CN204490513U - Vertical broken artificial graphite treatment facility - Google Patents

Vertical broken artificial graphite treatment facility Download PDF

Info

Publication number
CN204490513U
CN204490513U CN201520091647.XU CN201520091647U CN204490513U CN 204490513 U CN204490513 U CN 204490513U CN 201520091647 U CN201520091647 U CN 201520091647U CN 204490513 U CN204490513 U CN 204490513U
Authority
CN
China
Prior art keywords
electrode
treatment facility
distributor
artificial graphite
vertical broken
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520091647.XU
Other languages
Chinese (zh)
Inventor
赵永鹏
赵聚法
宋惠民
赵永钦
张晓�
陈忠臣
王金升
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XINZHENG DONGSHENG CARBON PRODUCTS CO Ltd
Original Assignee
XINZHENG DONGSHENG CARBON PRODUCTS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XINZHENG DONGSHENG CARBON PRODUCTS CO Ltd filed Critical XINZHENG DONGSHENG CARBON PRODUCTS CO Ltd
Priority to CN201520091647.XU priority Critical patent/CN204490513U/en
Application granted granted Critical
Publication of CN204490513U publication Critical patent/CN204490513U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carbon And Carbon Compounds (AREA)

Abstract

The utility model belongs to field of petrochemical industrial, specifically disclose a kind of vertical broken artificial graphite treatment facility, comprise the feeding device, calcining furnace, graphitizing furnace, the transportation equipment that connect successively, graphitizing furnace is provided with high temperature section, insulation section, cooling section and discharge section successively at vertical direction; High temperature section top is provided with the Graphite Electrodes of feeding mouth, vent valve and annular distribution; Graphitizable high temperature section is provided with the distributor of cone shape, is provided with the rolling disc of ring-type below distributor, rolling disc is evenly distributed with rotating electrode and blanking hole; Graphite Electrodes and rotating electrode form annular electric field; Be provided with breather line in distributor, bottom distributor, be provided with ventage.The utility model constant product quality, energy consumption are low and free from environmental pollution.

Description

Vertical broken artificial graphite treatment facility
Technical field
the utility model belongs to field of petrochemical industrial, relates to a kind of vertical broken artificial graphite treatment facility.
Background technology
Refinery coke starts desulfurization usually 1700 DEG C time, and ideal temperature is 2000 DEG C, 2200 DEG C time, start greying, and optimum temps is 2500 DEG C, and the heat treated major equipment of refinery coke is graphitizing furnace.At present, domestic is acheson furnace for carrying out the heat treated equipment of refinery coke.Acheson furnace is open type galley body structure, production process is that carbide is longitudinal or laterally arranged side by side, and around carbide filling metallurgical coke and quartz sand, be energized at the length direction of body of heater, utilize the resistance heating of coke, finally make heating object itself also produce resistance heating, adopt in the periphery of coke the waddings such as coke powder, carbon black, silica sand to carry out shielding with heat insulation again.
The defect of existing acheson furnace mainly contains:
1, acheson furnace is horizontal, unenclosed construction, and calorific loss is large, energy consumption is high, and product current consumption per ton is about 3700KW.
The volatile matter uncontrollable discharges such as the sulfurous gas 2, produced in production process, cause severe contamination to environment.
3, adopt and water water cooling mode and carry out coldly managing everywhere, serious waste water resources.
4, product is heated uneven, and core temperature can reach 2600 DEG C, and peripheral temperature is only at about 1000 DEG C, causes product degree of graphitization inequality, quality unstable.
Utility model content
The purpose of this utility model is to provide a kind of constant product quality, energy consumption vertical broken artificial graphite treatment facility low and free from environmental pollution.
For achieving the above object, the utility model is by the following technical solutions: vertical broken artificial graphite treatment facility, comprise the feeding device, calcining furnace, graphitizing furnace, the transportation equipment that connect successively, graphitizing furnace is provided with high temperature section, insulation section, cooling section and discharge section successively at vertical direction; High temperature section top is provided with the Graphite Electrodes of feeding mouth, vent valve and annular distribution; Graphitizable high temperature section is provided with the distributor of cone shape, is provided with the rolling disc of ring-type below distributor, rolling disc is evenly distributed with rotating electrode and blanking hole; Graphite Electrodes and rotating electrode form annular electric field; Be provided with breather line in distributor, bottom distributor, be provided with ventage.
Further, rotating electrode is vertically placed, and graphitizing furnace furnace wall has the electrode delivery port adapted with rotating electrode, is fixed with electrode delivery device outside electrode delivery port; Electrode delivery device comprises electrode conveying, electrode conveying one end connection electrode delivery port, the other end connecting fluid cylinder pressure.
Further, rotating electrode horizontal positioned, graphitizing furnace furnace wall is provided with ring electrode delivery port, is provided with the electrode delivery device hinged with rolling disc in ring electrode delivery port; Be provided with hydro-cylinder in electrode delivery device, hydro-cylinder is connected with the pushing plate of clamping limb.
Further, distributor is connected with the gear device of below with rolling disc.
Further, cooling section is externally connected to circulating water cooling system.
Further, vent valve connects flue, and flue is connected with sweetener.
Further, high power DC power delivery mode is adopted between Graphite Electrodes and rotating electrode.
Further, graphitizable high temperature section is doline or cylindrical.
Further, circulating water cooling system connects turbo-generator by water shoot, turbo-generator connection transformer, and transformer connects Graphite Electrodes and rotating electrode by electrical network.
Compared with prior art, the beneficial effects of the utility model are as follows: graphitizable high temperature section top is provided with the Graphite Electrodes of annular distribution, distributor bottom outside is provided with the rolling disc of ring-type, rolling disc is evenly distributed with rotating electrode, form stable annular electric field between Graphite Electrodes and rotating electrode, and then form stable high-temperature area, high temperature section is provided with the distributor of cone shape simultaneously, ensure that raw material can be heated completely in dropping process, and then ensure quality product; Be provided with motor conveyer, can supplement in time and change electrode, ensure continuous seepage; Vent valve connects flue, and flue is connected with sweetener, discharges after off gas treatment, avoids contaminate environment; Circulating water cooling system connects turbo-generator by water shoot, turbo-generator connection transformer, transformer connects Graphite Electrodes and rotating electrode by electrical network, the high-temperature steam that circulating water cooling system produces produces electric power supply electrode by turbo-generator, reduces power consumption and the production cost of production process.
Accompanying drawing explanation
Fig. 1 is rotating electrode structural representation of the present utility model when being vertical direction;
Fig. 2 is the structural representation of electrode delivery device in Fig. 1;
Fig. 3 is rotating electrode structural representation of the present utility model when being horizontal direction;
Fig. 4 is the structural representation of electrode delivery device in Fig. 3.
Embodiment
embodiment 1
Vertical broken artificial graphite treatment facility, as shown in Figure 1 and Figure 2, comprise the feeding device 2, calcining furnace 1, graphitizing furnace, the transportation equipment 11 that connect successively, graphitizing furnace is provided with high temperature section 17, insulation section 7, cooling section 8 and discharge section 10 successively at vertical direction; High temperature section 17 top is provided with the Graphite Electrodes 3 of feeding mouth 19, vent valve 18 and annular distribution; Graphitizable high temperature section 17 is provided with the distributor 16 of cone shape, after raw material enters graphitizing furnace by feeding mouth 19, under the effect of distributor 16, raw material can be evenly distributed in the electric field between Graphite Electrodes 3 and rotating electrode 4, be provided with the rolling disc 14 of ring-type below distributor 16, rolling disc 14 be evenly distributed with rotating electrode 4 and blanking hole 5; Graphite Electrodes 3 and rotating electrode 4 form annular electric field; Breather line 12 is provided with in distributor 16, breather line 12 is communicated with the aerating equipment 13 of graphitizing furnace outside, pass into the mixed gas that gas is nitrogen and a small amount of chlorine, be provided with ventage 15 bottom distributor 16, mixed gas enters the volatiles of high temperature section 17 absorption reaction generation by ventage 15.
Rotating electrode 4 is vertically placed, and graphitizing furnace furnace wall has the electrode delivery port 27 adapted with rotating electrode 4, is fixed with electrode delivery device 26 outside electrode delivery port 27; Electrode delivery device 26 comprises electrode conveying 29, electrode conveying 29 one end connection electrode delivery port 27, the other end connecting fluid cylinder pressure 28, rotating electrode 4 is pressed in electrode delivery port 27 along electrode conveying 29 by hydro-cylinder 28, after the rotating electrode 4 in rolling disc 14 consumes, when rolling disc 14 turns to electrode delivery port 27 place for the position of installing rotating electrode 4, new rotating electrode 4 is pressed in rolling disc 14 by hydro-cylinder 28.
Distributor 16 is connected with the gear device 6 of below with rolling disc 14, and gear device 6 is with driven distributing device 16 and rolling disc 14 uniform rotation.Cooling section 8 is externally connected to circulating water cooling system 9.Vent valve 18 connects flue 20, and flue 20 is connected with sweetener 21.Adopt high power DC power delivery mode between Graphite Electrodes 3 and rotating electrode 4, between electrode, form circular electric field.Graphitizable high temperature section 17 is doline or cylindrical.Circulating water cooling system connects turbo-generator 24 by water shoot 25, turbo-generator 24 connection transformer 23, and transformer 23 connects Graphite Electrodes 3 and rotating electrode 4 by electrical network 22.
embodiment 2
Vertical broken artificial graphite treatment facility, as shown in Figure 3, Figure 4, comprise the feeding device 2, calcining furnace 1, graphitizing furnace, the transportation equipment 11 that connect successively, graphitizing furnace is provided with high temperature section 17, insulation section 7, cooling section 8 and discharge section 10 successively at vertical direction; High temperature section 17 top is provided with the Graphite Electrodes 3 of feeding mouth 19, vent valve 18 and annular distribution; Graphitizable high temperature section 17 is provided with the distributor 16 of cone shape, after raw material enters graphitizing furnace by feeding mouth 19, under the effect of distributor 16, raw material can be evenly distributed in the electric field between Graphite Electrodes 3 and rotating electrode 4, be provided with the rolling disc 14 of ring-type below distributor 16, rolling disc 14 be evenly distributed with rotating electrode 4 and blanking hole 5; Graphite Electrodes 3 and rotating electrode 4 form annular electric field; Breather line 12 is provided with in distributor 16, breather line 12 is communicated with the aerating equipment 13 of graphitizing furnace outside, pass into the mixed gas that gas is nitrogen and a small amount of chlorine, be provided with ventage 15 bottom distributor 16, mixed gas enters the volatiles of high temperature section 17 absorption reaction generation by ventage 15.
Rotating electrode 4 horizontal positioned, graphitizing furnace furnace wall is provided with ring electrode delivery port 27, is provided with the electrode delivery device 26 hinged with rolling disc 14 in ring electrode delivery port 27, and electrode delivery device 26 rotates together along with rolling disc 14; Hydro-cylinder 28 is provided with in electrode delivery device 26, hydro-cylinder 28 is connected with the pushing plate 29 of clamping limb 30, after rotating electrode 4 front end in rolling disc 14 consumes, rotating electrode 4 rear end pushes in rolling disc 14 by hydro-cylinder 28, after whole rotating electrode 4 runs out of, rotating electrode e Foerderanlage 26, loads new rotating electrode 4 in clamping limb 30.
Distributor 16 is connected with the gear device 6 of below with rolling disc 14, and gear device 6 is with driven distributing device 16 and rolling disc 14 uniform rotation.Cooling section 8 is externally connected to circulating water cooling system 9.Vent valve 18 connects flue 20, and flue 20 is connected with sweetener 21.Adopt high power DC power delivery mode between Graphite Electrodes 3 and rotating electrode 4, between electrode, form circular electric field.Graphitizable high temperature section 17 is doline or cylindrical.Circulating water cooling system connects turbo-generator 24 by water shoot 25, turbo-generator 24 connection transformer 23, and transformer 23 connects Graphite Electrodes 3 and rotating electrode 4 by electrical network 22.

Claims (9)

1. vertical broken artificial graphite treatment facility, comprises the feeding device, calcining furnace, graphitizing furnace, the transportation equipment that connect successively, it is characterized in that: described graphitizing furnace is provided with high temperature section, insulation section, cooling section and discharge section successively at vertical direction; Described high temperature section top is provided with the Graphite Electrodes of feeding mouth, vent valve and annular distribution; Described graphitizable high temperature section is provided with the distributor of cone shape, is provided with the rolling disc of ring-type below distributor, rolling disc is evenly distributed with rotating electrode and blanking hole; Described Graphite Electrodes and rotating electrode form annular electric field; Be provided with breather line in described distributor, bottom distributor, be provided with ventage.
2. vertical broken artificial graphite treatment facility as claimed in claim 1, is characterized in that: described rotating electrode is vertically placed, and graphitizing furnace furnace wall has the electrode delivery port adapted with rotating electrode, is fixed with electrode delivery device outside electrode delivery port; Described electrode delivery device comprises electrode conveying, electrode conveying one end connection electrode delivery port, the other end connecting fluid cylinder pressure.
3. vertical broken artificial graphite treatment facility as claimed in claim 1, it is characterized in that: described rotating electrode horizontal positioned, graphitizing furnace furnace wall is provided with ring electrode delivery port, is provided with the electrode delivery device hinged with rolling disc in ring electrode delivery port; Be provided with hydro-cylinder in described electrode delivery device, hydro-cylinder is connected with the pushing plate of clamping limb.
4. the vertical broken artificial graphite treatment facility as described in claim 1 or 2 or 3, is characterized in that: described distributor is connected with the gear device of below with rolling disc.
5. vertical broken artificial graphite treatment facility as claimed in claim 4, is characterized in that: described cooling section is externally connected to circulating water cooling system.
6. vertical broken artificial graphite treatment facility as claimed in claim 5, is characterized in that: described vent valve connects flue, and flue is connected with sweetener.
7. vertical broken artificial graphite treatment facility as claimed in claim 6, is characterized in that: adopt high power DC power delivery mode between described Graphite Electrodes and rotating electrode.
8. vertical broken artificial graphite treatment facility as claimed in claim 7, is characterized in that: described graphitizable high temperature section is doline or cylindrical.
9. vertical broken artificial graphite treatment facility as claimed in claim 8, is characterized in that: described circulating water cooling system connects turbo-generator by water shoot, turbo-generator connection transformer, and transformer connects Graphite Electrodes and rotating electrode by electrical network.
CN201520091647.XU 2015-02-10 2015-02-10 Vertical broken artificial graphite treatment facility Expired - Fee Related CN204490513U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520091647.XU CN204490513U (en) 2015-02-10 2015-02-10 Vertical broken artificial graphite treatment facility

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520091647.XU CN204490513U (en) 2015-02-10 2015-02-10 Vertical broken artificial graphite treatment facility

Publications (1)

Publication Number Publication Date
CN204490513U true CN204490513U (en) 2015-07-22

Family

ID=53569801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520091647.XU Expired - Fee Related CN204490513U (en) 2015-02-10 2015-02-10 Vertical broken artificial graphite treatment facility

Country Status (1)

Country Link
CN (1) CN204490513U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104556024A (en) * 2015-02-10 2015-04-29 新郑市东升炭素有限公司 Vertical artificial graphite scrap treatment device and treatment process

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104556024A (en) * 2015-02-10 2015-04-29 新郑市东升炭素有限公司 Vertical artificial graphite scrap treatment device and treatment process
CN104556024B (en) * 2015-02-10 2016-05-18 新郑市东升炭素有限公司 Vertical broken artificial graphite treatment facility and technique

Similar Documents

Publication Publication Date Title
CN204490511U (en) The horizontal broken artificial graphite treatment facility of novel vertical electrode
CN104556024B (en) Vertical broken artificial graphite treatment facility and technique
CN207456153U (en) A kind of LiFePO4 rotary furnace
CN204333108U (en) A kind of cathode material of lithium ion battery graphite coat carbonizing plant
CN104477916B (en) A kind of calcium carbide production technology and equipments
CN103320152A (en) Vertical type sedimentation furnace for producing biological carbon
CN211570562U (en) Sectional type continuous thermal cracking device for waste plastics
CN204490513U (en) Vertical broken artificial graphite treatment facility
CN106219522A (en) Graphitizing furnace and artificial plumbago negative pole material graphitization production method
CN204490512U (en) Novel vertical electrode is perpendicular puts broken artificial graphite treatment facility
CN105514361B (en) Boat-free carbonization process for cathode material
CN204529316U (en) Two section type graphitizing furnace equipment
CN113213449A (en) Continuous reaction treatment method for graphite cathode material/phosphate and ternary anode material of lithium ion battery
CN103900241A (en) Hot water boiler without flammable fuel and water heating method
CN103723719B (en) Graphite purification equipment
KR101453326B1 (en) Large scale industrial continuous pyrolysis processing unit using plant biomass sources
CN203855414U (en) Tubular graphitization furnace
CN209893413U (en) Fluxing plasma furnace
CN111675214A (en) Preparation system of palm-based artificial graphite
CN204324896U (en) A kind of high purity graphite high temperature graphitization stove
CN110562972A (en) Self-heating graphitizing furnace for superfine powder
CN104724702A (en) Double-section graphitization furnace equipment and production process
CN104830350A (en) Biomass organic carbon preparation device
CN209065834U (en) A kind of vertical type biomass continuous carbonization furnace
CN103553025B (en) The close raising method of body of fine graphite goods

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150722

Termination date: 20170210