CN103615044B - Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline - Google Patents
Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline Download PDFInfo
- Publication number
- CN103615044B CN103615044B CN201310677748.0A CN201310677748A CN103615044B CN 103615044 B CN103615044 B CN 103615044B CN 201310677748 A CN201310677748 A CN 201310677748A CN 103615044 B CN103615044 B CN 103615044B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- inner sleeve
- manhole
- upstream
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Sewage (AREA)
Abstract
The invention discloses an inner sleeve blocking method for leakage of a small-diameter concrete drainage pipeline. The method includes the following steps that first, a leakage well segment is judged out with a segmentation flow measurement method; second, a double-face conical iron bucket dredging device is sleeved with a rope to move back and forth to clean up impurities in the pipeline; third, in an upstream well segment inspection well of the pipeline to be handled, air is supplied into a pipe network continuously through an air blower, and the upstream pipeline is blocked; fourth, an inner sleeve is installed in the pipeline to be handled; fifth, the inner sleeve and the pipeline are blocked in the connection position of the inspection well, and mortar is injected between the inner sleeve and the pipeline for blocking. According to the method, the inner sleeve is additionally arranged in the leakage pipe segment, after the pipeline end is sealed, positions between the inner sleeve and the pipeline are grouted, so that a circular grouting ring is added to the inner side of the leakage pipe segment, and then the pipe leakage prevention effect is achieved. The method has the advantages of being simple in whole work procedure operation, short in construction period, low in cost and the like.
Description
Technical field
The present invention relates to a kind of concrete drain pipeline leakage plugging method, particularly relate to a kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking.
Background technology
Along with city ancillary facility construction is accelerated, supporting drainage pipe Seepage increases, and minor diameter drainage pipe leakage scenarios is particularly outstanding, and small diameter pipeline typically refers to the pipeline that caliber is 400 ~ 800mm.Once there is small diameter pipeline seepage, existing processing mode nearly all adopts and again excavates, and reinstalls pipeline.This mode, to the section being in town road and sidewalk, repeats excavation in a short time again, and bring trip inconvenience and the hidden danger in safety can to neighbouring resident, and the operation cycle is long, cost is high.
Summary of the invention
For above shortcomings in prior art, the invention provides one and avoid bringing trip inconvenience and the upper hidden danger of safety to resident, simple to operate, the cycle is short, the minor diameter concrete drain pipeline seepage inner sleeve method for blocking at the bottom of cost.
In order to solve the problems of the technologies described above, present invention employs following technical scheme:
A kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking, the method comprises the steps:
1) adopt the method for segmentation flow measurement to judge seepage well section: first according to road drainage construction drawing, analytically descend sewage network layout, plan-position and trend; Then the position of employing high light electric light, mirror-reflection method determination pipe leakage, verifies pipeline and manhole alluvial blocks, discharge situation;
2) adopt two-sided taper metal bucket dredger to put rope back and forth the foreign material in pipeline, deposit cleaning to be rinsed well: first manufacture two-sided taper metal bucket dredger, described two-sided taper metal bucket dredger is made up of sleeve and rope, external diameter 10 ~ the 12cm less of internal diameter of the pipeline of described sleeve, sleeve two ends sealing and tapered, the two ends of sleeve connect a rope respectively; Two-sided taper metal bucket dredger is put into pipeline by upstream manhole, the rope of sleeve one end is placed on upstream manhole, the rope of the sleeve other end flow in the manhole of downstream with water in pipeline, or by threader, the rope of the sleeve other end is delivered to downstream manhole; Then in upstream and downstream manhole, pull sleeve by rope, the mud deposited in pipeline, foreign material are pushed in manhole, finally pick up with clear fishing combined tool and transport;
3) in the upstream well section manhole of pending pipeline, uninterruptedly blow in pipe network with blast fan, manually enter in manhole and carry out shutoff to upstream line, the ponding after shutoff in well adopts in the manhole of the downstream well section of the pending pipeline of mode suction of pump drainage;
4) in pending pipeline, install inner sleeve: inner sleeve adopts pvc pipe, the diameter 100mm less of pending pipe diameter of pvc pipe, pvc pipe adopts segmentation blanking, installs in down-hole segmentation; Progressively increase pipeline lower cushion block thickness along the every 6m of updrift side and meet drainage grade requirement; Connect by the mode that the mating connector two ends of this pvc pipe connect in well, after inner sleeve runs through pipeline, inner sleeve with the plan-position of pipeline is: upstream position inner sleeve top exterior walls is near duct bottom position, and downstream position inner sleeve top exterior walls is near duct bottom position;
5) inner sleeve and pipeline carry out shutoff at manhole link position place, and upstream shutoff mouth arranges grouting mouth, and downstream shutoff mouth sets out pore, and the space between inner sleeve and pipeline adopts the mode pouring into mortar to carry out shutoff after shutoff mouth intensity reaches requirement.
As a preferred embodiment of the present invention, in step 2) in, for pipeline that is dry, blocking, first with giant flushing pipe repeatedly, then dredge with two-sided taper metal bucket dredger.
As another kind of preferred version of the present invention, in step 2) in, after finding out the upstream and downstream of every bar drainage pipe, first desilting dredging from drain header road, the branch pipe(tube) that then cleaning blocking is serious is finally all the other branch pipe(tube)s.
Beneficial effect of the present invention: the present invention increases the inner wall form of light-wall pipe as inner sleeve of a minor diameter in the pipeline section of seepage, using the outer wall template of the pipeline section of original seepage as inner sleeve, after Seal treatment is carried out to pipe head, grouting treatment is carried out between two templates, make it increase a circular grouting ring in the insides of pipes of seepage, reach the effect preventing pipe seepage; Both avoided repeating excavation, avoid the hidden danger brought to neighbouring resident in trip inconvenience and safety, whole process operations is simple, short construction period, and the advantage such as at the bottom of cost, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is pipe-dredging schematic diagram;
Fig. 2 is Pipe installing schematic diagram;
Fig. 3 is ducts upstream shutoff sectional schematic diagram;
Fig. 4 is pipe downstream shutoff sectional schematic diagram.
In accompanying drawing: 1-sleeve; 2-rope; 3-upstream detection well; 4-detected downstream well; 5-foreign material; 6-lifting appliance; 7-inner sleeve; 8-pipeline; 9-upstream pipeline section; 10-downstream pipeline section; 11-cement grouting.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
A kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking, the method comprises the steps:
1) adopt the method for segmentation flow measurement to judge seepage well section: first according to road drainage construction drawing, analytically descend sewage network layout, plan-position and trend; Then the position of employing high light electric light, mirror-reflection method determination pipe leakage, verifies pipeline and manhole alluvial blocks, discharge situation.
2) adopt two-sided taper metal bucket dredger to put rope back and forth the foreign material in pipeline, deposit cleaning to be rinsed well: first manufacture two-sided taper metal bucket dredger, two-sided taper metal bucket dredger is made up of sleeve 1 and rope 2, external diameter 10 ~ the 12cm less of internal diameter of the pipeline of sleeve 1, sleeve two ends sealing and tapered, the two ends of sleeve connect a rope respectively.Two-sided taper metal bucket dredger is put into pipeline by upstream manhole 3, the rope of sleeve one end is placed on upstream manhole 3, the rope of the sleeve other end flow in downstream manhole 4 with water in pipeline, or by threader, the rope of the sleeve other end is delivered to downstream manhole 4; Then in upstream and downstream manhole, pull sleeve by rope, the mud deposited in pipeline, foreign material 5 are pushed in manhole, finally pick up with lifting appliance 6 and clear fishing combined tool and transport, as shown in Figure 1.
3) in the upstream well section manhole of pending pipeline, uninterruptedly blow in pipe network with blast fan, manually enter in manhole and carry out shutoff to upstream line, the ponding after shutoff in well adopts in the manhole of the downstream well section of the pending pipeline of mode suction of pump drainage.
4) in pending pipeline, inner sleeve is installed (as shown in Figure 2, in figure, 7 is inner sleeve, 8 is pipeline, 9 is upstream pipeline section, and 10 is downstream pipeline section): inner sleeve 7 adopts pvc pipe, the diameter 100mm less of pending pipe diameter of pvc pipe, pvc pipe adopts segmentation blanking, install in down-hole segmentation, because inner sleeve 7 is laid by size impact empty in manhole, then sleeve pipe adopts segmentation blanking (concrete cutting length is foundation according to site inspection well size and handled easily); Progressively increase pipeline lower cushion block thickness along the every 6m of updrift side and meet drainage grade requirement; Connect by the mode that the mating connector two ends of this pvc pipe connect in well, after inner sleeve runs through pipeline, inner sleeve with the plan-position of pipeline is: upstream position inner sleeve top exterior walls is near pipeline tip position, as shown in Figure 3, downstream position inner sleeve bottom outer wall is near duct bottom position, as shown in Figure 4, the drain slope of inner sleeve is increased with this.In Fig. 3 and Fig. 4,11 is tank cement paste.
5) inner sleeve and pipeline adopt leak stopping king to carry out shutoff at manhole link position place, upstream shutoff mouth arranges grouting mouth, downstream shutoff mouth sets out pore, and the space between inner sleeve and pipeline adopts the mode pouring into mortar to carry out shutoff after shutoff mouth intensity reaches requirement.
The present invention adopts the inner wall form of light-wall pipe as inner sleeve 7 increasing a minor diameter in the pipeline 8 of seepage, using the outer wall template of the pipeline 8 of original seepage as inner sleeve.After Seal treatment is carried out to pipe head, between two templates, carry out grouting treatment, make it inside the pipeline section of seepage, increase a circular grouting ring, reach the effect preventing pipe seepage.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.
Claims (3)
1. a minor diameter concrete drain pipeline seepage inner sleeve method for blocking, it is characterized in that, the method comprises the steps:
1) adopt the method for segmentation flow measurement to judge seepage well section: first according to road drainage construction drawing, analytically descend sewage network layout, plan-position and trend; Then the position of employing high light electric light, mirror-reflection method determination pipe leakage, verifies pipeline and manhole alluvial blocks, discharge situation;
2) adopt two-sided taper metal bucket dredger to put rope back and forth the foreign material in pipeline, deposit cleaning to be rinsed well: first manufacture two-sided taper metal bucket dredger, described two-sided taper metal bucket dredger is made up of sleeve and rope, external diameter 10 ~ the 12cm less of internal diameter of the pipeline of described sleeve, sleeve two ends sealing and tapered, the two ends of sleeve connect a rope respectively; Two-sided taper metal bucket dredger is put into pipeline by upstream manhole, the rope of sleeve one end is placed on upstream manhole, the rope of the sleeve other end flow in the manhole of downstream with water in pipeline, or by threader, the rope of the sleeve other end is delivered to downstream manhole; Then in upstream and downstream manhole, pull sleeve by rope, the mud deposited in pipeline, foreign material are pushed in manhole, finally pick up with clear fishing combined tool and transport;
3) in the upstream well section manhole of pending pipeline, uninterruptedly blow in pipe network with blast fan, manually enter in the well section manhole of upstream and carry out shutoff to upstream line, the ponding after shutoff in upstream well section manhole adopts in the manhole of the downstream well section of the pending pipeline of mode suction of pump drainage;
4) in pending pipeline, inner sleeve is installed: inner sleeve adopts pvc pipe, the diameter 100mm less of pending pipe diameter of pvc pipe, pvc pipe adopts segmentation blanking, install in down-hole segmentation, connect by the mode that the mating connector two ends of this pvc pipe connect in well, after inner sleeve runs through pending pipeline, inner sleeve with the plan-position of pipeline is: upstream position inner sleeve top exterior walls is near pipeline tip position, and downstream position inner sleeve bottom outer wall is near duct bottom position;
5) inner sleeve and pipeline carry out shutoff at manhole link position place, and upstream shutoff mouth arranges grouting mouth, and downstream shutoff mouth sets out pore, and the space between inner sleeve and pipeline adopts the mode pouring into mortar to carry out shutoff after shutoff mouth intensity reaches requirement.
2. a kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking according to claim 1, it is characterized in that: in step 2) in, for pipeline that is dry, blocking, first with giant flushing pipe repeatedly, then dredge with two-sided taper metal bucket dredger.
3. a kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking according to claim 1, it is characterized in that: in step 2) in, after finding out the upstream and downstream of every bar drainage pipe, first desilting dredging from drain header road, then the branch pipe(tube) that cleaning blocking is serious is finally all the other branch pipe(tube)s.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310677748.0A CN103615044B (en) | 2013-12-13 | 2013-12-13 | Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310677748.0A CN103615044B (en) | 2013-12-13 | 2013-12-13 | Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103615044A CN103615044A (en) | 2014-03-05 |
CN103615044B true CN103615044B (en) | 2015-03-11 |
Family
ID=50165759
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310677748.0A Active CN103615044B (en) | 2013-12-13 | 2013-12-13 | Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103615044B (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105804203B (en) * | 2016-04-05 | 2018-08-03 | 中铁七局集团第五工程有限公司 | Buried major diameter discards the method for blocking of sewage conduct |
CN110670419A (en) * | 2019-10-21 | 2020-01-10 | 中铁四院集团岩土工程有限责任公司 | Method for renovating waterproof and drainage structure of ballastless track roadbed |
CN110925516A (en) * | 2019-12-04 | 2020-03-27 | 陕西中科非开挖技术股份有限公司 | Method for plugging rubber air bag of pipeline |
CN113091563B (en) * | 2021-04-13 | 2022-06-03 | 中冶建工集团有限公司 | Method for measuring thickness of sediment in drain pipe |
CN117169447B (en) * | 2023-11-02 | 2024-01-26 | 南通海济环保科技有限公司 | Sewage pipeline cleaning detection method and detection device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2911839A1 (en) * | 1978-03-25 | 1979-09-27 | Yasushi Nakashin | METHOD OF REPAIRING LEAKS IN AN UNDERGROUND PIPE |
FR2696811A1 (en) * | 1992-10-09 | 1994-04-15 | Weber Adolphe | Detecting and repairing leak in pipe from surface - by determining position of leak by inflatable blocks and injecting expandable resin into ground |
CN1755184A (en) * | 2004-09-29 | 2006-04-05 | 孙跃平 | Excavation-free integral restoration method of underground conduit and inspection well |
CN101023226A (en) * | 2004-09-16 | 2007-08-22 | 客纳福来有限公司 | Method of repairing drain pipe |
CN202380562U (en) * | 2012-01-12 | 2012-08-15 | 周勇 | Device for trenchless repair of partial collapse pipeline |
-
2013
- 2013-12-13 CN CN201310677748.0A patent/CN103615044B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2911839A1 (en) * | 1978-03-25 | 1979-09-27 | Yasushi Nakashin | METHOD OF REPAIRING LEAKS IN AN UNDERGROUND PIPE |
FR2696811A1 (en) * | 1992-10-09 | 1994-04-15 | Weber Adolphe | Detecting and repairing leak in pipe from surface - by determining position of leak by inflatable blocks and injecting expandable resin into ground |
CN101023226A (en) * | 2004-09-16 | 2007-08-22 | 客纳福来有限公司 | Method of repairing drain pipe |
CN1755184A (en) * | 2004-09-29 | 2006-04-05 | 孙跃平 | Excavation-free integral restoration method of underground conduit and inspection well |
CN202380562U (en) * | 2012-01-12 | 2012-08-15 | 周勇 | Device for trenchless repair of partial collapse pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN103615044A (en) | 2014-03-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103615044B (en) | Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline | |
CN102486247B (en) | Water supply and drainage pipeline repair technique adopting size film lining method | |
CN206346209U (en) | A kind of quick solution dewatering well piping plugging structure | |
CN112762269A (en) | Construction method for repairing underground pipeline | |
CN105888693A (en) | Treating construction method for water burst of small underground river of highway tunnel | |
CN111075994A (en) | Flexible pipeline repairing construction method | |
CN104404960B (en) | A kind of underground diaphragm wall seam grouting device and constructional method | |
CN207130792U (en) | Side slope Leachate site drainage device | |
CN110985808A (en) | Drainage pipeline steel hoop repairing construction method | |
CN204080839U (en) | A kind of Yield rainfall relation device | |
CN204402406U (en) | A kind of down-hole coal bed mash gas pumping drilling prosthetic device | |
CN104196108B (en) | The servicing unit that a kind of pipeline is connected with manhole well seat | |
CN201165703Y (en) | Leak detection plastic inspection shaft for collapsible loess area | |
CN113374931A (en) | Non-excavation capacity expansion method for old urban pipelines | |
CN210217745U (en) | Anti-surging device of screw conveyor | |
CN204456228U (en) | A kind of diaphragm wall fast plugging device | |
JP6382053B2 (en) | Intake system | |
CN204282366U (en) | A kind of diaphragm wall seam grouting device | |
CN112031811B (en) | Cliff water injection plugging system and method | |
CN111677972B (en) | Prefabricated steel ring construction method applied to rapid repair of pressure pipeline | |
CN104251008B (en) | A kind of guiding gutter and restorative procedure repairing pipe duct and back drop with water | |
CN210013303U (en) | Connecting structure for new and old sewage pipelines | |
CN204491615U (en) | Netted provisions for grouting bottom steel lining | |
CN216110848U (en) | Device for filling paste into pipeline | |
CN205116196U (en) | A prosthetic devices for leaking waste pipe well is reported to sand |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |