CN204491822U CN201520097971.2U CN201520097971U CN204491822U CN 204491822 U CN204491822 U CN 204491822U CN 201520097971 U CN201520097971 U CN 201520097971U CN 204491822 U CN204491822 U CN 204491822U
Authority
CN
China
Prior art keywords
gallery
sewage
flushing
water
water storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520097971.2U
Other languages
Chinese (zh)
Inventor
李习洪
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Drainage Systems Co Ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201520097971.2U priority Critical patent/CN204491822U/en
Application granted granted Critical
Publication of CN204491822U publication Critical patent/CN204491822U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a kind of storm detention tank rinse-system, belongs to water-treatment technology field.Comprise the first water district, described first water district delivery port is provided with the first open and close door, at the first water district delivery port, the acclive flushing gallery of tool is set, in flushing gallery bottom, the acclive sewage gallery of tool is set, described sewage gallery and rinse that gallery is mutually vertical arranges, described sewage gallery top is provided with the second water district, and described second water district delivery port is provided with the second open and close door, is provided with submersible sewage pump bottom described sewage gallery.The utility model will be divided into quantity not wait and have the flushing gallery of certain slope bottom storage pond, each flushing gallery front end is provided with water district and automatic hydraulic flushing device; Rinse gallery end and establish the sewage gallery collected and wash away sewage and have certain slope, sewage gallery front end is provided with water district and automatic flushing device, and end is provided with submersible sewage pump; The sediment of rainwater in storage pond can be rinsed, easily and effectively.

Description

雨水调蓄池冲洗系统Rainwater storage tank flushing system

技术领域technical field

本实用新型属于水处理技术领域,具体涉及一种雨水调蓄池冲洗系统。The utility model belongs to the technical field of water treatment, in particular to a flushing system for a rainwater storage tank.

背景技术Background technique

随着城市进程的加快,不可渗透地表面的增加,地表面雨水径流量由原来的10%增加到55%,导致城市内涝及初期雨水污染严重。调蓄池不仅可消减雨水洪峰,而且可避免初期雨水造成的面污染,但是雨水中的杂质在调蓄池中很容易淤积,并积成板结,需及时清理,为下次正常运行做准备,但人工清除不仅危险,而且效率低,因此需要一套完整的冲洗系统。With the acceleration of the urban process and the increase of the impermeable surface, the surface rainwater runoff increased from 10% to 55%, resulting in serious urban waterlogging and initial rainwater pollution. The storage tank can not only reduce the flood peak of rainwater, but also avoid the surface pollution caused by the initial rainwater. However, impurities in the rainwater are easy to deposit in the storage tank and accumulate into compactions. It needs to be cleaned in time to prepare for the next normal operation. But manual removal is dangerous and inefficient, requiring a complete flushing system.

实用新型内容Utility model content

本实用新型的目的就是针对现有技术的缺陷,提供一种雨水调蓄池冲洗系统。The purpose of this utility model is to provide a flushing system for a rainwater storage tank aiming at the defects of the prior art.

本实用新型采用的技术方案是:包括第一存水区,所述第一存水区出水口设有第一启闭门,在第一存水区出水口设置具有坡度的冲洗廊道,在冲洗廊道底端设置具有坡度的污水廊道,所述污水廊道与冲洗廊道相互垂直设置,所述污水廊道顶端设有第二存水区,所述第二存水区出水口设有第二启闭门,所述污水廊道底部设有潜污泵。The technical scheme adopted by the utility model is: including the first water storage area, the water outlet of the first water storage area is provided with a first opening and closing door, and the water outlet of the first water storage area is provided with a flushing corridor with a slope, A sewage corridor with a slope is arranged at the bottom of the flushing corridor, the sewage corridor and the flushing corridor are arranged perpendicular to each other, a second water storage area is provided at the top of the sewage corridor, and the outlet of the second water storage area is provided There is a second opening and closing door, and a submersible sewage pump is arranged at the bottom of the sewage corridor.

作为优选,所述第一存水区包括第一存水室体,所述第一存水室体顶部不封口,所述第一存水室体内底部设有斜坡,所述斜坡底部一侧朝向第一启闭门设置。Preferably, the first water storage area includes a first water storage chamber, the top of the first water storage chamber is not sealed, and a slope is provided at the bottom of the first water storage chamber, and one side of the bottom of the slope faces The first opening and closing door setting.

作为优选,所述第一存水室体包括若干并排间隔设置的第一存水分区,每个第一存水分区出水口分别设有第一启闭门,所述冲洗廊道包括若干并排间隔设置的冲洗廊道支道,第一存水分区分别与冲洗廊道支道一一对应。Preferably, the first water storage chamber body includes several first water storage subregions arranged side by side at intervals, and the outlet of each first water storage subregion is respectively provided with a first opening and closing door, and the flushing corridor includes several side-by-side intervals. For the flushing corridor branches set, the first water storage partitions correspond to the flushing corridor branches one by one.

作为优选,所述第二存水区包括第二存水室体,所述第二存水室体顶部不封口,所述第二存水室体内底部设有斜坡,所述斜坡底部一侧朝向第二启闭门设置。Preferably, the second water storage area includes a second water storage chamber, the top of the second water storage chamber is not sealed, and a slope is provided at the bottom of the second water storage chamber, and one side of the bottom of the slope faces The second opening and closing door setting.

作为优选,所述斜坡的坡度比是1:3至1:7之间。Preferably, the slope ratio of the slope is between 1:3 and 1:7.

作为优选,所述第一启闭门为拍门式冲洗门。Preferably, the first opening and closing door is a flap-type flushing door.

作为优选,所述第二启闭门为微型拦蓄门。Preferably, the second opening and closing door is a miniature storage door.

作为更优选,所述第一存水区内设有第一液位传感器,所述第二存水区内设有第二液位传感器。More preferably, a first liquid level sensor is provided in the first water storage area, and a second liquid level sensor is provided in the second water storage area.

本实用新型将调蓄池底部分为数量不等及具有一定坡度的冲洗廊道,每个冲洗廊道前端设置有存水区和水力自动冲洗装置;冲洗廊道末端设收集冲刷污水及具有一定坡度的污水廊道,污水廊道前端设置有存水区和自动冲洗装置,末端设置有潜污泵;能够将调蓄池中雨水的沉淀物进行冲洗,方便有效。The utility model divides the bottom of the storage pool into flushing corridors with different numbers and a certain slope. The front end of each flushing corridor is provided with a water storage area and a hydraulic automatic flushing device; For the sloped sewage corridor, the front end of the sewage corridor is equipped with a water storage area and an automatic flushing device, and the end is equipped with a submersible sewage pump; it can flush the rainwater sediment in the storage tank, which is convenient and effective.

附图说明Description of drawings

图1是本实用新型结构示意图;Fig. 1 is a structural representation of the utility model;

图2是本实用新型侧视图。Fig. 2 is a side view of the utility model.

图中,1-第一存水区、2-第一启闭门、3-冲洗廊道、4-污水廊道、5-第二启闭门、6-第二存水区、7-第一液位传感器、8-第二液位传感器、9-潜污泵、10-斜坡。In the figure, 1-first water storage area, 2-first opening and closing door, 3-flush corridor, 4-sewage corridor, 5-second opening and closing door, 6-second water storage area, 7-the first One liquid level sensor, 8-second liquid level sensor, 9-submersible sewage pump, 10-slope.

具体实施方式Detailed ways

下面结合附图和具体实施例对本实用新型作进一步的详细说明,便于清楚地了解本实用新型,但它们不对本实用新型构成限定。The utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments to facilitate a clear understanding of the utility model, but they do not limit the utility model.

如图1、图2所示,本实用新型包括第一存水区1,所述第一存水区1出水口设有第一启闭门2,在第一存水区1出水口设置具有坡度的冲洗廊道3,在冲洗廊道3底端设置具有坡度的污水廊道4,所述污水廊道4与冲洗廊道3相互垂直设置,所述污水廊道4顶端设有第二存水区6,所述第二存水区6出水口设有第二启闭门5,所述污水廊道4底部设有潜污泵9。所述第一存水区1内设有第一液位传感器7,所述第二存水区6内设有第二液位传感器8。As shown in Fig. 1 and Fig. 2, the utility model comprises a first water storage area 1, the first opening and closing door 2 is provided at the water outlet of the first water storage area 1, and the water outlet of the first water storage area 1 is provided with a The flushing corridor 3 with a slope is provided with a sloped sewage corridor 4 at the bottom of the flushing corridor 3, the sewage corridor 4 and the flushing corridor 3 are arranged perpendicular to each other, and the top of the sewage corridor 4 is provided with a second storage In the water area 6, a second opening and closing door 5 is provided at the water outlet of the second water storage area 6, and a submersible sewage pump 9 is provided at the bottom of the sewage corridor 4. A first liquid level sensor 7 is provided in the first water storage area 1 , and a second liquid level sensor 8 is provided in the second water storage area 6 .

上述技术方案中,所述第一存水区1包括第一存水室体1.1,所述第一存水室体1.1顶部不封口,所述第一存水室体1.1内底部设有斜坡10,所述斜坡10的坡度比是1:3至1:7之间,优选1:5,所述斜坡10底部一侧朝向第一启闭门2设置。所述第一存水室体1.1包括若干并排间隔设置的第一存水分区1.2,每个第一存水分区1.2出水口分别设有第一启闭门2,所述冲洗廊道3包括若干并排间隔设置的冲洗廊道支道3.1,第一存水分区1.2分别与冲洗廊道支道3.1一一对应,所述第一启闭门2为拍门式冲洗门。In the above technical solution, the first water storage area 1 includes a first water storage chamber body 1.1, the top of the first water storage chamber body 1.1 is not sealed, and the inner bottom of the first water storage chamber body 1.1 is provided with a slope 10 , the slope ratio of the slope 10 is between 1:3 and 1:7, preferably 1:5, and the bottom side of the slope 10 is set toward the first opening and closing door 2 . The first water storage chamber body 1.1 includes a number of first water storage subregions 1.2 arranged side by side at intervals, and the outlet of each first water storage subregion 1.2 is respectively provided with a first opening and closing door 2, and the flushing corridor 3 includes several The flushing corridor branches 3.1 arranged side by side at intervals and the first water storage area 1.2 correspond to the flushing corridor branches 3.1 respectively, and the first opening and closing door 2 is a flap-type flushing door.

上述技术方案中,所述第二存水区6包括第二存水室体,所述第二存水室体顶部不封口,所述第二存水室体内底部设有斜坡10,所述斜坡10的坡度比是1:3至1:7之间,优选1:5,所述斜坡10底部一侧朝向第二启闭门5设置,所述第二启闭门5为微型拦蓄门。In the above technical solution, the second water storage area 6 includes a second water storage chamber body, the top of the second water storage chamber body is not sealed, and a slope 10 is provided at the bottom of the second water storage chamber body, and the slope The slope ratio of 10 is between 1:3 and 1:7, preferably 1:5, and the bottom side of the slope 10 is set towards the second opening and closing door 5, which is a miniature storage door.

本实用新型中第一存水区1用于储存水对冲洗廊道3中的沉淀物进行冲洗;冲洗廊道3主要用于收集调蓄池中雨水的沉淀物;污水廊道4主要用于收集冲洗廊道3冲刷下来的污水,通过潜污泵9排放到与污水处理厂相连的管道中;污水廊道4顶端设有第二存水区6用于冲刷污水廊道4。In the utility model, the first water storage area 1 is used for storing water to flush the sediment in the flushing corridor 3; the flushing corridor 3 is mainly used for collecting the sediment of rainwater in the storage tank; the sewage corridor 4 is mainly used for The sewage washed down by the flushing corridor 3 is collected and discharged into the pipeline connected with the sewage treatment plant through the submersible sewage pump 9;

本实用新型工作过程:当一次强降雨后,雨水调蓄池中蓄水慢慢排出,此时调蓄池底部沉淀许多脏污,因此必须要对其进行冲洗。此时,设置在第一存水区1墙壁上的拍门式冲洗门2开启,第一存水区1瞬间释放,产生强大的冲击力对冲洗廊道3上的沉淀物进行冲刷;第一存水区1中的水排空后,第一液位传感器7发送信号给控制中心,拍门式冲洗门2关闭,等待下一次冲洗。The working process of the utility model: after a heavy rainfall, the water stored in the rainwater storage tank is slowly discharged. At this time, a lot of dirt is deposited on the bottom of the storage tank, so it must be washed. At this time, the flapper-type flushing door 2 arranged on the wall of the first water storage area 1 is opened, and the first water storage area 1 is released instantly, generating a strong impact force to wash away the sediment on the flushing corridor 3; the first After the water in the water storage area 1 is emptied, the first liquid level sensor 7 sends a signal to the control center, and the flap door type flushing door 2 is closed, waiting for the next flushing.

冲刷到污水廊道4中的污水通过潜污泵9排到污水处理厂的输送管道中,等待污水廊道4中的污水抽干后,污水廊道4中的第二液位传感器8发送信号给控制中心,污水廊道4存水区前端的微型拦蓄门5自动开启,释放的水对污水廊道4进行冲洗,冲洗的污水通过潜污泵9排放到污水处理厂相连的管道中。The sewage washed into the sewage corridor 4 is discharged into the delivery pipeline of the sewage treatment plant through the submersible sewage pump 9, and after the sewage in the sewage corridor 4 is drained, the second liquid level sensor 8 in the sewage corridor 4 sends a signal For the control center, the micro-retention door 5 at the front end of the sewage corridor 4 water storage area is automatically opened, and the released water flushes the sewage corridor 4, and the flushed sewage is discharged into the pipeline connected to the sewage treatment plant through the submersible sewage pump 9.

本说明书未作详细描述的内容属于本领域专业技术人员公知的现有技术。The content not described in detail in this specification belongs to the prior art known to those skilled in the art.

Claims (8)

1. a storm detention tank rinse-system, it is characterized in that: comprise the first water district (1), described first water district (1) delivery port is provided with the first open and close door (2), at the first water district (1) delivery port, the acclive flushing gallery (3) of tool is set, in flushing gallery (3) bottom, the acclive sewage gallery (4) of tool is set, described sewage gallery (4) is arranged with flushing gallery (3) is mutually vertical, described sewage gallery (4) top is provided with the second water district (6), described second water district (6) delivery port is provided with the second open and close door (5), described sewage gallery (4) bottom is provided with submersible sewage pump (9).
2. storm detention tank rinse-system according to claim 1, it is characterized in that: described first water district (1) comprises the first water storage chamber body (1.1), described first water storage chamber body (1.1) top open-ended, described first water storage chamber body (1.1) inner bottom part is provided with slope (10), and side, described slope (10) bottom is arranged towards the first open and close door (2).
3. storm detention tank rinse-system according to claim 2, it is characterized in that: described first water storage chamber body (1.1) comprises the first water subregion (1.2) that some spacing side by side are arranged, each first water subregion (1.2) delivery port is respectively equipped with the first open and close door (2), described flushing gallery (3) comprises the flushing gallery by-path (3.1) that some spacing side by side are arranged, the first water subregion (1.2) respectively with flushing gallery by-path (3.1) one_to_one corresponding.
4. storm detention tank rinse-system according to claim 1, it is characterized in that: described second water district (6) comprises the second water storage chamber body, described second water storage chamber body top open-ended, described second water storage chamber body inner bottom part is provided with slope (10), and side, described slope (10) bottom is arranged towards the second open and close door (5).
5. the storm detention tank rinse-system according to claim 2 or 4, is characterized in that: the ratio of slope of described slope (10) is between 1:3 to 1:7.
6. storm detention tank rinse-system according to claim 1 and 2, is characterized in that: described first open and close door (2) is flap type flushing door.
7. the storm detention tank rinse-system according to claim 1 or 4, is characterized in that: described second open and close door (5) retains door for miniature.
8. storm detention tank rinse-system according to claim 1, it is characterized in that: in described first water district (1), be provided with the first liquid level sensor (7), in described second water district (6), be provided with the second liquid level sensor (8).
CN201520097971.2U 2015-02-11 2015-02-11 Storm detention tank rinse-system Expired - Fee Related CN204491822U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520097971.2U CN204491822U (en) 2015-02-11 2015-02-11 Storm detention tank rinse-system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520097971.2U CN204491822U (en) 2015-02-11 2015-02-11 Storm detention tank rinse-system

Publications (1)

Publication Number Publication Date
CN204491822U true CN204491822U (en) 2015-07-22

Family

ID=53571129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520097971.2U Expired - Fee Related CN204491822U (en) 2015-02-11 2015-02-11 Storm detention tank rinse-system

Country Status (1)

Country Link
CN (1) CN204491822U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631612A (en) * 2015-02-11 2015-05-20 武汉圣禹排水系统有限公司 Flushing system for rainwater regulation and storage tanks
CN107626700A (en) * 2017-09-30 2018-01-26 武汉圣禹排水系统有限公司 Rainwater treatment pond flusher and the online device for treating rain water for including it

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104631612A (en) * 2015-02-11 2015-05-20 武汉圣禹排水系统有限公司 Flushing system for rainwater regulation and storage tanks
CN107626700A (en) * 2017-09-30 2018-01-26 武汉圣禹排水系统有限公司 Rainwater treatment pond flusher and the online device for treating rain water for including it

Similar Documents

Publication Publication Date Title
CN207405728U (en) A kind of reverse-filling shunting well
CN204139302U (en) One can self-cleaning rectangle storm detention tank
CN104179248B (en) A kind of vacuum of drainage pipeline networks rinses desilting system
CN104878825A (en) High-capacity impound pipeline rainwater impounding and discharging system and method
CN103806525A (en) Gantry self-flushing device for rainwater storage tank
CN203230037U (en) Unpowered impoundment flushing gate used for drainpipe automatic flushing
CN104631612B (en) Flushing system for rainwater regulation and storage tanks
CN108457364A (en) A kind of rainwater-collecting purified treatment reclaiming system
CN205259259U (en) Energy saving building rainwater collecting system
CN208578136U (en) An initial rainwater separation device
CN214884288U (en) Rainwater regulation and storage tank cleaned by utilizing aeration sand settling and sand pump suction and discharge of silt
CN203113499U (en) Rainwater collecting, current discarding, and filtering unit capable of electrically control liquid level
CN209874028U (en) A rainwater storage tank with hydraulic self-purification function
CN105839757B (en) A kind of rainwater drainage method and device based on hydrodynamics and lever principle
CN203498996U (en) Sewage pumping station forebay structure convenient for desilting
CN206512842U (en) The first rain storage pond of supernatant gravity-elution
CN206706890U (en) A kind of sponge Urban roof rainwater delay shunt recovery system
CN210066991U (en) Regulation pond convenient to wash silt
CN204959950U (en) Rainwater automatic collection emptying devices
CN103741785B (en) A kind of rain water drainage part flow arrangement
CN204401774U (en) Underground open type storage pond
CN209490519U (en) A kind of irrigation channel water rinses the device of deposit in storage pond
CN204212052U (en) A kind of bridge deck rainwater collecting eco-filtration device
CN108867756B (en) Rainwater recycling device
CN207582617U (en) A kind of drainage system with first rain storage pond and online processing storage pond

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20220211