CN204490263U - Intelligent corridor is ridden instead of walk elevator - Google Patents
Intelligent corridor is ridden instead of walk elevator Download PDFInfo
- Publication number
- CN204490263U CN204490263U CN201520147939.0U CN201520147939U CN204490263U CN 204490263 U CN204490263 U CN 204490263U CN 201520147939 U CN201520147939 U CN 201520147939U CN 204490263 U CN204490263 U CN 204490263U
- Authority
- CN
- China
- Prior art keywords
- elevator
- corridor
- pedal
- walk
- switch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Maintenance And Inspection Apparatuses For Elevators (AREA)
Abstract
The utility model discloses a kind of intelligent corridor to ride instead of walk elevator, comprise the same number of several lifting unit with stair bench, the corridor wall that each stair bench is corresponding is fixed with guide rail, lifting unit comprises elevator, challenge switch and control unit, elevator is slidably arranged on guide rail, elevator is provided with pedal and camera towards the lateral surface of corridor side, pedal is provided with pressure sensor, challenge switch is arranged on the corridor wall in landing district, control unit controls elevator according to the closure state of challenge switch and moves to the direction of challenge switch, connect the power supply of camera.The utility model, each bench of corresponding stair arranges a lifting unit, each lifting unit can independent operating, not by the impact of other lifting unit, easy to use, efficient, meanwhile, camera can be opened automatically when user calls out elevator, when elevator et out of order or resident family take elevator appearance accident, be convenient to related personnel's Timeliness coverage and process.
Description
Technical field
The utility model relates to elevator, is specifically related to intelligent corridor and rides instead of walk elevator.
Background technology
In recent years, China's aging population trend is obvious gradually, and the handicapped colony such as the elderly and the disabled obtains increasing concern, and government department has also put into effect corresponding regulation to give the healthy of the elderly and life facility provides safeguard.
In eighties of last century 80, the nineties, China had once built in many cities the residential building of a large amount of less than seven layers, then there is the house of a lot of nine, ten layers in coastal cities, the corridor of these houses is generally made up of the bench of continuous step, platform and maintenance component etc., connects by each bench is mutually folding and forms flexuose corridor entirety.And for the consideration of the factors such as cost, elevator is established in these buildings hardly, and at present, these residential buildings also in use, have much handicapped old man in resident family wherein, and these old men need to be come in and gone out by stair climbing, be very inconvenience; If belongings are just more arduous, but due to building old, installing traditional lifting type elevator needs to carry out structure of modification, is unfavorable for implementing.
For this reason, Chinese utility model patent CN 201737561 U discloses one " new construction of lifting chair for stair of house ", is mainly made up of chair lift, driving device, clamping device and rail bar device.Chair lift is foldable, and is provided with a driving device and a clamping device, and rail bar device is located on the side of banister, and along the bending of stair corner upwards, comprise upper and lower two rail bars, driving device is placed on lower rail bar, and clamping device is then set on rail bar.When starting driving device, upper and lower rail bar can be utilized to be elevated to control chair lift device, but this scheme once can only transport a people, suppose have two people to need to use this device upstairs, then need by one people transport get home after, again return and could transport the second people downstairs, therefore service efficiency is lower.Meanwhile, this chair lift does not possess watch-dog, if occur unexpected when chair lift is taken by chair lift et out of order or resident family, can not Timeliness coverage and process, and thus this chair lift has certain potential safety hazard.
Utility model content
Technical problem to be solved in the utility model is that the stair lifting chair service efficiency in existing old residential building is lower, and occur unexpected when chair lift is taken by chair lift et out of order or resident family, can not Timeliness coverage and process, there is the problem of certain potential safety hazard.
In order to solve the problems of the technologies described above, the technical scheme that the utility model adopts is to provide a kind of intelligent corridor and rides instead of walk elevator, comprise the same number of several lifting unit with stair bench, the corridor wall that each stair bench is corresponding is fixed with guide rail, and described lifting unit comprises:
Elevator, be slidably arranged on described guide rail, described elevator is provided with pedal towards the lateral surface of corridor side, and described pedal is hinged on the lower end of described elevator, and described pedal is provided with pressure sensor, and described elevator is provided with camera;
Challenge switch, is arranged on the corridor wall in landing district;
Actuating device, moves up and down along corresponding guide rail for driving described elevator;
Control unit, controls described elevator according to the closure state of described challenge switch and moves to the direction of described challenge switch, and connect the power supply of described camera.
In such scheme, the unmanned testing result used that described control unit obtains according to described pressure sensor, disconnects the power supply of described camera.
In such scheme, described control unit, according to the closure state of described challenge switch, controls described pedal and to open and vertical with the lateral surface of described elevator; Be unmanned use according to the testing result of described pressure sensor, control described pedal and close and fit with the lateral surface of described elevator.
In such scheme, described guide rail comprises upper rail and the lower guideway of side-by-side parallel setting, and the two ends up and down of described elevator are slidably arranged on described upper rail and described lower guideway respectively, and described actuating device is arranged on the top of described elevator.
In such scheme, described elevator is provided with handrail towards the lateral surface of corridor side, described handrail is provided with the first safety switch, and described control unit starts according to the state of the testing result of described pressure sensor and described first safety switch or closes described actuating device.
In such scheme, the middle part of described elevator is provided with seat, and described seat is hinged on the lateral surface of described elevator.
In such scheme, the both sides of described seat are provided with handrail, and described armrest is provided with the second safety switch, and described second safety switch is in parallel with described first safety switch.
The utility model, each bench of corresponding old residential building stair arranges a lifting unit, each lifting unit all can independent operating, not by the impact of other lifting unit, more convenient to use and efficient, in addition, elevator is provided with camera, automatically can opens when user calls out elevator, the picture of elevator is taken by the resident family of monitoring in real time, when elevator et out of order or user take elevator appearance accident, be convenient to related personnel's Timeliness coverage and process.
Accompanying drawing explanation
Fig. 1 to ride instead of walk the structural representation of lifting unit in elevator for intelligent corridor that the utility model provides;
Fig. 2 to ride instead of walk the running state schematic diagram of elevator for intelligent corridor that the utility model provides.
Detailed description of the invention
Below in conjunction with Figure of description, the utility model is described in detail.
The utility model provides a kind of intelligent corridor and to ride instead of walk elevator, as shown in Figure 1 and Figure 2, comprise several lifting unit, the number of lifting unit is identical with bench 1 number of corridor, wherein, each lifting unit comprises an elevator 2 and an actuating device and a control unit, and elevator 2 drives the guide rail along its correspondence to move up and down by actuating device.
The corridor wall of each stair bench 1 correspondence is fixedly installed guide rail, and the arranged direction of guide rail is consistent with the trend of its corresponding stair bench 1, elevator 2 is slidably arranged on corresponding guide rail, guide rail is preferably designed for upper and lower two, i.e. upper rail 18 and lower guideway 19, the two be arranged in parallel, and the two ends up and down of elevator 2 are slidably arranged on upper rail 18 and lower guideway 19 respectively.The two ends of guide rail extend to the platform area 6 of stair in the horizontal direction, so that elevator 2 comes to a complete stop in platform area 6, resident family can change to up and down at the safer pulsation-free in platform area 6.
Each lifting unit is equipped with one group of corresponding challenge switch 13, and challenge switch 13 is arranged on the corridor wall in landing district 6, and control unit controls elevator 2 according to the closure state of challenge switch 13 and moves to the direction of challenge switch 13.In the present embodiment, often organize challenge switch 13 to be made up of a up call switch and a downlink call switch.Wherein, up call switch-linear hybrid, on the corridor wall that the platform area, lower end of stair bench 1 correspondence is corresponding, moves downwardly to platform area, lower end for calling out elevator 2 for user, and takes realization upstairs in platform area, lower end.Downlink call switch-linear hybrid, on the corridor wall that the platform area, upper end of stair bench 1 correspondence is corresponding, moves up to platform area, upper end for calling out elevator 2 for user, and takes realization in platform area, upper end downstairs.
Control unit controls elevator 2 according to the closure state of challenge switch 13 and moves to the direction of challenge switch 13, and namely press any one challenge switch 13, elevator 2 will move to platform area 6 to this side challenge switch 13, facilitates personnel to take, designs hommization more.Be specially: when user presses up call switch, control unit detects that up call switch closes, thus sends control signal, controls elevator 2 and moves to platform area, stair bench lower end, for user prepares upstairs; When user presses downlink call switch, control unit detects that downlink call switch closes, thus sends control signal, controls elevator 2 and moves to platform area, stair bench upper end, for user prepares downstairs.
Scheme provided by the invention, due to each stair bench 1 all correspondence be provided with an elevator 2, and can isolated operation, comparing traditional rotary stair lifting chair same time can only a people use, elevator 2 in this programme uses more convenient, substantially increases service efficiency.
Elevator 2 is also provided with safety strap, and safety strap is arranged on the outside middle portion of elevator 2, and this safety strap improves the safety that elevator uses.
The bottom of each elevator 2 is provided with pedal 7, pedal 7 is hinged on the lateral surface of elevator 2 by pedal shaft 8, pedal 7 is provided with pressure sensor, when resident family does not use elevator 2, pedal 7 the automatic recovery is to the side of elevator 2, reduce taking stair space, the convenient resident family's stair activity not taking elevator 2.
The upper outside face of elevator 2 is provided with camera 12, and control unit connects the power supply of camera 12 according to the closure state of challenge switch 13, according to the unmanned testing result used that pressure sensor obtains, disconnects the power supply of camera 12.That is: when resident family uses elevator 2, when challenge switch 13 is opened, the power connection of camera 12, camera 12 is opened; When elevator 2 leaves in resident family, pressure sensor is without detected value, show unmanned use, now control unit sends control signal, disconnect the power supply of camera 12, camera 12 is closed, and this camera 12 can monitor this picture in real time when elevator 2 is taken by resident family, and only camera just can be opened when there being people to use elevator 2, save the energy.
In addition, in the scheme that the utility model provides, control unit is according to the closure state of challenge switch 13, and control pedal 7 is opened and vertical with the lateral surface of elevator 2; Be unmanned use according to the testing result of pressure sensor, control pedal 7 is closed and is fitted with the lateral surface of elevator 2, and that is, when user calls out elevator, elevator 2 is in the process that user is close, and pedal 7 can be opened automatically, improves service efficiency; When user leaves elevator 2, pressure sensor does not have detected value, and show unmanned use, so control unit sends control signal, control pedal 7 is regained.
The outside middle portion of elevator 2 is provided with safety rail 11, for subscriber station immediately.The middle part of elevator 2 is also provided with the seat 9 of collapsible recovery, and seat 9 is provided with armrest, for the user of being inconvenient to stand.The side of seat 9 and the lateral surface of elevator 2 are hinged by seat rotating shaft 10, seat rotating shaft 10 be provided with drive seat 9 resilience return power structure, during use, manually seat 9 is put down, seat 9 when not using the automatic recovery to the side of elevator 2.Seat rotating shaft 10 is slided and is arranged on the lateral surface of elevator 2, and seat 9 passes through the lateral surface vertical lift of seat rotating shaft 10 along elevator 2, so that the height of adjusting seat 9.
Safety rail 11 and armrest are respectively equipped with the first safety switch 16 and the second safety switch 17, first safety switch 16 and the second safety switch 17 in parallel.Control unit starts according to the state of the testing result of pressure sensor and safety switch or closes actuating device.Be specially: the testing result of pressure sensor and a preset value are compared, thus obtain the testing result whether someone uses, when user's pin steps down on pedal 7, the testing result of pressure sensor uses for there being people, when user leaves from pedal 7, the testing result of pressure sensor is unmanned use, why by the testing result of pressure sensor compared with a preset value, reason is to prevent toy from setting foot on unintentionally pedal 7 and causing maloperation.
When the testing result of pressure sensor uses for there being people, and when the first safety switch 16 or the second safety switch 17 close, control unit sends control signal and starts actuating device, makes elevator 2 upstream or downstream;
When the testing result of pressure sensor is unmanned use, or when the first (the second) safety switch disconnects, control unit sends control signal and closes actuating device.
The advantage of this design is: only have when user stands firm and presses safety switch on pedal always, elevator could run, once user surprisingly leaves pedal or surprisingly unclamps safety switch, elevator all can be made to stop immediately, thus substantially increase the safety of use.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn the structural change made under enlightenment of the present utility model, and every have identical or close technical scheme with the utility model, all falls within protection domain of the present utility model.
Claims (7)
1. intelligent corridor is ridden instead of walk elevator, and it is characterized in that, comprise the same number of several lifting unit with stair bench, the corridor wall that each stair bench is corresponding is fixed with guide rail, and described lifting unit comprises:
Elevator, be slidably arranged on described guide rail, described elevator is provided with pedal towards the lateral surface of corridor side, and described pedal is hinged on the lower end of described elevator, and described pedal is provided with pressure sensor, and described elevator is provided with camera;
Challenge switch, is arranged on the corridor wall in landing district;
Actuating device, moves up and down along corresponding guide rail for driving described elevator;
Control unit, controls described elevator according to the closure state of described challenge switch and moves to the direction of described challenge switch, and connect the power supply of described camera.
2. intelligent corridor as claimed in claim 1 is ridden instead of walk elevator, it is characterized in that, the unmanned testing result used that described control unit obtains according to described pressure sensor, disconnects the power supply of described camera.
3. intelligent corridor as claimed in claim 1 is ridden instead of walk elevator, it is characterized in that, described control unit, according to the closure state of described challenge switch, controls described pedal and to open and vertical with the lateral surface of described elevator; Be unmanned use according to the testing result of described pressure sensor, control described pedal and close and fit with the lateral surface of described elevator.
4. intelligent corridor as claimed in claim 1 is ridden instead of walk elevator, it is characterized in that, described guide rail comprises upper rail and the lower guideway of side-by-side parallel setting, the two ends up and down of described elevator are slidably arranged on described upper rail and described lower guideway respectively, and described actuating device is arranged on the top of described elevator.
5. intelligent corridor as claimed in claim 1 is ridden instead of walk elevator, it is characterized in that, described elevator is provided with handrail towards the lateral surface of corridor side, described handrail is provided with the first safety switch, and described control unit starts according to the state of the testing result of described pressure sensor and described first safety switch or closes described actuating device.
6. intelligent corridor as claimed in claim 5 is ridden instead of walk elevator, and it is characterized in that, the middle part of described elevator is provided with seat, and described seat is hinged on the lateral surface of described elevator.
7. intelligent corridor as claimed in claim 6 is ridden instead of walk elevator, and it is characterized in that, the both sides of described seat are provided with handrail, and described armrest is provided with the second safety switch, and described second safety switch is in parallel with described first safety switch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520147939.0U CN204490263U (en) | 2015-03-16 | 2015-03-16 | Intelligent corridor is ridden instead of walk elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520147939.0U CN204490263U (en) | 2015-03-16 | 2015-03-16 | Intelligent corridor is ridden instead of walk elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204490263U true CN204490263U (en) | 2015-07-22 |
Family
ID=53569551
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520147939.0U Expired - Fee Related CN204490263U (en) | 2015-03-16 | 2015-03-16 | Intelligent corridor is ridden instead of walk elevator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204490263U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108423501A (en) * | 2018-02-02 | 2018-08-21 | 江苏工程职业技术学院 | A kind of staircase safety system |
-
2015
- 2015-03-16 CN CN201520147939.0U patent/CN204490263U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108423501A (en) * | 2018-02-02 | 2018-08-21 | 江苏工程职业技术学院 | A kind of staircase safety system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104724579A (en) | Intelligent corridor elevator instead of walk | |
CN206158309U (en) | Wire pole vertical ladder anti -climb device that stretches out and draws back | |
CN104649105A (en) | Intelligent corridor walking elevator | |
CN205132833U (en) | Corridor intelligence elevator | |
CN104724580A (en) | Control system and method for intelligent corridor elevator instead of walk | |
CN204490263U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN204454179U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN104724578A (en) | Intelligent passageway transpiration elevator | |
CN204454174U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN108996370B (en) | Corridor elevator capable of being taken by two persons based on double-screw rod nut mechanism | |
CN204490264U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN204454177U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN206645674U (en) | Two-sided chute type stair lift | |
CN104803258A (en) | Intelligent passageway transportation elevator | |
CN204474083U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN205838260U (en) | A kind of self-service elevator of old man | |
CN205151456U (en) | Split type track intelligence elevator of riding instead of walk | |
CN204490265U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN204454175U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN204454173U (en) | Intelligent corridor is ridden instead of walk elevator | |
CN111270818A (en) | Stair handrail for helping old people and using method | |
CN104724581A (en) | Intelligent corridor elevator instead of walk | |
CN203898577U (en) | Electric wheelchair capable of going upstairs or downstairs along stair armrest rail | |
CN204454176U (en) | Intelligent corridor is ridden instead of walk the control system of elevator | |
CN205132857U (en) | Intelligence elevator loader |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150722 Termination date: 20180316 |
|
CF01 | Termination of patent right due to non-payment of annual fee |