CN204490355U - Compact vertical lifting device - Google Patents

Compact vertical lifting device Download PDF

Info

Publication number
CN204490355U
CN204490355U CN201420797094.5U CN201420797094U CN204490355U CN 204490355 U CN204490355 U CN 204490355U CN 201420797094 U CN201420797094 U CN 201420797094U CN 204490355 U CN204490355 U CN 204490355U
Authority
CN
China
Prior art keywords
tracks
ceiling mounted
lifting device
vertical lifting
compact vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201420797094.5U
Other languages
Chinese (zh)
Inventor
徐重力
吴浩
朱雷鹤
吴波
谭小兵
魏强
杨杰
张杰峰
储旺准
矛开平
成立新
赵建永
金向阳
安春秀
黄达雨
王志勇
陈攀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Zhejiang Electric Power Transmission and Transforming Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Zhejiang Electric Power Transmission and Transforming Engineering Co filed Critical State Grid Corp of China SGCC
Priority to CN201420797094.5U priority Critical patent/CN204490355U/en
Application granted granted Critical
Publication of CN204490355U publication Critical patent/CN204490355U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Leg Units, Guards, And Driving Tracks Of Cranes (AREA)

Abstract

A kind of compact vertical lifting device, relate to electric system power transformation engineering preparation of construction field, at present, compact vertical structure converter valve is the nucleus equipment of current conversion station, its equipment and technology requires high, needs a series of strict quality control, the working procedure held water and technique to ensure between installation period.The utility model is arranged on roof truss lower edge, and roof truss lower edge is provided with ceiling mounted tracks, and ceiling mounted tracks is provided with some separate monorail cranies, and monorail crane can move on ceiling mounted tracks; Two monorail cranies on two tracks adjacent in ceiling mounted tracks are connected with balance hanging beam, distance in distance between balance hanging beam and the monorail crane point of connection at two ends and ceiling mounted tracks between adjacent two tracks is identical, and balance hanging beam is connected with equipment hanger.The technical program is when hanging device, result of use is good, in the installation of the valve tower especially in Multi-end flexible direct current transmission power transformation engineering, can significantly reduce labour intensity, improve operating efficiency, make the integral valve Room that simple, specification, reasonable, cost-saving is installed.

Description

Compact vertical lifting device
Technical field
The utility model relates to electric system power transformation engineering preparation of construction field, especially a kind of for the compact vertical lifting device in compact vertical structure converter valve construction in Multi-end flexible direct current transmission power transformation engineering.
Background technology
Zhoushan Multi-end flexible direct current transmission demonstration project is the great science and technology demonstration project of State Grid Corporation of China's investment construction, the Ye Shi world first five terminal flexible DC power transmission engineering.Engineering dynamic investment 42.1 hundred million yuan, newly-built 5 ± 200kV current conversion station, newly-built circuit 140.4 km, wherein submarine cable 129 km, and build corresponding supporting interchange defeated change station engineering.After engineering is built up and is put into operation, to significantly promote scientific and technological content and the intelligent level of Zhoushan electrical network, improve mains supply reliability and operational flexibility, promote Zhoushan Island new forms of energy access capability energetically, be the important breakthrough of China's intelligent grid and HVDC Transmission Technology simultaneously.
Multi-end flexible direct current transmission as a kind of novel HVDC Transmission Technology, on the one hand, its theoretical cognition not enough deeply comprehensively, as the cooperation control, Load flow calculation optimization etc. of Multi-end flexible direct current transmission and AC system; On the other hand, for Multi-end flexible direct current transmission, therefore there is the essentiality of in-depth study, comprise the crucial field engineerings such as the flexible direct current valve Room in the field engineering specification that China is not ripe for the crucial field engineering of Multi-end flexible direct current transmission engineering.In the DC engineering of built routine, converter valve adopts suspension type structure.Zhoushan Multi-end flexible direct current transmission demonstration project adopts compact vertical structure converter valve, and it is the nucleus equipment of current conversion station, and its equipment and technology requires high, needs a series of strict quality control, the working procedure held water and technique to ensure between installation period.
Common engineering converter valve system has 18 valve towers, is made up of 6 brachium pontis, and one end of brachium pontis is for exchanging inlet wire, and the other end is direct current outlet.Whole valve tower is made up of ground insulation, the support of interlayer support insulator, valve section, piezometer ring, busbar, water-cooling system and fibre system etc.
Integrated form converter valve tower adopts single-row point four layers layout, and converter valve tower unit is of a size of: 10090*2730*6934mm.Spacing between same valve arm two integrated form valve tower unit is 1600mm, and adjacent valve arm two column pitch is 3500mm, middle two row brachium pontis spacing 4000mm.1 valve tower is made up of 4 valve layer, and 1 valve group is made up of 4 valve sections, 1 valve tower weight about 24 tons, valve Duan Chongyue 1.5 tons.
Utility model content
The purpose of this utility model is deficiency in order to solve above-mentioned technology and provides a kind of structure simple, can impel the compact vertical lifting device that valve tower etc. is easy for installation.
In order to achieve the above object, the compact vertical lifting device designed by the utility model, it is arranged on roof truss lower edge, and roof truss lower edge is provided with ceiling mounted tracks, and ceiling mounted tracks is provided with some separate monorail cranies, and monorail crane can move on ceiling mounted tracks; Two monorail cranies on two tracks adjacent in ceiling mounted tracks are connected with balance hanging beam, distance in distance between balance hanging beam and the monorail crane point of connection at two ends and ceiling mounted tracks between adjacent two tracks is identical, and balance hanging beam is connected with equipment hanger.
Technique scheme, multiple monorail crane is arranged on adjacent track, and monorail crane on adjacent orbit is connected with balance hanging beam, then carry out hanging device by equipment hanger, structure is simple, after equipment hanger and equipment connection, monorail crane by two ends synchronously rises, and balance of plant can be sling, and by monorail crane moving and realizing the cross motion of equipment in orbit after slinging, more steady, impel equipment to install more simple and convenient.
As optimization, described ceiling mounted tracks is S type track, and its structure is: the straight rail that it is parallel to each other by multistage forms with the arc orbit for being connected adjacent straight rail, and arc orbit is crisscross arranged at the two ends of straight rail, is together in series by straight rail; Distance between described straight rail is identical.The setting of its S type track, achieves the operation of monorail crane between each straight rail, can reduce the overall quantity of monorail crane greatly.In use, only monorail crane need be moved to assigned address, can lift, and a monorail crane can be realized lift at whole lifting area operation, thus the holistic cost of hanging apparatus can be reduced, improve the degree of utilization of monorail crane.Ceiling mounted tracks is S type track simultaneously, and shape is more attractive in appearance.
As optimization, on balance hanging beam interval be provided with multiple hoisting ring, equipment hanger is connected with balance hanging beam by hoisting ring.This structure can regulate according to the different installation site of the Different Weight proportion at equipment two ends or equipment, thus is when realizing distinct device, different installation site and carries out smooth running, steadily lifts, and improves the overall in-use performance of hanging device.
Described monorail crane adopts wireless telecommunication system, synchronous control system, remote manipulation, full frequency conversion drive, adopts bikini slide wire power supply.Two monorail cranies that this structure can realize balance hanging beam two ends carry out remote manipulation, and synchronized operation, both sling heights remain consistent with operation displacement, thus can realize in equipment hoisting process more steady.
As preferably, roof truss is the roof truss in the flexible direct current valve Room in Multi-end flexible direct current transmission power transformation engineering, this hanging apparatus can be applied to the installation of the valve tower in Multi-end flexible direct current transmission power transformation engineering, by the utilization of this device, when installing converter valve, can ensure in the valve Room, to keep clean, meet the requirement that converter valve is high to clean environment degree.
The quantity of described monorail crane is four, and two is one group, and two monorail cranies of each group lay respectively on two tracks adjacent in ceiling mounted tracks.This vibrational power flow two groups of monorail cranies, coordinate bikini slide wire power supply simultaneously, realize both sides, the valve Room and lift valve tower simultaneously, thus improve lifting efficiency, reduce the lifting time; When operating maintenance, monorail crane can also be utilized to carry out single valve module and to carry out auxiliary lifting.
In described ceiling mounted tracks arbitrary neighborhood two tracks between distance be 7.5 meters; The maximum lifting weight of each monorail crane is 3 tons.This structure, in order to adapt to the demand of distance when general converter valve is installed, makes the installation of converter valve more steady.
Described equipment hanger is H type; Four angles of the equipment hanger of H type are equipped with for lifting a little with the equipment of equipment connection.This structure can increase the attachment point between equipment hanger and equipment, thus facilitates the fixing of equipment, makes the lifting firm stable more of equipment, avoids accidents.
The compact vertical lifting device that the utility model obtains, when hanging device, result of use is good, in the installation of the valve tower especially in Multi-end flexible direct current transmission power transformation engineering, can labour intensity be significantly reduced, improve operating efficiency, will design and organically combine with construction, make the integral valve Room that simple, specification, reasonable, cost-saving is installed, create normalisation valve Room construction technology standard.
Accompanying drawing explanation
Fig. 1 is the structural representation of ceiling mounted tracks of the present utility model;
Fig. 2 is structural representation of the present utility model.
Detailed description of the invention
Below by embodiment, the utility model will be further described by reference to the accompanying drawings.
Embodiment 1:
As shown in Figure 1 and Figure 2, the compact vertical lifting device that the present embodiment describes, it is arranged on roof truss lower edge, and roof truss lower edge is provided with ceiling mounted tracks 2, and ceiling mounted tracks 2 is provided with some separate monorail cranies 5, and monorail crane 5 can move on ceiling mounted tracks 2; Two monorail cranies 5 on two tracks adjacent in ceiling mounted tracks 2 are connected with balance hanging beam 6, distance in distance between balance hanging beam 6 and monorail crane 5 point of connection at two ends and ceiling mounted tracks 2 between adjacent two tracks is identical, and balance hanging beam 6 is connected with equipment hanger 7; Described ceiling mounted tracks 2 is S type track, and its structure is: the straight rail 3 that it is parallel to each other by multistage forms with the arc orbit 4 for being connected adjacent straight rail 3, and arc orbit 4 is crisscross arranged at the two ends of straight rail 3, is together in series by straight rail 3; Distance between described straight rail 3 is identical.On balance hanging beam 6 interval be provided with multiple hoisting ring, equipment hanger 7 is connected with balance hanging beam 6 by hoisting ring.
Described monorail crane 5 adopts wireless telecommunication system, synchronous control system, remote manipulation, full frequency conversion drive, adopts bikini slide wire power supply.
Roof truss is the roof truss in the flexible direct current valve Room 1 in Multi-end flexible direct current transmission power transformation engineering, this hanging apparatus can be applied to the installation of the valve tower in Multi-end flexible direct current transmission power transformation engineering; The quantity of described monorail crane 5 is four, and two is one group, and two monorail cranies 5 of each group lay respectively on two tracks adjacent in ceiling mounted tracks 2.In described ceiling mounted tracks 2 arbitrary neighborhood two tracks between distance be 7.5 meters; The maximum lifting weight of each monorail crane 5 is 3 tons; Described equipment hanger 7 is H type; Four angles of the equipment hanger 7 of H type are equipped with for lifting a little with the equipment of equipment connection.

Claims (9)

1. a compact vertical lifting device, is characterized in that: it is arranged on roof truss lower edge, and roof truss lower edge is provided with ceiling mounted tracks, and ceiling mounted tracks is provided with some separate monorail cranies, and monorail crane can move on ceiling mounted tracks; Two monorail cranies on two tracks adjacent in ceiling mounted tracks are connected with balance hanging beam, distance in distance between balance hanging beam and the monorail crane point of connection at two ends and ceiling mounted tracks between adjacent two tracks is identical, and balance hanging beam is connected with equipment hanger.
2. a kind of compact vertical lifting device according to claim 1, it is characterized in that: described ceiling mounted tracks is S type track, its structure is: the straight rail that it is parallel to each other by multistage forms with the arc orbit for being connected adjacent straight rail, arc orbit is crisscross arranged at the two ends of straight rail, is together in series by straight rail; Distance between described straight rail is identical.
3. a kind of compact vertical lifting device according to claim 2, is characterized in that: on balance hanging beam interval be provided with multiple hoisting ring, equipment hanger is connected with balance hanging beam by hoisting ring.
4. a kind of compact vertical lifting device according to Claims 2 or 3, is characterized in that: described monorail crane adopts wireless telecommunication system, synchronous control system, remote manipulation, full frequency conversion drive, adopts bikini slide wire power supply.
5. a kind of compact vertical lifting device according to claim 4, is characterized in that: roof truss is the roof truss in the flexible direct current valve Room in Multi-end flexible direct current transmission power transformation engineering.
6. a kind of compact vertical lifting device according to claim 5, it is characterized in that: the quantity of described monorail crane is four, two is one group, and two monorail cranies of each group lay respectively on two tracks adjacent in ceiling mounted tracks.
7. a kind of compact vertical lifting device according to claim 5, is characterized in that: in described ceiling mounted tracks arbitrary neighborhood two tracks between distance be 7.5 meters.
8. a kind of compact vertical lifting device according to claim 6, is characterized in that: the maximum lifting weight of each monorail crane is 3 tons.
9. a kind of compact vertical lifting device according to claim 5, is characterized in that: described equipment hanger is H type; Four angles of the equipment hanger of H type are equipped with for lifting a little with the equipment of equipment connection.
CN201420797094.5U 2014-12-15 2014-12-15 Compact vertical lifting device Active CN204490355U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420797094.5U CN204490355U (en) 2014-12-15 2014-12-15 Compact vertical lifting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420797094.5U CN204490355U (en) 2014-12-15 2014-12-15 Compact vertical lifting device

Publications (1)

Publication Number Publication Date
CN204490355U true CN204490355U (en) 2015-07-22

Family

ID=53569643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420797094.5U Active CN204490355U (en) 2014-12-15 2014-12-15 Compact vertical lifting device

Country Status (1)

Country Link
CN (1) CN204490355U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495633A (en) * 2014-12-15 2015-04-08 国家电网公司 Compact vertical hoisting device
CN105014374A (en) * 2015-07-28 2015-11-04 南京南瑞继保电气有限公司 Assembling method for straight-way converter valve
CN105908833A (en) * 2016-06-17 2016-08-31 同济大学 Mobile curtain hanger-rail composite device

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104495633A (en) * 2014-12-15 2015-04-08 国家电网公司 Compact vertical hoisting device
CN105014374A (en) * 2015-07-28 2015-11-04 南京南瑞继保电气有限公司 Assembling method for straight-way converter valve
CN105014374B (en) * 2015-07-28 2017-02-01 南京南瑞继保电气有限公司 Assembling method for straight-way converter valve
WO2017016392A1 (en) * 2015-07-28 2017-02-02 南京南瑞继保电气有限公司 Assembly method for dc converter valve
RU2691361C1 (en) * 2015-07-28 2019-06-11 Нр Электрик Ко., Лтд Method of installation of safety valve of direct current
AU2016300492B2 (en) * 2015-07-28 2019-07-25 Nr Electric Co., Ltd Assembly method for DC converter valve
US10632578B2 (en) 2015-07-28 2020-04-28 Nr Electric Co., Ltd Assembly method for DC converter valve
CN105908833A (en) * 2016-06-17 2016-08-31 同济大学 Mobile curtain hanger-rail composite device

Similar Documents

Publication Publication Date Title
CN104270016A (en) Novel valve tower of thyristor converter valve
CN204490355U (en) Compact vertical lifting device
CN112510745B (en) Flexible direct current offshore converter station with 66kV current collection line access
CN108649577A (en) A kind of transmission system
CN110130295B (en) Offshore wind power flexible direct current transmission converter station bridge arm valve tower layout and offshore platform
CN213342030U (en) Wiring arrangement structure of flexible straight converter valves adjacent to homopolar valve tower
CN104495633A (en) Compact vertical hoisting device
CN204045951U (en) A kind of arrangement of 220kV power distribution equipment
CN104767227B (en) A kind of intelligent distribution network transformation device busbar flow controller
CN202689613U (en) Combined arrangement of GIS (gas insulated switchgear) power distribution device area and circulating water pump house of thermal power plant
CN202103326U (en) Phase-splitting medium-sized layout structure of bridge wiring outdoor open type distribution device
CN102515046A (en) Lifting bracket for electrical device
CN110112730A (en) A kind of transmission system
CN204873491U (en) Self -supporting does not have crossbeam hoist system
CN208184354U (en) Novel framework type single loop terminal shaft tower
CN103346499B (en) The arrangement of large-scale air cooling fired power generating unit Air-Cooling Island and high voltage distribution installation
CN210884958U (en) Hoisting system of converter station valve room
CN105261986A (en) Optimization structure of 220kV substation
CN204938709U (en) A kind of ceiling mount bracket of Novel movable rotor
CN106033935A (en) Flexible DC power transmission converter valve tower
CN205791186U (en) GIS power distribution equipment end outlet structure
CN204174995U (en) A kind of framework being applicable to transformer station's outlet
CN202503207U (en) Prefabricated transformer substation
CN203326442U (en) Arrangement structure of general step-down substation and rectification station
CN203071586U (en) Flexible direct-current power transmission system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant