CN204491615U - Netted provisions for grouting bottom steel lining - Google Patents

Netted provisions for grouting bottom steel lining Download PDF

Info

Publication number
CN204491615U
CN204491615U CN201520161875.XU CN201520161875U CN204491615U CN 204491615 U CN204491615 U CN 204491615U CN 201520161875 U CN201520161875 U CN 201520161875U CN 204491615 U CN204491615 U CN 204491615U
Authority
CN
China
Prior art keywords
grouting
steel lining
arm
netted
supervisor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520161875.XU
Other languages
Chinese (zh)
Inventor
詹剑霞
汪文亮
刘焕
刘勇
朱俊杰
谢国胜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gezhouba Xinjiang Engineering Co ltd
Original Assignee
China Gezhouba Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Gezhouba Group Co Ltd filed Critical China Gezhouba Group Co Ltd
Priority to CN201520161875.XU priority Critical patent/CN204491615U/en
Application granted granted Critical
Publication of CN204491615U publication Critical patent/CN204491615U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

Netted provisions for grouting bottom a kind of steel lining, comprise grouting supervisor and grouting arm, grouting arm is responsible for the multiple preformed holes on steel lining as crosspoint with grouting, crisscross in netted mounting arrangements, the stack be connected with the arm that is in the milk also is laid with outside it, the multiple preformed hole of described grouting supervisor's lateral direction penetrating is close to bottom steel lining, and in bending roundabout layout, grouting arm longitudinally connects two adjacent preformed holes and is close to bottom steel lining and arranges.Netted provisions for grouting bottom the steel lining that the utility model provides, be communicated with grouting supervisor by tube drawing grouting arm and form netted grouting pipeline, cement paste is injected from one end of grouting supervisor, whole line arrangement regional perfusion can be made closely knit, overcome and to be provided with stiffening ring bottom steel lining and to be difficult to arrange that pulp boxlike grouting system and grout cell easily damage and occur the problem that blocks, expand grouting contact area, ensure that grouting quality, reduce construction cost, be especially applicable to the contact grouting in Large Steel substrate portion.

Description

Netted provisions for grouting bottom steel lining
Technical field
The utility model relates to construction work grouting construction field, is specially netted provisions for grouting bottom a kind of steel lining.
Background technology
In the steel lining concrete constructions such as the penstock in power station and unit draft tube elbow, concrete setting bottom steel lining can produce after shrinking and change phenomenon of coming to nothing into, usual employing pre-buried pulp boxlike grouting system, then grout injection is clearance filled closely knit by what come to nothing.There is following problem in this form of construction work: on the one hand, owing to having laid multiple tracks stiffening ring bottom ell, penstock, affect the layout of grouting system, cause the fixing difficulty of grout cell, bury difficult quality underground and produce a desired effect, in casting process, grout cell is easily shifted and damages, cause grouting pipeline Partial Blocking to be scrapped, grouting quality cannot effectively be ensured.On the other hand, pulp boxlike grouting system is point cantact pulp, and grouting scope can not bottom all standing steel lining, need the later stage to set up grout hole supplementary irrigation in steel lining face, increases construction cost.
Summary of the invention
Technical problem to be solved in the utility model is to provide netted provisions for grouting bottom a kind of steel lining, can solve and be provided with stiffening ring bottom steel lining and be difficult to arrange that pulp boxlike grouting system and grout cell easily damage and occur the problem that blocks, expand grouting contact area, effective raising grouting quality, and bury underground conveniently, simple to operate, steady quality, with low cost.
For solving the problems of the technologies described above, the technical scheme that the utility model adopts is:
Netted provisions for grouting bottom a kind of steel lining, comprise grouting supervisor and grouting arm, grouting arm is responsible for the multiple preformed holes on steel lining for crosspoint with grouting, crisscross in netted mounting arrangements, is also laid with the stack be connected with the arm that is in the milk outside it.
The described multiple preformed hole of grouting supervisor's lateral direction penetrating is close to bottom steel lining, in bending roundabout layout.
Described grouting arm longitudinally connects two adjacent preformed holes and is close to bottom steel lining and arranges.
Described grouting supervisor and grouting arm pass through U-shaped bracket support in the bottom of steel lining.
The lower concrete that described steel lining preformed hole is corresponding has cavity.
Described grouting supervisor is hard plastic tube, and grouting arm is flexible plastic tube drawing.
Described grouting supervisor cuts off through before the part grouting of preformed hole.
Close with steel closure plate before described steel lining preformed hole grouting.
The utility model has following beneficial effect:
Netted provisions for grouting bottom a kind of steel lining that the utility model provides, is close to bottom steel lining snakelike laying grouting supervisor, is communicated with grouting supervisor forms netted grouting pipeline by tube drawing grouting arm.Inject cement paste from one end of grouting supervisor, whole line arrangement regional perfusion can be made closely knit.Overcome and to be provided with stiffening ring bottom steel lining and to be difficult to arrange that pulp boxlike grouting system and grout cell easily damage and occur the problem that blocks, expand grouting contact area, ensure that grouting quality, reduce construction cost.Especially the contact grouting in Large Steel substrate portion is applicable to.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail.
Fig. 1 is layout schematic diagram of the present utility model.
Fig. 2 is the A place enlarged fragmentary cross section of Fig. 1.
Fig. 3 is the B place enlarged fragmentary cross section of Fig. 1.
Fig. 4 is U-shaped bracket schematic diagram of the present utility model.
Fig. 5 is the utility model grouting supervisor and the front sectional drawing of arm crossover node grouting.
In figure, grouting supervisor 1, grouting arm 2, preformed hole 3, stack 4, steel lining 5, cavity 6, U-shaped bracket 7, steel closure plate 8.
C stock inlet, D grout outlet, E exhaust opening.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiment of the present utility model is described further.
As shown in Figure 1, netted provisions for grouting bottom a kind of steel lining, comprises grouting supervisor 1 and grouting arm 2, grouting arm 2 with grouting supervisor 1 with the multiple preformed holes 3 on steel lining 5 for crosspoint, crisscross in netted mounting arrangements, be also laid with the stack 4 be connected with the arm 2 that is in the milk outside it.
The multiple preformed hole 3 of described grouting supervisor 1 lateral direction penetrating is close to bottom steel lining 5, in bending roundabout layout, grouting supervisor 1 takes lateral arrangement consistent with steel lining stiffening ring arranged direction, the small sircle hole local wide of stiffening ring and steel lining joint makes grouting be responsible for 1 to pass, avoid the interference of stiffening ring by corner.
Described grouting arm 2 longitudinally connects two adjacent preformed holes 3 and is close to layout bottom steel lining 5.
As shown in Figure 2, the lower concrete of steel lining 5 preformed hole 3 correspondence has cavity 6, and cavity draws the type of scraping out before concrete initial set bottom steel lining.
Described grouting supervisor 1 is hard plastic tube, and grouting arm 2 is flexible plastic tube drawing, and grouting supervisor 1 preferably diameter is 40mm hard plastic tube, and grouting arm 2 preferably diameter is 20mm flexible plastic tube.Tube drawing diameter passes through the small sircle hole of stiffening ring and steel lining joint compared with I, avoids the interference of stiffening ring.The duct that formation extracted by tube drawing after concreting is grouting branch passageway.
As shown in Figure 3, grouting arm is drawn concrete storehouse surface part and is installed stack 4, stack 4 preferably diameter is 40mm hard plastic tube, tee junction is set with stack joint, grouting arm 2 one end is inserted in established concrete pore passage, the other end runs in tracheae tee junction, and stack is discharged by air in hole when ensureing grouting.
As shown in Figure 4, grouting supervisor 1 and grouting arm 2 are supported on the bottom of steel lining 5 by U-shaped bracket 7, the U-shaped of U-shaped bracket 7 blocks grout pipe, and support bottom is fixed on steel mesh reinforcement.
As shown in Figure 5, described grouting supervisor 1 cuts off through before the part grouting of preformed hole 3, makes grouting be responsible for 1 duct formed with grouting arm 2(tube drawing) form the netted grouting channel of right-angled intersection.
As shown in Figure 5, close with steel closure plate 8 before steel lining 5 preformed hole 3 is in the milk, supervisor 1 of being namely in the milk closes at infall (steel lining preformed hole) with grouting arm 2, ensures that whole netted grouting system is enclosed construction, steel closure plate 8 and preformed hole adopt welded closure, not spillage when ensureing to be in the milk.
Specific works process of the present utility model and operating principle are:
Implementation step: be close to steel lining bottom surface and install grouting supervisor 1 and grouting arm 2, grouting supervisor 1 and grouting arm 2 are supported on the bottom of steel lining 5 with U-shaped bracket 7, tray chamber is every 50 ㎝ pitch arrangement.Inflate and be full of in hole in concreting forward direction grouting arm 2.
Position in storehouse checks and accepts after-pouring steel lining lower concrete.
Before concrete initial set, manually the below of steel lining preformed hole 3 correspondence is drawn and scrapes out cavity, until concrete initial set after about 1 hour flexible plastic tube exhaust extract flexible pipe, form grouting arm 2 passage.Grouting supervisor 1 cut off through before the part of preformed hole 3, and clear up the foreign material in cavity, pressure wind checks the unobstructed situation of pipeline, is closed by each preformed hole on steel lining with steel closure plate 8.
Can carry out grouting works after above-mentioned work completes, during grouting, enter slurry from the inlet pipe mouth of grouting supervisor 1, grout outlet pulp, the strengthening motoring reaching design requires rear stopping.

Claims (6)

1. netted provisions for grouting bottom a steel lining, comprise grouting supervisor (1) and grouting arm (2), it is characterized in that, grouting arm (2) is responsible for (1) with the multiple preformed holes (3) on steel lining (5) for crosspoint with grouting, crisscross in netted mounting arrangements, be also laid with the stack (4) be connected with the arm that is in the milk (2) outside it;
The described grouting supervisor's multiple preformed hole of (1) lateral direction penetrating (3) is close to steel lining (5) bottom, in bending roundabout layout;
Described grouting arm (2) longitudinally connects two adjacent preformed holes (3) and is close to steel lining (5) bottom layout.
2. netted provisions for grouting bottom a kind of steel lining according to claim 1, is characterized in that: grouting supervisor (1) and grouting arm (2) are supported on the bottom of steel lining (5) by U-shaped bracket (7).
3. netted provisions for grouting bottom a kind of steel lining according to claim 1, is characterized in that: the lower concrete that steel lining (5) preformed hole (3) is corresponding has cavity (6).
4. netted provisions for grouting bottom a kind of steel lining according to claim 1, is characterized in that: described grouting supervisor (1) is hard plastic tube, and grouting arm (2) is flexible plastic tube drawing.
5. netted provisions for grouting bottom a kind of steel lining according to claim 1, is characterized in that: described grouting supervisor (1) is cut off through before the part grouting of preformed hole (3).
6. netted provisions for grouting bottom a kind of steel lining according to claim 1, is characterized in that: close with steel closure plate (8) before described steel lining (5) preformed hole (3) grouting.
CN201520161875.XU 2015-03-23 2015-03-23 Netted provisions for grouting bottom steel lining Expired - Fee Related CN204491615U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520161875.XU CN204491615U (en) 2015-03-23 2015-03-23 Netted provisions for grouting bottom steel lining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520161875.XU CN204491615U (en) 2015-03-23 2015-03-23 Netted provisions for grouting bottom steel lining

Publications (1)

Publication Number Publication Date
CN204491615U true CN204491615U (en) 2015-07-22

Family

ID=53570916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520161875.XU Expired - Fee Related CN204491615U (en) 2015-03-23 2015-03-23 Netted provisions for grouting bottom steel lining

Country Status (1)

Country Link
CN (1) CN204491615U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235391A (en) * 2018-11-01 2019-01-18 中国电建集团成都勘测设计研究院有限公司 The surface grouting structure of diversion outlet closuring concrete

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109235391A (en) * 2018-11-01 2019-01-18 中国电建集团成都勘测设计研究院有限公司 The surface grouting structure of diversion outlet closuring concrete

Similar Documents

Publication Publication Date Title
CN106120801B (en) Pipeline crosses the construction method at foundation ditch in water-rich sand layer
CN105484773A (en) System plugging and draining structure for tunnel leakage treatment
CN103132488B (en) Reverse osmosis water processing method and reverse osmosis drainage system in construction period of concrete faced rockfill dam
CN106089297A (en) Railway tunnel bottom structure drainage device and method to set up thereof
CN103615044B (en) Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline
CN204491615U (en) Netted provisions for grouting bottom steel lining
CN102677676B (en) Groove-pipe combined exhaust technology for joint grouting for normal concrete arch dam
CN105525631A (en) Leaking stoppage method and structure for treating water bursting holes of bottom plate
CN205714215U (en) Tunnel-liner decompression section of jurisdiction and pipe-plate lining structure
CN104032709A (en) Silt prevention method for curves of urban rivers
CN103806412B (en) A kind of expansion joint of pool leaks repair structure
CN205370597U (en) A system's leaking stoppage and drainage structures for tunnel seepage is administered
CN107542097B (en) Drainage device for water seepage at joint of deep foundation pit support structure and construction method thereof
CN205954632U (en) Pipeline crosses supporting construction of foundation ditch department in rich water sand layer
CN202323880U (en) Reverse osmosis drainage system of concrete face rockfill dam in construction period
CN205477669U (en) A slip casting system that is used for combined type lining cutting structure to backfill slip casting behind one's back
CN205012283U (en) Bulky concrete shutoff body structure in hydraulic tunnel
CN210013303U (en) Connecting structure for new and old sewage pipelines
CN103821109B (en) Expansion joint of pool leaks restorative procedure
CN203925521U (en) A kind of shield tunnel bottom stratum consolidation channels configuration
CN205918445U (en) Railway tunnel polycrystalline substance drainage device
CN202055256U (en) Concentrated water diversion and drainage device for large-area water seepage slope surface
CN205171554U (en) Chute inspection shaft is inlayed to socket joint formula
CN105060668A (en) Prefabricated reinforced concrete septic tank and assembly method thereof
CN101392513B (en) Structural joint design by utilizing exterior hydraulic pressure and construction process thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180105

Address after: 830049 No. 918 Xinhua South Road, the Xinjiang Uygur Autonomous Region, Urumqi

Patentee after: Gezhouba Xinjiang Engineering Co.,Ltd.

Address before: 443002 Hubei province Yichang City Road No. 1

Patentee before: CHINA GEZHOUBA GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

CF01 Termination of patent right due to non-payment of annual fee