CN103615044B CN201310677748.0A CN201310677748A CN103615044B CN 103615044 B CN103615044 B CN 103615044B CN 201310677748 A CN201310677748 A CN 201310677748A CN 103615044 B CN103615044 B CN 103615044B
Authority
CN
China
Prior art keywords
pipeline
inner sleeve
manhole
upstream
sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310677748.0A
Other languages
Chinese (zh)
Other versions
CN103615044A (en
Inventor
梁华燕
何俨
杨洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201310677748.0A priority Critical patent/CN103615044B/en
Publication of CN103615044A publication Critical patent/CN103615044A/en
Application granted granted Critical
Publication of CN103615044B publication Critical patent/CN103615044B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The invention discloses an inner sleeve blocking method for leakage of a small-diameter concrete drainage pipeline. The method includes the following steps that first, a leakage well segment is judged out with a segmentation flow measurement method; second, a double-face conical iron bucket dredging device is sleeved with a rope to move back and forth to clean up impurities in the pipeline; third, in an upstream well segment inspection well of the pipeline to be handled, air is supplied into a pipe network continuously through an air blower, and the upstream pipeline is blocked; fourth, an inner sleeve is installed in the pipeline to be handled; fifth, the inner sleeve and the pipeline are blocked in the connection position of the inspection well, and mortar is injected between the inner sleeve and the pipeline for blocking. According to the method, the inner sleeve is additionally arranged in the leakage pipe segment, after the pipeline end is sealed, positions between the inner sleeve and the pipeline are grouted, so that a circular grouting ring is added to the inner side of the leakage pipe segment, and then the pipe leakage prevention effect is achieved. The method has the advantages of being simple in whole work procedure operation, short in construction period, low in cost and the like.

Description

A kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking
Technical field
The present invention relates to a kind of concrete drain pipeline leakage plugging method, particularly relate to a kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking.
Background technology
Along with city ancillary facility construction is accelerated, supporting drainage pipe Seepage increases, and minor diameter drainage pipe leakage scenarios is particularly outstanding, and small diameter pipeline typically refers to the pipeline that caliber is 400 ~ 800mm.Once there is small diameter pipeline seepage, existing processing mode nearly all adopts and again excavates, and reinstalls pipeline.This mode, to the section being in town road and sidewalk, repeats excavation in a short time again, and bring trip inconvenience and the hidden danger in safety can to neighbouring resident, and the operation cycle is long, cost is high.
Summary of the invention
For above shortcomings in prior art, the invention provides one and avoid bringing trip inconvenience and the upper hidden danger of safety to resident, simple to operate, the cycle is short, the minor diameter concrete drain pipeline seepage inner sleeve method for blocking at the bottom of cost.
In order to solve the problems of the technologies described above, present invention employs following technical scheme:
A kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking, the method comprises the steps:
1) adopt the method for segmentation flow measurement to judge seepage well section: first according to road drainage construction drawing, analytically descend sewage network layout, plan-position and trend; Then the position of employing high light electric light, mirror-reflection method determination pipe leakage, verifies pipeline and manhole alluvial blocks, discharge situation;
2) adopt two-sided taper metal bucket dredger to put rope back and forth the foreign material in pipeline, deposit cleaning to be rinsed well: first manufacture two-sided taper metal bucket dredger, described two-sided taper metal bucket dredger is made up of sleeve and rope, external diameter 10 ~ the 12cm less of internal diameter of the pipeline of described sleeve, sleeve two ends sealing and tapered, the two ends of sleeve connect a rope respectively; Two-sided taper metal bucket dredger is put into pipeline by upstream manhole, the rope of sleeve one end is placed on upstream manhole, the rope of the sleeve other end flow in the manhole of downstream with water in pipeline, or by threader, the rope of the sleeve other end is delivered to downstream manhole; Then in upstream and downstream manhole, pull sleeve by rope, the mud deposited in pipeline, foreign material are pushed in manhole, finally pick up with clear fishing combined tool and transport;
3) in the upstream well section manhole of pending pipeline, uninterruptedly blow in pipe network with blast fan, manually enter in manhole and carry out shutoff to upstream line, the ponding after shutoff in well adopts in the manhole of the downstream well section of the pending pipeline of mode suction of pump drainage;
4) in pending pipeline, install inner sleeve: inner sleeve adopts pvc pipe, the diameter 100mm less of pending pipe diameter of pvc pipe, pvc pipe adopts segmentation blanking, installs in down-hole segmentation; Progressively increase pipeline lower cushion block thickness along the every 6m of updrift side and meet drainage grade requirement; Connect by the mode that the mating connector two ends of this pvc pipe connect in well, after inner sleeve runs through pipeline, inner sleeve with the plan-position of pipeline is: upstream position inner sleeve top exterior walls is near duct bottom position, and downstream position inner sleeve top exterior walls is near duct bottom position;
5) inner sleeve and pipeline carry out shutoff at manhole link position place, and upstream shutoff mouth arranges grouting mouth, and downstream shutoff mouth sets out pore, and the space between inner sleeve and pipeline adopts the mode pouring into mortar to carry out shutoff after shutoff mouth intensity reaches requirement.
As a preferred embodiment of the present invention, in step 2) in, for pipeline that is dry, blocking, first with giant flushing pipe repeatedly, then dredge with two-sided taper metal bucket dredger.
As another kind of preferred version of the present invention, in step 2) in, after finding out the upstream and downstream of every bar drainage pipe, first desilting dredging from drain header road, the branch pipe(tube) that then cleaning blocking is serious is finally all the other branch pipe(tube)s.
Beneficial effect of the present invention: the present invention increases the inner wall form of light-wall pipe as inner sleeve of a minor diameter in the pipeline section of seepage, using the outer wall template of the pipeline section of original seepage as inner sleeve, after Seal treatment is carried out to pipe head, grouting treatment is carried out between two templates, make it increase a circular grouting ring in the insides of pipes of seepage, reach the effect preventing pipe seepage; Both avoided repeating excavation, avoid the hidden danger brought to neighbouring resident in trip inconvenience and safety, whole process operations is simple, short construction period, and the advantage such as at the bottom of cost, has broad application prospects.
Accompanying drawing explanation
Fig. 1 is pipe-dredging schematic diagram;
Fig. 2 is Pipe installing schematic diagram;
Fig. 3 is ducts upstream shutoff sectional schematic diagram;
Fig. 4 is pipe downstream shutoff sectional schematic diagram.
In accompanying drawing: 1-sleeve; 2-rope; 3-upstream detection well; 4-detected downstream well; 5-foreign material; 6-lifting appliance; 7-inner sleeve; 8-pipeline; 9-upstream pipeline section; 10-downstream pipeline section; 11-cement grouting.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
A kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking, the method comprises the steps:
1) adopt the method for segmentation flow measurement to judge seepage well section: first according to road drainage construction drawing, analytically descend sewage network layout, plan-position and trend; Then the position of employing high light electric light, mirror-reflection method determination pipe leakage, verifies pipeline and manhole alluvial blocks, discharge situation.
2) adopt two-sided taper metal bucket dredger to put rope back and forth the foreign material in pipeline, deposit cleaning to be rinsed well: first manufacture two-sided taper metal bucket dredger, two-sided taper metal bucket dredger is made up of sleeve 1 and rope 2, external diameter 10 ~ the 12cm less of internal diameter of the pipeline of sleeve 1, sleeve two ends sealing and tapered, the two ends of sleeve connect a rope respectively.Two-sided taper metal bucket dredger is put into pipeline by upstream manhole 3, the rope of sleeve one end is placed on upstream manhole 3, the rope of the sleeve other end flow in downstream manhole 4 with water in pipeline, or by threader, the rope of the sleeve other end is delivered to downstream manhole 4; Then in upstream and downstream manhole, pull sleeve by rope, the mud deposited in pipeline, foreign material 5 are pushed in manhole, finally pick up with lifting appliance 6 and clear fishing combined tool and transport, as shown in Figure 1.
3) in the upstream well section manhole of pending pipeline, uninterruptedly blow in pipe network with blast fan, manually enter in manhole and carry out shutoff to upstream line, the ponding after shutoff in well adopts in the manhole of the downstream well section of the pending pipeline of mode suction of pump drainage.
4) in pending pipeline, inner sleeve is installed (as shown in Figure 2, in figure, 7 is inner sleeve, 8 is pipeline, 9 is upstream pipeline section, and 10 is downstream pipeline section): inner sleeve 7 adopts pvc pipe, the diameter 100mm less of pending pipe diameter of pvc pipe, pvc pipe adopts segmentation blanking, install in down-hole segmentation, because inner sleeve 7 is laid by size impact empty in manhole, then sleeve pipe adopts segmentation blanking (concrete cutting length is foundation according to site inspection well size and handled easily); Progressively increase pipeline lower cushion block thickness along the every 6m of updrift side and meet drainage grade requirement; Connect by the mode that the mating connector two ends of this pvc pipe connect in well, after inner sleeve runs through pipeline, inner sleeve with the plan-position of pipeline is: upstream position inner sleeve top exterior walls is near pipeline tip position, as shown in Figure 3, downstream position inner sleeve bottom outer wall is near duct bottom position, as shown in Figure 4, the drain slope of inner sleeve is increased with this.In Fig. 3 and Fig. 4,11 is tank cement paste.
5) inner sleeve and pipeline adopt leak stopping king to carry out shutoff at manhole link position place, upstream shutoff mouth arranges grouting mouth, downstream shutoff mouth sets out pore, and the space between inner sleeve and pipeline adopts the mode pouring into mortar to carry out shutoff after shutoff mouth intensity reaches requirement.
The present invention adopts the inner wall form of light-wall pipe as inner sleeve 7 increasing a minor diameter in the pipeline 8 of seepage, using the outer wall template of the pipeline 8 of original seepage as inner sleeve.After Seal treatment is carried out to pipe head, between two templates, carry out grouting treatment, make it inside the pipeline section of seepage, increase a circular grouting ring, reach the effect preventing pipe seepage.
What finally illustrate is, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from aim and the scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (3)

1. a minor diameter concrete drain pipeline seepage inner sleeve method for blocking, it is characterized in that, the method comprises the steps:
1) adopt the method for segmentation flow measurement to judge seepage well section: first according to road drainage construction drawing, analytically descend sewage network layout, plan-position and trend; Then the position of employing high light electric light, mirror-reflection method determination pipe leakage, verifies pipeline and manhole alluvial blocks, discharge situation;
2) adopt two-sided taper metal bucket dredger to put rope back and forth the foreign material in pipeline, deposit cleaning to be rinsed well: first manufacture two-sided taper metal bucket dredger, described two-sided taper metal bucket dredger is made up of sleeve and rope, external diameter 10 ~ the 12cm less of internal diameter of the pipeline of described sleeve, sleeve two ends sealing and tapered, the two ends of sleeve connect a rope respectively; Two-sided taper metal bucket dredger is put into pipeline by upstream manhole, the rope of sleeve one end is placed on upstream manhole, the rope of the sleeve other end flow in the manhole of downstream with water in pipeline, or by threader, the rope of the sleeve other end is delivered to downstream manhole; Then in upstream and downstream manhole, pull sleeve by rope, the mud deposited in pipeline, foreign material are pushed in manhole, finally pick up with clear fishing combined tool and transport;
3) in the upstream well section manhole of pending pipeline, uninterruptedly blow in pipe network with blast fan, manually enter in the well section manhole of upstream and carry out shutoff to upstream line, the ponding after shutoff in upstream well section manhole adopts in the manhole of the downstream well section of the pending pipeline of mode suction of pump drainage;
4) in pending pipeline, inner sleeve is installed: inner sleeve adopts pvc pipe, the diameter 100mm less of pending pipe diameter of pvc pipe, pvc pipe adopts segmentation blanking, install in down-hole segmentation, connect by the mode that the mating connector two ends of this pvc pipe connect in well, after inner sleeve runs through pending pipeline, inner sleeve with the plan-position of pipeline is: upstream position inner sleeve top exterior walls is near pipeline tip position, and downstream position inner sleeve bottom outer wall is near duct bottom position;
5) inner sleeve and pipeline carry out shutoff at manhole link position place, and upstream shutoff mouth arranges grouting mouth, and downstream shutoff mouth sets out pore, and the space between inner sleeve and pipeline adopts the mode pouring into mortar to carry out shutoff after shutoff mouth intensity reaches requirement.
2. a kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking according to claim 1, it is characterized in that: in step 2) in, for pipeline that is dry, blocking, first with giant flushing pipe repeatedly, then dredge with two-sided taper metal bucket dredger.
3. a kind of minor diameter concrete drain pipeline seepage inner sleeve method for blocking according to claim 1, it is characterized in that: in step 2) in, after finding out the upstream and downstream of every bar drainage pipe, first desilting dredging from drain header road, then the branch pipe(tube) that cleaning blocking is serious is finally all the other branch pipe(tube)s.
CN201310677748.0A 2013-12-13 2013-12-13 Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline Active CN103615044B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310677748.0A CN103615044B (en) 2013-12-13 2013-12-13 Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310677748.0A CN103615044B (en) 2013-12-13 2013-12-13 Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline

Publications (2)

Publication Number Publication Date
CN103615044A CN103615044A (en) 2014-03-05
CN103615044B true CN103615044B (en) 2015-03-11

Family

ID=50165759

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310677748.0A Active CN103615044B (en) 2013-12-13 2013-12-13 Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline

Country Status (1)

Country Link
CN (1) CN103615044B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804203B (en) * 2016-04-05 2018-08-03 中铁七局集团第五工程有限公司 Buried major diameter discards the method for blocking of sewage conduct
CN110670419A (en) * 2019-10-21 2020-01-10 中铁四院集团岩土工程有限责任公司 Method for renovating waterproof and drainage structure of ballastless track roadbed
CN110925516A (en) * 2019-12-04 2020-03-27 陕西中科非开挖技术股份有限公司 Method for plugging rubber air bag of pipeline
CN113091563B (en) * 2021-04-13 2022-06-03 中冶建工集团有限公司 Method for measuring thickness of sediment in drain pipe
CN117169447B (en) * 2023-11-02 2024-01-26 南通海济环保科技有限公司 Sewage pipeline cleaning detection method and detection device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2911839A1 (en) * 1978-03-25 1979-09-27 Yasushi Nakashin METHOD OF REPAIRING LEAKS IN AN UNDERGROUND PIPE
FR2696811A1 (en) * 1992-10-09 1994-04-15 Weber Adolphe Detecting and repairing leak in pipe from surface - by determining position of leak by inflatable blocks and injecting expandable resin into ground
CN1755184A (en) * 2004-09-29 2006-04-05 孙跃平 Excavation-free integral restoration method of underground conduit and inspection well
CN101023226A (en) * 2004-09-16 2007-08-22 客纳福来有限公司 Method of repairing drain pipe
CN202380562U (en) * 2012-01-12 2012-08-15 周勇 Device for trenchless repair of partial collapse pipeline

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2911839A1 (en) * 1978-03-25 1979-09-27 Yasushi Nakashin METHOD OF REPAIRING LEAKS IN AN UNDERGROUND PIPE
FR2696811A1 (en) * 1992-10-09 1994-04-15 Weber Adolphe Detecting and repairing leak in pipe from surface - by determining position of leak by inflatable blocks and injecting expandable resin into ground
CN101023226A (en) * 2004-09-16 2007-08-22 客纳福来有限公司 Method of repairing drain pipe
CN1755184A (en) * 2004-09-29 2006-04-05 孙跃平 Excavation-free integral restoration method of underground conduit and inspection well
CN202380562U (en) * 2012-01-12 2012-08-15 周勇 Device for trenchless repair of partial collapse pipeline

Also Published As

Publication number Publication date
CN103615044A (en) 2014-03-05

Similar Documents

Publication Publication Date Title
CN103615044B (en) Inner sleeve blocking method for leakage of small-diameter concrete drainage pipeline
CN102486247B (en) Water supply and drainage pipeline repair technique adopting size film lining method
CN206346209U (en) A kind of quick solution dewatering well piping plugging structure
CN112762269A (en) Construction method for repairing underground pipeline
CN105888693A (en) Treating construction method for water burst of small underground river of highway tunnel
CN111075994A (en) Flexible pipeline repairing construction method
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN207130792U (en) Side slope Leachate site drainage device
CN110985808A (en) Drainage pipeline steel hoop repairing construction method
CN204080839U (en) A kind of Yield rainfall relation device
CN204402406U (en) A kind of down-hole coal bed mash gas pumping drilling prosthetic device
CN104196108B (en) The servicing unit that a kind of pipeline is connected with manhole well seat
CN201165703Y (en) Leak detection plastic inspection shaft for collapsible loess area
CN113374931A (en) Non-excavation capacity expansion method for old urban pipelines
CN210217745U (en) Anti-surging device of screw conveyor
CN204456228U (en) A kind of diaphragm wall fast plugging device
JP6382053B2 (en) Intake system
CN204282366U (en) A kind of diaphragm wall seam grouting device
CN112031811B (en) Cliff water injection plugging system and method
CN111677972B (en) Prefabricated steel ring construction method applied to rapid repair of pressure pipeline
CN104251008B (en) A kind of guiding gutter and restorative procedure repairing pipe duct and back drop with water
CN210013303U (en) Connecting structure for new and old sewage pipelines
CN204491615U (en) Netted provisions for grouting bottom steel lining
CN216110848U (en) Device for filling paste into pipeline
CN205116196U (en) A prosthetic devices for leaking waste pipe well is reported to sand

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant