CN204491948U - A kind of two-sided prefabricated superimposed sheet - Google Patents

A kind of two-sided prefabricated superimposed sheet Download PDF

Info

Publication number
CN204491948U
CN204491948U CN201520114585.XU CN201520114585U CN204491948U CN 204491948 U CN204491948 U CN 204491948U CN 201520114585 U CN201520114585 U CN 201520114585U CN 204491948 U CN204491948 U CN 204491948U
Authority
CN
China
Prior art keywords
ribbing
prefabricated
base plate
top board
rib
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520114585.XU
Other languages
Chinese (zh)
Inventor
王国富
胡永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinan Rail Transit Group Co Ltd
Original Assignee
Jinan Rail Transit Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinan Rail Transit Group Co Ltd filed Critical Jinan Rail Transit Group Co Ltd
Priority to CN201520114585.XU priority Critical patent/CN204491948U/en
Application granted granted Critical
Publication of CN204491948U publication Critical patent/CN204491948U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Reinforcement Elements For Buildings (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The utility model discloses a kind of two-sided prefabricated superimposed sheet, prefabricated base plate with ribbing, prefabricated base plate with ribbing lays baseplate reinforcing bar respectively along vertical, horizontal, and vertically on prefabricated base plate with ribbing, lay reserved lacing wire, prefabricated base plate with ribbing transversely interval is laid with and organizes rib of slab more, and on horizontal rib of slab, parallel interval is laid with the many groups of flank preformed holes for rear pouring concrete; Prefabricated top board with ribbing is provided with above prefabricated base plate with ribbing, described prefabricated top board with ribbing lays roof steel bar along vertical, horizontal, and vertically on prefabricated top board with ribbing, lay reserved lacing wire, on prefabricated top board with ribbing, transversely interval is laid with and organizes rib of slab more, and prefabricated top board with ribbing is reserved with concreting hole or extravasating hole.The utility model only need transport prefabricated base plate with ribbing and prefabricated top board with ribbing, transport and easy for installation, quick, and without the need to formwork, crack resistance, good integrity, efficiency of construction is high, and helps on-the-spot maintenance neatly.

Description

A kind of two-sided prefabricated superimposed sheet
Technical field
The utility model relates to the realm of building construction, particularly relates to a kind of two-sided prefabricated superimposed sheet.
Background technology
Current floor mainly adopts cast-in-place concrete floor, precast floor slab and assembled integral floor.Wherein, there is the defects such as template consumption is large, efficiency of construction is low, easy to crack in cast-in-place concrete floor, there is the defect such as structural integrity, poor seismic behavior in precast floor slab, assembled integral floor existence construction trouble, globality are poor, reliability is difficult to ensure the defects such as card.Though superimposed sheet has application, apply less, and in rear pouring concrete, reinforcing bar is laid less or does not establish reinforcing bar, causes the globality between precast plate and Bars In Poured Concrete Slab poor.In addition, in concreting process, workman's operation in concreting of being everlasting, construction inconvenience, efficiency of construction is low.
Utility model content
The utility model is the deficiency for solving above-mentioned technology, provides a kind of two-sided prefabricated superimposed sheet, and this two-sided prefabricated superimposed sheet is high without the need to formwork, efficiency of construction, cracking resistance and good integrity, and helps and on-the-spotly keep clean and tidy.
For achieving the above object, the utility model adopts following technical proposals:
A kind of two-sided prefabricated superimposed sheet, comprise prefabricated base plate with ribbing, prefabricated base plate with ribbing lays baseplate reinforcing bar respectively along vertical, horizontal, and vertically on prefabricated base plate with ribbing, lay reserved lacing wire, prefabricated base plate with ribbing transversely interval is laid with and organizes rib of slab more, and on horizontal rib of slab, parallel interval is laid with the many groups of flank preformed holes for rear pouring concrete; Prefabricated top board with ribbing is provided with above prefabricated base plate with ribbing, described prefabricated top board with ribbing lays roof steel bar along vertical, horizontal, and vertically on prefabricated top board with ribbing, lay reserved lacing wire, on prefabricated top board with ribbing, transversely interval is laid with and organizes rib of slab more, and prefabricated top board with ribbing is reserved with concreting hole.
The baseplate reinforcing bar of described prefabricated base plate with ribbing adopts prestressed reinforcement or interval to lay prestressed reinforcement and nonprestressed reinforcement.
The roof steel bar of described prefabricated base plate with ribbing adopts nonprestressed reinforcement.
The reserved lacing wire of described prefabricated base plate with ribbing and vertical, horizontal baseplate reinforcing bar are that spatial vertical angle is arranged.
The reserved lacing wire of described prefabricated top board with ribbing and vertical, horizontal roof steel bar are that spatial vertical angle is arranged.
Reserved lacing wire on described prefabricated top board with ribbing longitudinally parallel interval is laid.
The reserved lacing wire of described prefabricated base plate with ribbing is provided with many groups, often forms use, and corresponding symmetry is laid in the rib of slab both sides of prefabricated base plate with ribbing, realizes the connection of reserved lacing wire on base plate and top board, strengthens the globality of superimposed sheet.
Central authorities and four corner locations of prefabricated top board with ribbing are located in described concreting hole.
The height of described prefabricated base plate rib of slab with ribbing is at least higher than prefabricated top plate rib 20mm with ribbing.
A construction method for described two-sided prefabricated superimposed sheet, comprises the following steps:
(1) lay the prestressed reinforcement of prefabricated base plate with ribbing or prestressed reinforcement and nonprestressed reinforcement are laid in interval in vertical, horizontal, lay the nonprestressed reinforcement of prefabricated top board with ribbing in vertical, horizontal respectively;
(2) the template of mounting base and top board, after the prestressed reinforcement of stretch-draw base plate, the moulding prefabricated top board with ribbing of concreting, prefabricated base plate with ribbing;
(3) stripping, after maintenance steel concrete to 85% of design strength, cuts off the prestressed reinforcement that end is unnecessary, by prefabricated base plate with ribbing, prefabricated top board handling with ribbing to depositing place;
(4) prefabricated base plate with ribbing, prefabricated top board with ribbing are transported to job site, after prefabricated base plate installation with ribbing, by the plane downward snapping insertion prefabricated with ribbing base plate of prefabricated top board with ribbing with rib of slab;
By the reserved pouring hole concreting on prefabricated top board with ribbing and vibrate formed after water reinforced concrete floor, complete construction.
A kind of two-sided prefabricated superimposed sheet, comprise: prefabricated base plate with ribbing, prefabricated base plate with ribbing lays baseplate reinforcing bar respectively along vertical, horizontal, and vertically on prefabricated base plate with ribbing, lay reserved lacing wire, prefabricated base plate with ribbing transversely interval is laid with and organizes rib of slab more, and on horizontal rib of slab, parallel interval is laid with the many groups of flank preformed holes for rear pouring concrete; Prefabricated top board with ribbing is provided with above prefabricated base plate with ribbing, described prefabricated top board with ribbing lays roof steel bar along vertical, horizontal, and vertically on prefabricated top board with ribbing, lay reserved lacing wire, on prefabricated top board with ribbing, transversely interval is laid with and organizes rib of slab more, and prefabricated top board with ribbing is reserved with concrete extravasating hole.
The baseplate reinforcing bar of described prefabricated base plate with ribbing adopts prestressed reinforcement or interval to lay prestressed reinforcement and nonprestressed reinforcement.
The roof steel bar of described prefabricated base plate with ribbing adopts nonprestressed reinforcement.
The reserved lacing wire of described prefabricated base plate with ribbing and vertical, horizontal baseplate reinforcing bar are that spatial vertical angle is arranged.
The reserved lacing wire of described prefabricated top board with ribbing and vertical, horizontal roof steel bar are that spatial vertical angle is arranged.
Reserved lacing wire on described prefabricated top board with ribbing longitudinally parallel interval is laid.
The reserved lacing wire of described prefabricated base plate with ribbing is provided with many groups, often forms use, and corresponding symmetry is laid in the rib of slab both sides of prefabricated base plate with ribbing, realizes the connection of reserved lacing wire on base plate and top board, strengthens the globality of superimposed sheet.
Described concrete extravasating hole is located at four corner locations of prefabricated top board with ribbing.
The height of described prefabricated base plate rib of slab with ribbing is at least higher than prefabricated top plate rib 20mm with ribbing.
A construction method for described two-sided prefabricated superimposed sheet, comprises the following steps:
(1) lay the prestressed reinforcement of prefabricated base plate with ribbing along vertical, horizontal or prestressed reinforcement and nonprestressed reinforcement are laid in interval, lay the nonprestressed reinforcement of prefabricated top board with ribbing in vertical, horizontal respectively;
(2) the template of mounting base and top board, after the prestressed reinforcement of stretch-draw base plate, the moulding prefabricated top board with ribbing of concreting, prefabricated base plate with ribbing;
(3) stripping, after maintenance steel concrete to 85% of design strength, cuts off the prestressed reinforcement that end is unnecessary, by prefabricated base plate with ribbing, prefabricated top board handling with ribbing to depositing place;
(4) prefabricated base plate with ribbing, prefabricated top board with ribbing are transported to job site, after prefabricated base plate installation with ribbing, vibrate according to amount of calculation concreting;
(5), before concrete initial set, by the plane downward snapping insertion prefabricated with ribbing base plate of prefabricated top board with ribbing with rib of slab, unnecessary concrete is discharged by the extravasating hole on prefabricated top board with ribbing, thus completes the construction of superimposed sheet.
The beneficial effects of the utility model:
1. without the need to formwork: adopt prefabricated base plate with ribbing as the bed die of superimposed sheet, without the need to installation form.
2. efficiency of construction is high: after prefabricated base plate with ribbing, prefabricated mounting of roof plate with ribbing complete, can operation on prefabricated top board with ribbing, by concreting hole concreting reserved on prefabricated top board with ribbing, precast plate convenient transportation, quick for installation, and without the need to wiping one's face after having constructed, improve efficiency of construction.
3. cracking resistance is good: prefabricated base plate with ribbing, prefabricated top board with ribbing are produced in factory, and crudy is better than cast in situs; Be provided with prestressed reinforcement in prefabricated base plate with ribbing, improve the anti-crack ability of superimposed sheet.
4. good integrity: prefabricated base plate with ribbing, prefabricated top board with ribbing are equipped with reserved lacing wire, and can wear reinforcing bar in addition, makes prefabricated top board with ribbing, prefabricated base plate with ribbing becomes to be integrated with middle in-situ layer, improve the globality of superimposed sheet.
5. on-the-spot clean and tidy.Because adopting precast plate as the bed die of superimposed sheet, concrete slurry is not easily omitted unrestrained, helps job site and keeps clean and tidy.
Accompanying drawing explanation
Fig. 1 is the generalized section of embodiment 1 of the present utility model;
Fig. 2 is the prefabricated base plate plane figure with ribbing of the embodiment 1 in the utility model;
Fig. 3 is A-A sectional view in Fig. 2;
Fig. 4 is the prefabricated top plate plant tilting figure with ribbing of the embodiment 1 in the utility model;
Fig. 5 is B-B sectional view in Fig. 4;
Fig. 6 is the actual use schematic diagram of the embodiment 1 in the utility model;
Fig. 7 is the generalized section of the base plate prefabricated with ribbing of embodiment 2 of the present utility model;
Fig. 8 is the generalized section on prefabricated base plate with ribbing after concreting in embodiment 2 of the present utility model;
Fig. 9 is the generalized section of embodiment 2 of the present utility model;
Figure 10 is the actual use schematic diagram of the embodiment 2 in the utility model;
The wherein prefabricated base plate with ribbing of 1-, the prefabricated top board with ribbing of 2-, 3-baseplate reinforcing bar, 4-roof steel bar, 5-base plate rib of slab, 6-top board rib of slab, 7-reserves lacing wire, 8-base plate flank preformed hole, pouring concrete after 9-, 10-concreting hole, 11-extravasating hole, 12-top board rib of slab reserving rib, 13-exposed steel bar.
Detailed description of the invention
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Embodiment 1
As Fig. 1-5 shows, a kind of two-sided prefabricated superimposed sheet, comprises prefabricated base plate with ribbing 1, prefabricated top board 2 with ribbing and rear pouring concrete layer 9;
Prefabricated base plate with ribbing 1 lays prefabricated baseplate reinforcing bar with ribbing 3 respectively along vertical, horizontal, and vertically on prefabricated base plate 1 with ribbing, lay reserved lacing wire 7, prefabricated base plate with ribbing 1 is transversely laid with the prefabricated base plate rib of slab 5 with ribbing of many groups, and on horizontal rib of slab 5, parallel interval is laid with the many groups of base plate flank preformed holes 8 for rear pouring concrete; Prefabricated top board with ribbing 2 is provided with above prefabricated base plate with ribbing 1, described prefabricated top board 2 with ribbing is laid the roof steel bar 4 of prefabricated top board with ribbing along vertical, horizontal, and vertically on prefabricated top board 2 with ribbing, lay reserved lacing wire 7, roof steel bar 4 is extended prefabricated top board with ribbing 2 and is formed exposed steel bar 13, on prefabricated top board with ribbing, transversely interval is laid with the prefabricated top plate rib 6 with ribbing of many groups, top board rib of slab 6 is laid top board rib of slab reserving rib 12, prefabricated top board 2 with ribbing is reserved with concreting hole 10; Prefabricated top board with ribbing is with the prefabricated base plate with ribbing of the downward snapping of plane of rib of slab, and portion is watered after forming concrete in the space after prefabricated base plate with ribbing and prefabricated top board snapping with ribbing, by the reserved plug hole concrete perfusion on top board, and pouring concrete layer after being formed.
The baseplate reinforcing bar 3 of prefabricated base plate with ribbing 1 adopts prestressed reinforcement.The reserved lacing wire 7 of prefabricated base plate with ribbing 1 is arranged in spatial vertical angle with the baseplate reinforcing bar 3 of the prefabricated base plate with ribbing of vertical, horizontal.The reserved lacing wire 7 of prefabricated top board with ribbing 2 is arranged in spatial vertical angle with the prefabricated roof steel bar 4 with ribbing of vertical, horizontal.Reserved lacing wire 7 on prefabricated top board with ribbing 2 longitudinally parallel interval is laid.The reserved lacing wire 7 of prefabricated base plate with ribbing 1 comprises many groups, often forms use, and corresponding symmetry is laid in the both sides of prefabricated base plate rib of slab 5 with ribbing.The middle position of prefabricated top board with ribbing 2 is located in concreting hole 10.The height of prefabricated base plate rib of slab with ribbing is at least higher than prefabricated top plate rib 20mm with ribbing.
A construction method for described two-sided prefabricated superimposed sheet, comprises the following steps:
(1) lay the prestressed reinforcement of prefabricated base plate with ribbing respectively along vertical, horizontal or prestressed reinforcement and nonprestressed reinforcement are laid in interval, lay the nonprestressed reinforcement of prefabricated top board with ribbing in vertical, horizontal respectively;
(2) the template of mounting base and top board, after the prestressed reinforcement of stretch-draw base plate, the moulding prefabricated top board with ribbing of concreting, prefabricated base plate with ribbing;
(3) stripping, after maintenance steel concrete to 85% of design strength, cuts off the prestressed reinforcement that end is unnecessary, by prefabricated base plate with ribbing, prefabricated top board handling with ribbing to depositing place;
(4) prefabricated base plate with ribbing, prefabricated top board with ribbing are transported to job site, after prefabricated base plate installation with ribbing, by one end downward snapping prefabricated with ribbing base plate of prefabricated top board with ribbing with rib of slab;
By the reserved pouring hole concreting on prefabricated top board with ribbing and vibrate formed after water reinforced concrete floor, complete construction.
From above-mentioned steps, the construction method of embodiment 1 is after prefabricated base plate with ribbing and prefabricated top board with ribbing being installed respectively, by prefabricated top board with ribbing and prefabricated base plate snapping with ribbing, then by process that concrete is built from the plug hole top board.
As shown in Figure 6, be the actual use figure of the present embodiment, determine that superimposed sheet thickness of slab is 120mm, prefabricated base plate 1 thickness of slab 40mm with ribbing, prefabricated top board 2 thickness of slab 30mm with ribbing, the high 50mm of prefabricated base plate rib of slab 5 with ribbing, the high 30mm of prefabricated top plate rib 6 with ribbing.
Embodiment 2
As Figure 7-9, a kind of two-sided prefabricated superimposed sheet, comprise: prefabricated base plate with ribbing, prefabricated base plate with ribbing lays baseplate reinforcing bar respectively along vertical, horizontal, and vertically on prefabricated base plate with ribbing, lay reserved lacing wire, prefabricated base plate with ribbing transversely interval is laid with and organizes rib of slab more, and on horizontal rib of slab, parallel interval is laid with the many groups of flank preformed holes for rear pouring concrete; Prefabricated top board with ribbing is provided with above prefabricated base plate with ribbing, described prefabricated top board with ribbing lays roof steel bar along vertical, horizontal, and vertically on prefabricated top board with ribbing, lay reserved lacing wire, roof steel bar is extended prefabricated top board with ribbing and is formed exposed steel bar, on prefabricated top board with ribbing, transversely interval is laid with and organizes rib of slab more, top board rib of slab is laid top board rib of slab reserving rib, prefabricated top board with ribbing is reserved with concrete extravasating hole.
The baseplate reinforcing bar 3 of prefabricated base plate with ribbing 1 adopts prestressed reinforcement.The reserved lacing wire 7 of prefabricated base plate with ribbing 1 is arranged in spatial vertical angle with the prefabricated baseplate reinforcing bar 3 with ribbing of vertical, horizontal.The reserved lacing wire 7 of prefabricated top board with ribbing 2 is arranged in spatial vertical angle with the prefabricated roof steel bar 4 with ribbing of vertical, horizontal.Reserved lacing wire 7 on prefabricated top board with ribbing 2 longitudinally parallel interval is laid.The reserved lacing wire 7 of prefabricated base plate with ribbing 1 comprises many groups, often forms use, and corresponding symmetry is laid in the both sides of prefabricated base plate rib of slab 5 with ribbing.Concrete extravasating hole is located at four corner locations of prefabricated top board with ribbing 2.The height of prefabricated base plate rib of slab with ribbing is at least higher than prefabricated top plate rib 20mm with ribbing.
As Figure 7-9, a kind of construction method of described two-sided prefabricated superimposed sheet, comprises the following steps:
(1) lay the prestressed reinforcement of prefabricated base plate with ribbing along vertical, horizontal or prestressed reinforcement and nonprestressed reinforcement are laid in interval, lay the nonprestressed reinforcement of prefabricated top board with ribbing in vertical, horizontal respectively;
(2) the template of mounting base and top board, after the prestressed reinforcement of stretch-draw base plate, the moulding prefabricated top board with ribbing of concreting, prefabricated base plate with ribbing;
(3) stripping, after maintenance steel concrete to 85% of design strength, cuts off the prestressed reinforcement that end is unnecessary, by prefabricated base plate with ribbing, prefabricated top board handling with ribbing to depositing place;
(4) prefabricated base plate with ribbing, prefabricated top board with ribbing are transported to job site, after prefabricated base plate installation with ribbing, vibrate according to amount of calculation concreting;
(5), before concrete initial set, by one end downward snapping prefabricated with ribbing base plate of prefabricated top board with ribbing with rib of slab, unnecessary concrete is discharged by the extravasating hole on prefabricated top board with ribbing, thus completes the construction of superimposed sheet.
From Fig. 7-Fig. 9, construction sequence in embodiment 2 is after being installed by prefabricated base plate with ribbing, first at prefabricated base plate upper concrete with ribbing, and then prefabricated top board with ribbing is snapped onto on layer of concrete and prefabricated base plate with ribbing, unnecessary concrete will be discharged from the extravasating hole prefabricated top board with ribbing.
As shown in Figure 10, be the actual use figure of the present embodiment, determine that superimposed sheet thickness of slab is 120mm, prefabricated base plate 1 thickness of slab 40mm with ribbing, prefabricated top board 2 thickness of slab 30mm with ribbing, the high 50mm of prefabricated base plate rib of slab 5 with ribbing, the high 30mm of prefabricated top plate rib 6 with ribbing.
By reference to the accompanying drawings detailed description of the invention of the present utility model is described although above-mentioned; but the restriction not to the utility model protection domain; one of ordinary skill in the art should be understood that; on the basis of the technical solution of the utility model, those skilled in the art do not need to pay various amendment or distortion that creative work can make still within protection domain of the present utility model.

Claims (10)

1. a two-sided prefabricated superimposed sheet, it is characterized in that, comprise: prefabricated base plate with ribbing, prefabricated base plate with ribbing lays baseplate reinforcing bar respectively along vertical, horizontal, and vertically on prefabricated base plate with ribbing, lay reserved lacing wire, prefabricated base plate with ribbing transversely interval is laid with and organizes rib of slab more, and on horizontal rib of slab, parallel interval is laid with the many groups of flank preformed holes for rear pouring concrete; Prefabricated top board with ribbing is provided with above prefabricated base plate with ribbing, described prefabricated top board with ribbing lays roof steel bar along vertical, horizontal, and vertically on prefabricated top board with ribbing, lay reserved lacing wire, on prefabricated top board with ribbing, transversely interval is laid with and organizes rib of slab more, and prefabricated top board with ribbing is reserved with concreting hole or extravasating hole.
2. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, is characterized in that, the baseplate reinforcing bar of described prefabricated base plate with ribbing all adopts prestressed reinforcement or interval to lay prestressed reinforcement and nonprestressed reinforcement.
3. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, the reserved lacing wire of described prefabricated base plate with ribbing and vertical, horizontal baseplate reinforcing bar are that spatial vertical angle is arranged.
4. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, the reserved lacing wire of described prefabricated top board with ribbing and vertical, horizontal roof steel bar are that spatial vertical angle is arranged.
5. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, the roof steel bar of described prefabricated base plate with ribbing all adopts nonprestressed reinforcement.
6. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, is characterized in that, the reserved lacing wire on described prefabricated top board with ribbing longitudinally parallel interval is laid.
7. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, the reserved lacing wire of described prefabricated base plate with ribbing is provided with many groups, often forms use, and corresponding symmetry is laid in the rib of slab both sides of prefabricated base plate with ribbing, base plate is connected with the reserved lacing wire of top board.
8. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, central authorities and four corner locations of prefabricated top board with ribbing are located in described concreting hole.
9. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, described concrete extravasating hole is located at four corner locations of prefabricated top board with ribbing.
10. a kind of two-sided prefabricated superimposed sheet as claimed in claim 1, it is characterized in that, the height of described prefabricated base plate rib of slab with ribbing is at least higher than prefabricated top plate rib 20mm with ribbing.
CN201520114585.XU 2015-02-16 2015-02-16 A kind of two-sided prefabricated superimposed sheet Active CN204491948U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520114585.XU CN204491948U (en) 2015-02-16 2015-02-16 A kind of two-sided prefabricated superimposed sheet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520114585.XU CN204491948U (en) 2015-02-16 2015-02-16 A kind of two-sided prefabricated superimposed sheet

Publications (1)

Publication Number Publication Date
CN204491948U true CN204491948U (en) 2015-07-22

Family

ID=53571258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520114585.XU Active CN204491948U (en) 2015-02-16 2015-02-16 A kind of two-sided prefabricated superimposed sheet

Country Status (1)

Country Link
CN (1) CN204491948U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631675A (en) * 2015-02-16 2015-05-20 济南轨道交通集团有限公司 Double-face prefabricated superimposed plate

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631675A (en) * 2015-02-16 2015-05-20 济南轨道交通集团有限公司 Double-face prefabricated superimposed plate
CN104631675B (en) * 2015-02-16 2017-08-25 济南轨道交通集团有限公司 A kind of two-sided prefabricated superimposed sheet

Similar Documents

Publication Publication Date Title
CN204435638U (en) A kind of hollow laminated floor slab
CN107542196A (en) Prestressed concrete bidirectional laminated slab and preparation method
CN202577704U (en) Composite floor slab for steel structure building
CN104612300A (en) Hollow composite floor slab and construction method thereof
CN104631674A (en) Composite floor slab and construction method thereof
CN102535711A (en) Laminated floor slab for steel buildings
CN201962877U (en) Reinforcing net for building wall
CN104234305A (en) Reinforced concrete prefabricated part plate with reserved holes in vertical and transverse directions
CN113898102A (en) Ribbed concrete laminated slab
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN212670968U (en) Composite floor and building
CN204491948U (en) A kind of two-sided prefabricated superimposed sheet
CN111877622B (en) Full-assembly type concrete floor slab seam butterfly type connecting node
CN104631675A (en) Double-face prefabricated superimposed plate
CN107965081A (en) Plastic hollow ball overlaps prefabricated board
CN210713517U (en) Assembled superposed beam structure
KR101014570B1 (en) Deck for constructing concrete slabes
CN209703805U (en) A kind of novel superposed superstructure suitable for steel construction H profile steel beam
CN203129604U (en) Structure for controlling thickness of reinforced concrete floor slab
CN204491947U (en) A kind of laminated floor slab
CN206957042U (en) Light composite heat insulation outer wall plate and particular manufacturing craft
CN114182867A (en) Ribbed concrete laminated slab and implementation method thereof
CN204676695U (en) Prefabricated balcony breast board installation structure
CN208309947U (en) A kind of hollow floor
CN206256587U (en) Steel bar girder

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant