CN204473097U - Suspended scaffold on ships and light boats deck - Google Patents
Suspended scaffold on ships and light boats deck Download PDFInfo
- Publication number
- CN204473097U CN204473097U CN201520065342.1U CN201520065342U CN204473097U CN 204473097 U CN204473097 U CN 204473097U CN 201520065342 U CN201520065342 U CN 201520065342U CN 204473097 U CN204473097 U CN 204473097U
- Authority
- CN
- China
- Prior art keywords
- ships
- light boats
- connecting strap
- pin hand
- base
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Clamps And Clips (AREA)
Abstract
The utility model provides a kind of suspended scaffold on ships and light boats deck, include: one group of horizontal chuck, one group of pin hand connecting strap, one group of base, a load-bearing steel pipe and polylith foot plank, wherein, horizontal chuck is separately fixed at the edge on ships and light boats deck, the upper end of pin hand connecting strap is vertically connected with horizontal chuck respectively, the lower end of pin hand connecting strap is connected with one end of base and load-bearing steel pipe, and the other end of load-bearing steel pipe is connected with base with the lower end of the pin hand connecting strap of corresponding side.The suspended scaffold that theres is provided of the utility model is provided, reduces the cycle of tearing open of taking, save pin hand material, and can according to building thing and move, convenient construction on ships and light boats deck.
Description
Technical field
The utility model relates to a kind of scaffold, particularly a kind of suspended scaffold on ships and light boats deck.
Background technology
Ships and light boats deck builds thing, adopts conveyor line mode of construction, need often to move, accordingly, in prior art, adopt floor type scaffold to construct.Such as, but the mode of setting up of floor type scaffold can not meet user demand, occurs a series of problem, owing to adopting pipelining, tear open if all will again take at every turn, waste a large amount of manpower and materials; Floor type scaffold moves with building thing, then will be fixed reinforcement bottom; Floor type scaffold set up that its time is long, work capacity is large.
Utility model content
The technical problems to be solved in the utility model is that the mode of setting up of floor type scaffold in order to overcome prior art can not meet user demand defect, provides a kind of and takes the cycle of tearing open short, conveniently moving, the suspended scaffold of province's material labour-saving on ships and light boats deck.
The utility model solves above-mentioned technical matters by following technical proposals:
The utility model provides a kind of suspended scaffold on ships and light boats deck, include: one group of horizontal chuck, one group of pin hand connecting strap, one group of base, a load-bearing steel pipe and polylith foot plank, wherein, horizontal chuck is separately fixed at the edge on ships and light boats deck, the upper end of pin hand connecting strap is vertically connected with horizontal chuck respectively, the lower end of pin hand connecting strap is connected with one end of base and load-bearing steel pipe, and the other end of load-bearing steel pipe is connected with base with the lower end of the pin hand connecting strap of corresponding side.
The suspended scaffold adopting the utility model to provide, can reduce the cycle of tearing open of taking, save the material of scaffold; In addition, suspended scaffold can move with the thing of building on ships and light boats deck easily, and then brings facility to construction.
Preferably, horizontal chuck is made up of a transverse slat and base, on the edge of transverse slat, be provided with a pair with the through hole be connected with pin hand connecting strap, the bottom of base is provided with the Baltimore groove of opening, one side of base is fixedly connected with transverse slat, and the another side of base is provided with the some tapped bore for clamping ships and light boats deck.
Preferably, it is characterized in that, pin hand connecting strap is provided with multiple connecting bore.
Preferably, base is made up of a long slab and a short slab, and long slab is provided with the patchhole for the grafting of load-bearing steel pipe, and short slab is provided with the through hole for being connected with pin hand connecting strap, and long slab and short slab are weldingly connected.
Preferably, the end of long slab is provided with circular arc, and one side end of short slab is provided with circular arc.
Preferably, the lower end of pin hand connecting strap and base and load-bearing steel pipe with bolts.
In the utility model, above-mentioned optimum condition can combination in any on the basis meeting this area general knowledge, obtains each preferred embodiment of the utility model.
Positive progressive effect of the present utility model is: adopt the suspended scaffold that provides of the utility model, reduces the cycle of tearing open of taking, saves pin hand material, and can according to building thing and move, convenient construction on ships and light boats deck.
Accompanying drawing explanation
Fig. 1 is the structural representation of the suspended scaffold on ships and light boats deck of the utility model preferred embodiment.
Fig. 2 is the structural representation of the horizontal chuck of the suspended scaffold on ships and light boats deck of the utility model preferred embodiment.
Fig. 3 is the front elevation of the base of the suspended scaffold on ships and light boats deck of the utility model preferred embodiment.
Fig. 4 is the lateral plan of the base of the suspended scaffold on ships and light boats deck of the utility model preferred embodiment.
Fig. 5 is the structural representation of the pin hand connecting strap of the suspended scaffold on ships and light boats deck of the utility model preferred embodiment.
Fig. 6 is that area schematic established by the tower of suspended scaffold on ships and light boats deck of the suspended scaffold on ships and light boats deck of the utility model preferred embodiment.
Description of reference numerals
Horizontal chuck 1
Transverse slat 11
Base 12
Baltimore groove 13
Tapped bore 14
Pin hand connecting strap 2
Connecting bore 20
Upper end 21
Lower end 22
Base 3
Long slab 31
Short slab 32
Patchhole 33
Circular arc 34
Through hole 40
Load-bearing steel pipe 5
Foot plank 6
Deck 7
Region 8 established by tower
Detailed description of the invention
Lift preferred embodiment below, and come by reference to the accompanying drawings clearlyer intactly the utility model to be described.
A kind of suspended scaffold on ships and light boats deck as shown in figures 1 to 6, Fig. 1 shows the structural representation of suspended scaffold, one group of horizontal chuck, 1, one group of pin hand connecting strap, 2, one group of base 3, load-bearing steel pipe 5 and polylith foot plank 6, wherein, horizontal chuck is separately fixed at the edge on ships and light boats deck 7, the upper end 21 of pin hand connecting strap is vertically connected with horizontal chuck respectively, the lower end 22 of pin hand connecting strap is connected with one end of base and load-bearing steel pipe, and the other end of load-bearing steel pipe is connected with base with the lower end of the pin hand connecting strap of corresponding side.
Fig. 2 shows the structure of the horizontal chuck of suspended scaffold, horizontal chuck 1 is made up of with base 12 transverse slat 11, on the edge of transverse slat, be provided with a pair with the through hole 40 be connected with pin hand connecting strap, the bottom of base is provided with the Baltimore groove 13 of opening, one side of base is fixedly connected with transverse slat, and the another side of 7 bases is provided with the some tapped bore 14 for clamping ships and light boats deck.Fig. 3 and Fig. 4 shows the structure of the base of suspended scaffold, base 3 is made up of a long slab 31 and a short slab 32, long slab is provided with the patchhole 33 for the grafting of load-bearing steel pipe, short slab is provided with the through hole 40 for being connected with pin hand connecting strap, one side end of long slab is provided with circular arc 34, and the end of short slab is provided with circular arc 34.In the present embodiment, long slab and short slab are weldingly connected.Fig. 5 shows the pin hand connecting strap 2 of suspended scaffold, and this pin hand connecting strap is provided with multiple connecting bore 20.The lower end of pin hand connecting strap and base and load-bearing steel pipe with bolts.The position in region 8 established by the tower of suspended scaffold on ships and light boats deck that Fig. 6 shows suspended scaffold.
As shown in Figure 6, establish on the position in region 8 at bulge carrier boat deck tower, there is a circle to exceed the band iron of 100mm around, the suspended scaffold that the utility model provides can be used, first clamp the band iron of deck flange with horizontal chuck, then successively pin hand connecting strap, base, load-bearing steel pipe connecting are connected, carry out the laying of foot plank again, in the place that width is larger, can at the suitable position weld zone pin hand code of deck reverse side, as the support of centre, follow-up carrying out is removed and touch-up paint.
Although the foregoing describe detailed description of the invention of the present utility model, it will be understood by those of skill in the art that these are only casehistorys, protection domain of the present utility model is defined by the appended claims.Those skilled in the art, under the prerequisite not deviating from principle of the present utility model and essence, can make various changes or modifications to these embodiments, but these change and amendment all falls into protection domain of the present utility model.
Claims (6)
1. the suspended scaffold on ships and light boats deck, it is characterized in that, include: one group of horizontal chuck, one group of pin hand connecting strap, one group of base, a load-bearing steel pipe and polylith foot plank, wherein, described horizontal chuck is separately fixed at the edge on ships and light boats deck, the upper end of described pin hand connecting strap is vertically connected with described horizontal chuck respectively, the lower end of described pin hand connecting strap is connected with one end of described base and described load-bearing steel pipe, and the other end of described load-bearing steel pipe is connected with described base with the lower end of the described pin hand connecting strap of corresponding side.
2. the suspended scaffold on ships and light boats deck as claimed in claim 1, it is characterized in that, described horizontal chuck is made up of a transverse slat and base, on the edge of described transverse slat, be provided with a pair with the through hole be connected with described pin hand connecting strap, the bottom of described base is provided with the Baltimore groove of opening, and a side of described base is fixedly connected with described transverse slat, and the another side of described base is provided with the some tapped bore for clamping ships and light boats deck.
3. the suspended scaffold on ships and light boats deck as claimed in claim 1, it is characterized in that, described pin hand connecting strap is provided with multiple connecting bore.
4. the suspended scaffold on ships and light boats deck as claimed in claim 1, it is characterized in that, described base is made up of a long slab and a short slab, described long slab is provided with the patchhole for the grafting of described load-bearing steel pipe, described short slab is provided with the through hole for being connected with described pin hand connecting strap, and described long slab and described short slab are weldingly connected.
5. the suspended scaffold on ships and light boats deck as claimed in claim 4, it is characterized in that, the end of described long slab is provided with circular arc, and one side end of described short slab is provided with circular arc.
6. the suspended scaffold on ships and light boats deck as described in any one of claim 1-5, is characterized in that, the lower end of described pin hand connecting strap and described base and described load-bearing steel pipe with bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520065342.1U CN204473097U (en) | 2015-01-29 | 2015-01-29 | Suspended scaffold on ships and light boats deck |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520065342.1U CN204473097U (en) | 2015-01-29 | 2015-01-29 | Suspended scaffold on ships and light boats deck |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204473097U true CN204473097U (en) | 2015-07-15 |
Family
ID=53628886
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520065342.1U Active CN204473097U (en) | 2015-01-29 | 2015-01-29 | Suspended scaffold on ships and light boats deck |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204473097U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319040A (en) * | 2018-10-10 | 2019-02-12 | 上海江南长兴造船有限责任公司 | A kind of scaffold building method for hull turn of the bilge region |
CN111942547A (en) * | 2020-06-30 | 2020-11-17 | 上海江南长兴造船有限责任公司 | Pre-lapping method for scaffold at butt joint of ship bulkhead |
-
2015
- 2015-01-29 CN CN201520065342.1U patent/CN204473097U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109319040A (en) * | 2018-10-10 | 2019-02-12 | 上海江南长兴造船有限责任公司 | A kind of scaffold building method for hull turn of the bilge region |
CN111942547A (en) * | 2020-06-30 | 2020-11-17 | 上海江南长兴造船有限责任公司 | Pre-lapping method for scaffold at butt joint of ship bulkhead |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202430895U (en) | Docked H-shaped steel girder with groove type reinforcing plates | |
CN204473097U (en) | Suspended scaffold on ships and light boats deck | |
CN203021166U (en) | Steel plate lifting appliance | |
CN204661166U (en) | Harbour import and export of goods handling machinery | |
CN204590598U (en) | A kind of readily removable inner corner trim unit for aluminum alloy mould plate system | |
CN205172022U (en) | Novel shop's thick liquid bucket that can be used to hollow building block | |
CN203959672U (en) | Hoisting crane electric block track | |
CN204162279U (en) | Large ship lifting component bracing means | |
CN205328456U (en) | Orange -peel bucket for hoist | |
CN204282609U (en) | A kind of separate type precast truss frame floor support plate | |
CN205116685U (en) | Can dismantle shaped steel of encorbelmenting platform of unloading | |
CN204081536U (en) | For the detachable safety device of Steel Structure Installation in a kind of building operations | |
CN201756171U (en) | Assembly jig technical equipment component for blook-combination construction of a longitudinal bulkhead | |
CN103966990A (en) | Single-rack pile leg block closure method and single-rack pile leg block closure tool | |
CN206624560U (en) | The lifting device of over-long roof metal press plate | |
CN204822026U (en) | Hatch encloses work platform | |
CN202163585U (en) | Mounting frame for movable deck of roll-on-roll-off ship | |
CN204081429U (en) | Overhead welding and hoisted in position job platform | |
CN204549836U (en) | A kind of building suspension bucket | |
CN203334195U (en) | Connecting member of steel corrugated culvert pipe for bridges and culverts with annular reinforcing parts | |
CN204343455U (en) | A kind of novel plugging steel construction piece | |
CN204357100U (en) | A kind of scaffold floor | |
CN202147740U (en) | Overturning device for automobile disassembly line | |
CN203394060U (en) | Concrete transporting device for bridge construction | |
CN204323720U (en) | A kind of PVC particle finished product equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |