CN204457832U - Hydraulic support balanced controls experimental rig - Google Patents

Hydraulic support balanced controls experimental rig Download PDF

Info

Publication number
CN204457832U
CN204457832U CN201420850325.4U CN201420850325U CN204457832U CN 204457832 U CN204457832 U CN 204457832U CN 201420850325 U CN201420850325 U CN 201420850325U CN 204457832 U CN204457832 U CN 204457832U
Authority
CN
China
Prior art keywords
hydraulic support
caving shield
front rod
balance jack
balanced controls
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420850325.4U
Other languages
Chinese (zh)
Inventor
刘顺斌
刘国柱
包冬生
李晓丽
康远宁
段志军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chinacoal Beijing Coal Mining Machinery Co Ltd
Original Assignee
Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinacoal Beijing Coal Mining Machinery Co Ltd filed Critical Chinacoal Beijing Coal Mining Machinery Co Ltd
Priority to CN201420850325.4U priority Critical patent/CN204457832U/en
Application granted granted Critical
Publication of CN204457832U publication Critical patent/CN204457832U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model discloses a kind of hydraulic support balanced controls experimental rig, hydraulic support comprises back timber, caving shield, base, column, front rod, back link, balance jack.First the front rod of hydraulic support side is removed, be loaded on the upper end of former front rod and the pin joint position of caving shield after being removed by the pin joint of the upper end of this rear flank connecting rod and caving shield, make it interfix; Then first rising column makes back timber face upward, balance jack bar chamber is pulled to safety valve and unloads and be drawn out at least 30mm, then falls column back timber is bowed, and balance jack plunger shaft is depressed into safety valve unloading and is pushed back at least 30mm, column up-down is once a circulation, altogether circulation at least 4000 times.Utilize the stroke of balance jack described in time controling, show that the average time of stretching out 30mm sets the time of feed flow by experiment.The intensity of balanced controls can be verified preferably, reduce down-hole accident.

Description

Hydraulic support balanced controls experimental rig
Technical field
The utility model relates to the balanced controls detection technique on a kind of coal-mine hydraulic support, particularly relates to a kind of hydraulic support balanced controls experimental rig.
Background technology
The balanced controls of two column protected type hydraulic support play vital effect in two column protected type hydraulic support.Along with the wideling popularize and applying at high-productivity faces of two column protected type high-end hydraulic support, test for balanced controls is also more and more important, does not have this project in " the GB_25974.1-2010_ coal-mine hydraulic support _ part 1: general technical specifications " of current domestic issue to the balanced controls test item on coal-mine hydraulic support.
In prior art, there is no good research technique for balanced controls yet.
Utility model content
The purpose of this utility model is to provide the hydraulic support balanced controls experimental rig that a kind of experiment effect is good, safety is high.
The purpose of this utility model is achieved through the following technical solutions:
Hydraulic support balanced controls experimental rig of the present utility model, hydraulic support comprises back timber, caving shield, base, column, the both sides of hydraulic support are respectively equipped with front rod and back link, the top and bottom of described front rod and back link respectively with described caving shield and base hinged, balance jack is provided with between described back timber and caving shield, the caving shield at the rear portion of described hydraulic support, front rod, back link, interfix between base, described balance jack is connected with balance reversible lock, described balance reversible lock comprises two one way valves, the inlet of each one way valve is connected with the fluid apertures mouth of another one way valve respectively, the liquid outlet of two one way valves is connected with the plunger shaft of described balance jack and bar chamber respectively, the plunger shaft of described balance jack is also connected with pressurized cylinder, the bar chamber of described balance jack is also connected with pumping plant.
The technical scheme provided as can be seen from above-mentioned the utility model, the hydraulic support balanced controls experimental rig that the utility model embodiment provides, utilize the characteristic of hydraulic support quadric chain, make caving shield and front-rear linkage mechanism effectively spacing, by the action of column, support is elevated, thus whole balanced controls are tested.This test can verify the intensity of balanced controls preferably, reduces down-hole accident.
Accompanying drawing explanation
The structural representation of the hydraulic support balanced controls experimental rig that Fig. 1 provides for the utility model embodiment;
Fig. 2 is the structural representation that the rear portion of hydraulic support in the utility model embodiment interfixes.
In figure: 1, base, 2, back link, 3, front rod, 4, caving shield, 5, column, 6, balance reversible lock, 7, balance jack, 8, pump station pressure sensor, 9, pressurized cylinder pressure sensor.
Detailed description of the invention
To be described in further detail the utility model embodiment below.
Hydraulic support balanced controls experimental rig of the present utility model, its preferably detailed description of the invention be:
Hydraulic support comprises back timber, caving shield, base, column, the both sides of hydraulic support are respectively equipped with front rod and back link, the top and bottom of described front rod and back link respectively with described caving shield and base hinged, balance jack is provided with between described back timber and caving shield, the caving shield at the rear portion of described hydraulic support, front rod, back link, interfix between base, described balance jack is connected with balance reversible lock, described balance reversible lock comprises two one way valves, the inlet of each one way valve is connected with the fluid apertures mouth of another one way valve respectively, the liquid outlet of two one way valves is connected with the plunger shaft of described balance jack and bar chamber respectively, the plunger shaft of described balance jack is also connected with pressurized cylinder, the bar chamber of described balance jack is also connected with pumping plant.
Described balance jack and the oil pipe between described pressurized cylinder and pumping plant are respectively equipped with pressurized cylinder pressure sensor and pump station pressure sensor.
The structure interfixed between the caving shield at the rear portion of described hydraulic support, front rod, back link, base is:
The front rod of hydraulic support side is removed, after being removed by the pin joint of the upper end of this rear flank connecting rod and caving shield, is loaded on the upper end of former front rod and the pin joint position of caving shield.
Hydraulic support balanced controls experimental rig of the present utility model realizes the method for hydraulic support balanced controls test, comprises step:
First, interfix between the caving shield at the rear portion of described hydraulic support, front rod, back link, base;
Then, first rising column makes back timber face upward, balance jack bar chamber is pulled to safety valve and unloads and be drawn out at least 30mm, falling column again makes back timber bow, balance jack plunger shaft is depressed into safety valve unloading and is pushed back at least 30mm, column up-down is once a circulation, altogether circulation at least 4000 times.
Utilize the stroke of balance jack described in time controling, show that the average time of stretching out 30mm sets the time of feed flow by experiment.
Hydraulic support balanced controls experimental rig of the present utility model, utilizes the characteristic of hydraulic support quadric chain, make caving shield and front-rear linkage mechanism effectively spacing, by the action of column, support is elevated, thus whole balanced controls is tested.This test can verify the intensity of balanced controls preferably, reduces down-hole accident.
Specific embodiment:
As shown in Figure 1 and Figure 2, support rear portion is suitably fixed, and first rises column and back timber is faced upward, and balance jack bar chamber is pulled to safety valve and unloads and be drawn out at least 30mm, falling column again makes back timber bow, and balance jack plunger shaft is depressed into safety valve unloading and is pushed back at least 30mm.Column up-down is once a circulation, circulates 4000 times altogether.
According to testing counter pipe-line system limitation, testing counter without gap sensors, consider the stroke utilizing time controling balance jack, repeatedly several times first, the time of feed flow is set according to the average time of stretching out 30mm, 4 supply openings are controlled as: topping up--and post falls, supercharging--setting prop, just support and fall post and balance upper and lower cavity fluid infusion respectively, while setting prop, the supercharging of balance jack epicoele, safety valve drainage, system is to cavity of resorption fluid infusion, balance jack is stretched out, otherwise, when falling post, system balances the fluid infusion of jack epicoele, the supercharging of balance jack cavity of resorption, cavity of resorption safety valve is opened, balance contraction.
The lifting of support can compress balance jack upper and lower cavity, and the safety valve of upper and lower cavity is opened, and system constantly gives upper and lower cavity fluid infusion, and process of the test obtains user certainly.
The beneficial effect that technical solutions of the utility model are brought:
Fill up the domestic and international blank about balanced controls test;
Effectively can verify the intensity of balanced controls and the sealing etc. of balance jack, improve the quality of products;
Add the confidence level of users at home and abroad to Products;
Make both at home and abroad to reach a new height to the understanding and cognition of hydraulic support balanced controls.
The above; be only the utility model preferably detailed description of the invention; but protection domain of the present utility model is not limited thereto; anyly be familiar with those skilled in the art in the technical scope that the utility model discloses; the change that can expect easily or replacement, all should be encompassed within protection domain of the present utility model.Therefore, protection domain of the present utility model should be as the criterion with the protection domain of claims.

Claims (3)

1. a hydraulic support balanced controls experimental rig, hydraulic support comprises back timber, caving shield, base, column, the both sides of hydraulic support are respectively equipped with front rod and back link, the top and bottom of described front rod and back link respectively with described caving shield and base hinged, balance jack is provided with between described back timber and caving shield, it is characterized in that, the caving shield at the rear portion of described hydraulic support, front rod, back link, interfix between base, described balance jack is connected with balance reversible lock, described balance reversible lock comprises two one way valves, the inlet of each one way valve is connected with the fluid apertures mouth of another one way valve respectively, the liquid outlet of two one way valves is connected with the plunger shaft of described balance jack and bar chamber respectively, the plunger shaft of described balance jack is also connected with pressurized cylinder, the bar chamber of described balance jack is also connected with pumping plant.
2. hydraulic support balanced controls experimental rig according to claim 1, is characterized in that, described balance jack and the oil pipe between described pressurized cylinder and pumping plant are respectively equipped with pressurized cylinder pressure sensor and pump station pressure sensor.
3. hydraulic support balanced controls experimental rig according to claim 2, is characterized in that, the structure interfixed between the caving shield at the rear portion of described hydraulic support, front rod, back link, base is:
The front rod of hydraulic support side is removed, after being removed by the pin joint of the upper end of this rear flank connecting rod and caving shield, is loaded on the upper end of former front rod and the pin joint position of caving shield.
CN201420850325.4U 2014-12-26 2014-12-26 Hydraulic support balanced controls experimental rig Expired - Fee Related CN204457832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420850325.4U CN204457832U (en) 2014-12-26 2014-12-26 Hydraulic support balanced controls experimental rig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420850325.4U CN204457832U (en) 2014-12-26 2014-12-26 Hydraulic support balanced controls experimental rig

Publications (1)

Publication Number Publication Date
CN204457832U true CN204457832U (en) 2015-07-08

Family

ID=53664734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420850325.4U Expired - Fee Related CN204457832U (en) 2014-12-26 2014-12-26 Hydraulic support balanced controls experimental rig

Country Status (1)

Country Link
CN (1) CN204457832U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533491A (en) * 2014-12-26 2015-04-22 中煤北京煤矿机械有限责任公司 Hydraulic support balancing mechanism testing device and method
CN107939430A (en) * 2017-11-30 2018-04-20 中煤北京煤矿机械有限责任公司 Two column hydraulic support of dibit balance jack
CN115182767A (en) * 2022-06-30 2022-10-14 郑州煤矿机械集团股份有限公司 Quick dismounting and mounting method for hydraulic support balance jack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104533491A (en) * 2014-12-26 2015-04-22 中煤北京煤矿机械有限责任公司 Hydraulic support balancing mechanism testing device and method
CN107939430A (en) * 2017-11-30 2018-04-20 中煤北京煤矿机械有限责任公司 Two column hydraulic support of dibit balance jack
CN115182767A (en) * 2022-06-30 2022-10-14 郑州煤矿机械集团股份有限公司 Quick dismounting and mounting method for hydraulic support balance jack

Similar Documents

Publication Publication Date Title
CN204457832U (en) Hydraulic support balanced controls experimental rig
CN104110527B (en) Oil pipeline support device
CN205103111U (en) Go up high low temperature impact test appearance of pneumatic over -and -under type
CN103089204A (en) Double-coal-bed layered pressure control device combining coal discharging and coal mining
CN103308302B (en) Hydraulic support balanced controls test method
CN203347815U (en) Testing apparatus of hydraulic support balance mechanism
CN104533491A (en) Hydraulic support balancing mechanism testing device and method
CN204752171U (en) Simple and easy liquid filling machine of lubricating oil
CN203347820U (en) Hydraulic system for testing hydraulic support balance mechanism
CN203347821U (en) Limiting device of hydraulic support balance mechanism
CN204269356U (en) Column dynamic testing equipment
CN205744406U (en) Oil-well pump of oil well increases row and helps picking device
CN206544886U (en) Bridge jacking jack device
CN204330369U (en) The double charger of hydraulic support pushing mechanism
CN204171907U (en) A kind of double leval jib locking device
CN208999088U (en) A kind of interior hydrostatic testing machine
CN204711963U (en) A kind of novel mechanical automation cannula system
CN203114260U (en) Double-coalbed layering pressure-controlling combined water exhausting and gas collecting device
CN204140113U (en) All-in-one
CN202846674U (en) High bridge pier concrete curing device
CN108716456B (en) Hydraulic booster pump
CN202690087U (en) Hydraulic prop with long stroke
CN205714230U (en) A kind of flexible hydraulic prop
CN204459781U (en) Liquid gas isolation water seal
CN203655262U (en) Oil extraction gas injection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150708

Termination date: 20161226

CF01 Termination of patent right due to non-payment of annual fee