CN204510172U - A kind of pipe laying formula hydroelectric installation - Google Patents
A kind of pipe laying formula hydroelectric installation Download PDFInfo
- Publication number
- CN204510172U CN204510172U CN201520156141.2U CN201520156141U CN204510172U CN 204510172 U CN204510172 U CN 204510172U CN 201520156141 U CN201520156141 U CN 201520156141U CN 204510172 U CN204510172 U CN 204510172U
- Authority
- CN
- China
- Prior art keywords
- pipe
- sewer pipe
- lower support
- parallel
- support rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title claims abstract description 16
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 11
- 230000003044 adaptive effect Effects 0.000 abstract description 3
- 230000005611 electricity Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to the technical field of water-power plant, particularly relate to a kind of pipe laying formula hydroelectric installation, pipe laying formula hydroelectric installation of the present utility model carries out hydroelectric generation by pipe laying diversion, thus effectively can avoid obstacle, and then strengthens adaptive capacity, comprise water-power plant, also comprise reservoir, first sewer pipe, parallel pipe, second sewer pipe and bracing frame, bracing frame comprises below platform and upper stage, the bottom of below platform is provided with supporting leg, the top of below platform is provided with lower support rod, the bottom of upper stage is provided with support stick, also comprise sleeve pipe, the inside of sleeve pipe is provided with female thread structure, the bottom of upper support stick and the top of lower support rod are provided with external thread structure, the bottom of upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, parallel pipe is fixed on the top of upper stage, and the water level of parallel pipe is lower than the water level of reservoir.
Description
Technical field
The utility model relates to the technical field of water-power plant, particularly relates to a kind of pipe laying formula hydroelectric installation.
Background technology
As everyone knows, water-power plant is the power station that kinetic energy that the powerful current utilizing water-head to produce have carries out generating electricity, and is called for short in " power station "; Utilize the water in river can promote hydraulic turbine drive electrical generators group and the industrial enterprise generated electricity.Advantage: low, free from environmental pollution without fuel, cost, electromechanical equipment manufacture simple, flexible operation etc.; Generate electricity simultaneously hydraulic structure can with control flood, irrigate, feed water, shipping, the cause such as cultivation be combined, implementation water resource fully utilizes; Shortcoming: capital investment is large, the construction period is long, by natural conditions limitation etc.; Existing hydroelectric installation finds in use, can only arrange hydroelectric generator when it carries out hydroelectric generation in fixed location, thus causes its adaptive capacity poor.
Summary of the invention
For solving the problems of the technologies described above, the utility model provides a kind of and carries out hydroelectric generation by pipe laying diversion, thus effectively can avoid obstacle, and then strengthens the pipe laying formula hydroelectric installation of adaptive capacity.
Pipe laying formula hydroelectric installation of the present utility model, comprise water-power plant, also comprise reservoir, first sewer pipe, parallel pipe, second sewer pipe and bracing frame, the top of described first sewer pipe is communicated with reservoir, the described bottom of the first sewer pipe is communicated with the left end of parallel pipe, the described top of the second sewer pipe is communicated with the right-hand member of parallel pipe, the bottom of described second sewer pipe is communicated with water-power plant, support frame as described above comprises below platform and upper stage, the bottom of described below platform is provided with supporting leg, the top of described below platform is provided with lower support rod, the bottom of described upper stage is provided with support stick, also comprise sleeve pipe, the inside of described sleeve pipe is provided with female thread structure, the bottom of described upper support stick and the top of lower support rod are provided with external thread structure, the bottom of described upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, described parallel pipe is fixed on the top of upper stage, and the water level of described parallel pipe is lower than the water level of reservoir.
Pipe laying formula hydroelectric installation of the present utility model, described upper support stick, lower support rod and sleeve pipe are two groups, and support stick is arranged on left side and the right side of upper stage bottom respectively on two groups, two groups of lower support rods are arranged on left side and the right side on platform top, below respectively.
Pipe laying formula hydroelectric installation of the present utility model, also comprises upper hose, and described upper hose and the second sewer pipe are all fixed on supporting leg, and the bottom of described upper hose is communicated with the left end of parallel pipe with the bottom of the first sewer pipe respectively with top.
Compared with prior art the beneficial effects of the utility model are: by above-mentioned setting, obstruction can be got around by the cooperation of the first sewer pipe, parallel pipe, the second sewer pipe and bracing frame, and carried out the adjustment of upper stage and below platform distance by revoling tube, and then reach and longitudinally adjust object.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Detailed description of the invention
Below in conjunction with drawings and Examples, detailed description of the invention of the present utility model is described in further detail.Following examples for illustration of the utility model, but are not used for limiting scope of the present utility model.
As shown in Figure 1, pipe laying formula hydroelectric installation of the present utility model, comprise water-power plant 1, also comprise reservoir 2, first sewer pipe 3, parallel pipe 4, second sewer pipe 5 and bracing frame, the top of the first sewer pipe is communicated with reservoir, the bottom of the first sewer pipe is communicated with the left end of parallel pipe, the top of the second sewer pipe is communicated with the right-hand member of parallel pipe, the bottom of the second sewer pipe is communicated with water-power plant, bracing frame comprises below platform 6 and upper stage 7, the bottom of below platform is provided with supporting leg 8, the top of below platform is provided with lower support rod 9, the bottom of upper stage is provided with support stick 10, also comprise sleeve pipe 11, the inside of sleeve pipe is provided with female thread structure, the bottom of upper support stick and the top of lower support rod are provided with external thread structure, the bottom of upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, parallel pipe is fixed on the top of upper stage, and the water level of parallel pipe is lower than the water level of reservoir, by above-mentioned setting, obstruction can be got around by the cooperation of the first sewer pipe, parallel pipe, the second sewer pipe and bracing frame, and carry out the adjustment of upper stage and below platform distance by revoling tube, and then reach and longitudinally adjust object.
Pipe laying formula hydroelectric installation of the present utility model, upper support stick, lower support rod and sleeve pipe are two groups, and support stick is arranged on left side and the right side of upper stage bottom respectively on two groups, two groups of lower support rods are arranged on left side and the right side on platform top, below respectively.
Pipe laying formula hydroelectric installation of the present utility model, also comprises upper hose 12, and upper hose and the second sewer pipe are all fixed on supporting leg, and the bottom of upper hose is communicated with the left end of parallel pipe with the bottom of the first sewer pipe respectively with top.
The above is only preferred embodiment of the present utility model; should be understood that; for those skilled in the art; under the prerequisite not departing from the utility model know-why; can also make some improvement and modification, these improve and modification also should be considered as protection domain of the present utility model.
Claims (3)
1. a pipe laying formula hydroelectric installation, comprise water-power plant, it is characterized in that, also comprise reservoir, first sewer pipe, parallel pipe, second sewer pipe and bracing frame, the top of described first sewer pipe is communicated with reservoir, the described bottom of the first sewer pipe is communicated with the left end of parallel pipe, the described top of the second sewer pipe is communicated with the right-hand member of parallel pipe, the bottom of described second sewer pipe is communicated with water-power plant, support frame as described above comprises below platform and upper stage, the bottom of described below platform is provided with supporting leg, the top of described below platform is provided with lower support rod, the bottom of described upper stage is provided with support stick, also comprise sleeve pipe, the inside of described sleeve pipe is provided with female thread structure, the bottom of described upper support stick and the top of lower support rod are provided with external thread structure, the bottom of described upper support stick and the top of lower support rod are all inserted and spiral shell is contained in sleeve pipe, described parallel pipe is fixed on the top of upper stage, and the water level of described parallel pipe is lower than the water level of reservoir.
2. pipe laying formula hydroelectric installation as claimed in claim 1, it is characterized in that, described upper support stick, lower support rod and sleeve pipe are two groups, and support stick is arranged on left side and the right side of upper stage bottom respectively on two groups, two groups of lower support rods are arranged on left side and the right side on platform top, below respectively.
3. pipe laying formula hydroelectric installation as claimed in claim 2, it is characterized in that, also comprise upper hose, described upper hose and the second sewer pipe are all fixed on supporting leg, and the bottom of described upper hose is communicated with the left end of parallel pipe with the bottom of the first sewer pipe respectively with top.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520156141.2U CN204510172U (en) | 2015-03-19 | 2015-03-19 | A kind of pipe laying formula hydroelectric installation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520156141.2U CN204510172U (en) | 2015-03-19 | 2015-03-19 | A kind of pipe laying formula hydroelectric installation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204510172U true CN204510172U (en) | 2015-07-29 |
Family
ID=53708164
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520156141.2U Expired - Fee Related CN204510172U (en) | 2015-03-19 | 2015-03-19 | A kind of pipe laying formula hydroelectric installation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204510172U (en) |
-
2015
- 2015-03-19 CN CN201520156141.2U patent/CN204510172U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204299779U (en) | The servo-actuated electricity generating device of a kind of river level | |
CN103538705A (en) | Platform device capable of being used for large-scale wave power generation | |
CN204851522U (en) | Water energy storage photovoltaic power generation system | |
CN105257455A (en) | Small adjustable hydraulic power generating device | |
CN204253258U (en) | A kind of novel combination type water generating equipment | |
CN204510172U (en) | A kind of pipe laying formula hydroelectric installation | |
CN204401553U (en) | Two contraction radio frequency channel generation breakwater | |
CN204082425U (en) | A kind of floating-tube type wave energy generating set | |
CN204239146U (en) | A kind of ocean wave generator | |
CN204458193U (en) | A kind of small hydroelectric generator | |
CN205224074U (en) | Power generating equipment on water and installation basis thereof | |
CN204783438U (en) | Novel unhurried current formula hydroelectric generator | |
CN205792359U (en) | Telescopic device of solar generating with wind-power electricity generation | |
TN2017000227A1 (en) | U-shaped tidal current energy power generation device carrier and base type tidal current energy power generation device | |
CN204392113U (en) | The piezoelectric generating device that hydroelectric station potential energy secondary utilizes | |
CN204174595U (en) | A kind of power station specific information output device | |
CN204267205U (en) | A kind of hydroelectric installation | |
CN105332358A (en) | Double-condensational-wave-channel electricity generation breakwater | |
CN204283712U (en) | A kind of hydroelectric generator | |
WO2019126834A8 (en) | Runner, hydraulic turbine, hydraulic turbine module and the turbine system for generating electricity | |
CN204456018U (en) | The special excitation system control device in a kind of power station | |
CN204553093U (en) | Building tower crane wind generating unit | |
CN103437938A (en) | Multi-blade turbine device | |
CN204511757U (en) | New hydropower generation station | |
CN204476650U (en) | Hydroelectric power plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150729 |
|
CF01 | Termination of patent right due to non-payment of annual fee |