CN204510289U - A kind of novel flood control earthquake-resistant building structure - Google Patents
A kind of novel flood control earthquake-resistant building structure Download PDFInfo
- Publication number
- CN204510289U CN204510289U CN201520021595.9U CN201520021595U CN204510289U CN 204510289 U CN204510289 U CN 204510289U CN 201520021595 U CN201520021595 U CN 201520021595U CN 204510289 U CN204510289 U CN 204510289U
- Authority
- CN
- China
- Prior art keywords
- operation platform
- layer
- intermediate layer
- protective case
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of novel flood control earthquake-resistant building structure, comprise building, described building is positioned in three part of the foundation foundation structures.The utility model structure is simple, be easy to construction, between building and foundation structure, buffer intermediate layer is set, when there is earthquake, the active force that seismic wave produces can not be transferred in operation platform layer by safe protective case bottom, ballast can balance the weight distribution of operation platform layer simultaneously, and further ensure the stable of building, linkage further increases the intensity of three part of the foundation foundation structures; When there is flood, a large amount of rainwater enters in buffer intermediate layer, and by the elongation of tension cables while increasing buoyancy, the height of support of buildings raises, and effectively serves the effect of flood control.
Description
Technical field
The utility model relates to building structure, is specifically related to novel flood control earthquake-resistant building structure.
Background technology
The infringement that earthquake and flood cause is often comparatively large, and the reconstruction after calamity and reparation need fund and the labour of at substantial; And the prior art of flood control and disaster reduction mainly improves depth of building and builds flood control dam, and the method improving depth of building is unsatisfactory, only for for small-sized building structure, the financial cost of building and safeguarding of dykes and dams is high, take large-area soil, and be easy to when earthquake occurs breach a dyke or cave in; In heavy construction structure, usually adopt base isolation or vibration damping vibrating isolation system, to alleviate seismic damage, and usually do not adopt the isolation structure that cost is high in middle-size and small-size building structure, be therefore vulnerable to destroy in earthquake.
Utility model content
For the problems referred to above, it is relatively low that problem to be solved in the utility model is to provide a kind of cost, not only can control flood but also can antidetonation, on the building structure of intensity without impact.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is, a kind of novel flood control earthquake-resistant building structure, comprises building and three part of the foundation foundation structures, and described building is positioned in three part of the foundation foundation structures; Described three part of the foundation foundation structures comprise safe protective case bottom, buffer intermediate layer and operation platform layer, described building is positioned on operation platform layer, described operation platform layer is embedded in buffer intermediate layer, operation platform layer is concordant with the upper surface of buffer intermediate layer, buffer intermediate layer is positioned at safe protective case bottom, and the bottom surface of buffer intermediate layer is connected with the end face of safe protective case bottom; Separated by a distance with the bottom of buffer intermediate layer bottom described operation platform layer, described buffer intermediate layer is provided with linkage, connection construction podium level and safe protective case bottom; Described safe protective case bottom cross section is ︺ shape, the rectangle of upper end open or the shape of other upper end open, and form surrounding sidewall, be provided with interval between the inner surface of described sidewall and the side of operation platform layer, constructability podium level moves on safe protective case bottom; Be provided with sensing device and the ballast for distributed weight in described operation platform layer, described ballast is connected with trigger, and described sensing device, trigger are all connected with control unit; Described ballast is arranged with ballast box, and described trigger is connected with ballast box.
As preferably, liquid material in described ballast box, after sensing device senses the angle of inclination of operation platform layer, transmission angle of inclination information is in control unit, control unit regulates liquid material in ballast in a ballast box in another ballast box by control trigger, thus regulate the balance of operation platform layer, ensure the stable of building.
As preferably, be provided with tension cables between described operation platform layer and safe protective case bottom, described tension cables is elasticity hawser, and when there is not earthquake or big flood, described tension cables is in nature extended length.
As preferably, described buffer intermediate layer is liquid buoyancy layer, buoyant gas layer or solid buoyancy layer, and the buoyancy of formation is more than or equal to the weight of building and operation platform.
As preferably, when buffer intermediate layer is liquid buoyancy layer, usually selects water to fill buffer intermediate layer, can additive be increased, use as increase buoyancy; Simultaneous buffering intermediate layer also can be used for storing water for fire extinguishing, drinking water or buck etc.
As preferably, when buffer intermediate layer is solid buoyancy layer, closed-cell foam material is often selected to fill buffer intermediate layer.
As preferably, described linkage is lightweight flexible supporting part, can arrange multiple; Described trigger and ballast box number correspondent equal.
As preferably, can arrange rotational structure in described operation platform layer, building can be rotated within the specific limits, building can rotate with sunshine direction, has practicality, views and admires and energy-efficient performance.
The utility model beneficial effect, the utility model structure is simple, be easy to construction, between building and foundation structure, buffer intermediate layer is set, when there is earthquake, the active force that seismic wave produces can not be transferred in operation platform layer by safe protective case bottom, buffer intermediate layer reduces the active force that seismic wave produces greatly, operation platform layer is removable in buffer intermediate layer, ballast can balance the weight distribution of operation platform layer simultaneously, further ensure the stable of building, linkage further increases the intensity of three part of the foundation foundation structures; When there is flood, a large amount of rainwater enters in buffer intermediate layer, increases the buoyancy of three part of the foundation foundation structures, and tension cables is extended, and the height of support of buildings raises, and effectively serves the effect of flood control; The utility model structure is not limited only to, for small and medium construction thing structure, also can be used in building structure.
Accompanying drawing explanation
Fig. 1 is the utility model structural section schematic diagram
Wherein, building 18, three part of the foundation foundation structure 10, safe protective case bottom 12, liquid intermediate layer 14, operation platform layer 16, lightweight flexible supporting part 46, ballast 54, first trigger 55a, the second trigger 55b, the first ballast box 56a, the second ballast box 56b,
Fig. 2 is the utility model structure top view
Wherein, building 18, safe protective case bottom 12, liquid intermediate layer 14, operation platform layer 16, sensing 42, central point 44, tension lines 58
Detailed description of the invention
By reference to the accompanying drawings, the utility model structure is described further.
A kind of novel flood control earthquake-resistant building structure, comprise building 18, three part of the foundation foundation structure 10, described building 18 is positioned in three part of the foundation foundation structures 10; Described three part of the foundation foundation structures 10 comprise safe protective case bottom 12, liquid intermediate layer 14 and operation platform layer 16, described building 18 is positioned on operation platform layer 16, described operation platform layer 16 is embedded in liquid intermediate layer 14, operation platform layer 16 is concordant with the upper surface in liquid intermediate layer 14, liquid intermediate layer 14 is positioned at safe protective case bottom 12, and the bottom surface in liquid intermediate layer 14 is connected with the end face of safe protective case bottom 12; Space is provided with bottom described operation platform layer 16 and between the bottom in liquid intermediate layer 14; Lightweight flexible supporting part 46 is provided with, connection construction podium level 16 and safe protective case bottom 12 in described liquid intermediate layer 14; Described safe protective case bottom 12 cross section is the rectangle of upper end open, and form surrounding sidewall, be provided with interval between the inner surface of described sidewall and the side of operation platform layer 16, constructability podium level 16 moves on safe protective case bottom 12; Be provided with sensing device and the ballast 54 for distributed weight in described operation platform layer 16, described ballast 54 is connected with trigger, and described sensing device, trigger are all connected with control unit; The two ends symmetry of described ballast 54 is respectively provided with a ballast box, be respectively the first ballast box 56a and the second ballast box 56b, described trigger comprises the first trigger 55a and the second trigger 55b, described first trigger 55a is connected with the first ballast box 56a, and described second trigger 55b is connected with the second ballast box 56b.
Further, be liquid material in described first ballast box 56a and the second ballast box 56b, the upper end of the first ballast box 56a and the second ballast box 56b is opening in communication; The angle of inclination of sensing device induction operation platform layer 16, transmission angle of inclination information is in control unit, control unit is by causing the distribution of the liquid material in the ballast box in trigger adjustment ballast 54, in first ballast box 56a (the second ballast box 56b), liquid material is adjusted in the second ballast box 56b (the first ballast box 56a), thus regulate the balance of operation platform layer 16, ensure the stable of building 18.
Further, the buoyancy that described liquid intermediate layer 14 is formed is more than or equal to the weight of building 18 and operation platform 16.
Further, arrange rotational structure in described operation platform layer 16, building 18 centrally can be put 44 and rotate along pointing to 42 directions.
Further, the corner place of described operation platform layer 16 is equipped with flexible tension lines 58, and described tension lines 58 is connected with the correspondence direction angle place of operation platform layer 16.
Claims (4)
1. a novel flood control earthquake-resistant building structure, comprises building, sensing device, control unit and trigger, it is characterized in that: described building is positioned in three part of the foundation foundation structures; Described three part of the foundation foundation structures comprise safe protective case bottom, buffer intermediate layer and operation platform layer, described building is positioned on operation platform layer, described operation platform layer is embedded in buffer intermediate layer, operation platform layer is concordant with the upper surface of buffer intermediate layer, buffer intermediate layer is positioned at safe protective case bottom, and the bottom surface of buffer intermediate layer is connected with the end face of safe protective case bottom; Above the bottom being positioned at buffer intermediate layer bottom described operation platform layer; Described buffer intermediate layer is provided with linkage, connection construction podium level and safe protective case bottom; The space of constructability podium level movement on safe protective case bottom is provided with between the surrounding side wall inner surfaces of described safe protective case bottom and the side of operation platform layer; Be provided with the ballast for distributed weight in described operation platform layer, described sensing device is positioned at operation platform layer, and described ballast is arranged with ballast box, and the upper end open of described ballast box is communicated with; Described trigger is connected with ballast box; Described sensing device, trigger are all connected with control unit, the angle of inclination information transmission of operation platform layer of sensing device induction is in control unit, and control unit causes the redistribution of liquid material in trigger actuation ballast box and regulates the balance of operation platform layer.
2. the novel flood control earthquake-resistant building structure of one according to claim 1, is characterized in that: described safe protective case bottom cross section is the rectangle of ︺ shape or upper end open.
3. the novel flood control earthquake-resistant building structure of one according to claim 1, is characterized in that: be provided with the elasticity tension hawser be fixedly connected with between described operation platform layer with safe protective case bottom.
4. the novel flood control earthquake-resistant building structure of one according to claim 1, is characterized in that: described buffer intermediate layer is liquid buoyancy layer, buoyant gas layer or solid buoyancy layer, and its buoyancy formed is more than or equal to the weight of building and operation platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520021595.9U CN204510289U (en) | 2015-01-13 | 2015-01-13 | A kind of novel flood control earthquake-resistant building structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520021595.9U CN204510289U (en) | 2015-01-13 | 2015-01-13 | A kind of novel flood control earthquake-resistant building structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204510289U true CN204510289U (en) | 2015-07-29 |
Family
ID=53708281
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520021595.9U Expired - Fee Related CN204510289U (en) | 2015-01-13 | 2015-01-13 | A kind of novel flood control earthquake-resistant building structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204510289U (en) |
-
2015
- 2015-01-13 CN CN201520021595.9U patent/CN204510289U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2018095304A1 (en) | Movable ballast leveling control device for use in floating wind turbine | |
CN203603292U (en) | Built-in-impeller type tuning liquid damper | |
CN104890830A (en) | Control system for stabilizing and reducing swing through tuning heaving plate of deep-water dynamic-positioning semi-submersible platform | |
DE602006004581D1 (en) | FLOOD BARRIER | |
CN102561174B (en) | Green shock and vibration absorbing bridge tower | |
CN204590738U (en) | A kind of flood control earthquake-resistant building structure | |
CN105961224A (en) | Assembled-type cement pier anchoring system for net cage fixation | |
CN105297764A (en) | Offshore wind plant fan single pile foundation and construction method thereof | |
CN204510289U (en) | A kind of novel flood control earthquake-resistant building structure | |
CN205012352U (en) | Sheet pile supporting construction with stagnant water function | |
KR101383159B1 (en) | Gravity type slab foundation for offshore wind power | |
JP6075953B2 (en) | Seismic isolation structure | |
CN102912811B (en) | Multi-base gravity type base structure | |
CN204803913U (en) | Take raft board combined type marine wind power fan single pile basis | |
JP2015190186A (en) | Floatation standing type tsunami protection breakwater | |
CN204174524U (en) | Bridge flood fighting buffering triangle watch box | |
CN216839222U (en) | Flexible energy dissipation anti-scouring device for offshore wind power single-pile foundation | |
CN206885289U (en) | It is a kind of to be applied to marine basis | |
CN207904950U (en) | A kind of anti-seismic construction pile | |
CN202577646U (en) | Building anti-seismic device | |
CN101769086B (en) | Earthquake resistant building structure with low carbon emission | |
CN204606161U (en) | Deep water dynamic positioning semisubmersible platform is tuning to hang down and swings plate and subtract to shake to subtract and swing control system | |
CN203755279U (en) | Self-resetting ocean platform based on tuned mass damper and swing wall | |
CN201212149Y (en) | Large earthquake resistance foundation structure of buildings | |
JP6021175B2 (en) | Wave power generation system and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150729 Termination date: 20160113 |