CN204470911U - Aluminium drill pipe and steel junction close assembling device - Google Patents

Aluminium drill pipe and steel junction close assembling device Download PDF

Info

Publication number
CN204470911U
CN204470911U CN201520120460.8U CN201520120460U CN204470911U CN 204470911 U CN204470911 U CN 204470911U CN 201520120460 U CN201520120460 U CN 201520120460U CN 204470911 U CN204470911 U CN 204470911U
Authority
CN
China
Prior art keywords
drill pipe
aluminium drill
steel joint
cooling
liquid nitrogen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520120460.8U
Other languages
Chinese (zh)
Inventor
李宝
刘宝昌
高德宝
张宇超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jilin Qixing Aluminum Industry Co.,Ltd.
Original Assignee
JILIN MIDAS ALUMINIUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JILIN MIDAS ALUMINIUM CO Ltd filed Critical JILIN MIDAS ALUMINIUM CO Ltd
Priority to CN201520120460.8U priority Critical patent/CN204470911U/en
Application granted granted Critical
Publication of CN204470911U publication Critical patent/CN204470911U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

A kind of aluminium drill pipe and steel junction close assembling device, it is characterized in that: in cooling device, seal washer is coated on two surfaces of cooling chamber inner chamber respectively, thermometric galvanic couple is arranged on two places up and down of cooling chamber respectively, the liquid nitrogen gas bomb air inlet of insulating tube with cooling chamber end face is connected, when cooling aluminium drill pipe, the flow of liquid nitrogen is controlled by the wearing flow valve of liquid nitrogen gas bomb, in the body water-cooling equipment of firing equipment, cyclic control system, stove, temperature measuring equipment and body of heater are integrated on firing equipment, and feedback temperature control display system is integrated on console; Clamping work pieces is carried out by the threaded rod on rotary pressure plate, after aluminium drill pipe and steel joint reach temperature retention time, rapidly steel joint is docked with aluminium drill pipe, start torsion motor, after steel joint and aluminium drill pipe screw and cool, reversion torsion motor, is separated steel joint with torsion motor profiling threaded post.Beneficial effect is: adopt cold and hot assembly method of simultaneously carrying out, not only reduce the heating-up temperature of steel joint, eliminate cooling device, avoids the annealing risk of aluminium drill pipe, improves yield rate.

Description

Aluminium drill pipe and steel junction close assembling device
Technical field
The utility model belongs to oil, natural gas drilling equipment technical field.
Background technology
At present, the aluminium drill pipe that oil and exploration industry use is buy from Russia, the U.S., Japan and other countries substantially, the elastic conjunction of external aluminium drill pipe and steel joint is adopt hot charge practice substantially, heat by steel joint, its size heat is risen, then be equipped with aluminium drill pipe, after cooling, realize elastic conjunction.Because steel joint needs to be heated to about 400 DEG C, and the annealing temperature of aluminum alloy materials only has 250 DEG C, the annealing phenomena of aluminium drill pipe is easily there is in this assembly method in assembling process, aluminium drill pipe is once annealing, just can not re-use, whole drilling rod and the steel joint assembled all will be scrapped, and for preventing aluminium drill pipe from annealing, need supporting aluminium drill pipe water cooling equipment, the circulatory system and temperature control system.A large amount of corollary equipments not only adds cost and takes up an area space, operationally also very loaded down with trivial details.Even but employ water cooling equipment, be also only the body of rod cooling aluminium drill pipe, the screw thread of elastic conjunction position is difficult to be cooled in time, and then has influence on the use of product.
Summary of the invention
The purpose of this utility model is: provide a kind of aluminium drill pipe and steel junction to close assembling device, it carries out elastic conjunction by cold and hot method of carrying out simultaneously, reduces the heating-up temperature of steel joint, and does not need aluminium drill pipe cooling device and the circulatory system.
The technical solution of the utility model is: be made up of aluminium drill pipe cooling device, steel joint firing equipment and support precession equipment.
In cooling device, seal washer is coated on two surfaces of cooling chamber inner chamber respectively, prevents liquid nitrogen from overflowing, and thermometric galvanic couple is arranged on two places up and down of cooling chamber respectively, digital display is connected with thermometric galvanic couple, and the liquid nitrogen gas bomb air inlet of insulating tube with cooling chamber end face is connected.When cooling aluminium drill pipe, being controlled the flow of liquid nitrogen by the wearing flow valve of liquid nitrogen gas bomb, after reaching chilling temperature, reducing liquid nitrogen flow, making cooling chamber remain on design temperature.In the body water-cooling equipment of firing equipment, cyclic control system, stove, temperature measuring equipment and body of heater are integrated on firing equipment, and feedback temperature control display system is integrated on console.Support bracket fastened pressure strip two bearing pins and matrix are fixed, and the threaded rod on rotary pressure plate carrys out clamping work pieces.Mobile adjustable support adjusts upper end locating piece height by regulating the nut on matrix four studs, and the positioning guide rail of mobile matrix lower end can adjust the right position of upper end locating piece.After aluminium drill pipe and steel joint reach temperature retention time, steel joint is released from heating furnace, transfer on mobile adjustable support, rapidly steel joint is docked with aluminium drill pipe, start torsion motor, after steel joint and aluminium drill pipe screw and cool, reversion torsion motor, is separated steel joint with torsion motor profiling threaded post.
The beneficial effects of the utility model are: adopt cold and hot assembly method of simultaneously carrying out, not only reduce the heating-up temperature of steel joint, eliminate the cooling device of aluminium drill pipe, also fundamentally avoiding the annealing risk of aluminium drill pipe, while reducing costs, improve yield rate, decrease and take up an area space and operating procedure.
Accompanying drawing explanation
Fig. 1-1 is the utility model fixed support front view;
Fig. 1-2 is the utility model fixed support side view;
Fig. 2-1 is that the utility model moves adjustable support front view;
Fig. 2-2 is that the utility model moves adjustable support side view;
Fig. 3 is that the utility model cools and front view under heated condition;
Fig. 4 is that the utility model cools and front view under heating completion status;
Fig. 5 is the utility model cold and hot convolution elastic conjunction figure;
Fig. 6 is that the utility model completes workpiece assembling front view.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further:
As shown in Fig. 1-1,1-2,2-1,2-2,1 be bearing pin, 2 are threaded rods, 3 are pressing plates, 4 are locating pieces, 5 is swingles, 6 are the rest body, 7 that are fixed and clamped are screw thread columns, 8 are rollers, 9 are lifting platforms, 10 are nuts, 11 are mobile adjustable support matrixes, 12 are position-limited wheels, 13 is limit guide rail.
As shown in Figure 3,14 are aluminium drill pipes, 15 are cooling chambers, 16 thermometric galvanic couples, 17 are power frequency heating furnaces, 18 are torsion motors.
As shown in Figure 6,19 are steel joints, 20 are profiling threaded post, 21 are drive links, 22 are shaft couplings, 23 are fastening bolts, 24 are keys, 25 is traversing carriages.
By conventionally by magnitude of interference steel joint being heated to higher temperature generation, instead by cooling aluminium drill pipe and producing the magnitude of interference by being heated to lower temperature to steel joint.Aluminium drill pipe is cooled to subzero less than 100 DEG C; steel joint is heated to 200 DEG C; like this when elastic conjunction; steel joint only has 200 DEG C; and aluminium drill pipe is subzero less than 100 DEG C; do not reach the annealing temperature of aluminium alloy far away, effectively achieve the protection of butt joint position aluminium drill pipe screw thread.
Cooling device is made up of cooling chamber, thermometric galvanic couple, digital display, liquid nitrogen gas bomb, seal washer, insulating tube.
Firing equipment is made up of temperature measuring equipment, feedback temperature control display system in Medium Frequency Induction Heating Furnace, body water-cooling equipment, cyclic control system, stove.
Support precession equipment to be made up of the support that is fixed and clamped, movable supporting frame, mobile adjustable support, torsion motor.
In cooling device, seal washer is coated on two surfaces of cooling chamber inner chamber respectively, prevents liquid nitrogen from overflowing, and two places being up and down arranged on cooling chamber differentiated by thermometric galvanic couple, digital display is connected with thermometric galvanic couple, and the liquid nitrogen gas bomb air inlet of insulating tube with cooling chamber end face is connected.During cooling aluminium drill pipe, controlled the flow of liquid nitrogen by the wearing flow valve of liquid nitrogen gas bomb, after reaching chilling temperature, reduce liquid nitrogen flow, make cooling chamber remain on design temperature.In the body water-cooling equipment of firing equipment, cyclic control system, stove, temperature measuring equipment and body of heater are integrated on firing equipment, and feedback temperature control display system is integrated on console.
Support bracket fastened pressure strip two bearing pins and matrix are fixed, and the threaded rod on rotary pressure plate carrys out clamping work pieces.Mobile adjustable support adjusts upper end locating piece height by regulating the nut on matrix four studs, and the positioning guide rail of mobile matrix lower end can adjust the right position of upper end locating piece.After aluminium drill pipe and steel joint reach temperature retention time, steel joint is released from heating furnace, transfer on mobile adjustable support, rapidly steel joint is docked with aluminium drill pipe, start torsion motor, after steel joint and aluminium drill pipe screw and cool, reversion torsion motor, is separated steel joint with torsion motor profiling threaded post.

Claims (1)

1. aluminium drill pipe and steel junction close an assembling device, it is characterized in that:
In cooling device, seal washer is coated on two surfaces of cooling chamber inner chamber respectively, thermometric galvanic couple is arranged on two places up and down of cooling chamber respectively, digital display is connected with thermometric galvanic couple, and the liquid nitrogen gas bomb air inlet of insulating tube with cooling chamber end face is connected, when cooling aluminium drill pipe, the flow of liquid nitrogen is controlled by the wearing flow valve of liquid nitrogen gas bomb, after reaching chilling temperature, reduce liquid nitrogen flow, make cooling chamber remain on design temperature, in the body water-cooling equipment of firing equipment, cyclic control system, stove, temperature measuring equipment and body of heater are integrated on firing equipment, and feedback temperature control display system is integrated on console, support bracket fastened pressure strip two bearing pins and matrix are fixed, clamping work pieces is carried out by the threaded rod on rotary pressure plate, mobile adjustable support is by regulating the nut adjustment upper end locating piece height on matrix four studs, the positioning guide rail of mobile matrix lower end can adjust the right position of upper end locating piece, after aluminium drill pipe and steel joint reach temperature retention time, steel joint is released from heating furnace, transfer on mobile adjustable support, rapidly steel joint is docked with aluminium drill pipe, start torsion motor, after steel joint and aluminium drill pipe screw and cool, reversion torsion motor, steel joint is separated with torsion motor profiling threaded post.
CN201520120460.8U 2015-03-02 2015-03-02 Aluminium drill pipe and steel junction close assembling device Active CN204470911U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520120460.8U CN204470911U (en) 2015-03-02 2015-03-02 Aluminium drill pipe and steel junction close assembling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520120460.8U CN204470911U (en) 2015-03-02 2015-03-02 Aluminium drill pipe and steel junction close assembling device

Publications (1)

Publication Number Publication Date
CN204470911U true CN204470911U (en) 2015-07-15

Family

ID=53626668

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520120460.8U Active CN204470911U (en) 2015-03-02 2015-03-02 Aluminium drill pipe and steel junction close assembling device

Country Status (1)

Country Link
CN (1) CN204470911U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107146714A (en) * 2017-07-03 2017-09-08 中国西电集团公司 One kind is used to bond insulating cylinder and metal joint attachment structure and assembly method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107146714A (en) * 2017-07-03 2017-09-08 中国西电集团公司 One kind is used to bond insulating cylinder and metal joint attachment structure and assembly method

Similar Documents

Publication Publication Date Title
CN204396531U (en) A kind of mould for school shape inside and outside titanium alloy member
CN204470911U (en) Aluminium drill pipe and steel junction close assembling device
CN107723436A (en) A kind of device and method for preventing heat treatment of workpieces deformation
CN104651581A (en) Heat treatment workshop afterheat utilization system
CN202079103U (en) Quick-cooling device for hot-rolled steel plate
CN207259538U (en) A kind of New-type transmission shaft surface hardening inductor
CN202861570U (en) Vacuum carrier gas aluminum soldering furnace
CN102873421B (en) Vacuum carrier gas aluminum brazing furnace
CN109374675A (en) Study the experimental provision that matrix arrangement nozzle is quickly cooled down high temperature plate (base) heat transfer
CN204897993U (en) Long tube inner wall guenching unit
CN204396530U (en) A kind of school shape mould of modifiable titanium alloy member position location
CN203346440U (en) Heat treatment and straightening integrated device used in wire rod production process
CN209685876U (en) A kind of continous way italic steel band austenite furnace
CN109355477B (en) Annealing device and annealing method
CN209162140U (en) A kind of Rebuild of Heat-treatment Annealing Furnace based on multipath gas pipeline
CN207515502U (en) Furnace Electric Pole Fluctuation device
CN203144465U (en) Compressing water-cooling quenching device
CN220300802U (en) Annealing furnace for nonferrous metal rolling
CN106048156A (en) Postweld thermal treatment process for forge pieces
CN110293161A (en) A kind of stabilizer bar end heating equipment
CN214212515U (en) Continuous atmosphere protection brazing furnace hearth
CN206521395U (en) Hot-bending machine
CN103252549A (en) Gas-heating brazing equipment
CN204509390U (en) A kind of heat treatment device of online band pressure
CN104611649B (en) A kind of online metal heating processing technology with pressure and its annealing device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
PP01 Preservation of patent right

Effective date of registration: 20180412

Granted publication date: 20150715

PP01 Preservation of patent right
PD01 Discharge of preservation of patent

Date of cancellation: 20190828

Granted publication date: 20150715

PD01 Discharge of preservation of patent
TR01 Transfer of patent right

Effective date of registration: 20200318

Address after: No.728, south 2nd Ring Road, economic and Technological Development Zone, Liaoyuan City, Jilin Province

Patentee after: Jilin Qixing Aluminum Industry Co.,Ltd.

Address before: 136200 No. 188, Fu Zhen Road, Liaoyuan, Jilin

Patentee before: JILIN MIDAS ALUMINIUM Co.,Ltd.

TR01 Transfer of patent right