoring End gooseneck, stretching end gooseneck, movable gooseneck and pedestal centrage are located along the same line.
4. a kind of pre-tensioning system precast beam integral tension system according to claim 1 it is characterised in that:Described track Parallel with force-transmitting pole, axis.
5. a kind of pre-tensioning system precast beam integral tension system according to claim 1 it is characterised in that:Described anchoring The centrage of end gooseneck, the centrage of stretching end gooseneck, the centrage of movable gooseneck, the centrage of steel hinge line, anchoring The centrage of terminal adapter, essence prick whorl brace rod and first, second essence pricks the centrage of whorl brace rod, the center of jack The centrage of the centrage of line and first, second adapter, the centrage anchoring spacing steel plate and first, second spacing steel plate is equal At grade.
6. a kind of pre-tensioning system precast beam integral tension system according to claim 1 it is characterised in that:Described essence bundle The radical that whorl brace rod, the first essence bundle whorl brace rod, the second essence prick whorl brace rod is identical with the radical of steel hinge line.
CN201510545305.5A 2015-08-31 2015-08-31 Integral tensioning system for pre-tensioning prefabricated beam slab Active CN105155420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510545305.5A CN105155420B (en) 2015-08-31 2015-08-31 Integral tensioning system for pre-tensioning prefabricated beam slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510545305.5A CN105155420B (en) 2015-08-31 2015-08-31 Integral tensioning system for pre-tensioning prefabricated beam slab

Publications (2)

Publication Number Publication Date
CN105155420A CN105155420A (en) 2015-12-16
CN105155420B true CN105155420B (en) 2017-03-01

Family

ID=54796440

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510545305.5A Active CN105155420B (en) 2015-08-31 2015-08-31 Integral tensioning system for pre-tensioning prefabricated beam slab

Country Status (1)

Country Link
CN (1) CN105155420B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110029582B (en) * 2019-05-16 2024-06-11 中铁十五局集团第一工程有限公司 Device and method for synchronous tensioning of double suspenders of tied-arch bridge
CN111456449A (en) * 2020-04-16 2020-07-28 中建四局第六建设有限公司 Construction device and method for guaranteeing uniform stress of each bundle of steel strands through beam body post-tensioning method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5747074A (en) * 1995-02-02 1998-05-05 Ollendick; David P. Apparatus for the manufacturing of prestressed reinforced concrete railroad ties and the like
JP5164004B2 (en) * 2008-05-19 2013-03-13 株式会社ピーエス三菱 Manufacturing method of pretension PC member
CN203284732U (en) * 2013-04-28 2013-11-13 中交第三公路工程局有限公司 Pre-tensioning plate girder track movable steel beam integral tensioning device
CN204183710U (en) * 2014-10-15 2015-03-04 中交四航局第二工程有限公司 A kind of pre-tensioning system makes the stretching bed seat of prestressed girder
CN204339983U (en) * 2014-12-08 2015-05-20 中国十七冶集团有限公司 Pre-tensioning system precast plate girder rod-pulling type integral tension device

Also Published As

Publication number Publication date
CN105155420A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
US9783987B2 (en) Pre-tensioned centrifugal concrete structure with steel strands
CN107849831A (en) Method for carrying out pushing tow/construction bridge using prefabricated panel and steel-pipe concrete truss
CN103255718A (en) Pre-tensioning method plate-beam track movable type steel transverse beam integer tensioning device and tensioning technology
CN105155420B (en) Integral tensioning system for pre-tensioning prefabricated beam slab
CN103306495B (en) Wooden construction truncated cylinder reinforced construction method
CN106544962B (en) The prestress reinforced construction method of concrete structure
CN203583884U (en) Outer climbing frame follow-up type discharging platform
CN104563103A (en) Composite-reinforcement partially-prestressed concrete solid square pile and production method thereof
CN201239993Y (en) Integral tension and relaxation system for pre-tensioned prestressing tension process
CN104652430A (en) Composite reinforcement partially prestressed concrete solid square pile and manufacturing method thereof
CN201738246U (en) Ground prepressing device for continuous beam hanging basket
CN103882856B (en) A kind of pre-tensioning system centrifugal concrete pile and manufacture method with steel strand
CN102776841A (en) Long-span steel truss suspension bridge jointing method and device
CN215289723U (en) Prefabricated bent cap subsection dry joint device
CN203867064U (en) Prestressed double-spliced glued wood beam
CN203049469U (en) Counter weight device for cantilever asymmetrical construction or large-span bridge construction
CN203007839U (en) External prestressed anchor device of CFRP (carbon fiber reinforced polymer) tendon wedge anchor
CN214783932U (en) Concrete pile construction device
CN107503472A (en) A kind of combination type prestressed anchorage
CN204435230U (en) Clip type fixed end ground tackle
CN209584864U (en) Anchor device after a kind of external hanging type for pushing tow steel truss girder
CN203654279U (en) Prestressing force loading device for glass fiber rib anchor rod
CN206173820U (en) Push -pull system is opened to endless chain formula prestressed wire rope automatic synchronization
CN202899173U (en) Tubular pile uplift-resistance test device
CN202194144U (en) Ground pit inclined tension pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant