CN204510172U - A kind of pipe laying formula hydroelectric installation - Google Patents

A kind of pipe laying formula hydroelectric installation Download PDF

Info

Publication number
CN204510172U
CN204510172U CN201520156141.2U CN201520156141U CN204510172U CN 204510172 U CN204510172 U CN 204510172U CN 201520156141 U CN201520156141 U CN 201520156141U CN 204510172 U CN204510172 U CN 204510172U
Authority
CN
China
Prior art keywords
pipe
sewer pipe
lower support
parallel
support rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520156141.2U
Other languages
Chinese (zh)
Inventor
宋俊文
高佳
张海鹏
余楚轲
王小娟
张志钟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meiyan Jixiang Hydropower Co Ltd
Original Assignee
Guangdong Meiyan Jixiang Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Meiyan Jixiang Hydropower Co Ltd filed Critical Guangdong Meiyan Jixiang Hydropower Co Ltd
Priority to CN201520156141.2U priority Critical patent/CN204510172U/en
Application granted granted Critical
Publication of CN204510172U publication Critical patent/CN204510172U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model relates to the technical field of water-power plant, particularly relate to a kind of pipe laying formula hydroelectric installation, pipe laying formula hydroelectric installation of the present utility model carries out hydroelectric generation by pipe laying diversion, thus effectively can avoid obstacle, and then strengthens adaptive capacity, comprise water-power plant, also comprise reservoir, first sewer pipe, parallel pipe, second sewer pipe and bracing frame, bracing frame comprises below platform and upper stage, the bottom of below platform is provided with supporting leg, the top of below platform is provided with lower support rod, the bottom of upper stage is provided with support stick, also comprise sleeve pipe, the inside of sleeve pipe is provided with female thread structure, the bottom of upper support stick and the top of lower support rod are provided with external thread structure, the bottom of upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, parallel pipe is fixed on the top of upper stage, and the water level of parallel pipe is lower than the water level of reservoir.

Description

A kind of pipe laying formula hydroelectric installation
Technical field
The utility model relates to the technical field of water-power plant, particularly relates to a kind of pipe laying formula hydroelectric installation.
Background technology
As everyone knows, water-power plant is the power station that kinetic energy that the powerful current utilizing water-head to produce have carries out generating electricity, and is called for short in " power station "; Utilize the water in river can promote hydraulic turbine drive electrical generators group and the industrial enterprise generated electricity.Advantage: low, free from environmental pollution without fuel, cost, electromechanical equipment manufacture simple, flexible operation etc.; Generate electricity simultaneously hydraulic structure can with control flood, irrigate, feed water, shipping, the cause such as cultivation be combined, implementation water resource fully utilizes; Shortcoming: capital investment is large, the construction period is long, by natural conditions limitation etc.; Existing hydroelectric installation finds in use, can only arrange hydroelectric generator when it carries out hydroelectric generation in fixed location, thus causes its adaptive capacity poor.
Summary of the invention
For solving the problems of the technologies described above, the utility model provides a kind of and carries out hydroelectric generation by pipe laying diversion, thus effectively can avoid obstacle, and then strengthens the pipe laying formula hydroelectric installation of adaptive capacity.
Pipe laying formula hydroelectric installation of the present utility model, comprise water-power plant, also comprise reservoir, first sewer pipe, parallel pipe, second sewer pipe and bracing frame, the top of described first sewer pipe is communicated with reservoir, the described bottom of the first sewer pipe is communicated with the left end of parallel pipe, the described top of the second sewer pipe is communicated with the right-hand member of parallel pipe, the bottom of described second sewer pipe is communicated with water-power plant, support frame as described above comprises below platform and upper stage, the bottom of described below platform is provided with supporting leg, the top of described below platform is provided with lower support rod, the bottom of described upper stage is provided with support stick, also comprise sleeve pipe, the inside of described sleeve pipe is provided with female thread structure, the bottom of described upper support stick and the top of lower support rod are provided with external thread structure, the bottom of described upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, described parallel pipe is fixed on the top of upper stage, and the water level of described parallel pipe is lower than the water level of reservoir.
Pipe laying formula hydroelectric installation of the present utility model, described upper support stick, lower support rod and sleeve pipe are two groups, and support stick is arranged on left side and the right side of upper stage bottom respectively on two groups, two groups of lower support rods are arranged on left side and the right side on platform top, below respectively.
Pipe laying formula hydroelectric installation of the present utility model, also comprises upper hose, and described upper hose and the second sewer pipe are all fixed on supporting leg, and the bottom of described upper hose is communicated with the left end of parallel pipe with the bottom of the first sewer pipe respectively with top.
Compared with prior art the beneficial effects of the utility model are: by above-mentioned setting, obstruction can be got around by the cooperation of the first sewer pipe, parallel pipe, the second sewer pipe and bracing frame, and carried out the adjustment of upper stage and below platform distance by revoling tube, and then reach and longitudinally adjust object.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model is described in further detail.Following examples for illustration of the utility model, but are not used for limiting scope of the present utility model.
As shown in Figure 1, pipe laying formula hydroelectric installation of the present utility model, comprise water-power plant 1, also comprise reservoir 2, first sewer pipe 3, parallel pipe 4, second sewer pipe 5 and bracing frame, the top of the first sewer pipe is communicated with reservoir, the bottom of the first sewer pipe is communicated with the left end of parallel pipe, the top of the second sewer pipe is communicated with the right-hand member of parallel pipe, the bottom of the second sewer pipe is communicated with water-power plant, bracing frame comprises below platform 6 and upper stage 7, the bottom of below platform is provided with supporting leg 8, the top of below platform is provided with lower support rod 9, the bottom of upper stage is provided with support stick 10, also comprise sleeve pipe 11, the inside of sleeve pipe is provided with female thread structure, the bottom of upper support stick and the top of lower support rod are provided with external thread structure, the bottom of upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, parallel pipe is fixed on the top of upper stage, and the water level of parallel pipe is lower than the water level of reservoir, by above-mentioned setting, obstruction can be got around by the cooperation of the first sewer pipe, parallel pipe, the second sewer pipe and bracing frame, and carry out the adjustment of upper stage and below platform distance by revoling tube, and then reach and longitudinally adjust object.
Pipe laying formula hydroelectric installation of the present utility model, upper support stick, lower support rod and sleeve pipe are two groups, and support stick is arranged on left side and the right side of upper stage bottom respectively on two groups, two groups of lower support rods are arranged on left side and the right side on platform top, below respectively.
Pipe laying formula hydroelectric installation of the present utility model, also comprises upper hose 12, and upper hose and the second sewer pipe are all fixed on supporting leg, and the bottom of upper hose is communicated with the left end of parallel pipe with the bottom of the first sewer pipe respectively with top.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.

Claims (3)

1. a pipe laying formula hydroelectric installation, comprise water-power plant, it is characterized in that, also comprise reservoir, first sewer pipe, parallel pipe, second sewer pipe and bracing frame, the top of described first sewer pipe is communicated with reservoir, the described bottom of the first sewer pipe is communicated with the left end of parallel pipe, the described top of the second sewer pipe is communicated with the right-hand member of parallel pipe, the bottom of described second sewer pipe is communicated with water-power plant, support frame as described above comprises below platform and upper stage, the bottom of described below platform is provided with supporting leg, the top of described below platform is provided with lower support rod, the bottom of described upper stage is provided with support stick, also comprise sleeve pipe, the inside of described sleeve pipe is provided with female thread structure, the bottom of described upper support stick and the top of lower support rod are provided with external thread structure, the bottom of described upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, described parallel pipe is fixed on the top of upper stage, and the water level of described parallel pipe is lower than the water level of reservoir.
2. pipe laying formula hydroelectric installation as claimed in claim 1, it is characterized in that, described upper support stick, lower support rod and sleeve pipe are two groups, and support stick is arranged on left side and the right side of upper stage bottom respectively on two groups, two groups of lower support rods are arranged on left side and the right side on platform top, below respectively.
3. pipe laying formula hydroelectric installation as claimed in claim 2, it is characterized in that, also comprise upper hose, described upper hose and the second sewer pipe are all fixed on supporting leg, and the bottom of described upper hose is communicated with the left end of parallel pipe with the bottom of the first sewer pipe respectively with top.
CN201520156141.2U 2015-03-19 2015-03-19 A kind of pipe laying formula hydroelectric installation Expired - Fee Related CN204510172U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520156141.2U CN204510172U (en) 2015-03-19 2015-03-19 A kind of pipe laying formula hydroelectric installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520156141.2U CN204510172U (en) 2015-03-19 2015-03-19 A kind of pipe laying formula hydroelectric installation

Publications (1)

Publication Number Publication Date
CN204510172U true CN204510172U (en) 2015-07-29

Family

ID=53708164

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520156141.2U Expired - Fee Related CN204510172U (en) 2015-03-19 2015-03-19 A kind of pipe laying formula hydroelectric installation

Country Status (1)

Country Link
CN (1) CN204510172U (en)

Similar Documents

Publication Publication Date Title
CN204299779U (en) The servo-actuated electricity generating device of a kind of river level
CN103538705A (en) Platform device capable of being used for large-scale wave power generation
CN204851522U (en) Water energy storage photovoltaic power generation system
CN105257455A (en) Small adjustable hydraulic power generating device
CN204253258U (en) A kind of novel combination type water generating equipment
CN204510172U (en) A kind of pipe laying formula hydroelectric installation
CN204401553U (en) Two contraction radio frequency channel generation breakwater
CN204082425U (en) A kind of floating-tube type wave energy generating set
CN204239146U (en) A kind of ocean wave generator
CN204458193U (en) A kind of small hydroelectric generator
CN205224074U (en) Power generating equipment on water and installation basis thereof
CN204783438U (en) Novel unhurried current formula hydroelectric generator
CN205792359U (en) Telescopic device of solar generating with wind-power electricity generation
TN2017000227A1 (en) U-shaped tidal current energy power generation device carrier and base type tidal current energy power generation device
CN204392113U (en) The piezoelectric generating device that hydroelectric station potential energy secondary utilizes
CN204174595U (en) A kind of power station specific information output device
CN204267205U (en) A kind of hydroelectric installation
CN105332358A (en) Double-condensational-wave-channel electricity generation breakwater
CN204283712U (en) A kind of hydroelectric generator
WO2019126834A8 (en) Runner, hydraulic turbine, hydraulic turbine module and the turbine system for generating electricity
CN204456018U (en) The special excitation system control device in a kind of power station
CN204553093U (en) Building tower crane wind generating unit
CN103437938A (en) Multi-blade turbine device
CN204511757U (en) New hydropower generation station
CN204476650U (en) Hydroelectric power plant

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150729

CF01 Termination of patent right due to non-payment of annual fee