The anti-solution cavity card pricker system of drill jumbo Download PDF

Info

Publication number
CN204512026U
CN204512026U CN201520100556.8U CN201520100556U CN204512026U CN 204512026 U CN204512026 U CN 204512026U CN 201520100556 U CN201520100556 U CN 201520100556U CN 204512026 U CN204512026 U CN 204512026U
Authority
CN
China
Prior art keywords
valve
propelling
impact
solution cavity
unloading
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201520100556.8U
Other languages
Chinese (zh)
Inventor
秦虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Epiroc Nanjing Construction and Mining Equipment Ltd
Original Assignee
Atlas Copco Nanjing Construction and Mining Equipment Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Atlas Copco Nanjing Construction and Mining Equipment Ltd filed Critical Atlas Copco Nanjing Construction and Mining Equipment Ltd
Priority to CN201520100556.8U priority Critical patent/CN204512026U/en
Application granted granted Critical
Publication of CN204512026U publication Critical patent/CN204512026U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of anti-solution cavity card pricker system of drill jumbo, wherein, advancing selector valve to be arranged between oil hydraulic pump and propelling cylinder, for regulating the working state of propelling cylinder; Reduction valve module installation, between propelling selector valve and propelling cylinder, puts on the propelling pressure of propelling cylinder in order to adjustment; The filler opening of unloading valve is advanced to be arranged between reduction valve module and propelling cylinder, oil outlet connected tank; Impacting selector valve is arranged between oil hydraulic pump and rock drill, to change the working state of the percussive hammer of rock drill; Throttle valve module installation in impact selector valve and rock drill between, in order to adjust the frequency of impact of percussive hammer; The filler opening impacting unloading valve is arranged between throttle valve module and percussive hammer, oil outlet connected tank; First shuttle valve, in order to when the bore bit of rock drill enters solution cavity, makes propelling unloading valve and impact unloading valve connect respective depressurized circuit and carries out release.This system of the present utility model, can prevent solution cavity card pricker.

Description

The anti-solution cavity card pricker system of drill jumbo
Technical field
The utility model relates to drill jumbo field, and specifically, the utility model relates to a kind of anti-solution cavity card pricker system of drill jumbo.
Background technique
Indicate that common card pricker type includes three types in " Lanzhou University of Science & Technology's journal " in June, 2009 (the 35th volume the 3rd phase) in 33rd ~ 38 pages of articles published " the automatic anti-blocking pricker control program of hydraulic gate ": I class card pricker-solution cavity card pricker, II class card pricker-gradual card pricker; III class card pricker-crack card pricker.
About I class card pricker-solution cavity card pricker, according to the record of article, when rock drill bit digs into solution cavity suddenly, bore bit is stuck by the rubble in solution cavity and the card pricker caused, is called " solution cavity card pricker ".When bore bit enters solution cavity district, because rock drill loses suddenly propelling resistance and the rotary resistance moment of rock, cause propelling force and turn pricker moment and can suddenly reduce, advance speed suddenly to increase simultaneously.And when crushed stone generation card pricker in bore bit incision " solution cavity " district is instantaneous, propelling resistance and rotary resistance moment can suddenly increase again.
See Fig. 1, it illustrates the change procedure of solution cavity card pricker, o is true origin, and abscissa t is the time, and y coordinate p is system oil pressure.Wherein, t 0for the card pricker omen point time, t 1for the card pricker appearance point time, t 2pricker and propelling pressure point time is turned for maximum; p tfor creeping into oil pressure, p zfor revolution oil pressure, p z0pricker pressure normal average value is turned, p for stablizing normal rock drilling z1for the critical value of solution cavity card pricker rotation pressure, p zmfor normally turning the maximum oil pressure of pricker.
Solution cavity card pricker be because the rubble in solution cavity bore bit is stuck caused by, and rubble is often stuck in the joint of bore bit and drill steel, and the external diameter because of bore bit is greater than the external diameter of drill steel, so once there is this type of card pricker, bore bit is just difficult to extract.Facts have proved, this type of card pricker is the card pricker fault that a kind of most difficulty is put.
For the problems referred to above, a kind of hydraulic system tool of such card pricker that can prevent is provided to be of great significance.
Model utility content
Technical problem to be solved in the utility model is to provide a kind of anti-solution cavity card pricker system of drill jumbo, and it can prevent the generation of card pricker.
In order to solve the problems of the technologies described above, the utility model have employed following technological scheme: a kind of anti-solution cavity card pricker system of drill jumbo, wherein, the anti-solution cavity card pricker system of this drill jumbo comprises: oil hydraulic pump, rock drill, propelling selector valve, reduction valve module, propelling unloading valve, propelling cylinder, impact selector valve, throttle valve module, impact unloading valve and the first shuttle valve, wherein
Described propelling selector valve is arranged between described oil hydraulic pump and described propelling cylinder, for regulating the working state of described propelling cylinder, to change the position of the described rock drill be connected with its piston rod;
Described reduction valve module installation, between described propelling selector valve and described propelling cylinder, puts on the propelling pressure of described propelling cylinder in order to adjustment;
The filler opening of described propelling unloading valve is arranged between described reduction valve module and described propelling cylinder, oil outlet connected tank;
Described impact selector valve is arranged between described oil hydraulic pump and described rock drill, to change the working state of the percussive hammer of described rock drill;
Described throttle valve module installation between described impact selector valve and described rock drill, in order to adjust the frequency of impact of described percussive hammer;
The filler opening of described impact unloading valve is arranged between described throttle valve module and described percussive hammer, oil outlet connected tank;
A filler opening of described first shuttle valve receives the oil from described propelling selector valve and/or described impact selector valve, another filler opening is arranged between described reduction valve module and described propelling cylinder, its oil outlet is connected with the control port of described propelling unloading valve and the control port of described impact unloading valve respectively, in order to when the bore bit of described rock drill enters solution cavity, make described propelling unloading valve and described impact unloading valve connect respective depressurized circuit and carry out release.
Preferably, the anti-solution cavity card pricker system of this drill jumbo also comprises pressure switch and the second shuttle valve, on the rod chamber oil circuit that two filler openings of described second shuttle valve are connected to described propelling cylinder and rodless cavity oil circuit, oil outlet is connected with described pressure switch, in order to work as described propelling unloading valve and described impact unloading valve off-load alarm.
Preferably, described propelling selector valve and described impact selector valve are three six hand-operated direction valves led to.
Preferably, the throttle valve group that described throttle valve module is formed for two throttle valve parallel connections, and the flow of two described throttle valve is different, by described impact selector valve commutation with the frequency of impact adjusting described percussive hammer.
Preferably, the anti-solution cavity card pricker system of this drill jumbo also comprises relief valve, and described relief valve is connected with the oil outlet of described oil hydraulic pump.
Preferably, between described reduction valve module and described propelling cylinder, propelling pressure table is connected with.
Preferably, between described throttle valve module and described percussive hammer, surge pressure table is connected with.
Preferably, the anti-solution cavity card pricker system of this drill jumbo also comprises on-off control valve, and described on-off control valve is connected to the filler opening place of described propelling unloading valve and described impact unloading valve, in order to control the break-make of described propelling unloading valve and described impact unloading valve.
Further, described on-off control valve is the Solenoid ball valve of two-position four-way.
Preferably, described propelling unloading valve and described impact unloading valve are two position three way directional control valve.
Compared with prior art, the beneficial effects of the utility model are: adopt the first shuttle valve to control propelling unloading valve and impact unloading valve, when rock drill be in standby condition, pre-punching and height raise rush state time, advance unloading valve and impact unloading valve and be subject to the pressure being greater than its spring preset pressure, so remain on the state of not off-load due to control port; And once bore bit enters to solution cavity, then propelling pressure is reduced to lower than spring preset pressure, advances unloading valve to carry out off-load with impact unloading valve, like this, stop when bore bit just enters solution cavity, effectively prevent the generation of card pricker phenomenon.
Accompanying drawing explanation
When Fig. 1 is solution cavity card pricker, revolution oil pressure and the graph of a relation advancing oil pressure;
Fig. 2 is the schematic diagram of the anti-solution cavity card pricker system of drill jumbo of the present utility model, and it is in standby condition;
Fig. 3 is the schematic diagram of the anti-solution cavity card pricker system of drill jumbo of the present utility model, and it is in pre-punching state;
Fig. 4 is the schematic diagram of the anti-solution cavity card pricker system of drill jumbo of the present utility model, and it is in height and raises the state of punching;
Fig. 5 is the schematic diagram of the anti-solution cavity card pricker system of drill jumbo of the present utility model, and it is in touch and gently rushes state;
Fig. 6 is the schematic diagram of the anti-solution cavity card pricker system of drill jumbo of the present utility model, and wherein, rock drill is in fallback state;
Fig. 7 is the structural representation of reduction valve module.
Embodiment
Below, with specific embodiment, the utility model is described in further detail by reference to the accompanying drawings, but not as to restriction of the present utility model.
Mention as background technique part, the card pricker of existing drill jumbo is mainly divided into solution cavity card pricker, gradual card pricker and crack card pricker (in addition, can write see Zhou Zhihong, Ma Fei, Zhang Wenming, Mao Jiling, " Underground Chisel Rock Equipment ", metallurgical industry publishing house, ISBN7-5024-3582-4,113-115 page, the introduction about solution cavity card pricker).This hydraulic system of the present utility model, mainly solves the problem of solution cavity card pricker.Further, this anti-sticking pricker system of the present utility model can be applied to the BOOMER rock drilling series chassis of Atlas Copco, as B281, B282, XL3D, K111, K41 series.Certainly, this anti-sticking pricker system, also by those skilled in the art according to circumstances, and can be applicable to the drill jumbo of other company/models.
The rock drilling mechanism of rock drilling system is: propelling pressure acts on propelling cylinder, and propelling cylinder makes rock drill move; Surge pressure acts on the internal hammer striker of rock drill, percussive hammer is moved back and forth and knocks bit shank to produce shock wave, and drill steel transmits this shock wave to bore bit, and rock contact bore bit is broken.
See Fig. 2, the anti-solution cavity card pricker system of drill jumbo of the present utility model includes oil hydraulic pump (not shown, to represent the oil outlet of oil hydraulic pump with the P in scheming), rock drill 15, advances selector valve 6, reduction valve module 14, advances unloading valve 3, propelling cylinder 8, impacts selector valve 9, throttle valve module, impact unloading valve 4 and the first shuttle valve 5.T in this figure, represents oil sump tank.
The oil outlet P of oil hydraulic pump is communicated with the first branch road A1 and the second branch road A2, and wherein the first branch road A1 is communicated with advancing a filler opening of selector valve 6, and the second branch road A2 is communicated with the filler opening impacting selector valve 9.For avoiding this hydraulic system pressure excessive, be also communicated with relief valve 13 at the oil outlet place of oil hydraulic pump, particularly, this relief valve 13 is communicated in the first branch road A1.
Advancing selector valve 6, be three six-way transfer valves, be arranged between oil hydraulic pump and propelling cylinder 8, for regulating the working state of propelling cylinder 8, thus changing the position of the rock drill 15 be connected with the piston rod of propelling cylinder 8.As shown in FIG., selector valve 6 is advanced to be connected with the first branch road A1 by a filler opening.Selector valve 6 is advanced to have three hydraulic fluid ports away from oil hydraulic pump oil outlet P side, first hydraulic fluid port (being arranged in figure downside) is communicated with by the rodless cavity of oil circuit with propelling cylinder 8, second hydraulic fluid port (being arranged in the middle of figure) is connected with the hydraulic fluid port impacting selector valve 9 by oil circuit, and the 3rd hydraulic fluid port (being arranged in figure upside) is communicated with by the rod chamber of oil circuit with propelling cylinder 8.Advance selector valve 6 can realize different functions by the switching of three working positions, in fig. 2 shown in meta time, this propelling cylinder 8 can be made to be in preparatory work state; To its adjustment make it be in figure the next time, propelling cylinder 8 can be made to be in advanced state; To its adjustment make it be in figure upper time, propelling cylinder 8 can be made to be in the state of returning.The piston rod of propelling cylinder 8 is connected with rock drill 15, for driving rock drill 15 to travel forward, changes its position.
This propelling selector valve 6 can make all more options, such as, be electrically-controlled valve etc., in the utility model, advances selector valve 6 to be hand-operated direction valve, carries out manually-operable Solid rocket engine handle commutate by operator.
For ease of knowing the size of propelling pressure, be communicated with propelling cylinder 8 rodless cavity oil circuit on be communicated with propelling pressure table 16, this propelling pressure table 16 between reduction valve module 14 and propelling cylinder 8, to observe propelling pressure.
Reduction valve module 14 is arranged on and advances between selector valve 6 and propelling cylinder 8, puts on the propelling pressure of propelling cylinder 8 in order to adjustment, and particularly, in the utility model, reduction valve module 14 can by the aperture corrective action of valve in the propelling pressure of propelling cylinder.As shown in FIG., reduction valve module 14 is series on oil circuit, to adjust the oil outlet pressure of oil hydraulic pump, this reduction valve module 14 can make all more options, arrange independent reduction valve or by reduction valve and other valves with the use of, can propelling pressure be adjusted.A kind of situation has been shown in Fig. 7, and wherein, this reduction valve module 14 is chosen as adjustable one way pressure-reducing valve, and it is series in the propelling oil circuit of propelling cylinder 8 by P mouth and R mouth, thus adjusts propelling pressure.
Advance unloading valve 3, its filler opening is arranged on the position between reduction valve module 14 and propelling cylinder 8, and its oil outlet is communicated with fuel tank.In the utility model, this propelling unloading valve 3 is two position three way directional control valve, and a working position, it can off-load, and in another working position, it can not off-load.Further, in the utility model, this propelling unloading valve 3 is controlled by the first shuttle valve 5, when rock drill 15 be in preparation, pre-punching (touching) and high push mode time, this propelling unloading valve 3 all not off-load.As shown in FIG., this propelling unloading valve 3 is hydraulic control pilot valve.
Impact selector valve 9, be arranged between oil hydraulic pump and rock drill 15, to change the working state of the percussive hammer (rock drill internal hammer striker, not shown) of rock drill 15.As shown in FIG., this impact selector valve 9 is also three six-way transfer valves, and it is connected with the second branch road A2 of oil hydraulic pump by a filler opening.Impact selector valve 9, away from advancing the side of selector valve 6, there are three hydraulic fluid ports, first hydraulic fluid port (being arranged in figure downside) is connected with rock drill 15 by impacting oil circuit, second hydraulic fluid port (being arranged in the middle of figure) is connected with a filler opening of the first shuttle valve 5 by oil circuit, 3rd hydraulic fluid port (being arranged in figure upside) is connected with rock drill 15 by impacting oil circuit, connects when the first hydraulic fluid port is different from the 3rd hydraulic fluid port.Percussive hammer can be made to be in the state of impact or to be in the state of not impacting by this impact selector valve 9.
For ease of knowing the size of surge pressure, impact oil circuit is communicated with surge pressure table 17, and further, this surge pressure table 17 position between throttle valve module and percussive hammer, to observe surge pressure.
Similarly, this impact selector valve 9 can make all more options, such as, be electrically-controlled valve etc., and in the utility model, impacting selector valve 9 is hand-operated direction valve, carries out manually-operable impulsive control handle commutate by operator.
Throttle valve module, is arranged at and impacts between selector valve 9 and rock drill 15, in order to adjust the frequency of impact of the percussive hammer of rock drill 15.This throttle valve block coupled in series in impact oil circuit on, to control the frequency of impact of the percussive hammer of rock drill 15.This throttle valve module can make all more options, and such as, the combination of the combination of throttle valve or the valve of other types, as long as it can make when impacting selector valve 9 and commutating, percussive hammer can obtain different frequency of impacts.In the utility model, this throttle valve module is the throttle valve group 7 that two throttle valve are arranged in parallel formation, and the flow of these two throttle valve is different, when impacting selector valve 9 and commutating, makes percussive hammer obtain different frequency of impacts according to throttle flow rate difference.
Particularly, one of them throttle valve 701 is communicated with the first hydraulic fluid port impacting selector valve 9, the percussive hammer of rock drill 15 can be made to impact bit shank with high frequency, and another throttle valve 702 is communicated with the 3rd hydraulic fluid port impacting selector valve 9, and the percussive hammer of rock drill 15 can be made to impact bit shank with low frequency.When impact selector valve 9 carries out position switching, percussive hammer can be made to obtain the oil of different flow, thus obtain different frequency of impacts.These two throttle valve, all can adjust flux, impacts and high frequency impact to adjust low frequency respectively.
Impact selector valve 9 can realize different functions by the switching of three working positions, in fig. 2 shown in upper time, the percussive hammer of rock drill 15 can be made to be in standby condition.Coordinate this throttle valve module to use, when impact selector valve 9 is adjusted to the meta in figure, the percussive hammer of rock drill 15 can be made to be in low frequency impact conditions; When to be adjusted in figure the next, the percussive hammer of rock drill 15 can be made to be in high frequency impact conditions.
Impact unloading valve 4, its filler opening is arranged between throttle valve module (such as, the throttle valve group 7 in the utility model) and the percussive hammer of rock drill 15, oil outlet connected tank.Similarly, this impact unloading valve 4 is two position three way directional control valve, and a working position, it can off-load, and in another working position, it can not off-load.As shown in FIG., this impact unloading valve 4 is hydraulic control pilot valve.
First shuttle valve 5, an one filler opening receives self-propelled selector valve 6 and/or impacts the oil of selector valve 9, another filler opening is arranged between reduction valve module 14 and propelling cylinder 8, its oil outlet is connected with the control port advancing unloading valve 3 and the control port of impacting unloading valve 4 respectively, in order to when the bore bit of rock drill 15 enters solution cavity, make propelling unloading valve 3 and impact unloading valve 4 connect respective depressurized circuit and carry out release.Shown in figure be, a filler opening of the first shuttle valve 5 receives self-propelled selector valve 6 and impacts the oil of selector valve 9, and, advance selector valve 6 when three working positions, this filler opening of first shuttle valve 5 is keep connecting all the time, so, it is easily understood that this filler opening of the first shuttle valve 5 is only subject to the control impacting selector valve 9.Further, in conjunction with this figure, after rock drill starts, only when impacting selector valve 9 and being in the position making percussive hammer high frequency impact, this filler opening is without pressure oil.
But this filler opening of the first shuttle valve 5 only can also be subject to the control advancing selector valve 6 or be subject to advancing selector valve 6 and impacting selector valve 9 simultaneously.Similarly, it also should meet such condition: when action advances selector valve 6 makes rock drill in preparatory work state or pre-punching state with impact selector valve 9, this filler opening exports the pressure oil from the 220bar of oil hydraulic pump, and the delivery pressure as the first shuttle valve 5 participates in advancing unloading valve 3 and the control impacting unloading valve 4; And when action advances selector valve 6 makes rock drill 15 normally advance with rock drilling (height raises punching) with impact selector valve 9, it does not participate in controlling advance unloading valve 3 and impact unloading valve 4 as delivery pressure, now, unloading valve 3 is advanced and impacts unloading valve 4 whether the filler opening of the first shuttle valve 5 between reduction valve module 14 and propelling cylinder 8 is depended in off-load.
As previously mentioned, advance unloading valve 3 to be hydraulic control pilot valve with impact unloading valve 4, it all has control port, and each control port is all connected with the oil outlet of the first shuttle valve 5.When the oil outlet pressure of the first shuttle valve 5 is greater than the spring preset pressure advancing unloading valve 3 with impact unloading valve 4, then advances unloading valve 3 and impact unloading valve 4 switch operating position, being in the state of not off-load.Specifically in the utility model, start at rock drill 15 bore bit started to rock drill 15 and enter in the time between solution cavity, advance unloading valve 3 to be all in the state of not off-load with impact unloading valve 4.In addition, advance unloading valve 3 and the spring preset pressure of impacting unloading valve 4 should be greater than bore bit when entering solution cavity, the propelling pressure of propelling cylinder 8 is (after bore bit enters solution cavity, propelling pressure declines, namely, the pressure of a filler opening of the first shuttle valve 5), ensure in this case, the two all connects release.
In addition, the second branch road A2 is also provided with the first one-way valve 11 and the second one-way valve 12, first one-way valve 11 and is communicated between the second branch road A2 and the filler opening advancing selector valve 6, the second one-way valve 12 serial communication is on the second branch road A2.Like this, fluid can be ensured by oil hydraulic pump to advancing selector valve 6 and impacting the unidirectional output of selector valve 9.
For being convenient to control advance unloading valve 3 and impact unloading valve 4 further, advancing unloading valve 3, the filler opening place impacting unloading valve 4 is provided with on-off control valve, in order to control to advance unloading valve 3 and the break-make of impacting unloading valve 4, when this on-off control valve is connected, unloading valve 3 is advanced to have the possibility of connection with impact unloading valve 4 side.As shown in FIG., this on-off control valve can be chosen as Solenoid ball valve 1, it is two-position four-way valve, two filler openings of this two-position four-way valve are communicated in the rodless cavity oil circuit and impact oil circuit that push away oil cylinder 8 respectively, and two oil outlet is communicated in respectively and advances unloading valve 3 and the filler opening impacting unloading valve 4.When the spool of this Solenoid ball valve 1 is in the first working position (bottom in figure), advance unloading valve 3 all can not connect with impact unloading valve 4; When the spool of this Solenoid ball valve 1 is in the second working position (upper in figure), advance unloading valve 3 may connect with impact unloading valve 4.
Know that the bore bit of rock drill 15 enters solution cavity for ease of operator, the anti-solution cavity card pricker system of this drill jumbo of the present utility model also comprises pressure switch 2 and the second shuttle valve 10, a filler opening of the second shuttle valve 10 is connected to the rod chamber oil circuit of propelling cylinder 8, another filler opening is connected to the rodless cavity oil circuit of propelling cylinder 8, the oil outlet Bonding pressure switch 2 of the second shuttle valve 10, advances unloading valve 3 in order to work as and impacts unloading valve 4 off-load alarm.This pressure switch 2 must depressed, and its electrical contact is normal off state, and under the cooperation of electrical system, the alarm indicator lamp of prevention solution cavity card pricker is in OFF state.
In addition, the RPCI function module 18 in figure and FPCI function module 19 are communicated in the two ends of reduction valve module 14 respectively.RPCI (rotation pressure control impact) function description: rotation pressure raises gradually, the stepless decline of propelling pressure; Rotation pressure exceedes anti-sticking pricker pressure, rock drill rollback.FPCI (feed pressure control impact) function description: raise punching (namely to high thrust during rock drill applying work at height, apply high frequency to percussive hammer to bit shank to impact) when there is card pricker under state, propelling pressure is stepless to be dropped to when being less than 50bar, and HI high impact changes to low impact; After card pricker is eliminated, when propelling pressure is raised to and is greater than 50bar, low impact turns back to HI high impact.This part does not belong to main improvement of the present utility model, therefore no longer launches to describe.
Next, be described in conjunction with the concrete operation of each accompanying drawing to this anti-sticking pricker system of the present utility model.
1) system enters standby condition.
Before drill jumbo starts, the spool impacting selector valve 9 is in figure upper, advances the spool of selector valve 6 to be in meta in figure.
As shown in Figure 2, after drill jumbo starts, hydraulic pump outlet P pressure oil is 220bar.This pressure oil is upper through the spool of overbump selector valve 9, enters the first shuttle valve 5.Thus, the outlet pressure of the first shuttle valve 5 is 220bar, and this 220bar pressure is pilot pressure, makes its spool all be in bottom after the spool promoting to advance unloading valve 3 and impact unloading valve 4 switches.Its effect is, the relief circuit of surge pressure is cut off, and the relief circuit of propelling pressure is also cut off.
Press electrical switch, Solenoid ball valve 1 obtains electric, and propelling pressure is connected and advanced unloading valve 3, and surge pressure is connected and impacted unloading valve 4.But be all in preparation job state owing to advancing unloading valve 3 and impacting unloading valve 4, now the propelling pressure of rock drill 15 and surge pressure are 0bar.
Second shuttle valve 10 is logic component, compares propelling cylinder 8 liang of active chamber input hydraulic fluid port pressure, takes large values as delivery pressure removes pilot pressure switch 2.
Pressure switch 2 is normal off state depressing its electrical contact, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " extinguishing " state.
So, control system " ready " can normally work.
2) the pre-drilling operation of rock drill.
Promote impulsive control handle, make the spool impacting selector valve 9 be in meta.As shown in Figure 3, pressure oil 220bar, by this spool meta, enters the first shuttle valve 5.This 220bar pressure oil connects by this spool meta the throttle valve 702 that throttle valve group 7 is arranged in figure right side simultaneously, makes the internal hammer striker of rock drill 15 impact bit shank operation with low frequency.
Promote Solid rocket engine handle, make to advance the spool of selector valve 6 to be in bottom.As shown in Figure 3, pressure oil flows through RPCI function module 18, reduction valve module 14 and FPCI function module 19, enters the rodless cavity of propelling cylinder 8.Wherein, reduction valve module 14 controls propelling pressure is 40bar.Propelling cylinder 8 carries out propelling operation with 40bar working pressure.Meanwhile, 40bar working pressure enters the first shuttle valve 5.
The oil outlet pressure of the first shuttle valve 5 is 220bar, continue to promote to advance unloading valve 3 and impact unloading valve 4 spool switch and make spool be in bottom, so the relief circuit of surge pressure and propelling pressure is also still in dissengaged positions.
Pressure switch 2 is normal off state depressing its electrical contact, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " extinguishing " state.
So, control system completes rock drill 15 " punching in advance " work (also can be referred to as " touching light punching " operation).
3) rock drill " height raises punching " operation.
Promote impulsive control handle, make the spool impacting selector valve 9 be in bottom.As shown in Figure 4, pressure oil 220bar enter the first shuttle valve 5 path be cut off.This 220bar pressure oil connects by this spool bottom the throttle valve 701 that throttle valve group 7 is arranged in figure left side simultaneously, makes the internal hammer striker of rock drill 15 impact bit shank operation with high frequency.
Promote Solid rocket engine handle, make the spool impacting selector valve 9 be in bottom.As shown in Figure 4, pressure oil flows through RPCI function module 18, reduction valve module 14 and FPCI function module 19, enters the rodless cavity of propelling cylinder 8.Wherein, reduction valve module 14 controls propelling pressure is 65bar.Propelling cylinder 8 carries out propelling operation with 65bar working pressure.Meanwhile, 65bar working pressure enters the first shuttle valve 5.
The oil outlet pressure of the first shuttle valve 5 is 65bar, and the spool continuing to promote to advance unloading valve 3 and impact unloading valve 4 switches, and makes spool be in bottom, so the relief circuit of surge pressure and propelling pressure is also still in dissengaged positions.
Pressure switch 2 is normal off state depressing its electrical contact, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " extinguishing " state.
So, control system completes rock drill 15 " height raises punching " work.
4) solution cavity card pricker state of alarm is prevented.
In operation 3) on basis, bore bit is pouring the moment of " solution cavity ", and the working pressure of propelling cylinder 8 reduces to about 40bar (should be test determination data) instantaneously.
The outlet pressure of the first shuttle valve 5 is 40bar, and this 40bar pressure acts on the spool advancing unloading valve 3 and impact unloading valve 4.But the spring preset pressure advancing unloading valve 3 and impact unloading valve 4 is 50bar, under spring force, unloading valve 3 is advanced to be in upper with the spool impacting unloading valve 4.Its effect is, the relief circuit of surge pressure is switched on, and the relief circuit of propelling pressure is also switched on.
Further effect is, propelling cylinder 8 stops advancing, and the internal hammer striker of rock drill 15 stops impacting bit shank operation simultaneously.Propelling pressure becomes 0bar, and surge pressure becomes 0bar.
Pressure switch 2 its electrical contact under decompression is normal open state, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " shinny " state, alert, and the bore bit of rock drill 15 enters solution cavity.
So, control system makes rock drill 15 be in " prevention solution cavity card pricker " working state.
5) system reset is to " touching light punching " job state.
This operation and operation 2) similar, promote impulsive control handle, make the spool impacting selector valve 9 be in meta.As shown in Figure 5, oil hydraulic pump oil outlet pressure is 220bar.This pressure oil, by impacting the spool meta of selector valve 9, enters into the first shuttle valve 5.
Promote Solid rocket engine handle, make to advance the spool of selector valve 6 to be in bottom.As previously mentioned, after reduction valve module 14, propelling pressure becomes 40bar.
The oil outlet pressure of the first shuttle valve 5 is 220bar, and this 220bar pressure is pilot pressure, makes spool be in bottom after the spool promoting to advance unloading valve 3 and impact unloading valve 4 switches.Its effect is, the relief circuit of surge pressure is cut off, and the relief circuit of propelling pressure is also cut off.
Pressure switch 2 is normal off state depressing its electrical contact, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " extinguishing " state.
So, control system makes rock drill 15 be in " touching light punching " working state.
6) deslagging operation is carried out in " touching light punching " working state.
In operation 5) state under, now propelling pressure is 40bar.Promote Solid rocket engine handle back and forth, advance the spool of selector valve 6 to switch between the next (as shown in Figure 5) and upper (as shown in Figure 6), propelling cylinder 8 makes the bore bit of rock drill 15 move back and forth with " solution cavity " switching phase place in rock stratum.Its effect is, rock drill bit is got rid of rock stratum in time and is cut with the rock at " solution cavity " switching phase place, eliminates the influence factor making drill steel deflection.
Pressure switch 2 is normal off state depressing its electrical contact, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " extinguishing " state.
So, control system makes rock drill 15 carry out " deslagging " operation at switching phase place.
7) cross in " solution cavity district " in " touching light punching " working state.
In operation 5) state under, now propelling pressure is 40bar.Control propelling cylinder 8 to continue to advance, bore bit starts to enter " solution cavity " district's operation.Under " touching light punching ", bore bit is relatively easily crossed " solution cavity " Ka Qianqu.
Because " solution cavity " rock stratum, district or stone distribute loose, rock drill 15 fltting speed is relatively very fast.When rock drill 15 fltting speed is from fast to slow, result shows that now bore bit is crossed " solution cavity " district.
Pressure switch 2 is normal off state depressing its electrical contact, and under the cooperation of electrical system, " prevention solution cavity card pricker " alarm indicator lamp is in " extinguishing " state.
So, control system makes rock drill 15 complete " solution cavity is interval " and passes through operation.
This system of the present utility model, before generation card pricker, namely stops the propelling of rock drill and impacts operation, effectively can avoid the generation of solution cavity card pricker.In addition, the boring due to solution cavity district is difficult to embark on journey, and the explosive that explosive loading truck loads in solution cavity district is also difficult to be shaped.Utilize the utility model, during bore bit operation, also can stop creeping in initiative recognition solution cavity district, like this, explosive can be loaded in non-solution cavity district by controlled loading of explosive car, improve the utilization ratio of explosive.
Above embodiment is only exemplary embodiment of the present utility model, is not used in restriction the utility model, and protection domain of the present utility model is defined by the claims.Those skilled in the art can in essence of the present utility model and protection domain, and make various amendment or equivalent replacement to the utility model, this amendment or equivalent replacement also should be considered as dropping in protection domain of the present utility model.

Claims (10)

1. the anti-solution cavity card pricker system of a drill jumbo, it is characterized in that, comprise: oil hydraulic pump, rock drill, propelling selector valve, reduction valve module, propelling unloading valve, propelling cylinder, impact selector valve, throttle valve module, impact unloading valve and the first shuttle valve, wherein
Described propelling selector valve is arranged between described oil hydraulic pump and described propelling cylinder, for regulating the working state of described propelling cylinder, to change the position of the described rock drill be connected with its piston rod;
Described reduction valve module installation, between described propelling selector valve and described propelling cylinder, puts on the propelling pressure of described propelling cylinder in order to adjustment;
The filler opening of described propelling unloading valve is arranged between described reduction valve module and described propelling cylinder, oil outlet connected tank;
Described impact selector valve is arranged between described oil hydraulic pump and described rock drill, to change the working state of the percussive hammer of described rock drill;
Described throttle valve module installation between described impact selector valve and described rock drill, in order to adjust the frequency of impact of described percussive hammer;
The filler opening of described impact unloading valve is arranged between described throttle valve module and described percussive hammer, oil outlet connected tank;
A filler opening of described first shuttle valve receives the oil from described propelling selector valve and/or described impact selector valve, another filler opening is arranged between described reduction valve module and described propelling cylinder, its oil outlet is connected with the control port of described propelling unloading valve and the control port of described impact unloading valve respectively, in order to when the bore bit of described rock drill enters solution cavity, make described propelling unloading valve and described impact unloading valve connect respective depressurized circuit and carry out release.
2. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, it is characterized in that, also comprise pressure switch and the second shuttle valve, on the rod chamber oil circuit that two filler openings of described second shuttle valve are connected to described propelling cylinder and rodless cavity oil circuit, oil outlet is connected with described pressure switch, in order to work as described propelling unloading valve and described impact unloading valve off-load alarm.
3. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, is characterized in that, described propelling selector valve and described impact selector valve are three six logical hand-operated direction valves.
4. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, it is characterized in that, the throttle valve group that described throttle valve module is formed for two throttle valve parallel connections, and the flow of two described throttle valve is different, by described impact selector valve commutation with the frequency of impact adjusting described percussive hammer.
5. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, it is characterized in that, also comprise relief valve, described relief valve is connected with the oil outlet of described oil hydraulic pump.
6. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, is characterized in that, between described reduction valve module and described propelling cylinder, be connected with propelling pressure table.
7. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, is characterized in that, between described throttle valve module and described percussive hammer, be connected with surge pressure table.
8. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, it is characterized in that, also comprise on-off control valve, described on-off control valve is connected to the filler opening place of described propelling unloading valve and described impact unloading valve, in order to control the break-make of described propelling unloading valve and described impact unloading valve.
9. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 8, it is characterized in that, described on-off control valve is the Solenoid ball valve of two-position four-way.
10. the anti-solution cavity card pricker system of drill jumbo as claimed in claim 1, it is characterized in that, described propelling unloading valve and described impact unloading valve are two position three way directional control valve.
CN201520100556.8U 2015-02-11 2015-02-11 The anti-solution cavity card pricker system of drill jumbo Withdrawn - After Issue CN204512026U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520100556.8U CN204512026U (en) 2015-02-11 2015-02-11 The anti-solution cavity card pricker system of drill jumbo

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520100556.8U CN204512026U (en) 2015-02-11 2015-02-11 The anti-solution cavity card pricker system of drill jumbo

Publications (1)

Publication Number Publication Date
CN204512026U true CN204512026U (en) 2015-07-29

Family

ID=53710008

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520100556.8U Withdrawn - After Issue CN204512026U (en) 2015-02-11 2015-02-11 The anti-solution cavity card pricker system of drill jumbo

Country Status (1)

Country Link
CN (1) CN204512026U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653529A (en) * 2015-02-11 2015-05-27 阿特拉斯科普柯(南京)建筑矿山设备有限公司 System of drill jumbo for preventing drill bit from being stuck in karst cave
CN105332967A (en) * 2015-12-11 2016-02-17 重庆纳川山隅重工设备有限公司 Self-adaptive valve bank for rock drilling machine
CN107131164A (en) * 2017-05-23 2017-09-05 上海应用技术大学 The hydraulic control system and method for elevating mechanism
CN107143537A (en) * 2017-05-19 2017-09-08 湖南文理学院 A kind of hydraulic gate test hydraulic system
CN107939757A (en) * 2017-12-29 2018-04-20 徐州徐工铁路装备有限公司 A kind of rock drilling control system of drill jumbo
CN108194444A (en) * 2018-03-20 2018-06-22 马鞍山唐拓凿岩机械有限公司 The blank-run prevention hydraulic system and its control method of a kind of top hammer drilling machine
CN108457920A (en) * 2016-09-27 2018-08-28 陈晓辉 A kind of anti-deflection control method
CN112727818A (en) * 2020-12-25 2021-04-30 中铁工程装备集团隧道设备制造有限公司 Hydraulic control system of rock drill
CN112983907A (en) * 2021-04-27 2021-06-18 中国铁建重工集团股份有限公司 Rock drilling impact hydraulic control system

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104653529A (en) * 2015-02-11 2015-05-27 阿特拉斯科普柯(南京)建筑矿山设备有限公司 System of drill jumbo for preventing drill bit from being stuck in karst cave
CN105332967A (en) * 2015-12-11 2016-02-17 重庆纳川山隅重工设备有限公司 Self-adaptive valve bank for rock drilling machine
CN108457920B (en) * 2016-09-27 2019-10-18 罗春华 A kind of anti-deflection control method
CN108457920A (en) * 2016-09-27 2018-08-28 陈晓辉 A kind of anti-deflection control method
CN107143537B (en) * 2017-05-19 2018-07-06 湖南文理学院 A kind of hydraulic gate test hydraulic system
CN107143537A (en) * 2017-05-19 2017-09-08 湖南文理学院 A kind of hydraulic gate test hydraulic system
CN107131164A (en) * 2017-05-23 2017-09-05 上海应用技术大学 The hydraulic control system and method for elevating mechanism
CN107939757A (en) * 2017-12-29 2018-04-20 徐州徐工铁路装备有限公司 A kind of rock drilling control system of drill jumbo
CN107939757B (en) * 2017-12-29 2024-03-12 徐州徐工能源装备有限公司 Rock drilling control system of drill jumbo
CN108194444A (en) * 2018-03-20 2018-06-22 马鞍山唐拓凿岩机械有限公司 The blank-run prevention hydraulic system and its control method of a kind of top hammer drilling machine
CN108194444B (en) * 2018-03-20 2024-02-13 马鞍山唐拓凿岩机械有限公司 Anti-idle-drilling hydraulic system of top hammer drilling machine and control method thereof
CN112727818A (en) * 2020-12-25 2021-04-30 中铁工程装备集团隧道设备制造有限公司 Hydraulic control system of rock drill
CN112983907A (en) * 2021-04-27 2021-06-18 中国铁建重工集团股份有限公司 Rock drilling impact hydraulic control system

Similar Documents

Publication Publication Date Title
CN204512026U (en) The anti-solution cavity card pricker system of drill jumbo
EP2597211B1 (en) Hydraulic excavator
CN103821451B (en) Hydraulic control system of anti-clamping drill rod of rock drilling machine
CN107939757B (en) Rock drilling control system of drill jumbo
CN104653529A (en) System of drill jumbo for preventing drill bit from being stuck in karst cave
WO2020119691A1 (en) Drilling jumbo and advancing hydraulic control system therefor
CN103649559A (en) Flow control valve for construction machinery
CN203716837U (en) Anti-clamping bit hydraulic control system for rock drill
CN104358285B (en) The energy-saving turntable drive system of excavator based on double motor and hydraulic accumulator
CN102606555A (en) Integrated linkage control valve bank for all-hydraulic coal mine drill
CN102383778B (en) Logic control loop for rock drilling operations of hydraulic rock drilling machine
CN102425401A (en) Electro-hydraulic logic control loop of rock drilling actions of hydraulic rock drilling machine
CN204266285U (en) Based on the energy-saving turntable drive system of the excavator of double motor and hydraulic accumulator
CN106949108A (en) Rock drill air defense impact Hydraulic system and control method
CN203272767U (en) Multifunctional electro-hydraulic control operating valve
CN103726784B (en) Hydraulic drill rig Solid rocket engine impacts hydraulic circuit and control method thereof
CN201884369U (en) Automatic hydraulic oil way switching device
CN203546778U (en) Hydraulic system and excavator
CN205153022U (en) Hydraulic shovel miscellaneous function control system
CN103148036A (en) Hydraulic valve
CN205243995U (en) Hydraulic pressure rock drilling machine bores valves
CN209430110U (en) A kind of churning driven based on degeneration factor knocks soil and reinforces intelligence control system
CN203948357U (en) A kind of jumbolter hydraulic oil pipe system
CN217354959U (en) Rock drilling propulsion system controlled by electro-hydraulic proportional valve
KR101004920B1 (en) Regenerative devices in hydraulic cylinders of construction machinery

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20150729

Effective date of abandoning: 20160817