CN204455960U - Based on the equipment of construction plant water spray dust - Google Patents

Based on the equipment of construction plant water spray dust Download PDF

Info

Publication number
CN204455960U
CN204455960U CN201520030879.4U CN201520030879U CN204455960U CN 204455960 U CN204455960 U CN 204455960U CN 201520030879 U CN201520030879 U CN 201520030879U CN 204455960 U CN204455960 U CN 204455960U
Authority
CN
China
Prior art keywords
dust
water
delay relay
drencher head
forcing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201520030879.4U
Other languages
Chinese (zh)
Inventor
沈志勇
姚正刚
王鹏凯
夏华
彭宝安
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New Eight Construction Group Co Ltd
Original Assignee
New Eight Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New Eight Construction Group Co Ltd filed Critical New Eight Construction Group Co Ltd
Priority to CN201520030879.4U priority Critical patent/CN204455960U/en
Application granted granted Critical
Publication of CN204455960U publication Critical patent/CN204455960U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model is mainly used in building operations place reduction dust based on the equipment of construction plant water spray dust, and protection construction environment, belongs to building engineering construction field.It is made up of water tank (1), force (forcing) pump (2), electromagnetic valve (3), vibration means for main pipe for supplying water (4), water supply arm (5), drencher head (6), dust detector (7), travel(l)ing rest (8), time-delay relay (9); Construction plant dust concentration is detected by dust detector (7), when dust reaches finite concentration, automatic sound-light alarm, and signal is passed to time-delay relay (9), time-delay relay (9) starts force (forcing) pump (2), start electromagnetic valve (3) by valve open simultaneously, spray spray water by drencher head (6) to dust, reduce construction plant dust.Drencher head (6) selects the drencher head watering plant, and jet length is far away, and mist-like property is better, and can carry out from movable pendulum spray according to spray angle, is ideal spraycan.

Description

Based on the equipment of construction plant water spray dust
Technical field
the utility model is mainly used in building operations place and reduces dust, and protection construction environment, belongs to building engineering construction field.
Background technology
the current building operations Slag of China this airborne dust is not processed, not only pollute surrounding enviroment but also physical impairment caused to construction worker.
Summary of the invention
the utility model solves the problems referred to above, and it is made up of water tank (1), force (forcing) pump (2), electromagnetic valve (3), vibration means for main pipe for supplying water (4), water supply arm (5), drencher head (6), dust detector (7), travel(l)ing rest (8), time-delay relay (9); Construction plant dust concentration is detected by dust detector (7), when dust reaches finite concentration, automatic sound-light alarm, and signal is passed to time-delay relay (9), time-delay relay (9) starts force (forcing) pump (2), start electromagnetic valve (3) by valve open simultaneously, spray spray water by drencher head (6) to dust, reduce construction plant dust.The drencher head watering plant that drencher head (6) selects China's agricultural conventional, jet length is far away, and mist-like property is better, and can carry out from movable pendulum spray according to spray angle, is ideal spraycan.
the utility model is made up of water tank (1), force (forcing) pump (2), electromagnetic valve (3), vibration means for main pipe for supplying water (4), water supply arm (5), drencher head (6), dust detector (7), travel(l)ing rest (8), time-delay relay (9); Water tank (1) is communicated with force (forcing) pump (2) by water pipe; The control cabinet of force (forcing) pump (2) is equipped with time-delay relay (9); Electromagnetic valve (3) is equipped with time-delay relay (9); Drencher head (6), dust detector (7) are all contained on travel(l)ing rest (8); Water supply arm (5) one end and drencher head (6) are connected, and the other end and vibration means for main pipe for supplying water (4) are connected; Vibration means for main pipe for supplying water (4) and force (forcing) pump (2) are connected and install electromagnetic valve (3); The holding wire of dust detector (7) is connected with the input of time-delay relay (9).
Accompanying drawing explanation
description of reference numerals: 1-water tank, 2-force (forcing) pump, 3-electromagnetic valve, 4-vibration means for main pipe for supplying water, 5-water supply arm, 6-drencher head, 7-dust detector, 8-travel(l)ing rest, 9-time-delay relay.
fig. 1 is floor map of the present utility model.
fig. 2 is the elevational schematic view of the utility model travel(l)ing rest (8) and drencher head (6).
fig. 3 is that the utility model drencher head (6) is by the schematic diagram of periphery to intermediate injection.
fig. 4 is the schematic diagram that the utility model drencher head (6) is sprayed to surrounding by centre.
Detailed description of the invention
below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described.
see Fig. 1, Fig. 2, needing the construction site layout travel(l)ing rest (8) of depositing dust, drencher head (6) and dust detector (7) are installed, the setting height(from bottom) of drencher head (6) can between 2 meters to 3 meters, according to construction plant situation (see Fig. 3, Fig. 4), can two arrangements put, also can be circular layout, by periphery to intermediate injection, also can intermediate arrangement, sprayed to surrounding by centre, certainly want economical by centre to the scheme that surrounding is sprayed, the spray angle of drencher head (6) can be selected between 0 to 360 degree, dust detector (7) can install one or several, ground, visual field and area and determining, water supply arm (5) and vibration means for main pipe for supplying water (4) each pipeline of joining water box (1), force (forcing) pump (2) are installed, the holding wire connecting dust detector (7) is to time-delay relay (9) and connect the power line of force (forcing) pump (2), electromagnetic valve (3), dust detector (7), fill it up with the water of water tank (1), water tank (1) should have tap water moisturizing simultaneously, and installation work completes.When construction plant dust reaches the concentration of setting, dust detector (7) sends sound and light alarm, and the voice module of dust detector (7) can input personalized speech: " also having 3 minutes will here comes the rain, takes shelter from the rain soon; also having 2 minutes will here comes the rain, takes shelter from the rain soon.", time-delay relay (9) can arrange 3 to 5 minutes and start force (forcing) pump (2) and electromagnetic valve (3) to system water supply, when dust drops to a certain degree, can also can automatically reset by manual reset, closedown force (forcing) pump (2) and the power supply of electromagnetic valve (3).In order to meet construction plant Different periods, the needs of different location depositing dust, equipment of the present utility model is all transportable.

Claims (2)

1. based on the equipment of construction plant water spray dust, it is characterized in that: it is made up of water tank (1), force (forcing) pump (2), electromagnetic valve (3), vibration means for main pipe for supplying water (4), water supply arm (5), drencher head (6), dust detector (7), travel(l)ing rest (8), time-delay relay (9); Water tank (1) is communicated with force (forcing) pump (2) by water pipe; The control cabinet of force (forcing) pump (2) is equipped with time-delay relay (9); Electromagnetic valve (3) is equipped with time-delay relay (9); Drencher head (6), dust detector (7) are all contained on travel(l)ing rest (8); Water supply arm (5) one end and drencher head (6) are connected, and the other end and vibration means for main pipe for supplying water (4) are connected; Vibration means for main pipe for supplying water (4) and force (forcing) pump (2) are connected and install electromagnetic valve (3); The holding wire of dust detector (7) is connected with the input of time-delay relay (9).
2. equipment based on construction plant water spray dust according to claim 1, is characterized in that drencher head (6) can be put in two arrangements, also can be circular layout, by periphery to intermediate injection; Also can intermediate arrangement, sprayed to surrounding by centre.
CN201520030879.4U 2015-01-17 2015-01-17 Based on the equipment of construction plant water spray dust Active CN204455960U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520030879.4U CN204455960U (en) 2015-01-17 2015-01-17 Based on the equipment of construction plant water spray dust

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520030879.4U CN204455960U (en) 2015-01-17 2015-01-17 Based on the equipment of construction plant water spray dust

Publications (1)

Publication Number Publication Date
CN204455960U true CN204455960U (en) 2015-07-08

Family

ID=53662869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520030879.4U Active CN204455960U (en) 2015-01-17 2015-01-17 Based on the equipment of construction plant water spray dust

Country Status (1)

Country Link
CN (1) CN204455960U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332356A (en) * 2015-11-27 2016-02-17 国宏汽车有限公司 Pure electric vehicle water sprinkling system
CN105771497A (en) * 2016-05-26 2016-07-20 保护伞环保科技成都有限公司 Construction site dust collection device
CN106759036A (en) * 2017-02-20 2017-05-31 东北大学 A kind of removable Intelligent spraying system of underground pipe gallery construction fugitive dust control
CN109453587A (en) * 2018-12-28 2019-03-12 江苏东南环保科技有限公司 A kind of firm support frame of special environmentally friendly device for reducing dust
CN109653500A (en) * 2018-11-02 2019-04-19 筑梦高科建筑有限公司 A kind of construction site 3-D scanning quality inspection device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105332356A (en) * 2015-11-27 2016-02-17 国宏汽车有限公司 Pure electric vehicle water sprinkling system
CN105771497A (en) * 2016-05-26 2016-07-20 保护伞环保科技成都有限公司 Construction site dust collection device
CN106759036A (en) * 2017-02-20 2017-05-31 东北大学 A kind of removable Intelligent spraying system of underground pipe gallery construction fugitive dust control
CN109653500A (en) * 2018-11-02 2019-04-19 筑梦高科建筑有限公司 A kind of construction site 3-D scanning quality inspection device
CN109653500B (en) * 2018-11-02 2021-07-27 广东博智林机器人有限公司 Building site three-dimensional scanning quality inspection device
CN109453587A (en) * 2018-12-28 2019-03-12 江苏东南环保科技有限公司 A kind of firm support frame of special environmentally friendly device for reducing dust

Similar Documents

Publication Publication Date Title
CN204455960U (en) Based on the equipment of construction plant water spray dust
CN203944254U (en) A kind of tower crane water injection system
CN103660021B (en) Precast beam automatic spray curing system
CN204689452U (en) Multipurpose tower machine
CN108636641A (en) A kind of system and its construction method for removing haze to construction site depositing dust
CN205404856U (en) Integration water level monitoring station
CN202252596U (en) Quickly-assembled water valve device
CN216906287U (en) Automatic irrigation system for greening
CN204305741U (en) Height-adjustable gardens equipment of sprinkler irrigation
CN205235647U (en) Environment -friendly tower crane mist spray dust removal equipment
CN203777567U (en) Automatic spray-type fire extinguishing device applied to oblique-roof structure
CN103272351A (en) Temporary fire-fighting system used in building
CN204690643U (en) A kind of greening wire mesh grating
CN102824714A (en) Self-rescue energy-saving fire-protecting device for high-rise building and integral building
CN203191171U (en) Rainwater-simulated spray apparatus
CN104314311B (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN210177437U (en) Foundation pit dust removal system
CN203606078U (en) An extensible rainfall test apparatus
CN204768019U (en) Dust fall system sprays
CN205461537U (en) Simple and easy spraying dedusting device in job site
CN204282460U (en) A kind of socket H pipe
CN113663253A (en) Power distribution device building fire extinguishing system
CN204357130U (en) For the liftable level of tower machine of constructing 360 ° of spray equipments
CN209423222U (en) A kind of construction sprinkling dust-removing device
CN205742272U (en) A kind of with guide locating device provided prefabricated piping lane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
DD01 Delivery of document by public notice
DD01 Delivery of document by public notice

Addressee: Finance of Xinba Construction Group Co., Ltd

Document name: Notification of Approving Refund