CN204497748U CN201520078854.1U CN201520078854U CN204497748U CN 204497748 U CN204497748 U CN 204497748U CN 201520078854 U CN201520078854 U CN 201520078854U CN 204497748 U CN204497748 U CN 204497748U
Authority
CN
China
Prior art keywords
peak
battery
valley
branch road
identification signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520078854.1U
Other languages
Chinese (zh)
Inventor
顾为东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Fengsheng seawater desalination Research Institute Co.,Ltd.
Original Assignee
顾为东
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 顾为东 filed Critical 顾为东
Priority to CN201520078854.1U priority Critical patent/CN204497748U/en
Application granted granted Critical
Publication of CN204497748U publication Critical patent/CN204497748U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems

Abstract

The utility model relates to the portable checkout equipment of peak-valley difference for electric power networks, belongs to electrical equipment technical field.This equipment comprises Peak-valley Difference Detection Circuit, induction installation and transmission circuit, it is characterized in that: in peak valley testing circuit, be provided with the first battery parallel with one another and the second battery, first branch road at the first battery place is provided with the first ground capacity, second battery is provided with the second ground capacity at the second branch road, is also provided with the on-off controller for controlling the first branch road and the second branch road opening and closing in peak valley testing circuit; Dsp chip in peak valley testing circuit receives the identification signal that induction installation sends, and transmission circuit transmits identification signal alternately by wireless network and other portable checkout equipments or transmits identification signal to the main control computer of power network terminal.The feature that this equipment has miniaturized portability is applicable to multiple spot operation, is beneficial to saving use cost, improves equipment use duration simultaneously, extends complete machine stand-by time.

Description

The portable checkout equipment of peak-valley difference
Technical field
The utility model relates to the portable checkout equipment of a kind of peak-valley difference, belongs to electrical equipment technical field.
Background technology
Since reform and opening-up, China's economic presents the growth of advancing by leaps and bounds, and between 1978 to 2004, the annual growth of Chinese GDP per capita is 8.16%, is in the prostatitis that world GDP increases always, achieves remarkable achievement.The rapid growth of this one-phase economy, the continuing to optimize of the industrial structure, develops and plays an important role.
Secondary industry is the pillar industry of China, but under the guide along with China's economic industry structure change policy, industry as China's pillar industry is also faced with the challenge of transition, highly energy-consuming trade is under the effect dissolving the policies of regulation and control such as production capacity surplus contradiction, and the proportion in industrial added value drops to 28.9% in 2013 from 32.2% in 2008.
The contribution rate that the large highly energy-consuming trade of production and supply industry six of chemical raw material and chemical product manufacturing, nonmetallic grounded module, ferrous metal smelting and rolling processing industry, non-ferrous metal metallurgy and calendering processing industry, PETROLEUM PROCESSING coking and nuclear fuel processing industry, electric power heating power increases whole society's electricity consumption is up to 42.7%, and high energy-consuming industry is still the main pulling force that whole society's electricity consumption increases.
But in order to construction of energy conservation-minded society, emphasize to give prominence to and do a good job of it Event tourism, file is administered in continuous appearance, implement step price, forbid reducing electricity price, along with commercial power price constantly adjusts to highly energy-consuming project, the floating of electricity price corrodes the profit margin of highly energy-consuming trade, this has had influence on the existence of highly energy-consuming trade, and the backward production facilities lacking competitive advantage progressively exit, industry restructuring redistribute resources in industry.
And also increase rapidly along with the supply of electric power of China while economic growth and electricity needs.Within 2012, China's Analyzing Total Electricity Consumption reaches 49,591 hundred million kilowatt hours, increases by 5.5% on a year-on-year basis.From 1980 to 2012, China's Analyzing Total Electricity Consumption increased by 16.8 times, increases by 9.2% every year.Supply of electric power problem in short supply in the whole nation is eased substantially.
As the coal of China's main body energy, account for about 70% of primary energy total quantity consumed.Within 2012, China's coal Denso machine scale has reached 7.58 hundred million kilowatts, accounts for 66.2% of total installed capacity; Coal electricity energy output 3.68 trillion kilowatt hour, accounts for 73.9% of gross generation.The coal resources natural endowment of China's abundant determines China and will keep in long period section based on the power supply architecture of coal electricity.
Coal electricity is that main power supply architecture can not degree of depth peak regulation, and therefore to there is power distribution unreasonable for China's large regional grid, causes power supply architecture (base, waist, peak load power supply) property contradiction, i.e. electrical network famine peaking power source.China forces peak regulation that is overcritical and ultra supercritical 600,000-100 ten thousand kilowatts of units participation certain limits always for many years, is pressed onto 50% subcritical operation, low-carbon (LC) unit high-carbon is run during low ebb.Along with urbanization, industrialization, the power load that electrical network increases every year, its peak-valley difference will more than 50%.
And along with the adjustment of the industrial structure, power structure there occurs the change of essence, and electricity consumption-power supply relation changes, and causes electrical network peak-valley difference day by day to increase.The peak-to-valley ratio of General development Chinese Home is 1:0.63, and the peak-to-valley ratio of developed country is 1:0.25, and the load peak-valley difference of each electric power system transprovincially of China is generally about 30% ~ 40% of peak load.
Because the current national conditions of China and the restriction of varied reason cause China can not make up peak-valley difference by the extensive peak regulation Intelligent Power Station (hydroenergy storage station, plant gas, oil fired power plant etc.) that utilizes as developed country, even if dope electric power value, peak regulation Intelligent Power Station can be used, its energy conversion efficiency is also only 75%, has the energy of 25% to be wasted.Therefore the peak regulation task that faces of China and pressure are just increasingly severe.
But the limitation of equipment makes peak valley flexibly regulate to be restricted, and can only process according to means such as planning in advance, and variable monitoring that can not be real-time.
Utility model content
The technical problems to be solved in the utility model is that on-the-spot real time data is carried out controlled docking transmission, and ensures the stable operation of checkout equipment, the portable checkout equipment of a kind of peak-valley difference for electric power networks of lengthening working hours.
The utility model is the technical scheme solving the problems of the technologies described above proposition, the portable checkout equipment of a kind of peak-valley difference in electric power networks is proposed, comprise Peak-valley Difference Detection Circuit, induction installation and transmission circuit, the first battery parallel with one another and the second battery is provided with in described peak valley testing circuit, first branch road at described first battery place is provided with the first ground capacity, described second battery place second branch road is provided with the second ground capacity, is also provided with the on-off controller for controlling described first branch road and the second branch road opening and closing in described peak valley testing circuit; Dsp chip in described peak valley testing circuit receives the identification signal that described induction installation sends, and described transmission circuit is undertaken transmitting described identification signal or transmitting described identification signal to the main control computer of described power network terminal alternately by wireless network and other portable checkout equipments;
Described first battery and described second battery all can support described portable checkout equipment work;
When described first battery-powered operation, described second battery is disconnected by described on-off controller; When described second battery-powered operation, described first battery puts disconnection by described on-off controller.
The improvement of technique scheme is: described dsp chip is circumscribed with relay indicating light for showing the operating state of the first battery and the second battery.
The improvement of technique scheme is: described wireless network refers to the network based on zigbee, TD-SCDMA or TDD-LTE, and in this, as transmission.
The improvement of technique scheme is: described identification signal comprises the frequecy characteristic value when line peak of described electric power networks, valley, peak valley difference and peak valley occur.
The beneficial effect of the utility model employing technique scheme is: the utility model is the method for signal by real-time or discontinuous transmission, for main control computer provides one to regulate and control reference, so that main control computer constantly revises anticipation reference value, revise the peak regulation parameter of electric power networks whereby, for the controlled real-time peak regulation in electric power networks provides reference data, improve peak regulation efficiency, alleviate peak-valley difference power consumption value, the waste on avoided peak the to owe energy that paddy causes; Meanwhile in order to ensure that the prolongation of the service time of equipment adopts parallel double loop power supply to carry out work and powers, lengthen working hours real-time transmittability and resolving capacity can be maintained; In addition consider that existing different running environment and operating condition adopt the DSP digit chip that can adapt to many wireless access environment, when wireless access really can not be adopted by the reforming mode of integrated limited port, by in equipment wired mode access communications network, but this operation can make equipment lose portable mobility, standby using forestland limitation is set up to multiple spot larger.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is the double loop power supply electrical block diagram in parallel of the utility model embodiment.
Fig. 2 is the pin definitions figure of the DSP data chip of the utility model embodiment.
Fig. 3 is the trial run electrical network model configuration figure mentioned in the present embodiment.
Embodiment
Embodiment
The portable checkout equipment of a kind of peak-valley difference in electric power networks of the present embodiment, comprise Peak-valley Difference Detection Circuit, induction installation and transmission circuit, the first battery ABAT parallel with one another as shown in Figure 1 and the second battery BBAT is provided with in peak valley testing circuit, first branch road at the first battery place is provided with the first ground capacity, second battery is provided with the second ground capacity at the second branch road, is also provided with the on-off controller for controlling the first branch road and the second branch road opening and closing in peak valley testing circuit; Dsp chip in peak valley testing circuit receives the identification signal that induction installation sends, and transmission circuit transmits identification signal alternately by wireless network and other portable checkout equipments or transmits identification signal to the main control computer of power network terminal;
First battery and the second battery all can support portable checkout equipment work;
When the first battery-powered operation, the second battery is disconnected by on-off controller; When the second battery-powered operation, the first battery puts disconnection by on-off controller.
The dsp chip of the present embodiment is as shown in Figure 2 circumscribed with relay indicating light for showing the operating state of the first battery and the second battery.
The wireless network of the present embodiment refers to the network based on zigbee, TD-SCDMA or TDD-LTE, and in this, as transmission.
The identification signal of the present embodiment comprises the frequecy characteristic value when line peak of electric power networks, valley, peak valley difference and peak valley occur.
Induction installation in the present embodiment adopts the forms such as conventional coupling circuit to realize, transmission circuit then adopts the transmission circuit of three multiple display modes compatibles to realize, if in addition when can not employing wireless port this equipment can be used by the mode fixed position of wired connection, but need many equipment to run simultaneously, do relaying transmission each other.
Embodiment of the present utility model not only can be applied to existing peak load regulation network and power, the electricity consumption peak valley situation of all right supervisory user simultaneously, can be applied in a kind of novel power grid pattern in addition, for equipment peak regulation provides the manipulation guidance of real-time visual data, make invisible power consumption convert tangible visible data to and be presented in face of user.
The application of this novel power grid model is as follows, is that highly energy-consuming trade user measuring and calculating can arrange electric energy power at the electric power networks control centre foundation predicted load of electrical network and the rated output power of Generation Side; Electrical network (removes traditional highly energy-consuming trade power load according to traditional electrical network prediction load, namely obtains novel power grid side customer charge; Thermal power plant and nuclear power station to be exerted oneself load operation according to optimum, and the little thermoelectricity of part is due to of poor benefits and close down and be not connected to the grid, and thermoelectricity, nuclear power and water power are according to 80% load operation of Daily treatment cost; Renewable energy power generation with send out with, be not embodied on average generation load; Renewable energy power generation is directly consumed by highly energy-consuming user;
Highly energy-consuming trade user is made to carry out electricity consumption operation according to the electric energy the arranged power of measuring and calculating again; Highly energy-consuming trade, by technological innovation, can realize violent fluctuating load;
The difference that electric energy power is rated output power and predicted load can be arranged.
Power grid user side comprises resident, primary industry user, tertiary industry user and regular industrial user; Predicted load is resident's load, primary industry customer charge, tertiary industry customer charge and regular industrial customer charge.
Generation Side is nuclear power plant, thermal power plant, renewable energy power generation factory, variable load plant.
From traditional electrical network users prediction load line, average generation load line, novel power grid user in predicting load line and high energy industry can be found out by power load line, in an embodiment of the present invention, traditional electrical network users prediction load line and novel power grid user in predicting load line move towards basically identical, and high energy industry can power load line completely contrary with the above two as its trend of peak regulation electricity consumption, but finally make electricity consumption-power supply reach balance, make to meet the average generation load line of Generation Side, improve energy transition rate whereby, indirectly reduce the energy resource consumption of non-renewable energy resources, for low-carbon environment-friendly contributes.
Under above-mentioned this applicable cases, because high energy industry itself does not see that the setting that the feature of motility makes this portable equipment in the present embodiment to fix and some ad-hoc location carry out collection and the transmission of data, for the peak regulation of high energy industry monitors the guidance provided in data, under the guidance directly perceived of these data, staff reasonably can carry out work according to the electric energy the arranged power be assigned to, position set by equipment will be distributed according to field condition, and the position be assigned to mostly is key position.
This grid mode is in experimental stage, for this reason embodiment of the present utility model also main just right be peak load regulation network design, if consider some characteristics of peak load regulation network, the distribution of each transformer station comparatively disperses, put all supporting permanent plant input on position everywhere and show slightly huge, and under normal operating conditions, these equipment are all in resting state, only just enable when testing or overhaul, its reliability and actual effect are all very low, consider from economy and environmental angle, portable equipment effect be better than fixed.
The utility model is not limited to above-described embodiment.All employings are equal to the technical scheme of replacing and being formed, and all drop on the protection range of the utility model requirement.

Claims (4)

1. the portable checkout equipment of the peak-valley difference for electric power networks, comprise Peak-valley Difference Detection Circuit, induction installation and transmission circuit, it is characterized in that: in described peak valley testing circuit, be provided with the first battery parallel with one another and the second battery, first branch road at described first battery place is provided with the first ground capacity, described second battery place second branch road is provided with the second ground capacity, is also provided with the on-off controller for controlling described first branch road and the second branch road opening and closing in described peak valley testing circuit; Dsp chip in described peak valley testing circuit receives the identification signal that described induction installation sends, and described transmission circuit is undertaken transmitting described identification signal or transmitting described identification signal to the main control computer of described power network terminal alternately by wireless network and other portable checkout equipments;
Described first battery and described second battery all can support described portable checkout equipment work;
When described first battery-powered operation, described second battery is disconnected by described on-off controller; When described second battery-powered operation, described first battery puts disconnection by described on-off controller.
2., as claimed in claim 1 for the portable checkout equipment of peak-valley difference of electric power networks, it is characterized in that: described dsp chip is circumscribed with relay indicating light for showing the operating state of the first battery and the second battery.
3., as claimed in claim 1 for the portable checkout equipment of peak-valley difference of electric power networks, it is characterized in that: described wireless network refers to the network based on zigbee, TD-SCDMA or TDD-LTE, and in this, as transmission.
4. as claimed in claim 1 for the portable checkout equipment of peak-valley difference of electric power networks, it is characterized in that: described identification signal comprises the frequecy characteristic value when line peak of described electric power networks, valley, peak valley difference and peak valley occur.
CN201520078854.1U 2015-02-04 2015-02-04 The portable checkout equipment of peak-valley difference Active CN204497748U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520078854.1U CN204497748U (en) 2015-02-04 2015-02-04 The portable checkout equipment of peak-valley difference

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520078854.1U CN204497748U (en) 2015-02-04 2015-02-04 The portable checkout equipment of peak-valley difference

Publications (1)

Publication Number Publication Date
CN204497748U true CN204497748U (en) 2015-07-22

Family

ID=53577035

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520078854.1U Active CN204497748U (en) 2015-02-04 2015-02-04 The portable checkout equipment of peak-valley difference

Country Status (1)

Country Link
CN (1) CN204497748U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016124062A1 (en) * 2015-02-04 2016-08-11 顾为东 High-efficiency and energy-saving method for operating power network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2016124062A1 (en) * 2015-02-04 2016-08-11 顾为东 High-efficiency and energy-saving method for operating power network

Similar Documents

Publication Publication Date Title
AU2020104463A4 (en) High-efficiency and energy-saving method for operating power network
Zhou et al. Optimal load distribution model of microgrid in the smart grid environment
He et al. A review on the influence of intelligent power consumption technologies on the utilization rate of distribution network equipment
CN104283308A (en) Smart central strategy control system for micro-grid
CN103577892A (en) Progressive intelligent power distribution system scheduling method
Suciu et al. Energy integration of CO2 networks and power to gas for emerging energy autonomous cities in Europe
CN103441520A (en) Micro-grid distribution type new energy storage system
CN105406515A (en) Hierarchically-controlled independent microgrid
CN205011850U (en) Hot balance control device of aluminium cell
Byk et al. The efficiency of distributed and centralized power system integration
Wang et al. Prospects for key technologies of new-type urban integrated energy system
CN203151218U (en) Energy efficiency management system based on intelligent station area
Jin Impact of renewable energy penetration in power systems on the optimization and operation of regional distributed energy systems
Ma et al. Optimal configuration of 5G base station energy storage considering sleep mechanism
CN104638680A (en) Control system for wind power and thermal power combined power generation
CN204497748U (en) The portable checkout equipment of peak-valley difference
Wu et al. Modified Shapley Value-Based Profit Allocation Method for Wind Power Accommodation and Deep Peak Regulation of Thermal Power
Fang et al. A study on the energy storage scenarios design and the business model analysis for a zero-carbon big data industrial park from the perspective of source-grid-load-storage collaboration
CN112436607A (en) Town energy Internet system
Fu et al. Quantitative analysis of the feasibility of realizing the transformation to clean energy for China’s energy increment by 2035
CN205017018U (en) Large -scale aluminum cell peak regulation power station
CN102118042B (en) Charging station management system and method
Qu et al. Multi-objective optimization operation of micro energy network with energy storage system based on improved weighted fuzzy method
Feng et al. Optimal dispatching based on electric thermal coupling characteristics analysis and wind power consumption
CN203481823U (en) Intelligent electricity utilization load controller

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220314

Address after: 266041 17th floor, building 28, Qingdao International academician port, 171 Jinshui Road, Licang District, Qingdao, Shandong

Patentee after: Qingdao Fengsheng seawater desalination Research Institute Co.,Ltd.

Address before: Room 301, unit 2, building 13, Zhonghai phoenix garden, No. 1, Qingliangmen street, Nanjing, Jiangsu 210024

Patentee before: Gu Weidong